This is a Project Manual and bidding document package for the City of Jennings, Louisiana, for roadway improvements to West Interstate Drive and Walmart Drive in Jefferson Davis Parish. The project involves constructing roadway improvements including a new lane adjacent to existing roadway, drainage improvements, and milling and overlay of existing roadway. The work is broken down into unit price bid items covering clearing and grubbing, pavement removal, excavation, drainage pipe installation, curbing, asphalt and concrete paving, pavement markings, and related site work. Bidders must hold a commercial contractor's license with a classification in "Highway, Street, and Bridge Construction." Bids are due electronically by November 9, 2026, at 10:00 a.m. local time, with public bid opening at Jennings City Hall. A non-mandatory pre-bid conference is scheduled for October 29, 2026, at 2:00 p.m. The Successful Bidder must execute the contract and furnish required bonds and insurance documentation within 10 days of the Notice of Award, with the contract period to be specified in the executed agreement.

The bid is requested on a unit price basis with estimated quantities provided for approximately 45 line items ranging from clearing and grubbing (1 lump sum) to pavement striping and markings (multiple linear feet quantities). Bid security equal to five percent of the maximum bid price is required in the form of a bid bond. The project is exempt from state sales and use taxes (Exemption No. 1313097-001). Contractors must maintain comprehensive insurance coverage including worker's compensation, general liability ($1,000,000 per occurrence), automobile liability, umbrella coverage ($5,000,000), and Owner's Contractor Protective Liability insurance, with all policies naming the City of Jennings as an additional insured. Performance and payment bonds equal to the contract price are required. The document includes standard Louisiana public works attestation requirements regarding criminal convictions, employee verification of legal work status, and non-collusion affidavits. Subcontractor listings must be submitted within ten days of bid opening. No incumbents or set-asides are identified in the bidding documents.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

FOR

WEST INTERSTATE DR. AND WALMART DR. ROADWAY IMPROVEMENTS

Prepared For

CITY OF JENNINGS

JEFFERSON DAVIS PARISH, LA

October 2026

Bluewing Civil Consulting, LLC

Alex Guillory, PE, CFM

Firm License No. EF 5887

WEST INTERSTATE DR. AND WALMART DR. ROADWAY IMPROVEMENTS

CITY OF JENNINGS

BWC PROJECT NO. 226011

TABLE OF CONTENTS

SECTION BID PHASE DOCUMENTS

00100 ADVERTISEMENT FOR BIDS

00105 INSTRUCTIONS TO BIDDERS

00106 INSURANCE REQUIREMENTS

00110 BID PROPOSAL (LOUISIANA UNIFORM PUBLIC WORK BID FORM)

00115 BID BOND

FORMS TO BE SUBMITTED WITHIN 10 DAYS OF THE BID OPENING

00200 ATTESTATION CLAUSE

00205 EMPLOYEE VERIFICATION AFFIDAVIT

00210 00215

NON-COLLUSION AFFIDAVIT

SUBCONTRACTOR LISTING

POST BID CONTRACT RELATED DOCUMENTS

00300 NOTICE OF AWARD

00305 PERFORMANCE BONDS

00310 PAYMENT BOND

00315 CONTRACT AGREEMENT

00320 DESIGNATION OF CONSTRUCTION CONTRACTOR AS AGENT OF A GOVERNMENTAL

ENTITY AND EXEMPTION CERTIFICATE

00325 NOTICE TO PROCEED

00330 WORK CHANGE DIRECTIVE

00335 CHANGE ORDER

00340 FIELD ORDER

00345 CERTIFICATE OF SUBSTANTIAL COMPLETION

00350 NOTICE BY OWNER OF ACCEPTANCE OF WORK

00355 APPLICATION OF PAYMENT

00370 FIREARM ENTITY NON-DISCRIMINATION CERTIFICATION

GENERAL/SUPPLEMENTARY CONDITIONS

00400 STANDARD GENERAL CONDITIONS

00405 SUPPLEMENTARY CONDITIONS

00415 TECHNICAL PROVISIONS

BID PHASE DOCUMENTS

00100

EJCDC® C-111, Advertisement for Bids for Construction Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

