This is an Invitation for Bids issued by the City of Sylvania, Georgia for a Copper Replacement Project. The project involves the replacement of approximately 3.9 miles of existing overhead copper electrical conductor with 1 AWG aluminum wire and the replacement of approximately 95 failing electrical distribution poles, together with associated electrical distribution hardware upgrades to improve reliability and resilience of the City's electrical distribution system. The contractor will be responsible for all labor, equipment, installation, removal, testing, commissioning, and related services. A pre-bid meeting is scheduled for December 8, 2026 at 11:00 a.m. at City Hall (attendance is non-mandatory). Sealed bids are due on January 13, 2027 at 11:00 a.m., submitted to City of Sylvania, 104 S. Main Street, Sylvania, GA 30467, clearly marked "COPPER REPLACEMENT PROJECT." The estimated project schedule includes approximately 60 days for planning and mobilization, 365 days for construction, and 30 days for testing and commissioning, for a total estimated duration of approximately 14 months from the Notice to Proceed.
Bids shall be submitted as a lump sum and must include all labor, equipment, supervision, materials, installation, testing, and incidentals necessary for project completion. The City shall furnish all project materials. Required bid documents include a bid form, contractor qualifications, detailed project schedule, minimum three references for similar projects, Georgia licensing proof, insurance certificates, contractor affidavit/E-Verify compliance documentation, non-collusion affidavit, debarment and suspension certification, Davis-Bacon compliance acknowledgment, Build America, Buy America certification, and a bid bond equal to 10 percent of the total bid amount. Contractors must maintain workers compensation insurance with employer's liability of $200,000, comprehensive general liability of $1,000,000 per occurrence or $2,000,000 combined single limit, and automobile liability as specified in final contract documents. Performance and payment bonds of 100 percent are required. If the project is funded in whole or in part with federal funds, all applicable federal sourcing, Build America Buy America requirements, Davis-Bacon Act prevailing wage requirements, E-Verify compliance, federal debarment and suspension requirements, and applicable federal procurement, labor, environmental, reporting, and recordkeeping requirements shall apply.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Summary of engineered plans 10222026.docx | DOCX document | |
| FINAL ENGINEER PLANS 10022026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CITY OF SYLVANIA, GEORGIA
INVITATION FOR BIDS
COPPER REPLACEMENT PROJECT
1. PROJECT INFORMATION
Project Name: Copper Replacement Project
Owner: City of Sylvania
104 S. Main Street
Sylvania, GA 30467
The City of Sylvania is soliciting sealed bids from qualified contractors for the replacement of approximately 3.9 miles of existing overhead copper electrical conductor with 1 AWG aluminum wire and the replacement of approximately 95 failing electrical distribution poles, together with associated electrical distribution hardware upgrades.
The project is intended to improve the reliability and resilience of the City of Sylvania's electrical distribution system. The contractor will be responsible for all labor, equipment, installation, removal, testing, commissioning, and related services necessary to complete the project in accordance with the bid documents and applicable requirements.
2. SCOPE OF WORK
The Contractor shall furnish all labor, supervision, equipment, tools, transportation, and incidentals necessary to complete the project.
A. Conductor Replacement
• Replace approximately 3.9 miles of existing overhead copper electrical conductor.
• Install 1 AWG aluminum wire in accordance with applicable utility and electrical standards.
• Provide all installation, transfer, reconnection, and associated work required for a complete operating system.
B. Pole Replacement
• Replace approximately 95 failing electrical distribution poles.
• Provide proper placement, alignment, setting, and structural integrity of replacement poles.
• Remove existing poles designated for replacement and properly dispose of removed materials.
C. Hardware Upgrades
• Upgrade or replace crossarms, insulators, connectors, grounding components, and other distribution hardware as required.
• Ensure all installations meet applicable utility, electrical, and safety standards.
D. Electrical Integration
• Transfer and reconnect conductors and associated electrical equipment.
• Maintain service continuity to the maximum extent possible.
• Coordinate planned outages with the City.
