This document is a Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items for an acquisition under the authority of AFFARS 5313.501 and 10 U.S.C. 3572.
The acquisition is for venue rental services to accommodate upcoming concerts by the United States Air Force Academy (USAFA) Band at Memorial Hall in Pueblo, Colorado. The services include facility usage, personnel, equipment, and materials necessary to host the USAFA Band's annual concert series in December. The estimated contract value is $749,900, and the period of performance is 3 years (1 December 2024 - 30 November 2027). Memorial Hall is identified as the sole-source vendor due to its unique capabilities, including a minimum seating capacity of 1,600, IMAG screens, power needs for high-quality video, adjustable acoustics, and logistical support. Market research found no alternative venues in the Pueblo area that meet the USAFA Band's requirements. The contracting officer will ensure the price is fair and reasonable.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
CONTROLLED UNCLASSIFIED INFORMATION
March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 4March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 4
NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.
Is this a new or amended J&A Document? New Amended ( Prior to Award Only! )
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Funding level for this acquisition: >SAT and < $750K > $750K and < $15M
Contracting Activity: 21 CONS/PKB
Purchase Request / Local ID Number: TBD
Program / Project (and PE, if applicable): USAF Academy Band Venue Rental, Memorial Hall, Class J&A
Program Type (PEO or Other Contracting):
Authority: AFFARS 5313.501 - 10 U.S.C. 3572, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)
AFFARS 5313.501 - 10 U.S.C. 3403, Special Emergency Procurement Authority (41 U.S.C. 1903)
Estimated Contract Cost (including options): $749,900.00 Justification Type: Class Individual
COORDINATION ( AFFARS 5306.304(a)) Sign and Save Procedure
** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
Date
23 Aug 2024
Contracting Officer Ryan J. Olson, Civ, DAF
21 CONS/PKB / 719-554-5620
Signature
X
Date
23 Aug 2024
Competition Advocate Kylie J. Hager, Civ, DAF
21 CONS/LGCD / 719-556-4835
Signature
X
APPROVAL (AFFARS 5306.304(a) )
Date
23 Aug 2024
Contracting Officer Ryan J. Olson, Civ, DAF
21 CONS/PKB / 719-554-5620
Signature
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 4March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 4
I. Contracting Activity.
21 CONS/PKB - Justification for other than full and open competition.
II. Nature and/or description of the action being processed.
The action under this class SSJ will be awarded as new firm-fixed price contracts. The United States Air Force Academy (USAFA) Band has a requirement for a venue rental space to accommodate upcoming concerts. The services being acquired include facility use, personnel, equipment, and materials to host the USAFA Band Concerts annually in December.
III. Description of supplies/services required to meet agency needs.
The class SSJ represents a ceiling ($749K) that will cover the recurring requirements for the USAFA Band performances. The services being acquired under this contract encompass venue rental for concert performances by the USAFA Band at Memorial Hall (Pueblo). This includes the provision of facility usage, personnel, equipment, and materials necessary for hosting the performances. Given the USAFA Band's commitment to conducting several public concerts in the greater Colorado Springs area each year in support of the Air Force Academy's community relations mission, securing a suitable concert hall is mandatory.
The period of performance will be determined by each purchase order issued under this class SSJ. The performance period will typically be one week or less and all contracts will be funded with Operations & Maintenance (O&M) 3400 funds. The period of performance for usage of this class SSJ is 3 years (1 December 2024 - 30 November 2027). The request for the multi-year class SSJ is based on the facts that this has been executed with individual SSJ's over the past two years and executing a class SSJ will streamline the process. As it stands, Memorial Hall is the only known source to have the capacity and support services to meet the requirements of their performances in the Pueblo, CO. area. One caveat is that prior to using the SSJ, 21 CONS will ensure adequate market research is conducted to ensure new facilities are not available that can meet the USAFA Band's concert series.