ADVERTISEMENT FOR BIDS

City of Jennings Jennings, Louisiana

West Interstate Dr. and Walmart Dr. Roadway Improvements

General Notice

City of Jennings (Owner) is requesting Bids for the construction of the following Project:

West Interstate Dr. and Walmart Dr. Roadway Improvements

Engineer’s Project No.: 226011

Bids for the construction of the Project will only be received electronically. No physical bid will be accepted for this project. Bids will be received until November 9, 2026 at 10:00 A.M., local time. At that time, the Bids received will be publicly read at Jennings City Hall, 154, N Main St, Jennings, LA 70546.

The Project includes the following Work:

Construct roadway improvements, including the construction of a new lane adjacent to the existing roadway, drainage improvements, and milling and overlay of the existing roadway.

Bids are requested for the following Contract: West Interstate Dr. and Walmart Dr. Roadway Improvements. Bidders must hold a commercial contractor’s license as well as a classification in “Highway, Street, and Bridge Construction”.

Obtaining the Bidding Documents

The Issuing Office for the Bidding Documents is:

Bid Express

Prospective Bidders may obtain complete Bidding Documents from www.bidexpress.com. Printed copies are not available from the Project Designer but arrangements can be made to obtain them through most reprographic firms. Plan holders are responsible for their own reproduction costs

Pre-bid Conference

A non-mandatory pre-bid conference for the Project will be held on Thursday, October 29, 2026 at 2:00 p.m. at Jennings City Hall located at 154 N Main St, Jennings, LA 70546.

Instructions to Bidders.

For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.

This Advertisement is issued by:

Owner: City of Jennings By: Henry Guinn Title: Mayor Publish Dates: October 14, 2026, October 21, 2026, October 28, 2026

00105

EJCDC® C-200, Instructions to Bidders for Construction Contract.

Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved.

TOC Page1 of 1

THE INSTRUCTIONS TO BIDDERS FOR CONSTRUCTION

CONTRACT

TABLE OF CONTENTS

Page

Article 1— Defined Terms

Article 2— Bidding Documents

Article 3— Qualifications of Bidders

Article 4— Pre-Bid Conference

Article 5— Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program; Other Work at the Site

Article 6— Bidder’s Representations and Certifications

Article 7— Interpretations and Addenda

Article 8— Bid Security

Article 9— Contract Times

Article 10— Substitute and “Or Equal” Items

Article 11— Subcontractors, Suppliers, and Others

Article 12— Preparation of Bid

Article 13— Basis of Bid

Article 14— Submittal of Bid

Article 15— Modification and Withdrawal of Bid

Article 16— Opening of Bids

Article 17— Bids to Remain Subject to Acceptance

Article 18— Evaluation of Bids and Award of Contract

Article 19— Bonds and Insurance

Article 20— Signing of Agreement

Article 21— Sales and Use Taxes

This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.

ARTICLE 1—DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office—The office from which the Bidding Documents are to be issued, and which registers plan holders.

ARTICLE 2—BIDDING DOCUMENTS

2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder’s responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.

2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.

2.03 Bidder may register as a plan holder and obtain complete sets of Bidding Documents, in the number and format stated in the Advertisement or invitation to bid, from the Issuing Office. Bidders may rely that sets of Bidding Documents obtained from the Issuing Office are complete, unless an omission is blatant. Registered plan holders will receive Addenda issued by Owner.

2.04 Plan rooms (including construction information subscription services, and electronic and virtual plan rooms) may distribute the Bidding Documents, or make them available for examination. Those prospective bidders that obtain an electronic (digital) copy of the Bidding Documents from a plan room are encouraged to register as plan holders from the Bidding Documents Website or Issuing Office. Owner is not responsible for omissions in Bidding Documents or other documents obtained from plan rooms, or for a Bidder’s failure to obtain Addenda from a plan room.

2.05 Electronic Documents

A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.

1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader Version 9.1 or later. It is the intent of the Engineer and Owner that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because the Owner and Engineer cannot totally control the transmission and receipt of Electronic Documents nor the Contractor’s means of reproduction of such documents, the Owner and Engineer cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.

