This document is a Scope of Work Estimate for the City of LaGrange Police Department in LaGrange, Georgia. The estimate covers roof repair work including the removal and replacement of single-ply roofing membrane, insulation, flashings, venting, and other components across six different roof areas on the two-story police department building. The scope provides detailed line item descriptions, quantities, and pricing for the roofing work. No allowance has been made for overtime or premium time, and the work is to be done during normal business hours. Testing and removal of hazardous materials is not included. The estimate was prepared by Young & Associates based on an inspection conducted on October 18, 2023, with a claim date of March 26, 2023.

The total estimated cost for the roof repair work is provided, along with line items for debris removal, temporary toilet, supervision/project management, and taxes/permits/fees. No information is given regarding procurement timelines, award criteria, funding sources, or contracting requirements. The document appears to be an internal estimate provided by the insurance adjuster to the City of LaGrange for the covered roof damage.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

YOUNG & Associates

Atlanta, GA

Insured: City of LaGrange - Police Dept Property: 100 W. Haralson St

LaGrange, GA 30240

Claim Rep.: John Belton Business: (628) 210-7781 E-mail: john.belton@mclarens.comPosition: Executive General Adjuster

Company: McLarens

Estimator: Trey Sullivan Cellular: (727) 423-9802 E-mail: trey.sullivan@youngonline.

com Position: Regional Consultant

Company: Young & Associates

Claim Number: VARIOUS - MARKET Policy Number: VARIOUS - MARKET Type of Loss: Hail

SHARE SHA

Date Contacted: 10/13/2023 12:30 PM Date of Loss: 3/26/2023 12:00 PM Date Received: 10/12/2023 3:00 PM

Date Inspected: 10/18/2023 10:30 AM Date Entered: 11/7/2023 3:32 PM

Price List: GACA8X_NOV23 Restoration/Service/Remodel

Estimate: CITY-LAGRANGE-POLICE

This scope of work is based on a visual inspection from 10.18.23 and is based on all work being done during normal business hours. No allowance has been made for overtime or premium time. This scope of work is based on a replacement basis and does not include code upgrades or emergency services.

Testing and/or removal of hazardous materials is not included in this scope document.

The intent of this document is to show repair quantities with the thought process of restoring the building to pre-loss condition.

The accuracy of these quantities/prices should be verified by the insured or their contractor and any proposals for the work should include all work required to restore the building to its pre-loss condition regardless of whether the trade description and quantities are shown in this document. Any potential discrepancies should be brought to our attention, in a timely manner, in order to come to an agreed scope of repair.

YA #SE-20231242

Atlanta, GA

CITY-LAGRANGE-POLICE 1/2/2024 Page: 2

CITY-LAGRANGE-POLICE

Roof 1

DESCRIPTION QTY

Roof Covering

1. Remove Single-ply membrane - Fully adhered system - 60 mil 47.16 SQ

2. Remove Additional charge for high roof (2 stories or greater) 47.16 SQ

3. Single-ply membrane - Fully adhered system - 60 mil 51.88 SQ

Includes 10% waste factor.

4. Additional charge for high roof (2 stories or greater) 47.16 SQ

5. R&R Flash parapet wall only - PVC/TPO - up to 3' 223.00 LF

Underlayment

6. Remove Insulation - ISO board, 3 1/2" 47.16 SQ

7. Insulation - ISO board, 3 1/2" 47.16 SQ

8. Tapered ISO (crickets) at drains 2.00 EA

Allowance for tapered crickets at drains.

9. R&R Membrane roofing - cant strips - perlite 223.00 LF

Flashings

10. Roof drain cover - Detach & reset 2.00 EA

11. R&R Roof scupper - PVC/TPO clad aluminum 3.00 EA

12. R&R Aluminum wall coping 223.00 LF

13. R&R Drip edge - PVC/TPO clad metal 70.00 LF

14. R&R Flashing - pipe jack 3.00 EA

15. R&R Aluminum termination bar / flashing for membrane roofs 223.00 LF

16. R&R Counterflashing - Apron flashing 90.00 LF

17. R&R Curb flashing - PVC/TPO 59.00 LF

Venting

18. R&R Gravity roof ventilator - 18" 1.00 EA

Miscellaneous

19. Roofer - per hour 16.00 HR

Additional labor allowance for installation of crickets, drains, curb flashing, and penetration flashing.

Coolant line insulation wrap

20. R&R Fiberglass pipe insulation - 2" wall for 4 1/2" to 6" pipe 98.00 LF

21. Plumber - per hour 8.00 HR

Additional labor allowance for working on limited access 2 story roof.