IV. Statutory authority permitting other than full and open competition.
DAFFARS 5313.501 - 10 U.S.C. 3572, Implementation of Simplified Acquisition Procedures (41 U.S.C. 1901)
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
The selection of Memorial Hall as the sole-source vendor for venue rental services is rooted in its unique capabilities and essential features that are required for hosting USAFA Band performances. Memorial Hall stands as the singular local venue offering a minimum seating capacity of 1,600 people, equipped with Image Magnification (IMAG) screens, significant power needs for high quality video projects that are recorded in high-definition (HD), adjustable acoustic panels and treatments, follow spotlights, an adequate loading dock, and comprehensive logistical support, personnel, and all rigging equipment necessary to support tailored for events of this magnitude. The seating capacity is needed to support the Pueblo community and customer base of more than 166,000 Pueblo County residents who attend the USAFA band concerts. Crucially, these essential requirements are not available at alternative venues such as public high schools, making Memorial Hall the only
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 4March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 4 venue capable of accommodating USAFA Band performances.
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
Memorial addresses the USAFA Band's significant power needs for high-quality video projects recorded in High-Definition (HD), ensuring seamless execution of multimedia elements integral to the performances. Its adaptable infrastructure, featuring adjustable acoustical panels and treatments, facilitates the accommodation of different ensemble sizes and types, enhancing the versatility and effectiveness of the venue for USAFA Band engagements.
Furthermore, Memorial Hall's capability to incorporate 9'x16' Image Magnification (IMAG) screens essential for projecting band close-ups and accompanying video presentations underscores its suitability as the only venue for showcasing any of the eight largest performing groups of the USAFA Band. Notably, the venue's reputation for attracting local and national entertainment acts comparable in size and scope to the USAFA Band underscores its credibility and reliability as a performance venue.
Past procurement practices further support the rationale for continuing to engage Memorial as the sole-source provider. Previous contracts have been awarded to Memorial Hall based on its unique attributes and demonstrated ability to meet the USAFA Band's requirements. Notably, recent contracts such as FA2517-24- P-0007 and FA2517-23-P-0006, awarded for specific performance periods in December 2023 and December 2022 respectively, exemplify the ongoing reliance on Memorial Hall to fulfill venue rental needs.
In light of the USAFA Band's recurring requirement for Memorial Hall as its performance venue, a multi-year SSJ spanning three years is now sought for the first time. This recognition of the consistent demand for this venue, streamlining procurement processes and ensuring continuity in performance arrangements.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
The contracting officer under FAR 13.106-3(a)(2) will ensure that the Government is receiving the best value at a fair and reasonable price by ensuring the Government continues to evaluate market research, utilize historical pricing, and compare independent government estimates (IGEs).
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
Extensive market research has been conducted by the Government to explore alternative concert halls within the geographic front-range area, seeking venues that are acoustically viable and possess a minimum audience capacity of 1,600 people. The Creative Arts Center and Southwest Motors Event Center, were contacted to ascertain performance hall capabilities, and with more sufficient time and planning, could be a viable option for a future event, but were not able to be a host for the time that USAFA needs and has limited services and logistics, no IMAG screens or Theatre style seating, and were unsure if they had enough materials to construct the stage to the dimensions needed IAW the PWS. Memorial Hall and the Pueblo Convention Center were also contacted and only Memorial Hall was able to fulfill all requirements for the Band. The Pueblo Convention Center could accommodate with more time and coordination, and excluding theatre style seating, so they are not able to accomplish all the necessary marks for the band.
In light of these findings, there are no alternative venues within the Pueblo area that meet the criteria of being
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items
March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 4March 2023 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 4 acoustically viable and possessing a sufficient audience capacity of at least 1,600 people to effectively host USAFA Band performances. Therefore, the sole-source procurement of venue rental services from Memorial Hall remains the most feasible and practical option for fulfilling the Government's requirements while ensuring the continued success of USAFA Band engagements within the local community.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
N/A
X. List of any sources that expressed, in writing, an interest in the acquisition.
N/A
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
Recognizing the nature of Pueblo and outlying communities ongoing expansion and development, the Government commits to conducting continual market research to assess the availability of new facilities that may meet its requirements for hosting USAFA Band performances. This proactive approach ensures that emerging venues within the local vicinity are considered for their potential to accommodate the Government's needs effectively.