B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.05.A above. However, Bidder assumes all risks associated with differences arising from

This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.

transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder’s reliance upon such derived information.

ARTICLE 3—QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within ten (10) days of Owner’s request, Bidder must submit the following information:

A. Written evidence establishing its qualifications such as financial data, previous experience, and present commitments.

B. A written statement that Bidder is authorized to do business in the state where the Project is located, or a written certification that Bidder will obtain such authority prior to the Effective Date of the Contract.

C. Bidder’s state or other contractor license number, if applicable.

D. Subcontractor and Supplier qualification information.

E. Other required information regarding qualifications.

3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

ARTICLE 4—PRE-BID CONFERENCE

4.01 A non-mandatory pre-bid conference will be held at the time and location indicated in the Advertisement or invitation to bid. Representatives of Owner and Engineer will be present to discuss the Project.

4.02 Information presented at the pre-Bid conference does not alter the Contract Documents. Owner will issue Addenda to make any changes to the Contract Documents that result from discussions at the pre-Bid conference. Information presented, and statements made at the pre-bid conference will not be binding or legally effective unless incorporated in an Addendum.

ARTICLE 5—SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF

SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE

5.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

5.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.

1. The Supplementary conditions identify the following regarding existing conditions at or adjacent to the Site:

a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.

b. Those drawings known to Owner of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.

c. Reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.

B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.

5.03 Other Site-related Documents

A. No other Site-related documents are available.

5.04 Site Visit and Testing by Bidders

A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.

B. Bidder must conduct the required Site visit during normal working hours.

C. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

D. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.

E. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.

F. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

5.05 Owner’s Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. If an Owner safety program exists, it will be noted in the Supplementary conditions.

5.06 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 6—BIDDER’S REPRESENTATIONS AND CERTIFICATIONS

6.01 Express Representations and Certifications in Bid Form, Agreement

A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder’s examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.

B. If Bidder is awarded the Contract, Bidder (as Contractor) will make similar express representations and certifications when it executes the Agreement.

ARTICLE 7—INTERPRETATIONS AND ADDENDA

7.01 Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents.

7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing.

7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

7.04 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.

ARTICLE 8—BID SECURITY

8.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of five (5) percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a Bid bond issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions. Such Bid bond will be issued in the form included in the Bidding Documents.

8.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.

and met the other conditions of the Notice of Award, whereupon the Bid security will be released.

If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 10 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a penal sum bid bond, and to the extent of Owner’s damages in the case of a damages-form bond. Such forfeiture will be Owner’s exclusive remedy if Bidder defaults.

8.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of 7 days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.

8.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.

ARTICLE 9—CONTRACT TIMES

9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.

9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

ARTICLE 10—SUBSTITUTE AND “OR EQUAL” ITEMS

10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least 14 days prior to the bid opening. Each such request must comply with the requirements of Paragraphs 7.05 and 7.06 of the General Conditions, and the review of the request will be governed by the principles in those paragraphs. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all registered Bidders. Bidders cannot rely upon approvals made in any other manner.

10.02 All prices that Bidder sets forth in its Bid will be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.

ARTICLE 11—SUBCONTRACTORS, SUPPLIERS, AND OTHERS

11.01 The apparent Successful Bidder, and any other Bidder so requested, must submit to Owner a list of the Subcontractors proposed for any work of the project via Subcontractor List Document with the 10 Day Documents.

11.02 If requested by Owner, such list must be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor or Supplier. If Owner or Engineer, after due investigation, has reasonable objection

This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.

to any proposed Subcontractor or Supplier, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder will submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

11.03 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors and Suppliers.

Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor or Supplier, so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.

ARTICLE 12—PREPARATION OF BID

12.01 The Bid Form is included with the Bidding Documents.

A. All blanks on the Bid Form must be completed electronically. A Bid price must be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”

12.02 Reserved

12.03 A Bid by a corporation must be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation must be shown.

12.04 A Bid by a partnership must be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address of the partnership must be shown.

12.05 A Bid by a limited liability company must be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm must be shown.

12.06 A Bid by an individual must show the Bidder’s name and official address.

12.07 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.

