CIZ26-TPW-4018 - On-Call Quiet Zones - RFQ.pdf

PDF 393 KB Posted

Attached to
On-Call Engineering Services for Establishment of Quiet Zones
Solicitation number
CIZ26-TPW-4018
Issued by
Tarrant County, Dallas City, Texas

About this file

This Request for Qualifications (RFQ) is issued by the City of Dallas Department of Transportation and Public Works seeking Statements of Qualification from experienced civil engineering firms to provide on-call engineering services for the establishment of railroad quiet zones throughout the City of Dallas. The City seeks professional engineering services necessary to evaluate, design, coordinate, and support the establishment of one or more railroad quiet zones in accordance with Federal Railroad Administration (FRA) regulations, railroad requirements, state requirements, and local agency standards. Services include production of signed and sealed engineered quiet zone diagnostic reports, risk analysis, feasibility analysis, evaluation of existing and proposed safety measures, preliminary engineering design, environmental and regulatory documentation, and potentially full plans, specifications, and estimates (PS&E). The contract term is three years on an as-needed basis. A pre-solicitation meeting will be held via Microsoft Teams on Tuesday, November 17, 2026, at 10:00 AM CST. The deadline for question submission is 3:00 PM CST on Wednesday, November 25, 2026. Statements of Qualification are due by 1:00 p.m. on Friday, December 4, 2026, submitted through the City's Euna portal (https://dallascityhall.bonfirehq.com). Interviews, if conducted, are anticipated for the week of December 14, 2026, in a 60-minute virtual format.

The approximate engineering services budget for this contract is $150,000.00 as an estimate only and not a commitment by the City to provide a certain amount of work or funding level. The Project Manager must be a licensed professional engineer in Texas with a minimum of seven years of experience in schematic development or roadway design, including a minimum of three years in railroad quiet zone establishment work, and minimum five years as a responsible project manager. Task leaders must be licensed professional engineers in Texas with a minimum of five years of demonstrated experience. The City has adopted the Developing Regional & Inclusive Vendor Enterprises (DRIVE) Policy with a Small Business Enterprise (SBE) goal of 15.19 percent. Evaluation points are awarded for SBE utilization (up to 8 points), local economic impact (up to 6 points), and engagement score (up to 6 points). All work must comply with FRA regulations, railroad requirements, state requirements, and City of Dallas standards. The City reserves the right to reject all submissions, and respondents must comply with all required forms including Business Information Form (OPS-02), SBE Affidavit, Local Participation and Workforce Impact Form, Non-Collusion Affidavit, Conflict of Interest Policy questionnaire, and Form 1295 Certificate of Interested Parties.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Dallas

Request for Qualifications (RFQ) Department of Transportation and Public Works

CIZ26-TPW-4018

On-Call Engineering Services for Establishment of Quiet

Zones The RFQ packet may be obtained beginning Thursday, November 12, 2026, from the City of Dallas

Euna site (https://dallascityhall.bonfirehub.com).

https://dallascityhall.bonfirehub.com/ http://www.dallascitynews.net/

SCOPE OF WORK

On-Call Engineering Services for Establishment of Quiet Zones

I. INTRODUCTION, PURPOSE, AND INTENT

The City of Dallas Department of Transportation and Public Works (City) is seeking Statements of Qualification (SOQs) from experienced civil engineering firms who can demonstrate they have the resources, experience, and qualifications to provide engineering services for the establishment of Quiet Zones in various locations throughout the City of Dallas.

The purpose of this project is to provide professional engineering services necessary to evaluate, design, coordinate, and support the establishment of one or more railroad quiet zones in accordance with applicable Federal Railroad Administration (FRA) regulations, railroad requirements, state requirements, and local agency standards.

The consultant shall perform all engineering, analysis, coordination, documentation, and support services required to assist the City in obtaining approval and implementation of the proposed quiet zone(s) or re-establishment of existing quiet zones, on an “as needed” basis as determined by the City to include but not limited to the scope of services as described below. The planned term for this contract is for three years.

The approximate engineering services budget for this contract is $150,000.00, which is included for informational purposes only and may be adjusted by the city. Please note that this is an estimate only and is not a commitment by the City to provide a certain amount of work or this level of funding over the contract timeline duration. This contract shall be used on an as needed basis until the date of expiration for this contract is met or funds are depleted.