Should a new facility emerge in the Pueblo area that demonstrates the capability to satisfy the Government's criteria for venue rental services, including acoustic viability and audience capacity of at least 1,600 people, the Government will aim to eliminate any existing competition barrier.
XII. Certification by the Contracting Officer.
As evidenced by my signature above, I have determined this document to be both accurate and complete to the best of my knowledge and belief.
XIII. Certification by the technical/requirements personnel.
As evidenced by my (our) signature(s) above, I (we) certify that any supporting data contained herein, which is my (our) responsibility, is both accurate and complete.
Remove the Guidance pages below.
Sole Source (Including Brand Name) Justification - Simplified Procedures for Certain Commercial Items March 2023 Page of International Agreement Competitive Restrictions (IACR) March 2023 Page of NOTE: If a Justification was approved for the preceding acquisition, a copy of the approved Justification for the predecessor action must be included in the staff package for approval of the instant Justification. This applies to Justification staff packages that are submitted for review and approval at a level above the contracting officer. The predecessor Justification will be used as a reference document by the approving official.
Is this a new or amended J&A Document?
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?
Funding level for this acquisition:
Authority:
Justification Type:
COORDINATION ( AFFARS 5306.304(a)) ** The text in the signature blocks below is editable, including the title.
** To remove a row, click the "X" next to the signature block. CAUTION: Once removed, it can only be restored by downloading the BLANK FORM again.
APPROVAL (AFFARS 5306.304(a)) NOTE: A signature block will appear here based on the funding level selected above.
(See "Specific Guidance for Completing this Template" below.)
I. Contracting Activity.
II. Nature and/or description of the action being processed.
III. Description of supplies/services required to meet agency needs.
IV. Statutory authority permitting other than full and open competition.
V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority).
VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
VII. Determination by the Contracting Officer that the anticipated cost to the Government will be fair and reasonable.
VIII. Description of the market research conducted and the results, or a statement of the reasons market research was not conducted.
IX. Any other facts supporting the use of Other Than Full and Open Competition.
X. List of any sources that expressed, in writing, an interest in the acquisition.
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required.
XII. Certification by the Contracting Officer.
XIII. Certification by the technical/requirements personnel.
Specific Guidance for Completing this Template
I. Contracting Activity. (FAR 6.303-2(b)(1))
Fully identify the contracting agency and organizational activity responsible for the proposed contracting action.
II. Nature and/or description of the action being processed. (FAR 6.303-2(b)(2))
State whether the action will be awarded as a new contract or by modification to an existing contract (identify contract number) and identify the type contract planned (FAR 12.207 and DFARS 212.207).
An individual Justification cannot be used to support more than one contract irrespective of the quantities or the dollar value stated therein. If a proposed contract will contain unpriced options (including NTE prices), those options must be supported by a separate Justification prior to option exercise or the Justification supporting the basic contract must be a Class Justification. For Class Justification situations (covers more than one contract) where the number of contracts in the class can be identified: (1) Provide a brief general description of actions; (2) identify the supplies and services that are being acquired; and (3) for each contract in the class identify the contractor, estimated value, type of contract and rationale for contract length, and estimated award date. Where the same information applies to more than one contract within the class, it need only be stated one time.
III. Description of the supplies/services required to meet agency needs. (FAR 6.303-2(b)(3))
Specifically describe the supplies and/or services to be acquired, the total estimated value of the acquisition - including options (provide cost estimate by year and, for class Justifications, by contract action), and the estimated delivery dates/periods of performance If commodities are being procured, provide quantities. All contract line items (CLIN) -- e.g., technical data, support equipment, support services, etc. -- should be listed. If all of the ancillary requirements associated with a particular item are not specifically described in the Justifications, those ancillary requirements cannot be included in the resulting contract and would require a second Justification. Also, state the type of appropriation (e.g., 3010, 3400) that will be used to fund each requirement listed.
