South Elevated Water Tank Rehab Project Contract Documents Summary

This is a construction contract document set and technical specification package issued by the City of Alice, Texas for the rehabilitation of a 500,000-gallon South Elevated Water Storage Tank, financed through a Texas Community Development Block Grant Program (CDBG-MIT) administered by the General Land Office under the U.S. Department of Housing and Urban Development. The project scope includes blast cleaning and inspection of interior and exterior tank surfaces, steel repairs and alterations, installation of new safety appurtenances including cable safety climb devices and replacement ladders, interior and exterior painting with specialized coating systems, disinfection, and hydro testing. The bid opening is scheduled for 10:00 am on Monday, September 14, 2026, at Alice City Hall, 500 E. Main Street, Alice, Texas 78332, with a non-mandatory pre-bid meeting on Thursday, September 3, 2026, at 11:00 am at the same location. The work must be completed within 240 consecutive calendar days from the Notice to Proceed, with liquidated damages assessed at $500 per day for delays. Bidders must register on www.CivcastUSA.com to obtain plans and specifications at no charge, and contract documents are available at Alice City Hall, 301 East Market Street.

Bid security of five percent of the bid amount is required, submitted as a bid bond, certified check, bank draft, or negotiable U.S. Government Bonds. The contractor must be fully experienced and qualified in structural repairs, blast containment, and lead abatement for large elevated steel storage tanks. The project is subject to Davis-Bacon prevailing wage requirements and federal compliance regulations including Section 3 employment policies. Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, Veteran-Owned Businesses, and Section 3 Businesses are encouraged to submit bids. The contractor must provide a full-time, qualified field superintendent and maintain a complete project file on-site. All contractors and subcontractors must be cleared through the System for Award Management (SAM.gov) and cannot be debarred or suspended. Exterior blast debris must be sampled and classified; if hazardous waste is identified (lead content exceeding 5 ppm), on-site treatment by a qualified waste treatment subcontractor is required at additional cost. The city reserves the right to reject any or all bids, and bids may be held for up to 90 days for review and bidder qualification investigation.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DOCUMENTS

TECHNICAL SPECIFICATIONS

FOR

Corpus Christi, Texas 78408

(361) 883-1984

TBPE Firm No. F-10053 801 Navigation, Suite 300

SOUTH ELEVATED WATER

TANK REHAB PROJECT

GLO CONTRACT NO. 24-065-150-F009

Financed through provisions of a

Texas Community Development Block Grant Program From the Texas Department of Agriculture

Mayor Cynthia Carraso

Mayor Pro Tem Robert R. Molina

Council Member - Place 1 Pete Beltran

Council Member - Place 2 Mauricio R. Garza II

Council Member – Place 3 Sandra J. Bowen

City Manager Michael Esparza

AUGUST 2026

Prepared by:

08/27/2026

CONTRACT DOCUMENTS

TECHNICAL SPECIFICATIONS

FOR

Corpus Christi, Texas 78408

(361) 883-1984

TBPE Firm No. F-10053 801 Navigation, Suite 300

SOUTH ELEVATED WATER

TANK REHAB PROJECT

GLO CONTRACT NO. 24-065-150-F009

Financed through provisions of a

Texas Community Development Block Grant Program From the Texas Department of Agriculture

Mayor Cynthia Carraso

Mayor Pro Tem

Robert R. Molina

Council Member - Place 1 Pete Beltran

Council Member - Place 2

Mauricio R. Garza II

Council Member – Place 3 Sandra J. Bowen

City Manager

Michael Esparza

AUGUST 2026

Prepared by:

Construction Advertisement and Invitation for Bids

The City of Alice will receive bids for the South Elevated Water Tank Rehab Project - GLO MIT MOD Contract No. 24-065-150-F009 until 10:00 am on Monday, September 14, 2026, at Alice City Hall, 500 E. Main Street, Alice, Texas 78332. Bids must be addressed to: City Clerk, Odilia Rodriguez. The bids will be publicly opened and read aloud at 10:00 am on Monday, September 14, 2026, at Alice City Hall, 500 E. Main Street, Alice, Texas 78332. A Pre-Bid Meeting will be held on Thursday, September 3, 2026, at 11:00 am at Alice City Hall, 500 E. Main Street, Alice, Texas 78332. This Pre-Bid Meeting is non-mandatory.

Bids are invited for several items and quantities of work as follows:

1. Rehabilitation of the interior and exterior of the 500,000 Gallon South Elevated Water Storage Tank.

Bid/Contract Documents, including Drawings and Technical Specifications are on file at the Alice City Hall, 301 East Market Street, Alice, Texas 78387. Copies of the Bid/Contract Documents may be obtained with the Engineer – Ardurra Group, Inc. at no charge.

Copies of the Bid/Contract Documents may be obtained from www.CivcastUSA.com. Bidders must register on this website in order to view and/or download plans and specifications for this project.

There is NO charge to view or download documents from the website.

A bid bond in the amount of 5 percent of the bid issued by an acceptable surety shall be submitted with each bid [for those contracts that exceed $100,000]. A certified check or bank draft payable to the City of Alice or negotiable U.S. Government Bonds (as par value) may be submitted in lieu of the Bid Bond.

The project to be constructed will be financed with assistance from the General Land Office (GLO) under the U.S. Department of Housing and Urban Development Community Development Block Grant

- Mitigation (CDBG-MIT) program and is subject to all applicable Federal and State laws and regulations. Attention is called to the fact that not less than, the federally determined prevailing Davis- Bacon and Related Acts wage rate, as issued by the Department of Labor and contained in the contract documents, must be paid on this project. In addition, the successful bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, sexual orientation, gender identity, or national origin. Adherence to the City of Alice Section 3 Policy is required for all contracts.

All contractors and subcontractors must be cleared (not suspended or debarred) prior to any formal action authorizing the award of a contract to the contractor. Minority Business Enterprises, Small Business Enterprises, Women Business Enterprises, Veteran-Owned Businesses, Section 3 Businesses, and labor surplus area firms are encouraged to submit bids.

The City of Alice reserves the right to reject any or all bids or to waive any informalities in the bidding.

Bids may be held by City of Alice for a period not to exceed 90 days from the date of the bid opening for the purpose of reviewing the bids and investigating the bidder’s qualifications prior to the contract award.

All contractors/subcontractors must not be debarred, suspended or otherwise excluded from or ineligible for participation in the System for Award Management (SAM.gov).