These services may include, but are not limited to:

• Production of signed and sealed engineered Quiet Zone diagnostic report, risk analysis, feasibility analysis, evaluation of existing and proposed safety measures, preliminary engineering design, environmental and regulatory documentation, and potentially the development of full associated plans, specifications and estimates (PS&E).

This Request for Qualifications (RFQ) will allow the City to select engineer firms for specific professional engineering services based on qualifications consistent with Chapter 2254 of the Texas Government Code.

This solicitation is a one step process. Based on RFQ responses, a selection committee will rank the firms and enter into an As-Needed Master Contract (Master Contract) with the most highly qualified firm.

When the City identifies a specific project, the City will issue a written Request for Proposal(s) to the firm awarded the As-Needed Master Contract under this solicitation. The Request for Proposals will have a description of the services required, the schedule and other details for the specific project. The City will place individual written Service Order assignments with that firm as needed and as required.

NOTES:

1) ALL ASSOCIATED WORK MUST MEET FEDERAL RAILROAD

ADMINISTRATION (FRA) REGULATIONS, RAILROAD REQUIREMENTS,

STATE REQUIREMENTS, AND CITY OF DALLAS STANDARDS.

II. SCHEDULE, QUESTIONS, AND INQUIRIES

During the solicitation process Respondents are required to limit their communication regarding this project to the Buyer referenced herein. A pre-solicitation meeting will be held by the City where Respondents will have an opportunity to ask the requesting department(s) questions and/or obtain clarification. This meeting will be the only time when Respondents and requesting department(s) will communicate directly, thereafter, all communication associated with this project shall be addressed to the assigned Buyer.

Respondents may submit their questions electronically through the City solicitation portal, https://dallascityhall.bonfirehub.com/login. All questions shall be submitted electronically, and the City will respond to all questions by way of addendum which will be posted as part of the solicitation. The City, its agents, and employees shall not be responsible for any information given by way of verbal communication.

The pre-solicitation meeting will be held via Microsoft Teams at 10:00 AM CST on Tuesday, November 17, 2026.

https://teams.microsoft.com/meet/266343435733052?p=0HsDLllNHuFjp7dzx V

Call-in Information for Pre-Solicitation Meeting: 1-469-217-7604;

Meeting ID 355 407 064# (audio only)

The deadline for the submission of questions is 3:00 PM CST on Wednesday, November 25, 2026.

III. SCOPE OF WORK

NOTE:

1) A Respondent may be awarded multiple service order assignments for multiple projects with select services from the expected major scope of services on an as needed basis and upon request by the City. Upon completion of the engineering services, the City will have the technical documentation, approvals, designs, and regulatory submissions https://dallascityhall.bonfirehub.com/login https://teams.microsoft.com/meet/266343435733052?p=0HsDLllNHuFjp7dzxV https://teams.microsoft.com/meet/266343435733052?p=0HsDLllNHuFjp7dzxV necessary to establish and implement the proposed railroad quiet zone(s), including any required crossing safety improvements.

2) All associated work must comply with Federal Railroad Administration (FRA) regulations, Railroad requirements, State requirements, and City of Dallas standards.

The major scope of services covers the following categories:

Production of signed sealed engineers diagnostic report for establishment of Quiet Zones and filing with the FRA at various locations throughout the City of Dallas

• Task 1: Project Management and Coordination The consultant shall:

o Conduct a project kickoff meeting with the agency and stakeholders.

o Develop a project management plan and schedule.

o Coordinate with railroad companies, regulatory agencies, emergency service providers, and affected jurisdictions.

o Conduct periodic project status meetings.

o Provide monthly progress reports and budget tracking.

Deliverables:

• Project management plan.

• Meeting agendas and meeting minutes.

• Monthly progress reports.

• Updated project schedule.

• Task 2: Existing Conditions Assessment The consultant shall:

o Collect and review available railroad crossing inventory information.

o Gather existing traffic, roadway, railroad, signal, and accident data.

o Conduct field investigations of all public crossings within the proposed quiet zone limits.

o Document existing crossing warning devices, roadway geometry, sight distance conditions, and adjacent land uses.

o Review previous studies and planned transportation improvements that may affect the quiet zone.

Deliverables:

• Existing conditions memorandum.