• Verify proper load distribution and system functionality following construction.
E. Testing & Commissioning
• Perform system testing necessary to verify the completed work.
• Provide inspection and testing documentation confirming compliance.
F. Engineering & Permitting
• Coordinate with the City on field adjustments and construction conditions.
• Obtain permits required for the Contractor's work if not already secured by the City.
G. Project Closeout
• Provide as-built documentation.
• Submit final inspection and testing reports.
• Provide warranty documentation and other closeout information reasonably required by the City.
• Turn over the completed system to the City for operational management.
3. MATERIALS
The City shall furnish all materials necessary to complete the project. The bid shall include all labor, equipment, and incidental costs necessary for complete installation.
If the project is funded in whole or in part with federal funds, all applicable federal sourcing and Build America, Buy America requirements shall apply to materials as required by the funding source.
4. PROJECT SCHEDULE
• Notice to Proceed: Upon contract execution and issuance by the City
• Estimated Planning / Mobilization: Approximately 60 days
• Estimated Construction: Approximately 365 days / 12 months
• Testing & Commissioning: Approximately 30 days
• Estimated Total Project Duration: Approximately 14 months
Contractor shall submit a detailed project schedule with the bid.
5. BID REQUIREMENTS
A. Bid Submission
Sealed bids must be submitted to:
City of Sylvania
104 S. Main Street
Sylvania, GA 30467
Bid Due Date: January 13, 2027
Time: 11:00am
Clearly marked: "COPPER REPLACEMENT PROJECT"
B. Required Contents
• Bid Form
• Contractor Qualifications
• Detailed Project Schedule
• References (minimum 3 similar projects)
• Proof of Georgia Licensing
• Insurance Certificates or evidence of insurability
• Contractor Affidavit / E-Verify Compliance
• Non-Collusion Affidavit
• Debarment and Suspension Certification, if federally funded
• Davis-Bacon Compliance Acknowledgment, if federally funded
• Build America, Buy America (BABA) Certification, if federally funded
• Bid Bond (10% of the total bid amount)
• Acknowledgment of Addenda
6. CONTRACTOR QUALIFICATIONS
• Have demonstrated experience with electrical distribution construction, conductor replacement, and/or pole replacement.
• Demonstrate successful completion of similar projects.
• Be properly licensed in Georgia for the work being performed.
• Provide at least three references for comparable work.
• Not be debarred, suspended, or otherwise ineligible for applicable public or federal contracting.
7. FEDERAL & STATE REQUIREMENTS
Where applicable based on the project's funding source, the project is subject to:
• Davis-Bacon Act and applicable prevailing wage requirements
• Build America, Buy America (BABA)
• E-Verify Compliance (O.C.G.A. § 13-10-91)
• Federal Debarment and Suspension Requirements
• Applicable federal procurement, labor, environmental, reporting, and recordkeeping requirements
Contractor shall support all required reporting, including:
• Progress reports
• Project documentation and photographs
• Certified payroll reports where required
• Compliance documentation
8. INSURANCE REQUIREMENTS
Contractor shall provide insurance meeting the City's requirements and the final contract documents, including:
• Workers Compensation – Statutory; Employer's Liability: $200,000.
• Comprehensive General Liability – $1,000,000 each occurrence or $2,000,000 combined single limit.
• Property Damage liability shall provide Explosion, Collapse and Underground coverage where applicable.
• Personal Injury, with employment exclusion deleted: $1,000,000 annual aggregate.
• Automobile Liability – limits to be specified in the final contract.
• Contractor shall show the City as additional insured where required.
These requirements are based on the City's existing insurance requirements. Final contract requirements shall control.
A. Bid Bond
Each bid must be accompanied by a bid bond in an amount not less than ten percent (10%) of the total bid amount. The bid bond shall be issued by a surety company authorized to conduct business in the State of
Georgia and shall be payable to the City of Sylvania.