City of Alice Cynthia Carrasco, Mayor 08/27/2026

BP 1 of 5

BID PROPOSAL

Proposal of a * (hereinafter called "BIDDER"), organized and existing under the laws of the State of Texas to City of Alice (hereinafter called "OWNER.)"

BIDDER hereby proposes to perform all WORK for the construction of the “South

Elevated Water Storage Tank Rehab Project - GLO MIT MOD Contract No. 24-065- 150-F009” in accordance with the CONTRACT DOCUMENTS, within the time set forth therein, and at the prices stated below.

By submission of this BID, each BIDDER certifies, and in the case of a joint BID each party thereto certifies as to its own organization, that this BID has been arrived at independently, without consultation, communication, or agreement as to any matter relating to this BID with any other BIDDER or with any competitor.

BIDDER hereby agrees to commence WORK under this contract on or before a date to be specified in the NOTICE TO PROCEED and to fully complete the PROJECT within 240 consecutive calendar days thereafter. BIDDER further agrees to pay as liquidated damages, the sum of $500.00 for each consecutive calendar day thereafter as provided in the General Conditions.

BIDDER acknowledges receipt of the following ADDENDUM:

*Insert "a corporation", "a partnership", or "an Individual" as applicable.

BIDDER agrees to perform all the work described in the CONTRACT DOCUMENTS for the following amount:

BP 2 of 5

BID SCHEDULE – SOUTH EST 500,000 GALLON TANK REHABILITATION

I

II

III

IV

V

ITEM QTY

DESCRIPTION

UNIT $ TOTAL $

GROUP I - INSPECTION BLASTING & GROUP II - MODIFICATIONS

I-1

1 LS

Exterior Surfaces Blasting (Surface Preparation) – Complete in Place per Lump Sum

I-2

Interior & Dry Surfaces Blasting (Surface Preparation) – Complete in Place per Lump Sum

SUBTOTAL GROUP I & II

GROUP III - ACCESSORIES

III-1

New Inside Safety Climb Devices Complete in Place per Lump Sum

III-2

New Outside Safety Climb Devices - Complete in Place per Lump Sum

III-3

1 EA

Replace 24" ø Roof Vent Neck & Cover - Complete in Place per Each

III-4

Repair Overflow Flap Valve - Complete in Place per Each

III-5

Repair Tower Ladder - Complete in Place per Each

III-6

Repair Exterior Shell Ladder - Complete in Place per Each

III-7

Repair Exterior Roof Ladder - Complete in Place per Each

III-8

Repair Water Compartment Ladder - Complete in Place Each

III-9

Replace 30" ø Roof Manway - Complete in Place per Each

III-10

New Ladder Gate & Side Panels - Complete in Place per Each

III-11

Replace Pressure Gauge & Sample Spigot - Complete in Place per Each

III-12

Repair Bowl Ladder - Complete in Place per Each

II-16

1 EA Replace Dry Riser Manway - Complete in Place per Each

SUBTOTAL GROUP III

BP 3 of 5

I

II

III

IV

V

ITEM QTY

DESCRIPTION

UNIT $ TOTAL $

GROUP IV - DEMOLITION

IV-1

Remove Roof Manway - Complete in Place per Each

IV-3

Remove Roof Vent Neck & Cover - Complete in Place per Each

IV-4

Remove Dry Riser Manway - Complete in Place per Each

SUBTOTAL GROUP IV

GROUP V - UNIT PRICE WORK

V-1

10 EA

Patches 6"x 6" - Complete in Place per Each

V-2

50 LF

Re-weld Bowl Seams - Complete in Place per Linear Feet

V-3

HRS

Misc. Welding - Complete in Place per Hour

SUBTOTAL GROUP V

GROUP VI - TREATMENT & DISPOSAL OF HAZARDOUS WASTE

VI-1

Interior Painting – Wet Surfaces - Complete in place per Lump Sum

VI-2

Interior Painting - Dry Surfaces - Complete in place per Lump Sum

VI-3

Exterior Painting, Including Tank Sign/Graphics - Complete in place per Lump Sum

VI-4

Disinfection and Hydro Testing - Complete in place per Lump Sum

VI-5

Cathodic Protection System per T-9 in Technical Specifications, Complete in place per Lump Sum.

SUBTOTAL GROUP VI

TOTAL GROUPS I – VI TANK REHAB BASE BID: ________________________________

BP 4 of 5

CONTRACTOR shall provide the following information:

Name of Paint Manufacturer for Interior Paint System: ____________________________ Manufacturer's Catalog/Series Number:________________________________________ Name of Paint Manufacturer for Exterior Paint System:____________________________ Manufacturer's Catalog/Series Number:________________________________________

The BIDDER, in compliance with the invitation for bids for South Elevated Water Storage Tank Rehab Project - GLO MIT MOD Contract No. 24-065-150-F009 for the City of Alice, Texas, having examined the plans and specifications with related documents and the site of the proposed work, and being familiar with all of the conditions surrounding the construction of the proposed project, including the availability of materials and labor, hereby proposes to furnish all labor, materials and supplies, and to construct the project in accordance with the contract documents, within the time set forth herein. These price(s) are to cover all expenses incurred in performing the work required under the contract documents, of which this proposal is a part. These price(s) are firm and shall not be subject to adjustment provided this Proposal is accepted within ninety (90) days after the time set for receipt of proposals.

BIDDER hereby agrees to commence work under this contract on or before a date to be specified in a written "Notice to Proceed" to be issued by the City and to substantially complete within 240 consecutive calendar days as stipulated in the specifications. BIDDER further agrees to pay as liquidated damages, the sum $500.00 for each consecutive calendar day.

I hereby acknowledge the receipt of the following addenda:

1.

2.

3.

SUBCONTRACTORS. The undersigned BIDDER proposes that he will be responsible to perform major portions of the work at the project site with his own forces and that specific portions of the work not performed by the undersigned will be subcontracted and performed by the following subcontractors.

Type of Work Subcontracted Name of Subcontractor

The undersigned hereby declares that he has visited the site and has carefully examined the contract documents relative to the work covered by the above bid.

BP 5 of 5

Respectfully Submitted:

Signature Address

Title Date

License number (if applicable) Date

Seal - (if BID is by a corporation)

PART T-1 - TS

GENERAL SCOPE OF PROJECT

PART T-1

TECHNICAL SPECIFICATIONS

1.0 SCOPE

1.1 This Part T-1 of the TECHNICAL SPECIFICATIONS provides for the following:

1.1.1 Project description and location.

1.1.2 General sequence of work.

1.1.3 General information and items of importance.

1.1.4 CONTRACTOR safety.

2.0 PROJECT DESCRIPTION

2.1 The required scope of work generally includes the following:

2.1.1 Blast cleaning at specified areas for structural inspection by the ENGINEER.

2.1.2 Steel repairs, alterations and removal of surplus items.

2.1.3 Clean and paint interior surfaces.

2.1.4 Clean and paint exterior surfaces.

2.1.5 Environmental protection systems.

2.1.6 Disinfect and hydro test.

2.1.7 Disposal of non-hazardous blast debris.

2.1.8 On-site treatment of hazardous waste blast debris.

2.2 Tank dimensions are shown on the General Exterior/Interior Dimension & Appurtenances drawings.

3.0 LOCATION OF WORK

3.1 The South 500,000 Gallon Elevated Water Storage Tank located in Alice, Jim Wells County, Texas.

4.0 GENERAL SEQUENCE OF WORK

4.1 The following Sequence Of Work shall be followed by the OWNER, the ENGINEER and CONTRACTOR for the entire PROJECT:

4.1.1 The ENGINEER will issue the Notice To Proceed and conduct the Pre-Construction Meeting.

4.1.2 Submittal Process: See Shop Drawings in the General Conditions.

4.1.3 CONTRACTOR will complete shop fabrication/purchase of new tank appurtenances.

4.1.4 CONTRACTOR will mobilize tools, equipment and materials.

4.1.5 OWNER will drain the tank after 5 calendar days notice to the OWNER has been given by the

CONTRACTOR.

4.1.6 CONTRACTOR will complete the inspection blasting.

4.1.7 CONTRACTOR will complete the steel repairs, alterations and removal of surplus items.

4.1.8 CONTRACTOR will clean and paint the interior and exterior surfaces.

4.1.9 CONTRACTOR will sample and classify the exterior blast debris.

4.1.10 CONTRACTOR will disinfect the interior.

4.1.11 OWNER will fill the tank for hydro testing, conduct the bacteriological tests and return the tank to service.

4.1.12 CONTRACTOR will transport all blast debris for landfill storage and shall be responsible for all disposal fees.

4.1.13 ENGINEER will perform the Final Inspection.

4.2 The intent of this required Sequence of Work is to assure that the work progresses in a timely manner and the tank is placed back into service at the earliest possible time.

4.3 Because of the items of work that must be performed by the OWNER and ENGINEER at designated points, it is critical that close coordination of the work by the CONTRACTOR, the OWNER and

ENGINEER be maintained during the entire course of the PROJECT.

5.0 PROJECT SUPERINTENDENCE, COORDINATION, RECORD KEEPING, ETC.

5.1 During the course of field work, it will be the CONTRACTOR'S responsibility to:

5.1.1 Maintain at the job site a telephone for communications between the CONTRACTOR, OWNER and ENGINEER. Telephone can be either fixed or mobile.

5.1.2 Maintain at the job site a full-time, fully experienced and qualified field superintendent/foreman. This person must be present at all times when work is being performed, including all SUB-CONTRACTOR'S work, and shall be authorized to coordinate and direct all work; to accept all materials/deliveries; and to communicate directly with the OWNER and ENGINEER on scheduling, inspections, status reporting, changes, extra work, etc. This designated superintendent/foreman shall not be removed, substituted or replaced without a minimum of 3 days prior notice to the ENGINEER. All replacements of superintendence shall be fully versed in the PROJECT status, schedules, scope of work, etc.

5.1.3 Fully coordinate the work between the CONTRACTOR, SUB-CONTRACTORS, OWNER and

ENGINEER in such a manner so that the work is executed in a timely manner and in the prescribed general Sequence of Work (Item No. 4.1, above).

5.1.4 Maintain at the job site office copies of the complete Contract Documents, lead test reports, ENGINEER'S Inspection Report, TCEQ notifications, any addenda, change orders, delivery tickets, testing reports, bar schedule, certification of welders, paint batch numbers, written instructions and/or interpretations from the ENGINEER and any other written data pertaining to the PROJECT. The above items shall be available to the OWNER and ENGINEER upon request at all times.

5.1.5 Follow the general Sequence of Work at all times. If, for whatever reason, it becomes necessary to deviate from the specified sequence, then it is CONTRACTOR'S responsibility to notify the ENGINEER.

6.0 OTHER GENERAL DATA

The following items, as briefly described below, are important in the preparation of BIDS, the planning and execution of the work and the timely completion of this PROJECT. Each item is outlined or discussed in more detail in other sections of these CONTRACT DOCUMENTS.

6.1 BID SECURITY

6.1.1 Bid Security for this PROJECT shall be five percent (5%) of the greatest amount bid.

6.1.2 A Statement of Bidder’s Qualification form must also be submitted with the Proposal.

6.2 CONTRACTOR QUALIFICATIONS

6.2.1 The CONTRACTOR must be fully experienced and qualified in the field of structural repairs, blast containment, lead abatement and the cleaning and painting of large steel, elevated storage tanks.

6.3 BAR SCHEDULE

6.3.1 The CONTRACTOR will prepare a PROJECT Bar Schedule.

6.3.2 This schedule shall include the PROJECT start date, each major item of work (as furnished by the ENGINEER), completion dates for major work items and PROJECT completion date.

6.3.3 The Schedule shall be presented to the OWNER and ENGINEER for review prior to the Pre-

Construction Meeting.

6.3.4 A copy of the Schedule shall be maintained at the job site and shall be updated (by

CONTRACTOR) as required to reflect any significant changes in the Sequence Of Work, completion times and/or extra work.

6.4 EXTRA AND UNIT PRICE WORK

6.4.1 It is recognized that the original scope of repair work might have to be revised as a result of conditions not fully apparent or accessible during the ENGINEER'S inspection.

6.4.2 Part T-2, STEEL REPAIRS, list several "suspect" areas which may require repair and/or replacement - dependent on the degree of structural damage caused by corrosion. The

CONTRACTOR’S BASE BID scope of work shall include blast cleaning these areas to allow access for inspection by the ENGINEER.

6.4.3 It is the intent of these CONTRACT DOCUMENTS that any required changes be addressed by all parties in a timely manner and completed quickly so as to not disrupt the PROJECT

Sequence of Work. Compensation for extra and unit price work shall be fair and in the best interest of the OWNER and CONTRACTOR.

6.4.4 Provisions for hourly rates for extra work and unit pricing are outlined in Part T-2, STEEL

REPAIRS, and on the PROPOSAL. The CONTRACTOR'S prices quoted on the PROPOSAL for Miscellaneous Welding and unit price work which, in the opinion of the ENGINEER, is excessively inflated over and above standard industry labor/equipment rates shall be grounds for disqualification of a BID.

6.4.5 The ENGINEER (with approval of the OWNER) shall determine and authorize the scope, the costs, and time extensions (if required) for all unit price and extra work in accordance with the

General Conditions. Extra work performed by the CONTRACTOR which is not authorized in writing by the ENGINEER (and approved by the OWNER) shall not be allowed.

6.5 ENVIRONMENTAL PROTECTION

6.5.1 CONTRACTOR must be aware that the removal of the existing lead, chromium, and cadmium contained exterior paint system by abrasive blasting, the collection of blast debris and the possible on-site waste treatment are "environmentally sensitive" operations and subject to strict

State and Federal environmental regulations.

6.5.2 All applicable environmental agencies shall be notified in advance of this PROJECT (by

ENGINEER). Notification shall include the name of the CONTRACTOR performing paint removal, location of the PROJECT, required removal and waste handling procedures, monitoring, daily hours of operation and duration of the PROJECT.

6.5.3 The requirements for the installation and maintenance of the environmental protection systems and the handling of blast debris are mandatory and shall be enforced by the CONTRACTOR at all times. No deviation from these requirements shall be allowed.

6.5.4 Because of the close proximity of commercial facilities, streets, resident homes, drainage systems, etc., it is imperative that none of the blast debris be allowed to escape onto the surrounding areas or contact the ground at the site.

6.5.5 It is the intent of these CONTRACT DOCUMENTS that the OWNER (the generator) be fully protected and in complete compliance with all applicable environmental regulations at all times.

6.6 INTERIOR BLAST DEBRIS

6.6.1 The existing inside paint system has been determined to be essentially lead-free.

6.6.2 The blast debris generated during the removal of this paint system shall be transported to a

Subtitle D landfill by the CONTRACTOR at the CONTRACTOR’s expense.

6.7 EXTERIOR BLAST DEBRIS

6.7.1 Immediately upon generation, the CONTRACTOR will sample, test and classify the exterior blast debris in accordance with EPA SW846. Until classification, the debris shall be assumed to be

Hazardous Waste and handled accordingly.

6.7.2 If determined to be non-hazardous, then the CONTRACTOR shall collect and transport to a

Subtitle D landfill. This work shall be included in the CONTRACTOR'S BASE BID scope of work.

6.7.3 If the classification indicates a lead content in excess of 5 ppm, then the waste shall be considered as hazardous and treated on-site by a qualified waste treatment SUB-

CONTRACTOR employing the best available technology in accordance with EPA guidelines.

The treated waste shall then be removed and transported to an appropriately licensed waste storage facility. The cost and additional completion time for the treatment and disposal of all hazardous waste, if required, shall be handled as an item of work as provided for on the

PROPOSAL.

6.7.4 The CONTRACTOR shall submit all transport manifests, test reports, chain of custodies, etc. to the OWNER and ENGINEER for all debris removed from the site.

6.8 WORK SCHEDULE AND TIME OF COMPLETION

6.8.1 The job site shall be made available to the CONTRACTOR for his work seven (7) days a week. The CONTRACTOR shall determine his own work schedule.

6.8.2 The work provided for in these CONTRACT DOCUMENTS shall be completed in the calendar day time stated on the PROPOSAL. A "calendar day" shall consist of 24 hours and measured from midnight to the next midnight.

6.8.3 Failure to complete the PROJECT on time shall result in the application of liquidated damages against the CONTRACTOR as defined herein.

6.8.4 CONTRACTOR must take into account their expected down-times due to typical weather conditions at the time the work is performed, equipment breakdowns, labor shortages, scheduling conflicts, material delivery delays, recognized holidays or any other incidents or conditions which can be expected to occur on a project of this size and magnitude. The

CONTRACTOR'S failure to properly staff the job, failure to manage the work or failure to allow for usual weather delays shall not entitle the CONTRACTOR to additional time.

6.8.5 No extensions of contract time due to weather delays shall be considered by the OWNER unless the OWNER is satisfied that the weather was significantly severe and unusual for long periods of time in which the work is performed and that the overall PROJECT completion time was, in fact, truly impacted by the severe and unusual weather. The burden to prove "severe" and "unusual" weather is upon the CONTRACTOR.

6.8.6 Time for completing this project is 120 calendar days. The tank shall be placed back into service by the OWNER.

6.9 OCCUPANCY OF SITE

6.9.1 Occupancy of the job site by the CONTRACTOR'S workmen for residential purposes during the

PROJECT shall not be allowed.

6.10 EXTERIOR WASHING

6.10.1 CONTRACTOR'S attention is directed to the exterior, between-coat washing requirements as outlined in Part T-4, PAINTING.

6.11 SEQUENCING OF REPAIR WORK

6.11.1 Item No. 4.1, above, outlines the required general sequence of the major items of work (steel repairs, painting, disinfection, etc.).

6.11.2 Part T-2, STEEL REPAIRS, lists numerous items of repair/replacement work on certain tank members which can be considered safety appurtenances (safety climb devices, handrails, ladders, access openings, etc.).

6.11.3 The sequence of installation and provisions for any temporary safety appurtenances during the repair/replacement work on these safety related tank appurtenances will be the sole responsibility of the CONTRACTOR.

6.12 INSPECTION

6.12.1 CONTRACTOR must be aware that the OWNER or the ENGINEER may not provide full-time construction monitoring/inspection services on this PROJECT.

6.12.2 As described in other sections of these TECHNICAL SPECIFICATIONS, monitoring, witnessing and/or inspection of the CONTRACTOR'S quality control by the ENGINEER is required at designated points in the PROJECT before the work can proceed.

6.12.3 It is the CONTRACTOR'S sole responsibility to ensure that each item of work is completed in accordance with the CONTRACTOR'S Quality Control Program, to notify the ENGINEER well in advance as to the schedule of required inspections, and to inform the ENGINEER in advance of any condition which may affect the ENGINEER'S schedule of inspection (weather, equipment breakdowns, labor/material shortages, etc.).

