Classroom Flooring RFP
106 KB Posted
- Attached to
- Elementary School Classroom Flooring
- Solicitation number
- 55152-2023-2041
- Issued by
- Lee County, Georgia
About this file
This is a Request for Proposal (RFP) issued by Lincoln County Schools District in Georgia for classroom flooring removal and installation services at an elementary school facility. The project involves the removal of existing flooring materials (carpet, vinyl composite tile, and asbestos-containing materials) from 28 rooms and their replacement with KAHRS UPOFLOOR QUARTZ tile that has been pre-procured by the district. The scope includes removal and reinstallation of wall and floor cabinets in certain rooms as needed. A mandatory pre-bid meeting is scheduled for March 2, 2023 at 2:45 P.M. at the Board of Education Office located at 423 Metasville Road, Lincolnton, Georgia 30817. The project must commence on May 30, 2023, after teachers and staff depart on May 26, 2023, and must be completed by July 21, 2023.
This is a federally funded project that requires compliance with the Davis-Bacon Act, which mandates prevailing wage requirements for all work performed. The winning contractor is responsible for proper disposal of all removed flooring materials and associated debris in accordance with applicable environmental and safety guidelines, particularly given the asbestos-containing materials present in 28 of the affected rooms. The district contact information is Lincoln County Schools District, Dr. Samuel P. Light, Superintendent, at (706) 359-3742 or via their website at www.lincolncountyschools.org.
Text of this file
LINCOLN COUNTY SCHOOLS
Dr. Samuel P. Light, Superintendent of Schools
The LCSD is soliciting bids for LCES Classroom flooring removal and installation.
The LCSD is seeking bids for Removal and Installation of the classrooms and Office flooring (of which 28 rooms are ACM and will need to be abated).
The LCSD has already procured the flooring: KAHRS UPOFLOOR QUARTZ. The LCSD is requesting bids from qualified installers to remove existing flooring (Carpet, VCT, some of which is ACM) and replace it with the Upofloor Quartz Tile.
In some rooms, there are wall/floor cabinets that will need to be removed and put back after the flooring is completed.
The Project can commence on May 30, 2023. We will still have teachers and staff until the 26th. The project must be completed by Jul 21, 2023.
This is a Federally Funded project and MUST meet the Davis-Bacon Act requirements.
The company that wins the bid is responsible for the disposal of the old flooring and associated debris according to appropriate guidelines.
423 Metasville Road ◊ Lincolnton, Georgia 30817-3444 ◊ (706) 359-3742 ◊ Fax (706) 359-7938 www.lincolncountyschools.org image6.png image4.png image7.png image5.png image1.jpg image2.jpg image3.png
Other files
| File | Type | Posted |
|---|---|---|
| Flooring Notification | — | |
| Award Information | — | |
| Square footage | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .