Clay_Co_DHR_LED_Lighting_Installation_Specification_1_30_2025.docx
DOCX document 15 KB Posted
- Attached to
- Clay Co DHR/LED light Installation
- Solicitation number
- SRC0000027020
- Issued by
- Clay County, Alabama
About this file
This is a specification document for LED lighting installation services at the Clay County Department of Human Resources (DHR) in Lineville, Alabama. The project involves a one-time service to remove and replace 710 LED bulbs (CURRENT LIGHTENING SOL, LED14BDT8/G4/840, double-end Type B glass 4ft tube 14W 4000K) throughout the office facility. The work includes removing fluorescent ballasts, rewiring existing light fixtures, and installing new 4ft LED bulbs. A site visit is recommended at 86930 Highway 9, Lineville, with Kristy Smith as the point of contact. The project must be completed by February 21, 2025, and all work must be completed in a single trip.
Pricing must be inclusive of all trip charges, mileage, supplies, labor, fees, permit fees, lift trucks, and all necessary costs to complete the work. Vendors must maintain a current license at the time of award and installation. Payment terms are Net 30, paid in arrears after service completion, with no invoicing permitted prior to completion. The DHR County office will supply the fluorescent lamps, ballasts, and bulbs, which must be verified on-site before scheduling installation. All removed materials must be disposed of off-site, and work areas must be left clean.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Quick_Quote_Standard_Boilerplate_updated_12.18.2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Clay Co DHR LED Lighting Installation Specification 1/30/2025:
Site visit: Recommended Address:
Clay Co DHR 86930 Highway 9 Lineville, Alabama 36266 Contact: Kristy Smith – 256-396-6832
One time service light installation (ONLY)
· Supplier shall remove and replace the needed LED Bulbs, Qty.: 710 EA, Supplier: CURRENT LIGHTENING SOL, Catalog number: LED14BDT8/G4/840, Description: DBL END TYPE B GLASS 4FT TUBE 14W 4000K
· Supplier shall remove fluorescent ballast and rewire existing light fixture to install new 4 ft LED bulbs in the office.
| • | Unit Price shall represent the total cost for installation, bulb and ballast removal, and cleanup |
| • | Existing ballasts, lamps, and bulbs are to be disposed of off-site. |
| • | All debris is to be removed and the work area is to be left clean. |
| • | Fluorescent lamps, ballasts, and bulbs will be supplied by the DHR County office. |
| o | Verify with POC that supplies are on-site before scheduling installation and coming on-site! |
| • | Quote must include all trip charges, mileage, supplies, labor, fees, permit fees (if applicable), lift trucks, and all amounts necessary to complete the work as specified. |
| • | All vendors need to have a current license on file at the time of award and installation. |
| • | All work to be completed in one trip. |
| • | Must be completed by February 21, 2025. |
Payment terms:
Net 30 paid in arrears after completion of service. No invoicing prior to completion of service.
File details come from the government source that posted it. Updated .