6.13 CONTRACTOR SAFETY

6.13.1 CONTRACTOR shall be fully responsible for safety on his job site.

6.13.2 CONTRACTOR shall follow OSHA’s Confined Space Entry Program Requirements.

PART T-2 - TS

STEEL REPAIRS

PART T-2

1.1 This Part T-2 of the TECHNICAL SPECIFICATIONS provides for the following:

1.1.1 Inspection blast cleaning.

1.1.2 Steel repairs and alterations to the existing tank appurtenances.

1.1.3 Additions of new steel appurtenances.

1.1.4 Removal of surplus items.

1.1.5 Unit price & Extra work.

1.1.6 CONTRACTOR qualifications.

2.0 STEEL REPAIRS

2.1 The inspection blasting, alterations, additions, removal of surplus items and unit price work are grouped as follows and as shown on the BID SCHEDULE:

2.1.1 Group I — Inspection blasting.

2.1.2 Group II — Modifications.

2.1.3 Group III — Accessories.

2.1.4 Group IV - Demolition.

2.1.5 Group V - Unit Price & Extra Work.

2.1.6 Group VI - Treatment & Disposal of Hazardous Waste.

2.2 GROUP I — Inspection Blasting

2.2.1 Blast Cleaning — CONTRACTOR is to abrasive blast clean the following areas at the specific locations selected by the ENGINEER:

a) Exterior Surfaces.

b) Interior & dry surfaces.

This inspection blasting shall be performed using a maximum of 500 lbs. of abrasive material in any one day. Blast containment for this cleaning work shall not be required, but at no time shall this type of work create a nuisance condition.

2.2.2 Inspection — CONTRACTOR is to provide the ENGINEER with assistance and safe access to the blast cleaned areas. The ENGINEER’S inspection shall be completed in not more than 2 hours at each area listed above.

2.2.3 Repair Work — The repairs (if required) shall be determined based on the findings of the

ENGINEER’S inspection. Payment for these repairs is provided for in PROPOSAL.

2.3 GROUP II — Modifications

2.3.1 Overflow Pipe Repair — Repair overflow pipe elbow (welded stee) in accordance with the

Technical Specification & Drawings.

2.4 GROUP III - Accessories

2.4.1 New Outside Safety Climb Devices (SCD) — Install new, stainless-steel, 3/8" dia., cable-type SCD's on the outside tower and roof ladders. SCD's shall be manufactured by D. B.

Industries, or approved equal. Roof ladder SCD cable shall be one-piece. Install a sufficient number of cable stand-off brackets on the curved roof ladder so that the minimum clearance between the SCD cable and ladder rungs is 4" at any point.

NOTE: Positioning of mounting brackets and tensioning of cables shall be in strict accordance with manufacturer's instructions.

2.4.2 New Inside Safety Climb Devices (SCD) — Install new, stainless-steel, 3/8" dia., cable-type SCD's on the inside water compartment and riser ladders. SCD's shall be manufactured by D. B. Industries, or approved equal.

NOTE: Positioning of mounting brackets and tensioning of cables shall be in strict accordance with manufacturer's instructions.

2.4.3 Replace 24" ø Roof Vent Neck & Cover - Replace the existing roof vent & cover with a new 24" ø steel vent neck & fiberglass cover in accordance with the Technical Specification

& Drawings

2.4.4 Replace Riser Rods, Diagonal Bracing, & Struts - Replace the riser rods, diagonal bracing, & struts in accordance with the Technical Specification & Drawings.

2.4.5 Replace Overflow Flap Valve - Replace overflow flap valve in accordance with the Technical

Specification & Drawings.

2.4.6 Replace Tower Ladder - Replace tower ladder in accordance with the Technical Specification

& Drawings.

2.4.7 Replace Exterior Shell Ladder — Replace exterior shell ladder in accordance with the

2.4.8 Replace Exterior Roof Ladder — Replace exterior roof ladder in accordance with the

2.4.9 Replace Water Compartment Ladder — Replace water compartment ladder in accordance with the Technical Specification & Drawings.

2.4.10 Replace 30" ø Roof Manway - Replace the existing roof manway with a new 30" ø manway in accordance with the Technical Specification & Drawings.

2.4.11 New Ladder Gate - Install a new “Ladder Gate” on tower ladder in accordance with the

Technical Specification & Drawings

2.4.12 New Pressure Gauge & Sample Spigot - Install a new pressure gauge & sample spigot in accordance with the Technical Specification & Drawings.

2.4.13 New Concrete Splash Pad — Install a new concrete splash pad in accordance with the

2.4.14 New Interior Bowl Ladder - Install a new interior shell ladder in accordance with the Technical

2.4.15 Replace 30" ø Shell Manway — Replace shell manway in accordance with the Technical

2.5 GROUP IV - DEMOLITION

The following items are no longer required and are to be demolished. The CONTRACTOR is to remove each one leaving the surfaces in the immediate area free of any burrs, projections, undercutting of welds, reduction of plate thickness or any other conditions which might reduce structural strength or leave the surfaces unsuitable for painting. Grind all corners and edges smooth. Surplus materials to be disposed of by the CONTRACTOR, unless noted otherwise.

2.5.1 Roof Manway - Remove the existing roof manway.

2.5.2 Roof Vent & Cover - Remove the existing roof vent & cover.

2.5.3 Riser Rods - Remove the existing Riser Rods.

2.5.4 Diagonal Bracing - Remove the existing Diagonal Bracing.

2.5.5 Struts - Remove the existing struts.

2.5.6 Overflow Flap Valve - Remove the existing overflow flap valve.

2.5.7 Exterior Shell Ladder - Remove the existing exterior shell ladder.

2.5.8 Exterior Roof Ladder - Remove the existing exterior roof ladder.

2.5.9 Water Compartment Ladder - Remove the existing water compartment ladder.

2.5.10 Dry Riser Manway - Remove the existing dry riser manway.

2.5.11 Tower Ladder - Remove the existing tower ladder.

2.5.12 Interior Roof Ladder - Remove the existing interior roof ladder.

2.4.13 Shell Manway - Remove the existing shell manway.

2.4.14 Exterior Ladder - Remove the existing exterior ladder.

2.6 GROUP V - UNIT PRICE WORK

The following items of work shall be performed by the CONTRACTOR at the specific direction of the

OWNER and ENGINEER and at the unit prices quoted by the CONTRACTOR on the PROPOSAL.

2.6.1 Spot Welding Pits - Spot weld concentrated areas of deep pitting.

2.6.2 Epoxy Seal Pits - Epoxy seal isolated pitted areas.

2.6.4 Patches - Install 1/4" x 6" x 6" patch plates on the exterior at a cost per patch plate. Full fillet weld and grind smooth.