12.08 All names must be printed electronically.

12.09 The Bid must contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.

12.10 Postal and e-mail addresses and telephone number for communications regarding the Bid must be shown.

12.11 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder’s licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such

This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.

certification to the Bid. Bidder’s state contractor license number, if any, must also be shown on the Bid Form.

ARTICLE 13—BASIS OF BID

13.01 Unit Price

A. Bidders must submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity”, which Owner or its representative has set forth in the Bid Form, for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

ARTICLE 14—SUBMITTAL OF BID

14.01 The Bidding Documents include one Bid Form, and, if required, the Bid Bond Form. The Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 2 of the Bid Form electronically.

14.02 A Bid must be received no later than the date and time prescribed and at the place indicated in the Advertisement or invitation to bid, the designated portion of the Project for which the Bid is submitted, the name and address of Bidder, and must be accompanied by the Bid security and other required documents. In the case where the Bidder’s maximum Bid price is greater than or equal to $50,000, the bidder’s Louisiana Contractor’s License Number must also be plainly marked. LA R.S. §37:2163.A.(2): Any bid that does not require the Contractor to be licensed shall state the exemption and shall be treated as a lawful bid.

14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.

ARTICLE 15—MODIFICATION AND WITHDRAWAL OF BID

15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.

15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.

15.03 If within 48 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and

This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.

the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further bidding on the Work.

ARTICLE 16—OPENING OF BIDS

16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

ARTICLE 17—BIDS TO REMAIN SUBJECT TO ACCEPTANCE

17.01 As provided by LA R.S. 38:2215A., all Bids will remain subject to acceptance for forty-five (45) calendar days after the day of bid opening, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

A. LA R.S. §38:2215: The public entity and the lowest responsible and responsive bidder, by mutually written consent, may agree to extend the deadline for the award by one or more extensions of the 30-calender days.

ARTICLE 18—EVALUATION OF BIDS AND AWARD OF CONTRACT

18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.

18.02 Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible.

18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to Owner or Engineer, then Owner will reject the Bid as nonresponsive.

18.04 If Owner awards the contract for the Work, such award will be to the responsible Bidder submitting the lowest responsive Bid.

18.05 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

18.06 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 19—BONDS AND INSURANCE

19.01 Article 6 of the General Conditions, as may be modified by the Supplementary conditions, sets forth Owner’s requirements as to performance and payment bonds, other required bonds (if any), This document is a MODIFIED version of EJCDC® C-200, Copyright© 2018 by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, or is based in part on excerpts from copyrighted EJCDC documents. All rights reserved. Those portions of the text that originated in copyrighted EJCDC documents remain subject to the copyright.

and insurance. When the Successful Bidder delivers the executed Agreement to Owner, it must be accompanied by required bonds and insurance documentation.

19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing bid bonds as part of the bidding process.

ARTICLE 20—SIGNING OF AGREEMENT

20.01 When Owner issues a Notice of Award to the Successful Bidder, it will be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 10 days thereafter, Successful Bidder must execute and deliver the required number of counterparts of the Agreement and any bonds and insurance documentation required to be delivered by the Contract Documents to Owner. Within 60 days of Notice of Award, Owner will deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.

ARTICLE 21—SALES AND USE TAXES

21.01 Owner is exempt from state sales and use taxes on materials and equipment to be incorporated in the Work. (Exemption No. 1313097-001). Said taxes must not be included in the Bid. Refer to Paragraph SC-7.10 of the Supplementary conditions for additional information.

West Interstate Dr. and Walmart Dr. Roadway Improvements Insurance Requirements for Project 00106

Section A - Types of Coverage Required

Where applicable, any Contractor, Subcontractor, Consultant, Architect, Engineer, Other Professional or Vendor (hereinafter referred to as Contractor collectively), who performs services for the Owner in the amount of one hundred thousand dollars or greater shall maintain the following insurance coverage with insurances companies acceptable to the Owner. Those insurance companies must be rated in the current A.M. Best Rating Guide with an A-rating or better. If insurance requirements are included elsewhere within any other procurement documents, the requirements contained within this article shall supersede any such reference.

