Turkey Creek Basin Micro-Detection Program
Solicitation number
PE-70760-NONST-2026-000000010
Issued by
Newton County, Georgia

About this file

The document is a Request for Proposal (RFP) issued by the Cities of Covington and Oxford in Georgia for Micro-Detection of Rain-Derived Inflow and Infiltration (RDII) services in the Turkey Creek Sanitary Sewer Basin. The project aims to identify and locate sources of inflow and infiltration in approximately 154,000 linear feet of sanitary sewer mains across both cities. Proposals are due on October 16, 2025, at 2:00 PM via QuestCDN, with questions accepted until October 9, 2025. The RFP evaluation will be finalized within 60 days of submission, with scoring based on team experience (20%), work plan (30%), service and support (5%), delivery schedule (10%), and cost (35%).

Funding for the project will be through local funds, with each city maintaining the option to select the same or different proponents for their respective service areas. The project will involve installing micro-detection meters, collecting field data, and producing comprehensive reports detailing ground water infiltration, RDII estimates, flow analysis, and prioritization of rehabilitation areas. The successful proponent will be required to provide performance and payment bonds, each equal to 100% of the contract price, and must have licensed engineers, documented experience with at least 500 level-only installations, and the ability to provide detailed work plans, data collection procedures, and final reporting in both online and printed formats.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Proposal for Services for Micro-Detection of Rain-Derived Inflow and Infiltration for the Turkey Creek Basin

OWNERS: City of Covington and City of Oxford

Project: Turkey Creek Basin Micro-Detection Program

Services: Micro-Detection of Rain Derived Inflow and Infiltration (RDII)

Proposal Due: October 16, 2025 at 2:00 PM via QuestCDN (questcdn.com)

The Cities of Covington and Oxford are soliciting proposals for Micro-Detection of RDII services in the

Turkey Creek Sanitary Sewer Basin. The services shall meet all aspects of the attached specifications.

Scoring criteria to compare proposals received will be done according to Section 2 herein and will be based on Team Experience and Qualifications, Work Plan, Service and Support, Delivery Schedule and Cost as described herein.

Complete digital specifications and contract documents are available at www.QuestCDN.com. Proponents may view the digital documents for free by entering this web address: https://cartersloope.com/outforbid or by entering the Quest project number 9872406 on the website’s search page. All questions regarding the proposal should be submitted to Patricia Rice via email to price@cartersloope.com by October 9, 2025 at

12:00 PM local time. All proposals should be submitted by 2:00 PM local time on October 16, 2025 to

Carter & Sloope, Inc. via QuestCDN. All other questions may be directed to the issuing office, Carter &

Sloope, Inc. 706-769-4119.

City of Covington and City of Oxford C&S Project No.: C8730.040 & O9800.011 Turkey Creek Basin Micro-Detection September 2025

Table of Contents

Section 1 Introduction & Project Overview……………………………………………………. ……..2

1.1 Purpose

1.2 Background

Section 2 General Instructions………………………………………………………………………….3

2.1 Submittal Instructions

2.2 Submittal Requirements

Section 3 General Terms and Conditions…………………………………………………………….. 7

3.1 Examination of RFP Document

3.2 No Gratuities or Favors

3.3 Accurate Information

3.4 Delivery and/or Storage of Equipment or Materials

3.5 Terms of Payment

3.6 Payment Bond

3.7 Performance Bond

3.8 Termination of Project

3.9 Contract Negotiations

3.10 Confidentiality

3.11 OWNERS and ENGINEER Rights

3.12 PROPONENT Guarantee

Section 4 Scope and Minimum Specifications…………………………………………………………9

4.1 Scope

4.2 Quality Assurance

4.3 Micro-Detection RDII Program Specifications

4.4 Project Locations, Traffic Control and Access

4.5 Equipment Specifications

4.6 Personnel Requirements

4.7 Field Data Collection Requirements

4.8 Data Review, Reporting and Deliverables

Appendices………………………………………………………………………………………..………13

I. TM – Flow Evaluation Summary II. Section 00610 - Performance Bond III. Section 00615 - Payment Bond

Section 1 – Introduction & Project Overview

Turkey Creek Basin Micro-Detection September 2025

Section 1 Introduction & Project Overview

1.1 Purpose

The Cities of Covington and Oxford (“Owners”) are requesting proposals to select a qualified company (“Proponent”) to provide Micro-Detection to identify Rainfall Derived Infiltration and Inflow (RDII). The purpose of this Request for Proposals is to solicit pricing and qualifications from qualified companies interested in and experienced in providing the services requested herein. The RFP evaluation and selection of a Proponent will be finalized within 60 days from the submittal date. Funding is through local funds.

1.2 Background

The Cities of Covington and Oxford have approximately 154,000 linear feet of various diameter sanitary sewer mains within the Turkey Creek Sanitary Sewer Basin. The Owners’ sanitary sewer is discharged to Newton County Water & Sewerage Authority’s (NCWSA) through the Turkey Creek Interceptor. In 2024, NCWSA completed a flow study for this Interceptor and identified significant increases in the flow resulting from RDII.

In order to accommodate future flows in the system, the Cities’ desire to identify inflow and infiltration to facilitate a future repair and rehabilitation project. Therefore, the Owners are moving forward with a micro-detection program to identify RDII contributors for effective rehabilitation efforts.

A Purchase Order will be issued by the OWNERS for the services provided based on the pricing negotiated for the program. Services related to the work will be authorized through separate contracts with each of the two Owners. Therefore, the OWNERS maintain the option to select the same Proponent or different Proponents for the project.