2.6.5 Re-weld Bowl Seams - Gouge and Re-weld bowl seams only upon written authorization from the ENGINEER.

2.7 GROUP VI - TREATMENT & DISPOSAL OF HAZARDOUS WASTE

2.7.1 Interior Painting - Water Compartment - Abrasive blast clean all interior surfaces of the water compartment to a “near white” grade of surface preparation. Apply the paint system identified in these Technical Specifications.

2.7.2 Interior Painting - Dry Surfaces - Pressure wash all interior pedestal, shaft, and access tube surfaces, including appurtenances, to remove all dirt and contamination. Spot abrasive blast clean all rust and pain failures and apply the paint system identified in these Technical

Specifications.

2.7.3 Exterior Painting, Including Tank Sign/Graphics - Abrasive blast clean all steel surfaces, including appurtenances, to a “commercial blast” grade of surface preparation. Apply the paint system identified in these Technical Specifications.

2.7.4 Disinfection and Hydro Testing - After all repairs and painting work are completed and the interior coating system is completely cured, disinfect the entire interior surfaces of the water compartment in accordance with Method 2 (spray) of the AWWA Standard C652-86 -

Disinfection of water Storage Facilities. Hydro Test the tank for leaks and place the tank in service.

3.0 EXTRA WORK

3.1 It is recognized that the repair/cleaning operations may uncover defective existing welds, damaged tank appurtenances or damaged structural members which were not apparent or accessible at the time this tank was inspected or covered by the Unit Price work listed above. Remedial/replacement repair work, if required, will be determined and authorized by the ENGINEER (and approved by the OWNER) in a timely manner so as to minimally disrupt the Sequence Of Work. Extra work shall be performed and paid for as follows

3.1.1 Miscellaneous Welding (Short Duration) - At the specific direction of the OWNER and

ENGINEER, CONTRACTOR is to re-weld or repair any existing defective welds, appurtenances or structural members at the hourly rate stated in the CONTRACTOR'S

Proposal Form. This hourly work, if needed, will be limited to short duration items (less than four 4 man-hours). The quoted rate shall include the cost of a welding machine, a qualified welder, welding electrodes, weld rods and other expendables. Any required material cost will be paid by the OWNER at actual cost plus fifteen percent (15%). This hourly rate shall not include the CONTRACTOR'S field supervisor's or foreman's time. See Group V, Bid Item V-

6 in the PROPOSAL.

3.1.2 Miscellaneous Welding (Long Duration) - Any repair, replacement or re-welding work in excess of four (4) man-hours shall be performed on a negotiated lump sum basis to be quoted by the CONTRACTOR. This lump sum amount shall be based on a detailed scope of work as determined by the ENGINEER. This lump sum cost will be incorporated into the

Base Contract and paid for in accordance with a written Change Order as prepared by the

ENGINEER.

4.0 SCHEDULING & COORDINATION OF REPAIR WORK

4.1 CONTRACTOR must arrange for and complete all shop fabrication, purchasing of manufactured parts, and delivery to the job site early in the PROJECT schedule so as not to hinder or delay the specified

Sequence Of Work.

4.2 CONTRACTOR must take into account the work to be done by the OWNER and ENGINEER (Item No.

2.1, above), must provide sufficient advance notice to the OWNER and ENGINEER, and must allow sufficient time in his schedule for this work to be done by the OWNER and ENGINEER.

5.0 WELDING

5.1 CONTRACTOR will be required to furnish fully qualified and certified welders, or welding operators, to follow the CONTRACTOR'S standard welding qualification procedures, and to comply with all applicable parts of Section 8, WELDING, of the AWWA Standard D100-96 and applicable parts of Section IX, of the ASME Code in regard to welder's qualification, joint design, joint preparation, joint fit-up, welding sequence, weld testing, and any other aspect of the shop or field welding.

5.2 CONTRACTOR shall furnish copies of all Welder Qualification Certificates to the ENGINEER prior to start of field work.

5.3 The ENGINEER'S Welding Inspector may, at any time, require any welder to demonstrate and prove his ability to perform satisfactory welds in all positions.

5.4 For the purpose of distinguishing between the two different types of welds normally called "field welds", the following nomenclature will apply:

5.4.1 Welds made in the shop or on the ground at the job site and prior to installation on the tank will be referred to as "ground welds".

5.4.2 Welds made in position "in the air" after installation on the tank will be referred to as "field welds".

5.5 Joints prepared and fit up during ground assembly or after erection in the field, which exceed specified fit up gaps and/or alignment, must be called to the attention of the ENGINEER before proceeding with the welding.

5.6 All butt joints, regardless of position or thickness, must have full penetration and fusion for the entire length of the joint. All lap joints, regardless of position or thickness, must have full fillet welds unless smaller weld sizes are specified.

5.7 Intermittent welding or tack welds (in the final assembly) will not be permitted at any new joints.

Strength welds and/or seal welds must be continuous throughout the entire length of the joint.

5.8 CONTRACTOR will be required to complete all repairs and new work by grinding, chipping, and/or wire brushing all new welded seams, joints, sharp edges, corners, cuts, burned areas, or similar places to eliminate any sharp corners, burrs, new weld spatter, etc.

5.9 All joints on new work or repairs, if not already shown on the CONTRACT DRAWINGS, must be seal welded.

5.10 Restrictions - At no time will the CONTRACTOR be allowed to burn holes in, cut any structural members, weld lugs on, or make any changes to any part of the tank or appurtenances unless already shown on the CONTRACT drawings or approved drawings, or unless prior approval in writing is granted by the ENGINEER.

6.0 QUALIFICATION OF CONTRACTOR’S WORKERS

6.1 All field supervisors and craftsmen assigned to do any work on these repairs must be fully qualified in the field of work assigned to each worker.

6.2 The ENGINEER reserves the right to require burners, chippers, grinders, layout men, welders, ironworkers, pipe fitters, electricians and other craftsmen to either demonstrate or furnish written certification from an agency recognized by the ENGINEER of their ability to do first class work.

6.3 CONTRACTOR’S on-site representative must be capable of reading and writing the English language.

6.4 It is the intent of these SPECIFICATIONS that the qualifications of the craftsmen performing the repairs, alterations and addition of new appurtenances must be the same as was required during the original erection of the tank, as well as any new qualifications required by the current issue of the reference standards listed in this SPECIFICATION.