• Field assessment documentation.

• Existing crossing inventory.

• Task 3: Quiet Zone Feasibility Analysis The consultant shall:

o Evaluate eligibility and feasibility of establishing the proposed quiet zone.

o Identify all public, private, and pedestrian railroad crossings within the study corridor.

o Calculate existing Quiet Zone Risk Index (QZRI) and Nationwide Significant Risk Threshold (NSRT).

o Assess operational, safety, and regulatory constraints.

o Evaluate potential impacts on roadway operations, emergency response, and adjacent properties.

o Identify crossings requiring improvements to meet FRA requirements.

Deliverables:

• Quiet zone feasibility report.

• Risk analysis documentation.

• Recommended quiet zone limits.

• Task 4: Supplementary Safety Measures (SSMs) and Alternative Safety Measures (ASMs) The consultant shall:

o Evaluate potential safety improvements necessary to achieve quiet zone eligibility.

o Recommend appropriate FRA-approved Supplementary Safety Measures (SSMs) and/or Alternative Safety Measures (ASMs).

o Analyze alternatives such as:

• Four-quadrant gate systems.

• Raised medians.

• Channelization devices.

• One-way street conversions.

• Permanent crossing closures.

• Pedestrian safety enhancements.

o Prepare conceptual designs and cost estimates for each alternative.

Deliverables:

• Alternatives evaluation report.

• Conceptual improvement layouts.

• Preliminary cost estimates.

• Task 5: Preliminary Engineering and Design, as applicable The consultant shall:

o Prepare preliminary engineering plans for selected crossing improvements.

o Develop geometric layouts, traffic control plans, signing and pavement marking plans, and drainage adjustments as required.

o Coordinate design requirements with the railroad company and regulatory agencies.

o Identify utility conflicts and right-of-way considerations.

Deliverables:

• Preliminary engineering plans.

• Preliminary quantity estimates.

• Engineer's opinion of probable construction cost.

• Task 6: Environmental and Regulatory Documentation, as applicable The consultant shall:

o Identify environmental clearance requirements.

o Assist the agency with applicable federal, state, and local permitting requirements.

o Prepare documentation necessary to support project approvals.

Deliverables:

• Environmental review memorandum.

• Permit coordination documentation.

• Task 7: Quiet Zone Implementation Documentation The consultant shall:

o Prepare all documentation required by the Federal Railroad Administration and affected railroads.

o Prepare Notices of Intent (NOI), Notices of Establishment (NOE), and supporting documentation.

o Coordinate review comments and revisions.

o Assist the agency with stakeholder outreach and regulatory coordination.

Deliverables:

• Draft and final Notice of Intent.

• Draft and final Notice of Establishment.

• Supporting calculations and exhibits.

• Task 8: Final Design and Construction Support (Optional) The consultant may be authorized to:

o Prepare final plans, specifications, and estimates (PS&E).

o Assist during bidding and procurement.

o Respond to contractor requests for information.

o Conduct construction observation and review.

o Assist with final inspections and project closeout.

Deliverables:

o Final PS&E package.

o Construction support documentation.

o Final inspection reports.

Final Project Deliverables

• At a minimum, the consultant shall provide:

o Project Management Plan.

o Existing Conditions Assessment Report.

o Quiet Zone Feasibility Study.

o Risk Index Calculations.

o Alternatives Analysis Report.

o Conceptual and Preliminary Engineering Plans.

o Cost Estimates.

o Environmental and Regulatory Documentation.

o Notice of Intent Package.

o Notice of Establishment Package.

o Final Project Report

IV. SUBMITTAL REQUIREMENTS

1. The due time and date for submitting the SOQ is 1:00 p.m. on Friday, December 4, 2026.

2. All submittals to be uploaded into the Euna (https://dallascityhall.bonfirehub.com/login) system by the due time and date.

The prime respondent must submit the SOQ in a PDF format in Euna. Late submittals will not be accepted.

The PDF file must be named according to the following convention: Prime Respondent’s legal name (limited to a maximum of the first ten characters)_the solicitation number. Example Prime provider name is XYZ Inc., file name should be:

XYZInc_CIZ26-TPW-4018

The submittal must consist of and is limited to the following attachments in numerical order:

1) Cover Page –The cover page should include the following information.

a. Use the included cover page template on page 17

b. Ensure to include the signature of the PM on the cover page.