See the “Turkey Creek Basin Flow Monitoring Evaluation” in Appendix I for a map of sanitary sewer service areas.

Section 2 – General Instructions

Turkey Creek Basin Micro-Detection September 2025

Section 2 General Instructions

2.1 Submittal Instructions

Electronic proposals submitted via QuestCDN.com will be received until Thursday, October 16, 2025, at 2:00 PM, local time.

Questions shall be submitted in writing via email to Patricia Rice at price@cartersloope.com. RFI’s will be accepted until 12:00 PM on Thursday, October 9, 2025. If needed, an Addendum addressing any questions received prior to the cut-off date will be issued by 12:00 PM on Monday, October13, 2025.

Proposals will be evaluated by the OWNERS and ENGINEER based on the following:

Evaluation Criteria Weight %

Team Experience and Qualifications 20% Work Plan 30% Service and Support 5% Delivery Schedule 10% Cost 35%

Any proposal received after said time and date will not be considered by the Owners. No proposal may be withdrawn after the closing time for the receipt of proposals for sixty (60) days except as provided by State law.

2.2 Submittal Requirements

Proposals shall be limited to a total page count of 60 pages or less, 8.5 x 11-inch equivalent, typed in an 11-point font size minimum and submitted electronically in PDF format on the QuestCDN.com website. The following elements are required:

a. Letter of Interest (1 page max.)

Provide a one-page letter describing how the Owner’s will benefit from your firm on this project. Include acknowledgement of any Addendum and RFIs that may be issued during the advertisement period.

b. PROPONENT Information (1 page max.)

Present information about the PROPONENT who is submitting the proposal including PROPONENT’S name and address; telephone number, and email address of the PROPONENT’S contact person and local representative; and a general overview of the PROPONENT’s corporate structure and business history.

c. Team Experience and Qualifications (5 pages max.)

Provide project organization charts identifying the role of key team staff on similar projects.

Describe experience and certifications of each key team member and include their role with this project.

PROPONENT shall have licensed engineers performing QA/QC.

PROPONENT shall have documented experience of at least 500 total level-only installations.

PROPONENT shall provide a list of at least five (5) projects of similar scope, size, and installations to this project within the previous five (5) years. If less than five (5) projects, so state and give reasons why. PROPONENT may provide additional similar projects for consideration beyond the previous five (5) years to meet minimum five (5) project requirement with reason beyond required time.

For all listed projects, provide the project name, address, and Owner contact information, the notice to proceed and completion date, materials/ equipment used for each installation, and a summary of the findings from the installation.

d. Work Plan (15 pages max.)

Based on conditions presented in the evaluation in Appendix I, submit a general work plan for flow verification, and standard operation procedures for the data collection and equipment maintenance the PROPONENT will implement, if selected. Work plan should clearly define responsibilities and assistance necessary from the Owners through the duration of the work. The work plan shall include a project applicable safety plan.

The work plan shall be descriptive for the OWNERS to understand what will occur at the measuring locations, how the PROPONENT will evaluate the collected data, and what will be provided to the OWNERS to use in addressing the RDII in this basin. An example report or key excerpts of a past similar project may be included with the work plan.

Inclusive with the work plan, present a description of the PROPONENT’S equipment based on the requirements specified herein. PROPONENT shall verify that the selected equipment will adequately perform under the conditions specified and per the work plan. The manufacturers’ literature and product data sheets for each primary piece of equipment to be used shall be provided separately and will not be included in the page count.

e. Service and Support (5 pages max.)

Include office/service locations, number and location of service technicians, description of in-house engineering capabilities, and description of remote troubleshooting and monitoring capabilities, as applicable.

PROPONENT should also describe any anticipated permits with a detailed approach for obtaining required permits. An example traffic control plan and approach should be included for work that may be performed that would impact the normal flow of traffic.

f. Delivery Schedule (2 pages max.)

PROPONENT should provide a detailed schedule identifying key milestones assuming a Notice to Proceed date sixty (60) days following submission of the Proposal. At a minimum, the schedule should include durations and dates for permitting, preliminary phase work, procurement, beginning and end dates for evaluation and final report.

g. Cost - Bid Worksheet – to be submitted via QuestCDN

The Bid Worksheet shall list the price for all work and equipment required to perform the micro-detection program. All work shall include any permitting requirements for traffic control and worksite safety, as required. The cost shall be provided at a unit cost rate based on the footage of gravity sanitary sewer monitored, as measured from the center of the manhole to the next manhole.

If the price offered by the PROPONENT cannot remain valid and unchanged for sixty (60) days from the date of submittal, submit documentation for the reasons and the number of days that pricing can remain valid and unchanged.

Work shall be measured by the ENGINEER or his representative with assistance from the PROPONENT prior to preparation of a payment request by the PROPONENT.

Unit quantities that are measured in place shall be measured at agreed intervals, typically monthly. The PROPONENT shall give the ENGINEER a minimum of two working days’ notice for making all required measurements.

Measurement Quantity for linear measurement shall be measured by the linear, at the item centerline or mean chord.

All items of Work not specifically listed in the Bid Worksheet shall be considered incidental to the construction, and the cost of all such work and material shall be included in the prices bid for various items listed.

Item 1. – PROJECT DEPLOYMENT Payment includes, but is not limited to the following items: service preparation, permit application and associated fees, site reconnaissance, equipment collection and preparation, final work plan development by designated area(s), mobilization, and applicable administrative operations associated with this item, including meetings and coordination.