7.0 DRAWINGS & ORIENTATION OF APPURTENANCES

7.1 The DRAWINGS included in these TECHNICAL SPECIFICATIONS shall not be considered detailed fabrication and installation drawings. Unless required by an extra work item and requested by the

ENGINEER, the CONTRACTOR will not be required to submit any drawings for approval.

7.2 All repairs to existing appurtenances and addition of new appurtenances must be installed at locations shown on the CONTRACT DRAWINGS or at locations selected by the ENGINEER in the field.

7.3 If there is any doubt whatsoever as to the intent of the SPECIFICATIONS or as to the amount of any dimension or location of any appurtenance, the CONTRACTOR'S supervisor must request and receive complete clarification from the ENGINEER before proceeding with the installation.

PART T-3 - TS

Blast Debris

BLAST DEBRIS

PART T-3

1.1 This Part T-3 of the TECHNICAL SPECIFICATIONS provides for the following:

1.1.1 Handling of interior blast debris.

1.1.2 Disposal of non-hazardous exterior blast debris.

1.1.3 On-site treatment and disposal of hazardous waste blast debris.

1.1.4 CONTRACTOR qualifications.

2.0 INTERIOR BLAST DEBRIS

2.1 All existing interior paint systems contain <0.025% lead by weight.

2.2 The blast debris generated during the removal of the existing inside paint system shall be removed from the tank, stockpiled and kept covered at all times. Precautions must be taken to prevent the debris from being wind blown off the site or washed onto adjacent property or drainage systems by rainfall.

2.3 The CONTRACTOR will transport the blast debris to a duly licensed Subtitle “D” class waste disposal facility using duly licensed transporters. All costs associated with disposal shall be paid for by the

CONTRACTOR.

2.4 Copies of all Non-Hazardous Waste Transport Manifests shall be furnished to the ENGINEER and

OWNER.

3.0 CLASSIFICATION OF EXTERIOR BLAST DEBRIS

3.1 The existing exterior paint systems:

3.1.1 All existing interior paint systems contain <0.025% lead by weight.

3.2 At the beginning of the exterior blasting operations, the CONTRACTOR will sample, test and classify the blast debris in accordance with EPA SW846.

3.3 Until classification, the material shall be assumed to be Hazardous Waste and handled accordingly.

3.4 If the material is classified as "non-hazardous", then it shall be disposed of in accordance with

Paragraph No. 4.0, below. This work shall be part of the CONTRACTOR'S BASE BID scope of work as shown on the PROPOSAL.

3.5 If the material is classified as "hazardous", then it shall be treated and disposed of in accordance with

Paragraph No. 5.0, below.

4.0 DISPOSAL OF NON-HAZARDOUS BLAST DEBRIS - (SUBSIDIARY TO THE CONTRACT)

4.1 The blast debris shall be placed in covered, steel containers furnished by the CONTRACTOR and maintained in a secure state at the site. CONTRACTOR shall handle and store all blast debris in accordance with all Federal and State environmental regulations.

4.2 The CONTRACTOR shall engage a fully qualified and experienced DISPOSAL SUB-CONTRACTOR to provide all necessary labor, superintendence, machinery, equipment, tools and materials to perform the transportation and disposal of the blast debris.

4.3 The DISPOSAL SUB-CONTRACTOR will transport the blast debris to a duly licensed waste disposal facility using duly licensed transporters.

4.4 DISPOSAL SUB-CONTRACTOR will handle, treat, load, stow, transport, store and dispose of the blast debris in a safe and workmanlike manner and in full compliance with all valid and applicable statutes, ordinances, orders, rules and regulations of the Federal, State and local governments in whose jurisdictions such activities are performed under this CONTRACT.

4.5 All vehicles or vessels, containers and personnel to be provided by DISPOSAL SUB-CONTRACTOR in the performance of the treatment and disposal work shall have obtained or will obtain all permits, licenses, certificates or approvals required to comply with valid and applicable statutes, ordinances, orders, rules and regulations of the Federal, State and local governments.

4.6 The disposal facility (to be selected by the DISPOSAL SUB-CONTRACTOR) shall have issued, as of the date of execution of this CONTRACT, all permits, licenses, certificates or approvals, required by valid and applicable statutes, ordinances, orders, rules and regulations of the Federal, State and local governments in which such facility is located necessary to allow such facility to accept and store or incinerate the blast debris.

4.7 Copies of all Class I Non-Hazardous Waste Transport Manifests shall be furnished to the ENGINEER and OWNER.

4.8 Containment of exterior blast debris must be maintained throughout the exterior blast process even if blast debris is determined to be non-hazardous.

5.0 ON-SITE TREATMENT AND DISPOSAL OF HAZARDOUS WASTE BLAST DEBRIS

5.1 The blast debris shall be placed in covered, steel containers furnished by the CONTRACTOR on a daily basis.

5.2 The CONTRACTOR shall engage a fully qualified and experienced WASTE TREATMENT SUB-

CONTRACTOR to provide all necessary supervision, labor, machinery, equipment, tools and materials to perform on-site hazardous waste treatment, containerization, transportation and disposal of the blast debris.

5.3 Treatment being described as a "chemical fixation and stabilization process" to render the debris non-hazardous (less than 0.75 ppm for lead).

5.4 All hazardous waste blast debris shall be treated on-site. No contaminated or untreated materials will be allowed to leave the site.

5.5 The WASTE TREATMENT SUB-CONTRACTOR shall employ the latest and best available treatment technologies in accordance with EPA guidelines.

5.6 All treated and untreated materials shall be kept covered and dry at all times.

5.7 The WASTE TREATMENT SUB-CONTRACTOR will arrange for and pay the cost of all "Final Analytical

Test On Processed Waste".

5.7.1 Testing shall be performed on each container prior to removal for disposal.

5.7.2 Copies of all testing shall be to be furnished to the ENGINEER and OWNER as soon as available.

5.8 Copies of the WASTE TREATMENT SUB-CONTRACTOR'S selected testing lab's Quality Control

Program shall be furnished to the ENGINEER and OWNER prior to testing.

5.9 The CONTRACTOR shall engage a fully qualified and experienced DISPOSAL SUB-CONTRACTOR to provide all necessary superintendence, labor, machinery, equipment, tools and materials to perform the transportation and disposal of the treated debris.

5.10 The DISPOSAL SUB-CONTRACTOR will remove the treated waste and transport to a duly licensed waste disposal facility using duly licensed transporters.