In connection therewith, the Contractor agrees to provide to the Owner, at the Contractor’s Expense and prior to any entry on the Owner’s property, proof of liability insurance coverage such forth. The Contractor agrees to furnish to the Owner certificates evidencing said insurance coverage for the full term of this agreement which certificates shall name the Owner as an additional named insured on all policies except errors and omissions policies and shall provide for thirty (30) days advanced written notice to the Owner in the event of cancellation or alteration of the policies.

The Contractor agrees to maintain the coverage limits and endorsements as listed herein. The Contractor obligation to provide the required insurance will not be waived by the Contractor’s failure to provide the certificate of insurance, the Owner’s acceptance of a certificate of insurance showing coverage varying from the required coverage, or the Owner’s allowance to commence work.

No work shall commence under any contract until the following insurance coverage is obtained by the Contractor:

(1) Worker’s Compensation (a)

(a) Standard Louisiana Coverage (Always Required) Worker’s Compensation coverage:

(i) should cover all employees, including owners, (ii) must be statutory for medical and indemnity and (iii) should have a minimum limit of:

Employer’s Liability - $1,000,000 each accident

$1,000,000 each employee – disease $1,000,000 policy limit – disease

(b) Maritime Coverage ☐ Required ☒ Not Required When specifically required by the Owner (as denoted with a “X” in the above “Required” box), the Contractor shall procure and maintain during the life of this contract a Worker’s Compensation Policy specifically covering maritime activities. The scope of the project will determine whether maritime insurance is required but if the project is going to be performed over any body of water, then this separate coverage should be obtained.

(2) Contractor’s Liability Insurance (Always Required)

(Note: The term Contractor refers collectively, where applicable, to any Contractor, Subcontractor, Consultant, Architect, Engineer, or Vendor performing services for the Owner) This insurance must be maintained for no less than three years after final completion.

(a) Contractor’s Comprehensive General Liability (“Claims Made Policies” may not be used)

$1,000,000 per occurrence $2,000,000 general aggregate (☒Limit applies to specific project☐Limit applies to policy) $1,000,000 products/completed operations aggregate $1,000,000 personal injury and advertising coverage

1. Products and completed operations coverage.

a. Such insurance must be maintained for three years after final payment.

b. Contractor shall furnish Owner and each other additional insured (as identified in the Supplementary Conditions or elsewhere in the Contract) evidence of continuation of such insurance at final payment and three years thereafter.

2. Blanket contractual liability coverage, including but not limited to coverage of Contractor’s contractual indemnity obligations in Paragraph 7.18.

3. Severability of interests and no insured-versus-insured or cross-liability exclusions.

4. Underground, explosion, and collapse coverage.

5. Personal injury coverage.

6. Additional insured endorsements that include both ongoing operations and products and completed operations coverage through ISO Endorsements CG 20 10 10 01 and CG 20 37 10 01 (together). If Contractor demonstrates to Owner that the specified ISO endorsements are not commercially available, then Contractor may satisfy this requirement by providing equivalent endorsements.

7. For design professional additional insureds, ISO Endorsement CG 20 32 07 04 “Additional Insured—Engineers, Architects or Surveyors Not Engaged by the Named Insured” or its equivalent.

8. Sudden and Accidental Pollution is required with minimum 30-day discovery 90-day reporting provision.

Commercial General Liability—Excluded Content: The commercial general liability insurance policy, including its coverages, endorsements, and incorporated provisions, must not include any of the following:

1. Any modification of the standard definition of “insured contract” (except to delete the railroad protective liability exclusion if Contractor is required to indemnify a railroad or others with respect to Work within 50 feet of railroad property).

2. Any exclusion for water intrusion or water damage.

3. Any provisions resulting in the erosion of insurance limits by defense costs other than those already incorporated in ISO form CG 00 01.

4. Any exclusion for the insured’s vicarious liability, strict liability, or statutory liability (other than worker’s compensation).