If approval for more than one fiscal year requirement is needed, give the rationale for this request. Generally, the scope of these actions is limited to current requirements only, so that actions may be taken to facilitate competition for out-year requirements.
In some cases, there are no feasible actions that could develop future competition, and it is reasonable to seek approval for more than one fiscal year's requirements.
For ID/IQ or requirements contracts, use the maximum dollar value of the total estimated orders as the estimated Justification dollar value.
IV. Statutory authority permitting other than full and open competition. (FAR 6.303-2(b)(4)) V. Demonstration that the contractor's unique qualifications or nature of the acquisition requires the use of the authority cited above (applicability of authority). (FAR 6.303-2(b)(5)) Provide, in narrative form, a detailed explanation supporting and clearly relating to the conditions described by the FAR for using the particular authority cited. This section is normally the most detailed part of the justification as the essence of the justification is presented here. For acquisitions that include both supplies and services, separately justify the use of the authority for the services and supplies.
Contracting without providing for full and open competition shall not be justified on the basis of lack of advance planning by the requiring activity or concerns related to the amount of funds available (e.g., funds will expire) (10 U.S.C. 3204) VI. Description of efforts made to ensure that offers are solicited from as many potential sources as practicable.
(FAR 6.303-2(b)(6))
Describe all efforts taken (or to be to be taken) to ensure that offers are solicited from as many potential sources as practicable under the circumstances. Although Market Research is covered in Section VIII, the information in Section VI should correlate with the Market Research described in Section VI. The following issues should be addressed in this paragraph:
Sources Sought Synopsis (used as part of market research). If a sources sought synopsis was issued, state the date the synopsis was issued and a brief description of its content. If any responses were received, describe in detail the results of the screening process and the rationale for determining the unacceptability of any synopsis respondents. Reference FAR 13.105, Synopsis and Posting Requirements.
Other Actions. In this paragraph, discuss any other actions taken or planned to facilitate competition for this acquisition. The discussion should include actions tried or considered even if the actions were unsuccessful. If the efforts were unsuccessful, so state and describe why.
Qualifying Country Sources. If qualifying country sources have expressed interest, but are to be excluded, provide supporting rationale.
VII. Determination by the Contracting Officer that the anticipated cost to the government will be fair and reasonable. (FAR 6.303-2(b)(7))
Include a statement by the contracting officer that the anticipated cost will be considered fair and reasonable and provide the basis for this determination. The steps that will be taken to ensure the final contract price will be fair and reasonable are also described here. Describe the extent of cost or price analysis anticipated including the requirements for certified cost or pricing data, technical evaluations, and audits.
VIII. Description of the market research conducted and the results, or explain why market research was not conducted. (FAR 6.303-2(b)(8))
Generally, some form of market research should be conducted. Discuss any market research conducted pursuant to FAR Part 10 and describe results of that research. Market research is any effort undertaken to determine if sources capable of satisfying the agency's requirements exist and to determine if commercial items or non-developmental items are either available or can be modified so that they will satisfy the agency's needs. Market research should be focused not only on identifying alternate sources, but also on alternate equipment or substitutes that might fulfill the Government needs with only minor modification. Regardless of the approach used, the results should provide a high level of confidence that no other qualified sources exist.
When other exceptions from the requirement to obtain full and open competition are relied upon, the market research might be limited to an examination of the acquisition history and experience with the marketplace under previous acquisitions for the same or similar items.
If no market research was conducted, so state and provide the rationale.
IX. Any other facts supporting the use of Other Than Full and Open Competition. (FAR 6.303-2(b)(9)(i))
Provide any other facts supporting the use of other than full and open competition, including an explanation of why technical data packages, specifications, engineering descriptions, statements of work, statements of objectives, or purchase descriptions suitable for full and open competition have not been developed, are not being developed, are not being used, or are not available.
X. List of sources, if any, that expressed interest in the acquisition. (FAR 6.303-2(b)(10))
If a sources sought synopsis was done and all interested sources are included in Section VI, it is acceptable to state, “See Section VI above.”