Item 2 – FIELD WORK Payment includes, but is not limited to the following items: site preparation, installation and calibration of equipment, data recording and collection for analysis, collecting pertinent field conditions and documentation for each site, and all associated measures to implement these items, and applicable administrative operations associated with this item, including meetings and coordination. Additionally, costs associated with the demobilization and removal of the installed equipment are included in this item.

Item 3 – REPORT SUBMISSION Payment includes, but is not limited to the following items: data review and verification, data analysis, delivery of data per specifications herein, evaluate and identify locations of RDII, develop options to mitigate, reduce or eliminate sources of located RDII, and report preparation as specified herein that details these findings and recommendations.

Additionally, costs associated with any applicable administrative operations for the reporting of the findings, such as report reviews and revisions, meetings, presentation, and delivery.

Turkey Creek Basin Micro-Detection September 2025

h. Bid Bond

Bids shall be accompanied by a bid bond or certified cashier’s check in an amount not less than 5% of the base bid. All bonds shall be by a surety company licensed in Georgia with an “A” minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of “Best’s Key Rating Guide Property Liability”. Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a “Power of Attorney” authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond.

i. Safety

PROPONENTs shall submit an electronic copy of the company’s safety manual with the proposal. PROPONENT shall meet all applicable laws and local ordinances, such as OSHA/Industry standards for safety during execution of the work.

j. Other Items

In addition to the elements listed above, PROPONENT shall also include the following with their submission:

• General Contractor Licenses

• Immigration and Security Form

• Non-Collusion Affidavit

• Business License and Insurance

• Certificate of Debarment

• List of Proposed Subcontractors

Section 3 – General Terms and Conditions

Turkey Creek Basin Micro-Detection September 2025

Section 3 General Terms and Conditions

3.1 Examination of RFP Document

PROPONENT shall thoroughly examine the RFP document to ensure that it understands the scope of services to be provided. Any discrepancies, errors, ambiguities, or conflicts shall be brought to the attention of the ENGINEER immediately.

3.2 No Gratuities or Favors

PROPONENT shall not offer any gratuities and/or favors to any member of the OWNERS or ENGINEER. Any attempt by the PROPONENT to influence the selection process shall be grounds for exclusion from the selection process.

3.3 Accurate Information

PROPONENT shall provide accurate information in its proposal. Any PROPONENT who provides false or misleading information in their proposal shall be excluded from the selection process.

3.4 Delivery and/or Storage of Equipment or Materials

The OWNERS will not receive any equipment and/or material to store for the PROPONENT for the project. The PROPONENT is responsible to obtain a storage or staging area for their equipment and/or materials, as needed.

3.5 Terms of Payment

The OWNER and ENGINEER will not pay for any costs associated with preparing the proposal.

All payments will be associated with the terms of the bid worksheet and specifications. All payments will be made by the Owner within 30 days of receipt of an approved invoice.

All or part of the Work to be completed as Unit Price Work may be invoiced as the work progresses based on the completed item per unit cost. Progress payment applications may be made at regular intervals, typically monthly. Progress payment applications shall include only completed work for the date listed and shall be submitted to the ENGINEER for review. Timely submittal of the progress payment application is the responsibility of PROPONENT to allow for review and to address any clarification or correction issues.

The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparison of Bids and determining initial Contract Price. Determination of actual quantities and classifications will be made by ENGINEER upon review of the completed work.

Each unit price will be deemed to include an amount considered by PROPONENT to be adequate to cover the PROPONENT’s overhead and profit for each separately identified item.

3.6 Payment Bond

If PROPONENT intends to use the services of a subcontractor and provide equipment to the OWNER(S) as part of the project, a payment bond is required for the successful PROPONENT.

Once awarded, the successful PROPONENT shall use the form in the appendix.

Section 3 – General Terms and Conditions

3.7 Performance Bond

A performance bond is required for the successful PROPONENT. Once awarded, the successful PROPONENT shall use the form in the appendix.

3.8 Termination of Project

The OWNER reserves the right to cancel this project at any time without cause. Cancellation of the project by the OWNER after the PROPONENT has been issued a purchase order by the OWNER will be subject to cancellation costs incurred by the PROPONENT for engineering, materials, component parts, direct out-of-pocket expenses incurred for labor, machine time, materials and any charges made to PROPONENT by their suppliers for cancellation up to the date of cancellation. Claims for said costs shall be submitted with supporting documentation of adequate detail to substantiate the claim.

3.9 Contract Negotiations

This RFP is not to be construed as a contract or as a commitment of any kind. The sole purpose of this RFP is to procure quotes and to negotiate pricing for the services to be provided. If this RFP results in a purchase order, a specific scope of work, compensation, insurance coverage, and other matters will be determined during negotiations as required.

Each of the Owners, Covington and Oxford, will negotiate and execute separate contracts with the selected proponent.

3.10 Confidentiality

All proposals shall be held confidential to the extent allowable by law until after the selection process is complete.

3.11 OWNERS and ENGINEER Rights

The OWNERS and ENGINEER reserve the right to evaluate the qualifications submitted; waive any irregularities therein; request more detailed information; accept any submittal or portion of a submittal; and/or reject any or all proposals should it be in the best interest of the OWNERS.

3.12 PROPONENT Guarantee

The PROPONENT certifies, by submission of its proposal, that neither it nor its subcontractors is presently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in any transaction with a public agency in the State of Georgia.