2) Topic Question Responses – See Topic Questions and Format sections below.

3) Appendix – Organizational Chart

V. TOPICS

The prime respondent must address the topics listed below in their submittal.

Topic No.

Page Limit

% Topic Question

1 3 30% The establishment of Quiet Zones requires coordination with a multitude of entities, organizations and stakeholders in addition to managing the technical requirements of a Quiet Zone.

a) Identify the top 3 (three) key critical issues and challenges for the establishment of Quiet Zones.

b) Discuss the approach the project manager will undertake to address the identified critical issues.

c) Discuss the critical tools and techniques the project manager will use to manage the required coordination on this contract to ensure successful implementation.

d) Provide one or two examples demonstrating the tools and techniques discussed in a, b and c that the project manager has implemented to address critical issues while effectively managing the schedule with quantifiable results.

2 3 25% This project requires experience with filing the “Quiet Zones” applications in addition to field verifications of the implementation of measures in compliance with the plans.

a) Describe the proposed respondent’s project manager and/or task(s) lead’s experience with the above listed item.

b) Describe the critical issues that you can foresee for this situation and note how this experience will help address these issues.

https://dallascityhall.bonfirehub.com/login

c) Provide one or two examples from the past five (5) years where you applied the approach you described above and what was the outcome

3 2 10% This project may require the development of new Quiet Zone PS&E.

a) Describe the project manager and/or task lead’s approach to this process

b) Provide two examples from the past five (5) years where the project manager or task lead utilized the above-described approach to produce a completed PS&E package and what was the outcome

4 2 10% This project will require development of a detailed diagnostic report as approved by FRA.

a) Describe the proposed project manager and/or task lead’s experience with the above listed item.

b) Describe the critical issues that you can foresee when trying to obtain FRA’s approval of the diagnostic report.

a) Provide one or two examples from the past five (5) years where you successfully produced a diagnostic report and what was the outcome

5 1 5% a) Describe your firm’s approach to Quality Assurance/Quality control (QA/QC) and provide an example or two highlighting the application of the described approach with tangible description of the outcome.

b) Given the complicated nature of this project, it is essential that an accurate contract time determination (CTD) is developed. Discuss the project factors that the project manager and/or task lead should consider in developing the CTD for this project and provide an example or two on how this approach resulted in a realistic and accurate CTD on prior projects

c) Describe the team’s quality assurance and quality control procedures including what is standard practice for all stages of the design process.

6 N/A 20% Developing Regional & Inclusive Vendor Enterprises (DRIVE) Plan (SBE

Goal 15.19%)

• It is the policy of the City of Dallas to involve certified small business enterprises (SBEs) to the greatest extent feasible in the City’s contracting opportunities. The City further seeks to encourage the growth and development of SBEs, promoting local economic growth and increased competition. In alignment with this commitment the City has adopted the Developing Regional & Inclusive Vendor Enterprises (DRIVE) Policy for City of Dallas contracts.

• Evaluation points shall be awarded as follows:

1. SBE Utilization – up to 8 points

a. Proposed SBE Commitment

b. First-time Contracting

2. Local Economic Impact – up to 6 points

a. Local Workforce

b. Local Supply Chain Usage

c. Local Community Investment

3. Engagement Score – up to 6 points

a. Past Subcontractor Utilization

b. Documented Engagement Efforts

c. Past Timely Payments to Subcontractors

Assistance in preparing the DRIVE forms may be obtained by emailing businessenterprisehub@dallas.gov

VI. STATEMENT OF QUALIFICATIONS MUST INCLUDE THE FOLLOWING

• An organizational chart containing the names, addresses, telephone and email addresses of the prime provider and any sub provider’s key personnel proposed for the team and their contract responsibilities by work category. The organization chart can be prepared with a font size no less than 11-point and is limited to one 11”X17” page. The organization chart is not included in the page limit and is considered an Attachment.

• Identification of the prime provider’s project manager who may be replaced during the selection and award process only by another person with a similar level of experience proposed for the prime provider’s team, as approved by the city.

• Verification in the form of a statement that the proposed team individuals are currently employed by either the prime provider or a sub provider.

