CJARedacted.pdf

PDF 580 KB Posted

Attached to
V-22 Flight Test Support
Solicitation number
N00019-20-RFPREQ-PMA-275-0477
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL AIR SYSTEMS COMMAND

RADM WILLIAM A. MOFFET BUILDING

47123 BUSE ROAD, BLDG 2272

PATUXENT RIVER, MARYLAND 20670-1547

052028

CLASS JUSTIFICATION AND APPROVAL

FOR USE OF OTHER THAN FULL AND OPEN COMPETITION

1. Contracting Activity.

Naval Air Systems Command (NA VAIR) Headquarters

2. Description of the Action Being Approved.

IN REPLY REFER TO:

CJ&A 17-0092

This Class Justification and Approval (CJ&A) authorizes and approves the issuance of orders against the V-22 Program Basic Ordering Agreement (BOA), NOOO 19-17-0-0002. Orders will be placed on a sole source basis with the Bell Boeing Joint Project Office (Bell-Boeing) for procurement of supplies and services in support of the V-22 program. The V-22 Bell-Boeing BOA will cover orders issued during the authorized ordering period. Authority to award orders pursuant to this CJ&A commences upon approval of this CJ&A and expires for initial orders on 11 January 2022.

3. Description of Supplies/Services.

Actions authorized under this CJ&A will support ongoing production and retrofit integration, Engineering Change Proposals (ECPs), reliability/sustainability improvements and continuing expansion of the V-22 flight envelope on production and fielded V-22 aircraft, simulators and trainers. Orders under the V-22 Bell-Boeing BOA and authorized under this CJ&A will include:

a. Development, manufacture and installation of engineering change proposals for block upgrades, forward fit and/or retrofit kits including, but not limited to, associated production assessments/life cycle analysis, non-recurring engineering, systems engineering, integrated logistics support, production support, prototyping, validation and verification of changes, development/validation/verification of technical publications/manuals/changes/directives, associated logistics impacts, testing of retrofit safety and test equipment changes, spare and repair parts for aircraft, subsystems, training simulators/devices, support equipment and related software efforts;

b. Software development and infrastructure support related to systems and subsystems originally developed and integrated by Bell-Boeing, including, but not limited to, avionics and air vehicle management systems upgrades, training simulator/device concurrency and modernization upgrades, avionics support and any hardware upgrades required to implement software updates;

File details come from the government source that posted it. Updated .