Section 4 – Scope and Minimum Specifications

Turkey Creek Basin Micro-Detection September 2025

Section 4 Scope and Minimum Specifications

4.1 Scope

The PROPONENT shall provide all labor, equipment, and materials to complete the specified work herein.

The Owners desire to determine the sources of rain derived inflow and infiltration (RDII) in their wastewater collection systems. It is the intent of the Owners to identify the locations of RDII and develop appropriate remedies for elimination. For this purpose, we are using the term micro-detection generically. This term is used as a descriptor for a technique to pinpoint exact location(s) of RDII by evaluating segments of the sewer basin with rapid identification techniques by localized sensors and algorithms. The Contractor’s means and methods are not being dictated by this term.

The Micro-Detection of RDII program shall meet the following requirements and specifications.

4.2 Quality Assurance

Equipment shall be standard products of a manufacturer who has made them for a minimum of five

(5) years and who provides published data and performance.

PROPONENT is made aware that all required appurtenances may not be specified in this RFP. It is the PROPONENT’s responsibility to identify missing appurtenances and include them in its Scope of Supply and cost.

4.3 Micro-Detection RDII Program Specifications

The PROPONENT shall provide all labor, equipment, and materials to complete the specified work herein, including, but not limited to the following:

1. Attend project kick-off meeting and final deliverable review meeting in person with the Owner and the Engineer.

2. Once Owner’s select extent of area for evaluation, PROPONENT shall develop a draft work plan, and coordinate with Engineer to finalize work plan per Owner’s direction. Upon acceptance by Owner, PROPONENT shall finalize and present a detailed work plan describing the planned approach to complete the work within the identified area.

3. Install micro-detection meters in adjacent manholes per final work plan.

4. Collect pictures of manholes including area photo, invert (with Northing markers) and any relevant defect conditions.

5. In coordination with Field Data Collection Requirements section, record all data collected from installation, data upload and removal in GIS.

6. Meters will remain installed for a minimum of 60 days with no additional cost to Owner for additional 30 days due to absence of significant rain event, defined as continuous rain fall in excess of 1”.

7. Provide the following information in an end of project summary and analysis detailed report:

a. Summary of work completed; Executive Summary of Findings

b. GDB deliverables including all manholes, pipelines, flow monitoring units and analysis reports.

c. Final Result table with Ground Water Infiltration Estimate, RDII Estimate, Total I/I calculations

d. Flow analysis charts and hydrographs detailing RDII and O&M source locations

e. Final calculation for each area in units of RDII per day / inch mile of pipe.

f. Ranking system to prioritize areas; Severe, Moderate, Fair, Good.

g. Complete in-person or remote (by determination of utility) results presentation.

h. Provide GIS-based high-resolution maps of results in 11x17 formatting.

4.4 Project Locations, Traffic Control and Access

1. Manholes are primarily located in back yards, easements and right of way areas. Proposal pricing must be inclusive to access all structures not more than 6” buried underground. Any structures buried should be presented to Owner for approval to uncover. No additional change orders will be accepted for additional equipment required to access structures unless they are buried in asphalt, concrete or hard scape and are uncovered by PROPONENT. Owner will assist in locating structures and communication with residents.

2. All traffic control is the responsibility of the PROPONENT and is considered incidental to this proposal.

3. All right-of-way permits are the responsibility of the PROPONENT and is considered incidental to this proposal.

4. PROPONENT shall use this information as basis of cost proposal and shall be inclusive of all costs required to complete the project in accordance with specifications, including any mobilization costs.

4.5 Equipment Specifications

1. Hardware Requirements:

Equipment shall be capable of adequately measuring sewer flows so that the PROPONENT can evaluate and identify the magnitude and location of RDII and from that, the PROPONENT shall make recommendations for the client to mitigate, reduce, or eliminate sources of RDII.

2. Software Requirements:

a. Software shall note potential erroneous data due to anomalies that regularly occur in a sanitary sewer environment for manual removal during analysis.

b. Final data that includes levels below 0.00 inches shall not be acceptable.

c. Final data that includes RDII values that are negative shall not be acceptable, unless there is sufficient data to confirm exfiltration is occurring.

d. Flow rate (GPM) estimates shall be based on collected on site velocity values.

e. Estimated velocity values shall be submitted and included within final deliverables

Turkey Creek Basin Micro-Detection September 2025

4.6 Personnel Requirements

1. All PROPONENTs shall submit a statement of qualifications for all personnel to be assigned to the project listing their prior applicable experience of projects of similar size and scope, certifications and industry licenses.

2. The PROPONENT’s team shall consist of personnel that meet the following requirements:

a. FIELD PERSONNEL - A minimum of two (2) field crew members shall possess current confined space certification and at least one (1) year of installation experience of the specified micro detection meters.

b. PROJECT MANAGER - Project Managers will be required to be accessible throughout the project, submit monthly status reports and act as the point of contact between City staff and the PROPONENT. Project managers shall have at least one (1) year of installation experience of the specified micro detection meters.

c. DATA PROCESSING STAFF - All data processing staff shall be trained in the specified software application. Additional qualifications will be considered valuable to the selected PROPONENT: - Current NASSCO Certification - Asset & Configuration Data Management Experience - Database Programming and Data Mining Experience.

4.7 Field Data Collection Requirements

1. All pertinent data (picture of installation, video of velocity, depth of flow, distance of device from rim) shall be recorded in the field into each Cities’ ArcGIS Online system. The Cities will invite the PROPONENT to a dataset for this project and PROPONENT will provide and utilize their own ESRI license(s) as needed.