5.11 DISPOSAL SUB-CONTRACTOR will handle, treat, load, stow, transport, store and dispose of the treated waste in a safe and workmanlike manner and in full compliance with all valid and applicable statutes, ordinances, orders, rules and regulations of the Federal, State and local governments in whose jurisdictions such activities are performed under this CONTRACT.

5.12 All vehicles or vessels, containers and personnel to be provided by DISPOSAL SUB-CONTRACTOR in the performance of the treatment and disposal work shall have obtained or will obtain all permits, licenses, certificates or approvals required to comply with valid and applicable statutes, ordinances, orders, rules and regulations of the Federal, State and local governments.

5.13 The disposal facility (to be selected by the DISPOSAL SUB-CONTRACTOR) shall have issued, as of the date of execution of this CONTRACT, all permits, licenses, certificates or approvals, required by valid and applicable statutes, ordinances, orders, rules and regulations of the Federal, State and local governments in which such facility is located necessary to allow such facility to accept and store the treated waste.

6.0 DOCUMENTATION

6.1 After the removal and disposal of all treated waste, the WASTE TREATMENT SUB-CONTRACTOR shall submit to the OWNER and ENGINEER the following documentation:

6.1.1 TCEQ Notification Of Treatment For Characteristic Hazardous Waste

6.1.2 Certification For Treated Characteristically Hazardous Waste

6.1.3 Waste Analysis Plan For Treated Characteristic Hazardous Waste

6.1.4 TCEQ Waste Treatment Approval

6.1.5 Requests For Non-Hazardous Waste Disposal, Waste Characterization Data Sheet and Final

Waste Analysis

6.1.6 Laboratory QC Report

6.1.7 Class II/III Non-Hazardous Waste Transport Manifests

6.2 The above documentation shall be assembled into booklet form with separate copies furnished to the

OWNER and the ENGINEER.

7.0 QUALIFICATION OF WASTE TREATMENT SUB-CONTRACTOR

7.1 The WASTE TREATMENT SUB-CONTRACTOR shall be experienced in the handling and on-site treatment of lead-contaminated blasting debris.

7.2 The WASTE TREATMENT SUB-CONTRACTOR shall, at the request of the ENGINEER, furnish written documentation of all similar treatment projects completed in the last three (3) years.

8.0 SPECIAL PRECAUTIONS

8.1 The WASTE TREATMENT SUB-CONTRACTOR must investigate and be aware of all site conditions, obstructions, existing drainage systems, the surrounding areas, etc.

8.2 During the treatment and removal operations, it will be the WASTE TREATMENT SUB-CONTRACTOR'S sole responsibility to take all precautions necessary to prevent any contaminated material from escaping the site boundaries or coming in direct contact with the ground at or around the site.

8.3 Should a ground or ground water contamination occur, the WASTE TREATMENT SUB-CONTRACTOR is to immediately stop work and notify the OWNER and the ENGINEER.

8.4 The WASTE TREATMENT SUB-CONTRACTOR will be responsible for any and all damages to public or private property.

8.5 The WASTE TREATMENT SUB-CONTRACTOR shall provide temporary barricading around the storage/handling/treatment area and shall post appropriate warning signs at these areas.

8.6 All ground covering materials shall be considered contaminated and handled and disposed of accordingly.

8.7 All WASTE TREATMENT SUB-CONTRACTOR personnel and any other persons at the site under the direct control of the WASTE TREATMENT SUB-CONTRACTOR shall be OSHA 1910.120 "HAZWOPER" trained and certified.

9.0 MEASUREMENT AND PAYMENT

9.1 No separate measurement will be performed for blasting, whether hazardous or not. No separate payment will be made for blasting or disposal of non-hazardous blast debris.

9.2 Payment for hazardous blast debris will be on a lump sum basis, complete, and in accordance with this specification, and to include all incidental items, appurtenances, storage, etc.

PART T-4 - TS

PAINTING

PART T-4

1.1 This Part T-4 of the TECHNICAL SPECIFICATIONS provides for the following:

1.1.1 Painting materials.

1.1.2 Surface preparation and painting of all interior surfaces.

1.1.3 Surface preparation and painting of all exterior surfaces and site piping.

1.1.4 Environmental protection systems.

1.1.5 Inspection and testing.

1.1.6 CONTRACTOR qualifications.

1.1.7 Paint application requirements.

1.2 All paint systems shall be applied in the field after the completion of all steel repairs, welding and grinding as specified in these TECHNICAL SPECIFICATIONS.

2.0 SELECTION OF PAINT AND PAINT MATERIALS

2.1 These TECHNICAL SPECIFICATIONS name the required generic paint systems for the interior and exterior surfaces.

2.2 All paint incorporated into this PROJECT shall be lead-free.

2.3 All paint, solvents and other miscellaneous paint materials for this PROJECT will be supplied by one of the following manufacturers:

2.3.1 TNEMEC CO., INC.

2.3.2 SHERWIN WILLIAMS CO.

2.3.3 PPG, INC.

2.4 The CONTRACTOR must submit the following on his/her PROPOSAL.

2.4.1 Name of the manufacturer he proposes to use for the exterior and interior paint systems.

2.4.2 The manufacturer’s catalog/series numbers.

3.0 PAINT SYSTEMS

3.1 The system required for all interior surfaces of the water compartment shall be an NSF 61 certified, two and a half (2 ½) coat hi-build, polyamide epoxy paint system consisting of a stripe coat of all weld seams and similar areas and two (2) full coats of hi-build, polyamide epoxy as specified in Paragraph

No. 7.1, below. The system required for all interior dry surfaces of the riser shall be as specified above, but will not required an NSF 61 certification.

3.2 The system required for all exterior surfaces of the tank shall be a three (3) coat epoxy/urethane system consisting of one (1) full coat of an organic zinc-rich epoxy primer, one (1) full coat of a hi-build polyamide epoxy and one (1) full coat of a polyurethane finish coat as specified in Paragraph No. 8.1 below.

3.3 Exposed concrete surfaces shall not require cleaning or painting.

3.4 Application of these systems must meet all the requirements of AWWA Std. D102-78, PAINTING STEEL WATER STORAGE TANKS, except as modified by this Section I.

4.0 ENVIRONMENTAL PROTECTION SYSTEMS

In accordance with Section §111.135 and §111.137 of the TCEQ’s “Abrasive Blasting Of Water Storage Tanks Performed By Portable Operations” the following procedures will be required during all exterior abrasive…