• The SOQ shall also include three (3) references for each of the following work categories:

a. Development of a detailed diagnostic report for quiet zones.

b. Development of plans, specifications and estimates for quiet zones.

c. Evaluation of FRA approved Supplementary Safety Measures (SSMs) and

Alternative Safety Measures (ASMs).

Each reference shall include agency name, contact name, contact address, contact telephone number, and contact email address. References for multiple work categories must be repeated under the heading. These references do not count toward the page limit and shall be included in the appendix.

• The SOQ document is limited to a total of eleven (11) 8-1/2”X11” pages, exclusive of the cover page, references, resumes, the organizational chart (may be 11”X17”), and required forms. The materials must be legible (font 11) with a minimum of 0.75-inch margins. Resumes of the project manager and key task leaders are limited to one page per person and may include work completed by the person while employed at another firm. The link between the work categories and each resume included in the SOQ must be clear.

• All written materials submitted will be evaluated by an Evaluation/Scoring Committee. The review of the submittals will be based on the evaluation criteria listed in this document.

VII. INTERVIEWING

At the city’s discretion, interviews may be conducted to assist with the selection of the most qualified respondent firm. The purpose of the interview process is to provide the respondent with the opportunity to highlight the key components of their submittal as well as the qualifications of key staff. Interviews consist of presentations by the respective highly qualified short-listed respondent firms. Interviews, if conducted, will generally be 60 minutes in duration and will be oral using a virtual format. The mailto:businessenterprisehub@dallas.gov respondent firm is generally limited to four people at the interview session, one of whom shall be the proposed Project Manager.

Presentations, if required, are in person but may be virtual as notified. As of the posting of this RFQ, it is anticipated the interviews, if required, will be held the week of December 14th, 2026, but that is subject to change depending on the evaluation team members’ availability.

The format of the interview is as follows:

Steps Time Allotment (Minutes)

Introductions 5 Consultant Firm Presentation * 32 Selection committee’s Follow Up Questions 15 Respondents Firm Concluding Statement 5 Selection Committee Chair’s Concluding Statement 3 Total Interview Allotted Time 60

* Presenters will be allowed to use a projector for slides; however, only PowerPoint is allowed for the presentations. PowerPoint presentations may not include anything other than slides - items such as animation, video clips, sounds and the like are not allowed. No boards will be allowed. Furthermore, no “leave-behinds” will be allowed (copies of presentation, exhibits, etc.)

VIII. LATE AND WITHDRAWN SUBMITTALS:

Solicitation responses are required to be submitted in the Euna system by the date and time indicated in Section IV above.

Submittals after the due date and time and hard copy submittals are not permissible and will not be accepted.

IX. REVIEW OF SOQs

1. The City will review and evaluate the submitted materials to determine if submittals demonstrate the required experience and qualifications to fulfill the obligations of the services identified in this RFQ.

2. The City may conduct all necessary inquiries or investigations, including but not limited to, contacting references to verify the statements, documents, and information submitted in connection with the submittal. The City may also seek clarification from the referenced firms about any financial and experience issues.

3. Please be aware that the City may use sources of information not supplied by the firm concerning the abilities to perform this work. Such sources may include current or past customers of the organization; current or past suppliers; articles from industry newsletters or other publications or from non-published sources made available to the City of Dallas.

X. REJECTION, ACCEPTANCE OR DISQUALIFICATION OF SUBMITTALS

1. This RFQ does not commit the City to award any contract.

2. The City reserves the right to reject any or all SOQs, to waive technicalities or minor irregularities, and to accept any submittal it deems to be in the best interest of the City. The City shall not be liable for any costs incurred by any firm responding to this RFQ.

3. Firms may be disqualified for any but not limited to the following reasons:

a. Reason to believe collusion exists among the firms

b. The firm is involved in any litigation against the City

c. The firm is in arrears on an existing contract or has failed to perform on a previous contract with the City

d. Lack of financial stability

e. Failure to use the City’s approved forms

XI. DISCUSSION WITH FIRMS

2. The City reserves the right to engage in discussions or conduct interviews, either oral or written, with the respondents determined by the evaluation criteria to be reasonably viable to being selected for award as part of the SOQ process.

3. After the most highly qualified firm(s) has been identified, contract negotiations may commence. If at any time contract negotiation activities are judged to be ineffective, the City will cease all activities with the respondent and begin contract negotiations with the next highest ranked respondent. This process may continue until either both the respondent and the City execute a completed contract, or the City determines that no acceptable alternative submission exists.