2. The Owners must be able to track PROPONENT progress on a continual, daily basis using a hosted GIS application, at the PROPONENT ’s expense, with no licensing fees issued to either City. Any inaccessible, surcharged or missing manholes and locations must be recorded in the program and pictures must be captured and submitted on a weekly basis to the respective City for review and deployment of that City’s staff. Each City will provide layers for manholes at PROPONENT’s request.

3. The PROPONENT is responsible for review of all collected data for accuracy.

4. Installation of rain gauges are required for the duration of the study period

4.8 Data Review, Reporting and Deliverables

1. All data shall be available in a web based online deliverable platform with printed hard copies available upon request. Data shall include:

a. Rain data

b. Raw data collected from micro detection units.

c. Manholes and Sewer line shape files with rating score and graphs

d. Level

e. Calculated estimated flow rate (GPM)

f. Groundwater Infiltration

g. Estimated Average Dry weather flow rate in units of GPM

h. Total Rain Derived inflow and Infiltration Estimate (RDII, Gallons)

i. Calculated estimated RDII per inch mile of pipe

Turkey Creek Basin Micro-Detection September 2025

j. Final Severity Ranking (Severe, Moderate, Fair, Good)

k. Executive Summary Analysis and Detailed Site Reports

l. A printable final report available within online data viewing platform.

2. PROPONENT shall provide an Executive Summary recap report that outlines the findings from the project separately for each City for their respective sanitary sewer system.

3. Online data platform to include data storage, available for each Owner online 24/7. Username and password to be provided. Online platform is considered incidental and included within project deliverables at no additional cost.

4. PROPONENT shall set up and host a “deliverables” meeting to recap the findings from the project and make recommendations for repairs for each City.

5. PROPONENT shall have a data quality program in place and be prepared to provide documentation upon request.

6. The PROPONENT must supply the Owners with a removable hard drive upon request, or other pre-approved media or FTP with the data and reports and at the PROPONENT’s expense.

END OF SECTION

Appendices

I. TM – Flow Evaluation Summary

II. Section 00610 – Performance Bond

III. Section 00615 – Payment Bond

APPENDIX I

TM – Flow Evaluation Summary

1031 Stonebridge Parkway P. O. Box 534 Watkinsville, Georgia 30677 706.769.4119 tel

TECHNICAL MEMORANDUM

Turkey Creek Basin Flow Monitoring Evaluation

DATE: August 21, 2025

TO: Mr. Kevin Sorrow and Mr. Bill Andrew

FROM: Carter & Sloope, Inc.

RE: City of Covington and City of Oxford

Turkey Creek Basin Micro-Detection

C & S Project No.: C8370.040 & O9800.011

The purpose of this technical memorandum is to present the evaluation of the Sewer Flow Monitoring

Report for Newton County Water & Sewerage Authority (NCWSA) in May 2024, respective to the

City of Covington and the City of Oxford, specifically within the Turkey Creek Basin. The report presents the flow monitoring data of the Turkey Creek Sanitary Sewer Basin which extends into the

City of Covington and City of Oxford sewer service area. C&S reviewed the data collected in the report to identify and rank the likelihood of rain derived inflow and infiltration (RDII) and separated it to their respective Service Provider.

Evaluation

As noted in the Sewer Flow Monitoring Report, a total of seven data loggers were installed in the

Turkey Creek Sanitary Sewer Basin (Figure 1). The data collection was to evaluate both dry-weather and wet-weather periods to quantify what RDII may occur during wet-weather events. Following the initial setup an additional sub-basin was added due to found conditions. Significant rain events occurred during the monitoring period that were acceptable for analysis. Based on the RDII analysis and surcharge information, RDII is attributing to the collected flow and subsequent surcharge events recommends further investigation.

C&S reviewed the data and ranked the likelihood of RDII (Table 1) by service area associated with the flow monitor location. The sewer length provided was calculated from the GIS data within the report and should be considered an estimation. The footage of the NCWSA’s Turkey Creek

Interceptor within these areas was not included.

The areas monitored by FM 1, FM 1A, FM 2, and FM 3 are primarily served by the City of

Covington (Figure 2). The areas monitored by FM 4, FM 5, FM 6, and FM 7 are primarily served by the City of Oxford (Figure 3). There are some overlap of service areas that are being reviewed. Of

City of Covington and City of Oxford note, the data collected at FM 4 includes the neighborhood within the Stone Street and Haygood

Avenue area that is served by the City of Covington.

Table 1

Ranking of Likelihood of RDII by Area

Rank Flow

Monitor Sewer Main (Linear Feet)

Primary Service Provider

1 FM 2 17,123 Covington

2 FM 4 39,947 Oxford

3 FM 6 19,315 Oxford

4 FM 3 28,052 Covington

5 FM 1 16,893 Covington

6 FM 1A 26,943 Covington

7 FM 5 1,698 Oxford

8 FM 7 4,064 Oxford

154,034 Total

Recommendation

C&S recommends further investigation of these areas to locate where appropriate remedies should be implemented to reduce RDII in the sewer system that is being collected in the NCWSA’s Turkey

Creek Interceptor. We propose to develop a request for proposal (RFP) to solicit pricing and qualifications from qualified companies interested in and experienced in providing micro-detection of RDII services beyond the interceptor. Based on the proposals and costs, each City can select the program and service area that fits their budget.