5. Any limitation or exclusion based on the nature of Contractor’s work.

6. Any professional liability exclusion broader in effect than the most recent edition of ISO form CG 22 79.

Sub Contractor Comprehensive General Liability Any Sub Contractors utilized on the project will be (☒ Required☐ Not Required ) to maintain the above comprehensive general liability policy limits.

(b) Contractor’s Automobile Liability (Owner, Non-Owned, and Hired Car)

$1,000,000 per occurrence Sub Contractor Automobile Liability Any Sub Contractors utilized on the project will be ( ☒Required☐ Not Required ) to maintain the above automobile liability policy limit.

(c) Contractor’s Umbrella Policy Unless specifically excluded for project specific reasons, the Contractor shall procure and maintain during the life of this contract an Umbrella Policy as follows:

$5,000,000 each occurrence $5,000,000 general aggregate Project The following underlying coverages must be included: General Liability, Auto, Employers Liability ☐ Coverage Specifically Excluded for Project

(3) Contractor’s Pollution Liability ☐Required ☒Not Required

When specifically required by the Owner (as denoted with an “X” in the above “Required” box), the Contractor shall procure and maintain during the life of this contract Contractors Pollution in a minimum amount of $1,000,000 (per occurrence) and $2,000,000 (general aggregate). This insurance must be maintained for no less than three years after final completion.

(4) Contractual Liability ☒Required ☐Not Required

Contractual Liability – Bodily Injury $1,000,000 Each Person $1,000,000 Each Accident

Contractual Liability – Property Damage $1,000,000 Each Accident $2,000,000 Annual Aggregate

(5) Owner’s Contractor Protective Liability Policy (OCP Policy) ☒Required ☐Not Required

When specifically required by the Owner (as denoted with an “X” in the above “Required” box), the Contractor shall procure and maintain during the life of this contract an Owner’s Contractor Protective Liability Policy (OCP) in a minimum amount of $1,000,000 (per occurrence) and $2,000,000 (general aggregate). This type of policy provides the Owner with separate coverage up to the above limits as opposed to shared coverage when the Owner is only named as an additional insured on the Contractor’s main policy.

Owner’s and Contractor’s Protective Liability (OCP): OCP insurance must:

1. be furnished by the contractor naming City of Jennings as the named insured

2. the policy period of the OCP insurance shall extend through final acceptance of the project.

3. the required combined single limit amount shall be as provided table 107-1 referenced in the Louisiana Department of Transportation and Development Standard Specifications for Roads and Bridges 2016 Edition Section 107.02 Permits, License, Taxes, and Insurance.

4. Owner’s and Contractor’s Protective Liability (OCP) and Other Property Insurance Deductibles: The purchaser of any required OCP, installation floater, or other property insurance will be responsible for costs not covered because of the application of a policy deductible.

a) The Owner’s and Contractor’s Protective Liability policy (or if applicable the installation floater) will be subject to a deductible amount of no more than $2,500.00 for direct physical loss in any one occurrence.

(6) Property Insurance (Builder’s Risk Insurance) ☒ Required ☐ Not Required

When specifically required by the Owner (as denoted with a “X” in the above “Required” box) the Contractor shall purchase and maintain property insurance covering the work site up to the full insurable value equal to the Contract sum and the insurance shall be endorsed to comply with any waiver of rights provisions. The property insurance shall be “All Risks Builder’s Risk Completed Value Form insurance or equivalent manuscript policy, and shall include without limitation, insurance against the perils of fire (with extended coverage) and physical loss or damage including, without duplication of coverage, theft including theft of materials whether or not attached to any structure, vandalism/malicious mischief, collapse, earthquake, windstorm, false work, testing and startup, temporary buildings and debris removal including demolition occasioned by enforcement of any law.

The property insurance shall also contain an endorsement or specific provision to cover damages, losses and expenses incurred in the repair or replacement of any insured property (including, but not limited to charges of engineers, architects, attorneys and others). The Property insurance also shall include by endorsement or special provision the following additional coverage elections: operational testing (if risk is present), off premises storage not on the site or in transit and property in transit. When required, no work may commence on the site until the Builder’s Risk Insurance is obtained.