4. The City reserves the right to reject any or all submittals received or to award, without discussions or clarifications, a contract on the basis of initial materials received. Therefore, each submittal should contain the firms’ best terms from a technical standpoint. Also, only respondents submitting an SOQ will be notified of relevant communications after the closing.

XII. CONFIDENTIALITY

Any information deemed confidential shall be clearly noted as such on each page of the solicitation response. The City cannot guarantee it will not be compelled to disclose all or part of any public record under the Texas Open Record Act. SOQs will be opened by the City to avoid disclosure of contents to competing respondents and kept secret and confidential during the solicitation process and prior to award.

Respondents who include information in a solicitation response that is legally protected as trade secret or confidential shall clearly indicate the information which constitutes a trade secret or confidential information by marking that part of the solicitation response “trade secret” or “confidential” at the appropriate place. If a request is made under the Texas Open Records Act to inspect information designated as trade secret or confidential in a solicitation response, the Respondent shall, upon request, immediately furnish sufficient written reasons and information as to why the information designated as a trade secret or confidential should be protected from disclosure, for the City Attorney to present the matter to the Attorney General of Texas for final determination.

XIII. PERMITS REQUIRED BY LAW

Firm shall comply with all requirements of federal, state, and local laws and regulations pertinent to or affecting any phase of this contract.

XV. RECORDS AND AUDIT

The Firm shall keep accurate records of all components of invoices to the City, including but not limited to times and payroll receipts for hourly personnel utilized by this contract. These records shall be retained for a minimum of three years after the conclusion of the contract. The City reserves the right to audit any records it deems necessary for the execution of this contract.

XVI. ASSIGNMENT OF CONTRACT

The Firm shall not assign, transfer, sublet, convey or otherwise dispose of the contract of any part therein or its right, title or interest therein or its power to execute the same to any other persons, firm, partnership, company or corporation without the prior written consent of the City. Should the Firm assign, transfer, sublet, convey or otherwise dispose of its right, title or interest or any part thereof in violation of this section, the City may, at its discretion, cancel the contract and all rights, title and interest of the Respondent shall therein cease and terminate, and the Firm shall be declared in default.

XVII. DEFAULT BY RESPONDENT

The following events shall be deemed to be events of default by Respondent under the Contract:

1. Respondent shall become insolvent, or shall make a transfer in fraud of creditors, or shall make an assignment for the benefit of creditors.

2. Respondent attempts to assign the Contract without the prior written consent of the City.

3. Respondent shall fail to perform, keep or observe any term, provision or covenant of the Contract; or

4. Respondent fails to properly and timely pay Respondent personnel, suppliers or other Contractors and the failure impacts the City or its property in any manner.

5. In the event a default occurs, the Director shall give the Respondent written notice of the default. If the default is not corrected to the satisfaction and approval of the Director within ten days of receipt of such notice by the Respondent, the City may immediately cancel the Contract. At the direction of the Director, the Respondent shall transition the work, vacate the premises and shall have no right to further operate under the Contract.

6. Within forty-eight hours after cancellation or termination of the Contract by the City, the Respondent, under the supervision of the Project Coordinator(s), shall remove all equipment and supplies to which Respondent is properly entitled, as specified herein.

7. The Respondent, in accepting the Contract, agrees that the City shall not be liable to prosecution for damages or lost anticipated profits in the event that the City cancels or terminates the Contract.

8. No waiver by the City of any default or breach of any covenant, condition, or stipulation shall be treated as a waiver of any subsequent default or breach of the same or any other covenant, condition, or stipulation.

XVIII. OWNERSHIP

All records, equipment, revenue, work product, and/or intellectual property produced through this contract becomes property of the City to use as its own property without restrictions.

XIX. MINIMUM QUALIFICATIONS/CERTIFICATION REQUIREMENTS

• Project Manager: (a) Is a licensed professional engineer in the State of Texas, (b) has a minimum of seven years of experience in schematic development or roadway design inclusive of a minimum of three years in work associated with the establishment of railroad quiet zones, and (c) minimum of five years as a responsible project manager.