The bid bond shall guarantee that the successful bidder will, if awarded the contract, execute the contract and furnish the required performance and payment bonds within the time specified by the City. Failure to do so may result in forfeiture of the bid bond, subject to applicable law and the terms of the bid bond.
The bid bond shall be submitted with the bid. A bid submitted without the required bid bond may be deemed nonresponsive. The City reserves the right to review and approve the form and sufficiency of the bid bond.
9. BID, PERFORMANCE & PAYMENT BONDS
B. Performance and Payment Bonds
• 100% Performance Bond required.
• 100% Payment Bond required.
Bond requirements shall be consistent with applicable City procurement requirements and the final contract documents.
10. BID EVALUATION CRITERIA
Bids will be evaluated based on:
• Total cost of the project
• Relevant electrical distribution experience
• Ability to meet the required schedule
• Compliance with bid and applicable funding requirements
• References and demonstrated performance
• Responsiveness and responsibility of the bidder
The City reserves the right to reject any or all bids and to make an award in accordance with applicable law and
City procurement requirements.
11. RESPONSIBILITY FOR EXISTING INFRASTRUCTURE
• Contractor shall protect existing City utilities, electrical infrastructure, roads, property, and other facilities.
• Contractor shall be responsible for damage caused by its negligence or failure to exercise reasonable care.
• Contractor shall coordinate work with City staff and minimize disruption to electric service.
12. GENERAL CONDITIONS
• The City reserves the right to reject any or all bids.
• Work must minimize disruption to electric service.
• Contractor must coordinate closely with City staff.
• Contractor shall comply with all applicable laws, ordinances, codes, safety requirements, and utility standards.
• Contractor shall maintain a safe and orderly work site and remove debris generated by its work.
• Changes to the scope or contract price must be authorized in writing by the City.
Compliance Note:
If federal funding applies, the Contractor shall cooperate with all required federal compliance, reporting, labor standards, sourcing, and recordkeeping measures.
13. PRE-BID MEETING
Date: December 8, 2026
Time: 11:00am
Location: City Hall,104 S Main St, Sylvania, GA 30467
Attendance: Non-Mandatory
14. QUESTIONS
Contact:
Stacy Mathis, City Manager, csylv@planters.net
Jimmie Cason, Utility Director, cosjcason@planters.net
Dylan Mathis, dmathis@planters.net mailto:csylv@planters.net mailto:cosjcason@planters.net mailto:dmathis@planters.net
15. BID FORM
Project: Copper Replacement Project
Owner: City of Sylvania
A. BIDDER INFORMATION
Company Name: __________________________________________
Address: __________________________________________
City/State/Zip: __________________________________________
Phone: __________________________________________
Email: __________________________________________
Authorized Representative: __________________________________________
Title: __________________________________________
B. BASE BID
The undersigned agrees to provide all labor, equipment, supervision, materials, installation, removal, testing, and incidentals necessary to complete the project as specified.
Total Lump Sum Bid:
C. PROJECT SCHEDULE
Proposed Start Date: __________________________________________
Estimated Completion Time: __________________________________________
D. ACKNOWLEDGEMENTS
• The bid has been prepared after review of the complete bid packet.
• The bid includes all labor, equipment, supervision, materials, installation, testing, and incidentals necessary to complete the work.
• The bidder will comply with applicable City, state, and federal requirements.
• The bidder will comply with Davis-Bacon and BABA requirements when applicable.
• The bidder acknowledges receipt of all addenda issued by the City.
Addenda Received (list):
E. SIGNATURE
The undersigned certifies that this bid is submitted in good faith and without collusion.
Signature: __________________________________________
Printed Name: __________________________________________
Title: __________________________________________
Date: __________________________________________
16. CONTRACTOR AFFIDAVIT (E-VERIFY COMPLIANCE)
(O.C.G.A. § 13-10-91)
By executing this affidavit, the undersigned contractor verifies compliance with the Georgia Security and
Immigration Compliance Act.
The undersigned contractor hereby attests that:
• The contractor is registered with and participates in the federal work authorization program (E-Verify).
