This document outlines additional contract clauses for the Maine Learning Results state and local contract opportunity. The contract includes provisions for vendor past performance evaluation as a factor in award determination, with an allowable overrun not to exceed 3% of the contract value. The State Purchasing Director reserves the right to extend the contract period beyond the initial expiration date with contractor consent, provided the total contract period does not exceed three years.
The pricing and contractual terms emphasize performance-based evaluation and cost control measures. The extension clause provides flexibility for contract continuation while establishing a clear ceiling on the total allowable contract duration, ensuring the state maintains oversight of long-term vendor relationships and costs associated with this procurement opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Conditions and Instructions to Bidders.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Additional Clauses
Vendor’s past performance may be a factor in the award.
Overrun not to exceed 3%
EXTENSION CLAUSE: The State Purchasing Director reserves the right to extend this contract period beyond the indicated expiration date with the consent of the contractor. Total contract period may not exceed three years.