• Task Leader: (a) Is a licensed professional engineer in the State of Texas for the assigned respective work category except for surveying where a registered land surveyor is required, and (b) has a minimum of five years of demonstrated experience.

XX. TERMINATION

The City may terminate this agreement in whole or in part by giving thirty days written notice thereof to Respondent. The City will compensate Respondent in accordance with the terms of the agreement for services delivered and accepted prior to the effective date of such termination notice.

XXI. MISCELLANEOUS

1. After executing the Contract, no consideration will be given to any claim of misunderstanding.

2. Respondents shall submit the required Respondent’s qualification statement with supporting information as stated herein along with all other supporting documentation requested.

3. Respondents shall thoroughly familiarize themselves with the provisions of these Specifications and the Facilities, as applicable.

4. The City reserves the right to reject all submissions and to waive any minor irregularities.

5. A Respondent’s qualification statement may be disqualified if the corporation or individual Respondent is in arrears or in default to the City for delinquent taxes or assessments or on any debt or Contract, whether as defaulter or bondsman; or who has defaulted upon any obligation to the City by failing to perform satisfactorily any previous agreement or Contract within the past seven years.

Also, Respondents may be disqualified for poor prior performance on similar contracts with the City or with other entities.

6. The Contract with the Respondent will be drawn by the City and may contain such other provisions as are deemed necessary to protect the interests of the City.

7. The Respondent agrees to abide by the rules and regulations as prescribed herein. The Respondent will, in all solicitations or advertisements for personnel to perform services under the contract, state that all qualified applicants will receive consideration for employment without regard to race, color, religion, gender, or national origin.

8. If either party hereto is prevented from completing its obligations under the contract by act of God, strike, lockout, material or labor restrictions by any governmental authority, civil riot, flood, or any other cause beyond the control of the parties hereto, then such party shall be excused from such performance for such period of time as is reasonably necessary after such occurrence to remedy the effects thereof.

9. The section headings in these Specifications are for convenience in reference and are not intended to define or limit the scope of any of the conditions, terms or provisions of these specifications.

10. Submitters are expected to examine all documents that make up the RFQ.

Submitters shall promptly notify the buyer of any omission, ambiguity, inconsistency, or error that they may discover upon examination of the solicitation documents. Submitters shall use the complete solicitation to prepare submittals.

The City assumes no responsibility for any errors or misrepresentations that result from the use of incomplete solicitations.

11. Should any question arise as to the proper interpretation of the terms and conditions of these specifications, the decision of the City Attorney or their authorized representative shall be final.

XXII. CONFLICT OF INTEREST

CHARTER XXII Sec. 11 FINANCIAL INTEREST OF EMPLOYEE OR

OFFICER PROHIBITED

a. No city official or employee shall have any financial interest, direct or indirect, in any contract with the City, or be financially interested, directly or indirectly, in the sale to the City of any land, materials, supplies or services, except on behalf of the City as a City official or employee. Any violation of this section shall constitute malfeasance in office, and any City official or employee guilty thereof shall thereby forfeit the City official’s or employee’s office or position with the City. Any violation of this section, with knowledge, express or implied, of the person or corporation contracting with the City shall render the contract involved voidable by the City Manager or the City Council.

b. The alleged violations of this section shall be matters to be determined either by the trial board in the case of employees who have the right to appeal to the trial board, and by the city council in the case of other employees.

c. The prohibitions of this section shall not apply to the participation by city employees in federally-funded housing programs, to the extent permitted by applicable federal or state law.

d. This section does not apply to an ownership interest in a mutual or common investment fund that holds securities or other assets unless the person owns more than 10 percent of the value of the fund.

e. This section does not apply to non-negotiated, form contracts for general city services or benefits if the city services or benefits are made available to the city official or employee on the same terms that they are made available to the general public. (f) This section does not apply to a nominee or member of a city board or commission, including a city appointee to the Dallas Area Rapid Transit Board. A nominee or member of a city board or commission, including a city appointee to the Dallas Area Rapid Transit Board, must comply with any applicable conflict of interest or ethics provisions in the state law and the Dallas City Code. (Amend. of 8-12-89, Prop. No. 1; Amend. of 8-12-89, Prop. No. 15; Amend. of 11-4-14, Prop.