City of Covington and City of Oxford

FIGURES

Turkey Creek Basin Miro-Detection September 2025

APPENDIX II

Section 00610 – Performance Bond

SECTION 00610 - 1

PERFORMANCE BOND

City of Covington and City of Oxford C & S Project No. C8370.040 & O9800.011 Turkey Creek Basin Micro-Detection September 2025 EJCDC C-610 Copyright © 2017 National Society of Professional Engineers. All rights reserved. Revision 0

PERFORMANCE BOND

Contractor Surety

Name: Name:

Address (principal place of business): Address (principal place of business):

Owner Contract

Name: Description (name and location):

Mailing address (principal place of business):

Contract Price:

Effective Date of Contract:

Bond

Bond Amount:

Date of Bond:

(Date of Bond cannot be earlier than Effective Date of Contract) Modifications to this Bond form:

☐ None ☐ See Paragraph 16 Surety and Contractor, intending to be legally bound hereby, subject to the terms set forth in this Performance Bond, do each cause this Performance Bond to be duly executed by an authorized officer, agent, or representative.

Contractor as Principal Surety

(Full formal name of Contractor) (Full formal name of Surety) (corporate seal)

By: By:

(Signature) (Signature)(Attach Power of Attorney)

Name: Name:

(Printed or typed) (Printed or typed)

Title: Title:

Attest: Attest:

(Signature) (Signature)

Name: Name:

(Printed or typed) (Printed or typed)

Title: Title:

Notes: (1) Provide supplemental execution by any additional parties, such as joint venturers. (2) Any singular reference to Contractor, Surety, Owner, or other party is considered plural where applicable.

SECTION 00610 - 2

City of Covington and City of Oxford C & S Project No. C8370.040 & O9800.011 Turkey Creek Basin Micro-Detection September 2025 EJCDC C-610 Copyright © 2017 National Society of Professional Engineers. All rights reserved. Revision 0

1. The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to the Owner for the performance of the Construction Contract, which is incorporated herein by reference.

2. If the Contractor performs the Construction Contract, the Surety and the Contractor shall have no obligation under this Bond, except when applicable to participate in a conference as provided in Paragraph 3.

3. If there is no Owner Default under the Construction Contract, the Surety’s obligation under this Bond will arise after:

3.1. The Owner first provides notice to the Contractor and the Surety that the Owner is considering declaring a Contractor Default. Such notice may indicate whether the Owner is requesting a conference among the Owner, Contractor, and Surety to discuss the Contractor’s performance.

If the Owner does not request a conference, the Surety may, within five (5) business days after receipt of the Owner’s notice, request such a conference. If the Surety timely requests a conference, the Owner shall attend. Unless the Owner agrees otherwise, any conference requested under this Paragraph 3.1 will be held within ten (10) business days of the Surety’s receipt of the Owner’s notice. If the Owner, the Contractor, and the Surety agree, the Contractor shall be allowed a reasonable time to perform the Construction Contract, but such an agreement does not waive the Owner’s right, if any, subsequently to declare a Contractor Default;

3.2. The Owner declares a Contractor Default, terminates the Construction Contract and notifies the Surety; and

3.3. The Owner has agreed to pay the Balance of the Contract Price in accordance with the terms of the Construction Contract to the Surety or to a contractor selected to perform the Construction Contract.

4. Failure on the part of the Owner to comply with the notice requirement in Paragraph 3.1 does not constitute a failure to comply with a condition precedent to the Surety’s obligations, or release the Surety from its obligations, except to the extent the Surety demonstrates actual prejudice.

5. When the Owner has satisfied the conditions of Paragraph 3, the Surety shall promptly and at the Surety’s expense take one of the following actions:

5.1. Arrange for the Contractor, with the consent of the Owner, to perform and complete the Construction Contract;

5.2. Undertake to perform and complete the Construction Contract itself, through its agents or independent contractors;

5.3. Obtain bids or negotiated proposals from qualified contractors acceptable to the Owner for a contract for performance and completion of the Construction Contract, arrange for a contract to be prepared for execution by the Owner and a contractor selected with the Owners concurrence, to be secured with performance and payment bonds executed by a qualified surety equivalent to the bonds issued on the Construction Contract, and pay to the Owner the amount of damages as described in Paragraph 7 in excess of the Balance of the Contract Price incurred by the Owner as a result of the Contractor Default; or

5.4. Waive its right to perform and complete, arrange for completion, or obtain a new contractor, and with reasonable promptness under the circumstances:

SECTION 00610 - 3

City of Covington and City of Oxford C & S Project No. C8370.040 & O9800.011 Turkey Creek Basin Micro-Detection September 2025 EJCDC C-610 Copyright © 2017 National Society of Professional Engineers. All rights reserved. Revision 0

5.4.1 After investigation, determine the amount for which it may be liable to the Owner and, as soon as practicable after the amount is determined, make payment to the Owner; or

5.4.2 Deny liability in whole or in part and notify the Owner, citing the reasons for denial.

6. If the Surety does not proceed as provided in Paragraph 5 with reasonable promptness, the Surety shall be deemed to be in default on this Bond seven days after receipt of an additional written notice from the Owner to the Surety demanding that the Surety perform its obligations under this Bond, and the Owner shall be entitled to enforce any remedy available to the Owner. If the Surety proceeds as provided in Paragraph 5.4, and the Owner refuses the payment, or the Surety has denied liability, in whole or in part, without further notice, the Owner shall be entitled to enforce any remedy available to the Owner.