Atlanta, GA

CITY-LAGRANGE-POLICE 1/2/2024 Page: 3

CONTINUED - Roof 1

DESCRIPTION QTY

NOTES:

Roof 2

DESCRIPTION QTY

Roof Covering

22. Remove Single-ply membrane - Mechanically attached - 60 mil 9.00 SQ

23. Remove Additional charge for high roof (2 stories or greater) 9.00 SQ

24. Single-ply membrane - Mechanically attached - 60 mil 9.90 SQ

Includes 10% waste factor.

25. Additional charge for high roof (2 stories or greater) 9.00 SQ

Underlayment

26. Remove Insulation - ISO board, 4" 9.00 SQ

27. Insulation - ISO board, 4" 4.00 SQ

28. Tapered ISO (crickets) at drains 3.00 EA

Allowance for tapered crickets at drains.

Flashings

29. Roof drain cover - Detach & reset 3.00 EA

30. R&R Aluminum wall coping 140.00 LF

31. R&R Drip edge - PVC/TPO clad metal 140.00 LF

32. R&R Flashing - pipe jack 1.00 EA

Miscellaneous

33. Roofer - per hour 6.00 HR

Additional labor allowance for installation of crickets, drains, curb flashing, and penetration flashing.

Atlanta, GA

CITY-LAGRANGE-POLICE 1/2/2024 Page: 4

CONTINUED - Roof 2

DESCRIPTION QTY

NOTES:

Roof 3

DESCRIPTION QTY

Roof Covering

34. Remove Single-ply membrane - Mechanically attached - 60 mil 1.78 SQ

35. Remove Additional charge for high roof (2 stories or greater) 1.78 SQ

36. Single-ply membrane - Mechanically attached - 60 mil 1.96 SQ

Includes 10% waste factor.

37. Additional charge for high roof (2 stories or greater) 1.78 SQ

38. R&R Flash parapet wall only - PVC/TPO - up to 3' 40.00 LF

Underlayment

39. Remove Insulation - ISO board, 4" 1.78 SQ

40. Insulation - ISO board, 4" 1.78 SQ

41. Tapered ISO (crickets) at drains 1.00 EA

Allowance for tapered crickets at drains.

Flashings

42. Roof drain cover - Detach & reset 1.00 EA

43. R&R Aluminum wall coping 50.00 LF

Miscellaneous

44. Roofer - per hour 4.00 HR

Additional labor allowance for installation of crickets, drains, curb flashing, and penetration flashing.

NOTES:

Atlanta, GA

CITY-LAGRANGE-POLICE 1/2/2024 Page: 5

Roof 4

DESCRIPTION QTY

Roof Covering

45. Remove Single-ply membrane - Fully adhered system - 60 mil 14.72 SQ

46. Remove Additional charge for high roof (2 stories or greater) 14.72 SQ

47. Single-ply membrane - Fully adhered system - 60 mil 16.19 SQ

Includes 10% waste factor.

48. Additional charge for high roof (2 stories or greater) 14.72 SQ

49. R&R Flash parapet wall only - PVC/TPO - up to 3' 70.00 LF

Underlayment

50. Remove Insulation - ISO board, 3 1/2" 14.72 SQ

51. Insulation - ISO board, 3 1/2" 14.72 SQ

52. Tapered ISO (crickets) at drains 1.00 EA

Allowance for tapered crickets at drains.

53. R&R Membrane roofing - cant strips - perlite 70.00 LF

Flashings

54. Roof drain cover - Detach & reset 1.00 EA

55. R&R Aluminum wall coping 70.00 LF

56. R&R Curb flashing - PVC/TPO 12.00 LF

Miscellaneous

57. Roofer - per hour 3.00 HR

Additional labor allowance for installation of crickets, drains, curb flashing, and penetration flashing.

NOTES:

Roof 5

DESCRIPTION QTY

Roof Covering

58. Remove Single-ply membrane - Fully adhered system - 60 mil 25.90 SQ

59. Remove Additional charge for high roof (2 stories or greater) 25.90 SQ

60. Single-ply membrane - Fully adhered system - 60 mil 28.49 SQ

Includes 10% waste factor.

Atlanta, GA

CITY-LAGRANGE-POLICE 1/2/2024 Page: 6

CONTINUED - Roof 5

DESCRIPTION QTY

61. Additional charge for high roof (2 stories or greater) 25.90 SQ

62. R&R Flash parapet wall only - PVC/TPO - up to 3' 150.00 LF

Underlayment

63. Remove Insulation - ISO board, 3 1/2" 25.90 SQ

64. Insulation - ISO board, 3 1/2" 25.90 SQ

65. Tapered ISO (crickets) at drains 2.00 EA

Allowance for tapered crickets at drains.