XI. A statement of the actions, if any, the agency may take to remove or overcome any barriers to competition before making subsequent acquisitions for the supplies or services required. (FAR 6.303-2(b)(11))
Describe any actions taken or to be taken to foster competition for future acquisitions of the supplies or services being acquired. Describe potential actions that could be taken to remove the barriers to competition that have been identified in the justification and include a milestone schedule, where available, for accomplishing these actions. For example, if a follow-on competitive acquisition is planned, so state and provide the planned award date, or state that the Government will attempt to acquire rights in technical data and computer software sufficient to compete follow-on acquisitions as a priced option in the contract action that is the subject of this Justification, or (if applicable) state how the Government intends to challenge nonconforming markings on technical data and computer software delivered to it under previous contracts so those markings can be removed in order that the technical data and computer software may be used in support of a follow-on competitive acquisition, or describe plans to qualify additional sources.
Address efforts to ensure competition for future spare parts and maintenance in support of systems or equipment covered by the justification, even when these acquisitions will be accomplished by other organizations. Include a discussion on available breakout data.
If no actions are planned, so state and provide reasons. If approval is sought for more than one year, explain why a sole source effort is required for the planned time duration.
For a non-competitive follow-on acquisition to a previous award for the same supply or service supported by a Justification citing the same authority, include a discussion of the actions planned to overcome barriers to competition established in the previous justification, the status of those actions, and the results of those actions. The approval authority shall determine whether the planned actions were completed. If the planned actions were not completed, the justification for the follow-on acquisition shall be approved by the approval authority one-level above the approval authority for the previous justification (see FAR 13.501(a)(2)). If the previous justification was approved by the Senior Procurement Executive (SPE), the approval remains at the SPE level.
[DFARS 213.501(a) and DFARS PGI 206.304(a)(S-70)(ii)] XII. Certification by the Contracting Officer. (FAR 6.303-2(b)(12))
As evidenced by his/her signature, the contracting officer has determined this document to be both accurate and complete to the best of his/her knowledge and belief.
XIII. Certification by the technical/requirements personnel. (FAR 6.303-2(c))
As evidenced by their signatures, the technical and/or requirements personnel have certified that any supporting data contained herein, which is their responsibility, is both accurate and complete.
Do You Need to "REDACT" Text?
This template is interactive and has special features. In its current state, it cannot be redacted. In order to redact any portion of this template, you must first convert it to a normal PDF file. Click here for instructions.
9.0.0.2.20120627.2.874785
| security_markings: CONTROLLED UNCLASSIFIED INFORMATION |
| CurrentPage: |
| PageCount: |
| new: |
| amended-with-original: |
| Yes: |
| No: |
| range_under-700K: |
| range_700K-13.5M: |
| Contracting-Activity: 21 CONS/PKB |
| PR-ID-Number: TBD |
| Program-Project: USAF Academy Band Venue Rental, Memorial Hall, Class J&A |
| Program-Type: |
| class: |
| individual: |
| Estimated_Cost: 749,900.00 |
| Sign_and_Save_1: |
| Date: 23 Aug 2024 |
| Date: 23 Aug 2024 |
| Date: 23 Aug 2024 |
| Name: |
| Signature: |
| Hide-PM-Coord: |
| Hide-CO-Coord: |
| Hide-CSO-Coord: |
| Hide-Legal-Coord: |
| Hide-COCO-Coord: |
| Hide-CA-Coord: |
| Hide-Blank-1-Coord: |
| Hide-Blank-2-Coord: |
| Section-I-Text: |
| Section-II-Text: |
| Section-III-Text: |
| Section-IV-Text: |
| Section-V-Text: |
| Section-VI-Text: |
| Section-VII-Text: |
| Section-VIII-Text: |
| Section-IX-Text: |
| Section-X-Text: |
| Section-XI-Text: |
| Section-XII-Text: |
| Section-XIII-Text: |
| Remove-Guidance-Pages: 1 |
File details come from the government source that posted it. Updated .