The Contactor is to provide Builder’s Risk Insurance to protect the Owner, Architect, Engineer, Contractor, and any Subcontractors as to any interests that may exist. Until acceptance of work by the Owner, all work in connection with a particular contract is in the custody, charge and care of the Contractor who will take every necessary precaution against injury or damage to any part thereof whether arising from execution or from the non-execution of the work.

Contractor shall be responsible for payment of the deductible for Builder’s Risk Insurance or any other property coverage deemed required to be purchased for this Contract, whether acquired by the Owner or otherwise.

(7) Errors & Omissions Policy (Professional Liability Insurance) (Applicable Only to Professional Services Contracts including, but not limited to, Architect, Engineer, Consultant or Other Professional Contracts) ☐ Required ☒ Not Required

This policy covers negligent acts, errors and omissions in its performance of professional services with minimum policy limits of $2,000,000 per occurrence and 2,000,000 general aggregate.

Note that Builder’s Risk for Flood Coverage is separate and may need to be considered for any project work occurring in a flood prone area. For this project Builder’s Risk for Flood is☐ Required ☒ Not Required

Section B – Other Insurance Requirements

(1) Additional Insured Classification and Waiver of Subrogation (Always Required)

The Owner, and Engineer must be listed as an additional insured on all policies except for worker’s compensation and professional liability insurance policies. All policies will provide thirty-day written notice of cancellation. Waiver of subrogation will be given to the Owner and Engineer Consultant on all policies which mean that the Contractor’s insurer(s) will have no right of recovery or subrogation against the Owner.

Except for professional liability insurance, it is the intention of the parties that the insurance policy shall protect both parties and be the PRIMARY COVERAGE for any and all losses covered. Again, all policies required above shall be primary to any insurance carried by the Owner, Engineer, and Engineer’s Consultant. The insurance companies shall have no recourse against the Owner, Engineer, and Engineer’s Consultant for payment of any premiums or for assessments under any of the above policies.

Owner: City of Jennings P.O. Box 1249 Jennings, LA 70546

Engineer: Bluewing Civil Consulting, LLC P.O. Box 3384 Lafayette, LA 70502

Other: Walmart Inc Attn: Shelby Almeida (Ref: Jennings, LA , Store No. 06042 814 Respect Drive Bentonville, AR 72716

Other: Chick-Fil-A, Inc Attn: Legal Department – Real Estate (Site #06042) 5200 Buffington Road Atlanta, GA 30308

Project: West Interstate Dr. and Walmart Dr. Roadway Improvements

(2) Indemnification for all Contractors, Except for Architects, Engineers or Other Licensed Professionals (Always Required)

The Contractor will indemnify, defend, and hold harmless the Owner, including the Owner’s employees and agents, from and against any and all claims or liabilities, arising from the fault of the Contractor, its employees, subcontractors or agents in carrying out the Contractor s duties and obligations under the terms of this agreement. The Owner will indemnify, defend, and hold harmless the Contractor, including the Contractor s employees and agents, from and against any and all claims or liabilities, arising from the fault of the Owner, its employees or agents in carrying out the Owner s duties and obligations under the terms of any agreement. This section will survive the termination of any agreement. In the event that either party takes any action to enforce this mutual indemnity provision, the prevailing party shall be entitled to recover reasonable attorney’s fees and costs arising as a result thereof.

(3) Indemnification for Architects, Engineers or Other Licensed Professionals (Always Required)

The Contractor will indemnify and hold harmless the Owner, including employees and agents, from and against any and all claims or liabilities, arising from the fault of the Contractor, its employees, subcontractors or agents in carrying out the Contractors duties and obligations under the terms of this agreement. The Owner will indemnify and hold harmless the Contractor, including the Contractor s employees and agents, from and against any and all claims or liabilities, arising from the fault of the Owner, its employees or agents in carrying out the Owner s duties and obligations under the terms of any agreement.

This section will survive the termination of any agreement. In the event that either party takes any action to enforce this mutual indemnity provision, the prevailing party shall be entitled to recover reasonable attorney’s fees and costs arising as a result thereof.

(4) Statutory Employer Status (Always Required Except for Architects, Engineers or Other Licensed Professionals)

The Owner as principal whether as the direct or…