7. If the Surety elects to act under Paragraph 5.1, 5.2, or 5.3, then the responsibilities of the Surety to the Owner will not be greater than those of the Contractor under the Construction Contract, and the responsibilities of the Owner to the Surety will not be greater than those of the Owner under the Construction Contract. Subject to the commitment by the Owner to pay the Balance of the Contract Price, the Surety is obligated, without duplication for:

7.1. the responsibilities of the Contractor for correction of defective work and completion of the Construction Contract;

7.2. additional legal, design professional, and delay costs resulting from the Contractor’s Default, and resulting from the actions or failure to act of the Surety under Paragraph 5; and

7.3. liquidated damages, or if no liquidated damages are specified in the Construction Contract, actual damages caused by delayed performance or non-performance of the Contractor.

8. If the Surety elects to act under Paragraph 5.1, 5.3, or 5.4, the Surety’s liability is limited to the amount of this Bond.

9. The Surety shall not be liable to the Owner or others for obligations of the Contractor that are unrelated to the Construction Contract, and the Balance of the Contract Price will not be reduced or set off on account of any such unrelated obligations. No right of action will accrue on this Bond to any person or entity other than the Owner or its heirs, executors, administrators, successors, and assigns.

10. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders, and other obligations.

11. Any proceeding, legal or equitable, under this Bond must be instituted in any court of competent jurisdiction in the location in which the work or part of the work is located and must be instituted within two years after a declaration of Contractor Default or within two years after the Contractor ceased working or within two years after the Surety refuses or fails to perform its obligations under this Bond, whichever occurs first. If the provisions of this paragraph are void or prohibited by law, the minimum periods of limitations available to sureties as a defense in the jurisdiction of the suit will be applicable.

12. Notice to the Surety, the Owner, or the Contractor must be mailed or delivered to the address shown on the page on which their signature appears.

13. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement will be deemed deleted therefrom and provisions conforming to such

SECTION 00610 - 4

City of Covington and City of Oxford C & S Project No. C8370.040 & O9800.011 Turkey Creek Basin Micro-Detection September 2025 EJCDC C-610 Copyright © 2017 National Society of Professional Engineers. All rights reserved. Revision 0 statutory or other legal requirement will be deemed incorporated herein. When so furnished, the intent is that this Bond will be construed as a statutory bond and not as a common law bond.

14. Definitions

14.1. Balance of the Contract Price—The total amount payable by the Owner to the Contractor under the Construction Contract after all proper adjustments have been made including allowance for the Contractor for any amounts received or to be received by the Owner in settlement of insurance or other claims for damages to which the Contractor is entitled, reduced by all valid and proper payments made to or on behalf of the Contractor under the Construction Contract.

14.2. Construction Contract—The agreement between the Owner and Contractor identified on the cover page, including all Contract Documents and changes made to the agreement and the Contract Documents.

14.3. Contractor Default—Failure of the Contractor, which has not been remedied or waived, to perform or otherwise to comply with a material term of the Construction Contract.

14.4. Owner Default—Failure of the Owner, which has not been remedied or waived, to pay the Contractor as required under the Construction Contract or to perform and complete or comply with the other material terms of the Construction Contract.

14.5. Contract Documents—All the documents that comprise the agreement between the Owner and Contractor.

15. If this Bond is issued for an agreement between a contractor and subcontractor, the term Contractor in this Bond will be deemed to be Subcontractor and the term Owner will be deemed to be Contractor.

16. Modifications to this Bond are as follows: None

Turkey Creek Basin Miro-Detection September 2025

APPENDIX III

Section 00615 – Payment Bond

SECTION 00615 - 1

PAYMENT BOND

City of Covington and City of Oxford C & S Project No. C8370.040 & O9800.011 Turkey Creek Basin Micro-Detection September 2025 EJCDC C-615 Copyright © 2018 National Society of Professional Engineers. All rights reserved. Revision 0

PAYMENT BOND

Contractor Surety

Name: Name:

Address (principal place of business): Address (principal place of business):

Owner Contract

Name: Description (name and location):

Mailing address (principal place of business):

Contract Price:

Effective Date of Contract:

Bond

Bond Amount:

Date of Bond:

(Date of Bond cannot be earlier than Effective Date of Contract) Modifications to this Bond form:

☐ None ☐ See Paragraph 18 Surety and Contractor, intending to be legally bound hereby, subject to the terms set forth in this Payment Bond, do each cause this Payment Bond to be duly executed by an authorized officer, agent, or representative.

Contractor as Principal Surety

(Full formal name of Contractor) (Full formal name of Surety) (corporate seal)

By: By:

(Signature) (Signature)(Attach Power of Attorney)

Name: Name:

(Printed or typed) (Printed or typed)

Title: Title:

Attest: Attest:

(Signature) (Signature)

Name: Name:

(Printed or typed) (Printed or typed)

Title: Title:

Notes: (1) Provide supplemental execution by any additional parties, such as joint venturers. (2) Any singular reference to Contractor, Surety, Owner, or other party is considered plural where applicable.

SECTION 00615 - 2

City of Covington and City of Oxford C & S Project No. C8370.040 & O9800.011 Turkey Creek Basin Micro-Detection September 2025 EJCDC C-615 Copyright © 2018 National Society of Professional Engineers. All rights reserved. Revision 0

1. The Contractor and Surety, jointly and severally, bind themselves, their heirs, executors, administrators, successors, and assigns to the Owner to pay for labor, materials, and equipment furnished for use in the performance of the Construction Contract, which is incorporated herein by reference, subject to the following terms.