Nos. 2 and 9) 1

1HAPTER XXII.1

XXIII. INDEMNITY

The selected Respondent agrees to defend, indemnify and hold the City, its officers, agents and employees, harmless against any and all claims, lawsuits, judgments, costs, and expenses for personal injury (including death), property damage or other harm for which recovery of damages is sought, suffered by any person or persons, that may arise out of or be occasioned by the selected Respondent’s breach of any of the terms or provisions of the contract, or by any other negligent or strictly liable act or omission of the selected Respondent, its officers, agents, employees, or sub-respondents, in the performance of the contract; except that the indemnity provided for in this paragraph shall not apply to any liability resulting from the sole negligence or fault of the City, its officers, agents, or employees and in the event of joint and concurrent negligence or fault of the selected Respondent and City, responsibility, and indemnity, if any, shall be apportioned comparatively in accordance with the laws of the State of Texas, without waiving any governmental immunity available to the City under Texas law and without waiving any defenses of the parties under Texas law. The provisions of this paragraph are solely for the benefit of the parties hereto and are not intended to create or grant any rights, contractual or otherwise, to any other person or entity.

XXIV. DEVELOPMENT COSTS

Neither City of Dallas nor its representatives shall be liable for any expenses incurred in connection with preparing a response to this SOQ. Respondents are encouraged to prepare their solicitation responses simply and economically, providing a straightforward and concise description of your firm’s ability to meet the requirements of the SOQ.

XXV. CERTIFICATE OF INTERESTED PARTIES (FORM 1295)

Respondent(s) recommended by City staff for a contract will be required to comply with Section 2252.908 of the Texas Government Code. Each vendor shall complete Form 1295-Certificate of Interested Parties- for every contract for which they are recommended. Vendor will complete the form electronically at the Texas Ethics Commission website:

https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm and submit a copy to the buyer before the contract information will be sent to the City Attorney’s Office to draft the contract. Once the terms of the contract are fully negotiated; the https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm recommended vendor has signed the contract indicating agreement with the terms of the contract; and the Form 1295 is on file at the Texas Ethics Commission website with a copy provided to the buyer; the staff recommendation will be placed on a City Council agenda to award the contract.

XV. DOCUMENTS SUBMITTED WITH SOLICITATION RESPONSE OR UPON

REQUEST

Required with Submittal – Included in EXHIBIT A Packet

1. Business Information Form (OPS-02)

2. SBE Affidavit – BEH-FRM-602.SAW (PDF and Word versions available)

3. Local Participation and Workforce Impact – BEH-FRM-604.SAW (PDF and Word versions available)

4. SBE Utilization Plan & Commitment to Local Economic Impact BEH-FRM-

605.SAW

5. Engagement Score & Past Commitment Form BEH-FRM-606.SAW

6. SBE Good Faith Effort Documentation Form – BEH-FRM-607.SAW (PDF and

Word versions available)

7. Prime Self Performance Declaration – BEH-FRM-609.SAW (PDF and Word versions available)

8. SBE Subcontractor Intent Form – BEH-FRM-610.SAW (PDF and Word versions available)

9. Disclosure of Lobbying Activities Form

10. Non-Collusion Affidavit

11. Conflict of Interest Policy and Questionnaire (OPS-06, State Form CIQ)

12. Form 1295 (https://www.ethics.state.tx.us/filinginfo/1295/)

13. Bidder’s Acknowledgement of Prohibition on Contracts with Companies

Boycotting Israel & Prohibition on Contracts with Foreign Terrorist Organizations

14. Debarment Certification Form

15. Statement of Insurability and Quote (OPS-04)

a. Insurance requirements

May be Requested at a Future Date (EXHIBIT B)

1. Copy of respondent’s internal affirmative action plan or policy

2. Schedule of Work and Actual Payment – BEH-FRM-603

3. Any other City documents as required

4. Example Engineering Contract https://www.ethics.state.tx.us/filinginfo/1295/

Cover Page Template:

Solicitation Number’s SOQ:

Project Description

Prime Respondent Legal Name

Printed Name of Prime Respondent’s Project Manager:

Date:

Prime Respondent’s Applicable TBPE/TBAE/TBPLS Firm Registration Number:

Project Manager’s Email Address:

Project Manager’s Address:

Project Manager’s Phone Number:

Prime Provider’s Project Manager Signature: ___________________________________

File details come from the government source that posted it. Updated .