66. R&R Membrane roofing - cant strips - perlite 270.00 LF

Flashings

67. Roof drain cover - Detach & reset 2.00 EA

68. R&R Roof scupper - PVC/TPO clad aluminum 4.00 EA

69. R&R Aluminum wall coping 150.00 LF

70. R&R Drip edge - PVC/TPO clad metal 30.00 LF

71. R&R Aluminum termination bar / flashing for membrane roofs 120.00 LF

72. R&R Counterflashing - Apron flashing 120.00 LF

73. R&R Curb flashing - PVC/TPO 32.00 LF

Miscellaneous

74. Roofer - per hour 8.00 HR

Additional labor allowance for installation of crickets, drains, curb flashing, and penetration flashing.

NOTES:

Roof 6

DESCRIPTION QTY

Roof Covering

75. Remove Single-ply membrane - Fully adhered system - 60 mil 8.00 SQ

76. Remove Additional charge for high roof (2 stories or greater) 8.00 SQ

Atlanta, GA

CITY-LAGRANGE-POLICE 1/2/2024 Page: 7

CONTINUED - Roof 6

DESCRIPTION QTY

77. Single-ply membrane - Fully adhered system - 60 mil 8.80 SQ

Includes 10% waste factor.

78. Additional charge for high roof (2 stories or greater) 8.00 SQ

Underlayment

79. Remove Insulation - ISO board, 3 1/2" 8.00 SQ

80. Insulation - ISO board, 3 1/2" 8.00 SQ

81. R&R Membrane roofing - cant strips - perlite 100.00 LF

Flashings

82. R&R Flashing - pipe jack 2.00 EA

83. R&R Aluminum termination bar / flashing for membrane roofs 100.00 LF

84. R&R Drip edge - PVC/TPO clad metal 60.00 LF

85. R&R Counterflashing - Apron flashing 100.00 LF

86. R&R Curb flashing - PVC/TPO 8.00 LF

Miscellaneous

87. Roofer - per hour 8.00 HR

Additional labor allowance for installation of crickets, drains, curb flashing, and penetration flashing.

NOTES:

General Conditions

DESCRIPTION QTY

Debris Removal

88. Dumpster load - Approx. 30 yards, 5-7 tons of debris 4.00 EA

89. General Laborer - per hour 40.00 HR

Labor allowance for staging materials and daily job site clean up.

General Items

90. Temporary toilet (per month) 1.00 MO

Atlanta, GA

CITY-LAGRANGE-POLICE 1/2/2024 Page: 8

CONTINUED - General Conditions

DESCRIPTION QTY

Supervision/Admin

91. Commercial Supervision / Project Management - per hour 40.00 HR

Permits/Fees

92. Taxes, insurance, permits & fees (Bid Item) 1.00 EA

As Incurred.

NOTES:

Grand Total Areas:

0.00 SF Walls 0.00 SF Ceiling SF Walls and Ceiling0.00

0.00 SF Floor 0.00 SY Flooring 0.00 LF Floor Perimeter

0.00 SF Long Wall 0.00 SF Short Wall 0.00 LF Ceil. Perimeter

0.00 Floor Area 0.00 Total Area 0.00 Interior Wall Area

1,972.61 Exterior Wall Area 0.00 Exterior Perimeter of

Walls

10,476.50 Surface Area 104.77 Number of Squares 946.47 Total Perimeter Length

0.00 Total Ridge Length 0.00 Total Hip Length

CITY-LAGRANGE-POLICE 1/2/2024 Page: 9

Roof

Roof5 F5

Roof4

F4

Roof1

F1

Roof3

F1

Roof6

F1

Roof2 F2

Roof5 F5

Roof4

F4

Roof1

F1

Roof3

F1

Roof6

F1

Roof2 F2

Roof

46' 3"

45' 10"

20' 8"

' 3

25' 2"

' 3

' 3

' 4

20' 8"

' 8

18' 4"

65' 2"

104' 2"

11'

' 1

' 1

18' 2"

7'

31' 8"

4'

21' 4"

' 6

34' 10"

' 6

' 6

40' 3"

10' 3"

30'

Coversheet
Line Item Detail
Line Item Detail
Line Item Detail
Line Item Detail
Line Item Detail
Line Item Detail
Line Item Detail

Sketch

File details come from the government source that posted it. Updated .