2. If the Contractor promptly makes payment of all sums due to Claimants, and defends, indemnifies, and holds harmless the Owner from claims, demands, liens, or suits by any person or entity seeking payment for labor, materials, or equipment furnished for use in the performance of the Construction Contract, then the Surety and the Contractor shall have no obligation under this Bond.

3. If there is no Owner Default under the Construction Contract, the Surety’s obligation to the Owner under this Bond will arise after the Owner has promptly notified the Contractor and the Surety (at the address described in Paragraph 13) of claims, demands, liens, or suits against the Owner or the Owner’s property by any person or entity seeking payment for labor, materials, or equipment furnished for use in the performance of the Construction Contract, and tendered defense of such claims, demands, liens, or suits to the Contractor and the Surety.

4. When the Owner has satisfied the conditions in Paragraph 3, the Surety shall promptly and at the Surety’s expense defend, indemnify, and hold harmless the Owner against a duly tendered claim, demand, lien, or suit.

5. The Surety’s obligations to a Claimant under this Bond will arise after the following:

5.1. Claimants who do not have a direct contract with the Contractor

5.1.1. have furnished a written notice of non-payment to the Contractor, stating with substantial accuracy the amount claimed and the name of the party to whom the materials were, or equipment was, furnished or supplied or for whom the labor was done or performed, within ninety (90) days after having last performed labor or last furnished materials or equipment included in the Claim; and

5.1.2. have sent a Claim to the Surety (at the address described in Paragraph 13).

5.2. Claimants who are employed by or have a direct contract with the Contractor have sent a Claim to the Surety (at the address described in Paragraph 13).

6. If a notice of non-payment required by Paragraph 5.1.1 is given by the Owner to the Contractor, that is sufficient to satisfy a Claimant’s obligation to furnish a written notice of non-payment under Paragraph 5.1.1.

7. When a Claimant has satisfied the conditions of Paragraph 5.1 or 5.2, whichever is applicable, the Surety shall promptly and at the Surety’s expense take the following actions:

7.1. Send an answer to the Claimant, with a copy to the Owner, within sixty (60) days after receipt of the Claim, stating the amounts that are undisputed and the basis for challenging any amounts that are disputed; and

7.2. Pay or arrange for payment of any undisputed amounts.

7.3. The Surety’s failure to discharge its obligations under Paragraph 7.1 or 7.2 will not be deemed to constitute a waiver of defenses the Surety or Contractor may have or acquire as to a Claim, except as to undisputed amounts for which the Surety and Claimant have reached agreement.

If, however, the Surety fails to discharge its obligations under Paragraph 7.1 or 7.2, the Surety shall indemnify the Claimant for the reasonable attorney’s fees the Claimant incurs thereafter to recover any sums found to be due and owing to the Claimant.

SECTION 00615 - 3

City of Covington and City of Oxford C & S Project No. C8370.040 & O9800.011 Turkey Creek Basin Micro-Detection September 2025 EJCDC C-615 Copyright © 2018 National Society of Professional Engineers. All rights reserved. Revision 0

8. The Surety’s total obligation will not exceed the amount of this Bond, plus the amount of reasonable attorney’s fees provided under Paragraph 7.3, and the amount of this Bond will be credited for any payments made in good faith by the Surety.

9. Amounts owed by the Owner to the Contractor under the Construction Contract will be used for the performance of the Construction Contract and to satisfy claims, if any, under any construction performance bond. By the Contractor furnishing and the Owner accepting this Bond, they agree that all funds earned by the Contractor in the performance of the Construction Contract are dedicated to satisfying obligations of the Contractor and Surety under this Bond, subject to the Owner’s priority to use the funds for the completion of the work.

10. The Surety shall not be liable to the Owner, Claimants, or others for obligations of the Contractor that are unrelated to the Construction Contract. The Owner shall not be liable for the payment of any costs or expenses of any Claimant under this Bond, and shall have under this Bond no obligation to make payments to or give notice on behalf of Claimants, or otherwise have any obligations to Claimants under this Bond.

11. The Surety hereby waives notice of any change, including changes of time, to the Construction Contract or to related subcontracts, purchase orders, and other obligations.

12. No suit or action will be commenced by a Claimant under this Bond other than in a court of competent jurisdiction in the state in which the project that is the subject of the Construction Contract is located or after the expiration of one year from the date (1) on which the Claimant sent a Claim to the Surety pursuant to Paragraph 5.1.2 or 5.2, or (2) on which the last labor or service was performed by anyone or the last materials or equipment were furnished by anyone under the Construction Contract, whichever of (1) or (2) first occurs. If the provisions of this paragraph are void or prohibited by law, the minimum period of limitation available to sureties as a defense in the jurisdiction of the suit will be applicable.

13. Notice and Claims to the Surety, the Owner, or the Contractor must be mailed or delivered to the address shown on the page on which their signature appears. Actual receipt of notice or Claims, however accomplished, will be sufficient compliance as of the date received.

14. When this Bond has been furnished to comply with a statutory or other legal requirement in the location where the construction was to be performed, any provision in this Bond conflicting with said statutory or legal requirement will be deemed deleted here from and provisions conforming to such statutory or other legal requirement will be deemed incorporated herein. When so furnished, the intent is that this Bond will be construed as a statutory bond and not as a common law bond.

15. Upon requests by any person or entity appearing to be a potential beneficiary of this Bond, the Contractor and Owner shall promptly furnish a copy of this Bond…