• The contractor will continue to use E-Verify throughout the contract period.
• The contractor will only subcontract with entities that also comply with applicable E-Verify requirements.
Name of Contractor: __________________________________________
Name of Project: Copper Replacement Project – City of Sylvania
Public Employer: City of Sylvania __________________________________________
Federal Work Authorization User Identification Number:
Date of Authorization: __________________________________________
I hereby declare under penalty of perjury that the foregoing is true and correct.
Executed on __________________________________________
Signature of Authorized Officer or Agent: __________________________________________
Printed Name and Title: __________________________________________
SUBSCRIBED AND SWORN BEFORE ME
on this __________________________________________
Notary Public: __________________________________________
My Commission Expires: __________________________________________
17. NON-COLLUSION AFFIDAVIT
Project: Copper Replacement Project
Owner: City of Sylvania
STATE OF __________________________________________
COUNTY OF __________________________________________
The undersigned bidder, being duly sworn, deposes and says:
• The bid submitted is genuine and not collusive or sham.
• The bidder has not colluded, conspired, connived, or agreed, directly or indirectly, with any other bidder or person to put in a sham bid or to refrain from bidding.
• The bidder has not sought by agreement or collusion to fix the bid price or any element thereof.
• The bidder has not paid or agreed to pay any person, other than a bona fide employee, any fee, commission, percentage, or brokerage fee contingent upon the award of the contract.
• The bidder has not disclosed the bid price to any other bidder prior to bid opening.
Company Name: __________________________________________
Authorized Representative: __________________________________________
Signature: __________________________________________
Date: __________________________________________
SUBSCRIBED AND SWORN BEFORE ME
on this __________________________________________
Notary Public: __________________________________________
My Commission Expires: __________________________________________
18. DEBARMENT AND SUSPENSION CERTIFICATION
Federal Requirement (2 CFR Part 180 & 2 CFR Part 3000)
Project: Copper Replacement Project – City of Sylvania
The undersigned certifies that neither the contractor nor its principals:
• Are presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any federal department or agency.
• Have been convicted or had a civil judgment rendered against them for fraud or criminal offenses related to public contracts.
• Are currently indicted or otherwise criminally or civilly charged by a governmental entity.
• Have had one or more public transactions terminated for cause or default within the past three (3) years.
If unable to certify to any of the above, the bidder shall attach an explanation.
Company Name: __________________________________________
Authorized Representative: __________________________________________
Signature: __________________________________________
Title: __________________________________________
Date: __________________________________________
19. DAVIS-BACON ACT COMPLIANCE ACKNOWLEDGMENT
Project: Copper Replacement Project – City of Sylvania
Where applicable, the undersigned contractor acknowledges and agrees that:
• The project is subject to the Davis-Bacon Act and applicable prevailing wage requirements.
• The contractor will pay laborers and mechanics at least the applicable prevailing wage rates determined by the U.S. Department of Labor.
• The contractor will submit certified payroll reports as required.
• The contractor will maintain payroll records and make them available for inspection.
• The contractor will comply with applicable labor standards, overtime, and recordkeeping requirements.
• The contractor will ensure applicable subcontractors comply with Davis-Bacon requirements.
Company Name: __________________________________________
Authorized Representative: __________________________________________
Signature: __________________________________________
Title: __________________________________________
Date: __________________________________________
20. BUILD AMERICA, BUY AMERICA (BABA) CERTIFICATION
Project: Copper Replacement Project – City of Sylvania
Where applicable, the undersigned contractor acknowledges that the project is subject to Build America, Buy
America requirements and agrees:
• To cooperate with the City in ensuring applicable materials comply with BABA requirements.
• To provide documentation as requested to verify compliance.
• Not to substitute materials without prior written approval from the City when approval is required.
• To ensure incidental materials provided by the Contractor meet applicable federal sourcing requirements.
Company Name: __________________________________________
Authorized Representative: __________________________________________
Signature: __________________________________________
Title: __________________________________________
Date: __________________________________________