About this file
City of Albany Transfer Station Project Manual
This is a Project Manual containing procurement and contracting requirements, technical specifications, and bidding documents for the City of Albany Transfer Station project, a municipal construction initiative in Albany, New York. The project involves comprehensive site development at 506 Rapp Road adjacent to the Rapp Road Landfill, encompassing erosion and sediment controls, demolitions, site clearing and grubbing, earthwork, foundation construction, utility installations, stormwater and wastewater management systems, asphalt paving, fencing and gates, a pre-engineered metal transfer station building, a prefabricated scale house, truck scale and radiation detector installations, electrical systems, water services, security systems, fire suppression systems and alarms, and vegetation establishment. The City of Albany Board of Contract & Supply is accepting sealed bids for four separate prime contracts: General Construction, Plumbing Construction, Mechanical Construction, and Electrical Construction. A pre-bid conference is scheduled for 9:00 a.m. on October 21, 2026, at the project site. Sealed bids are due by 12:00 p.m. on November 17, 2026, with public opening and reading at 1:30 p.m. the same day at City Hall, Room 103. The contract times for completion are 180 days for substantial completion and 240 days for final completion from the commencement date, with liquidated damages of $500 per day for delay to substantial completion and $1,000 per day for failure to meet final completion deadlines.
Bid security in the amount of five percent of the maximum bid price is required, with successful bidders obligated to furnish construction performance and payment bonds in the full contract amount. All bidders must register with the New York State Department of Labor under Labor Law Section 220-i and provide valid registration numbers at bid submission. The project is subject to prevailing wage requirements established by the New York State Department of Labor and City of Albany living wage ordinances. Minority and Women-Owned Business Enterprise (MWBE) participation is required with specific goals outlined in the MBE/WBE Participation Requirements & Plan. Bidders must demonstrate apprenticeship program participation or agreements for contracts exceeding $250,000. The City of Albany is exempt from New York State Sales and Use Taxes, and such taxes should not be included in contract pricing. Contingency allowances are specified for each trade: $50,000 for General Construction, $25,000 for Electrical Construction, $25,000 for Mechanical Construction, and $25,000 for Plumbing Construction. Retainage provisions apply per the Agreement terms, and all contract documents are available through Bidnet at www.bidnetdirect.com, with contractors required to register to receive addenda and official bid correspondence.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
CITY OF ALBANY
TRANSFER STATION
September 2026
CHA PROJECT #: 087279.000
Prepared for:
CITY OF ALBANY
ALBANY COUNTY, NEW YORK
Prepared by:
CHA
III Winners Circle
Albany, New York 12205
(518) 453-4500
TABLE OF CONTENTS PAGE 1 OF 4
CHA PROJECT NO. 087279
\\cha-llp.com\proj\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 01 10 Table of Contents.docx SECTION 000110
CITY OF ALBANY
TRANSFER STATION
CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
TABLE OF CONTENTS
Division 00 – Procurement and Contracting Requirements 001113 Advertisement for Bids 002113 Instructions to Bidders 004100 Bid Form – Electrical Construction Contract 004100 Bid Form – General Construction Contract 004100 Bid Form – Mechanical Construction Contract 004100 Bid Form – Plumbing Construction Contract
004313.10 Bid Bond
004513.10 Bidder’s Qualifications Questionnaire
004519 Non-Collusion Affidavit
004526.10 Affidavit – Worker’s Compensation
004543 Corporate Resolutions 005200 Agreement Form – Electrical Construction Contract 005200 Agreement Form – General Construction Contract 005200 Agreement Form – Mechanical Construction Contract 005200 Agreement Form – Plumbing Construction Contract
006113.13 Construction Performance Bond
006113.16 Construction Payment Bond
007200 General Conditions 007300 Supplementary Conditions
NYSDOL Prevailing Wage Rates City of Albany MBE/WBE Participation Requirements & Plan City of Albany Living Wage Certification & Documents
Division 01 – General Requirements 011000 Summary 011200 Multiple Contract Summary 011400 Work Restrictions 012100 Allowances 012300 Alternates 012600 Contract Modification Procedures 012900 Payment Procedures 013000 Project Management and Coordination 013200 Construction Progress Documentation 013300 Submittal Procedures 014000 Quality Requirements 014200 References 014534 Structural Tests and Special Inspections 015000 Temporary Facilities and Controls 016000 Product Requirements 017300 Execution Requirements 017316 Erection of Prefabricated Steel Building 017323 Bracing and Anchoring Prefabricated Steel Building
TABLE OF CONTENTS PAGE 2 OF 4
\\cha-llp.com\proj\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 01 10 Table of Contents.docx SECTION 000110
Division 01 – General Requirements (Continued) 017700 Closeout Procedures 017839 Project Record Documents 017900 Demonstration and Training
Division 03 – Concrete 033000 Cast-In-Place Concrete
Division 04 – Masonry 042000 Unit Masonry
Division 05 – Metals 053100 Steel Decking 055000 Metal Fabrications
Division 06 – Wood, Plastics, and Composites 061000 Rough Carpentry
Division 07 – Reserved Thermal and Moisture Protection 071100 Bituminous Dampproofing 072100 Thermal Insulation 079200 Joint Sealants
Division 08 – Reserved Openings 083323 High Speed Rubber Doors 087100 Door Hardware
Division 09 – Finishes 092900 Gypsum Board 099113 Exterior Painting 099123 Interior Painting
Division 10 – Specialties 101400 Signage 104416 Fire Extinguishers
Division 11 – Equipment 115100 Low Profile Steel Deck Truck Scales 115105 Radiation Detector
Division 13 – Special Construction 133419 Metal Building Systems 133420 Prefabricated Steel Building
TABLE OF CONTENTS PAGE 3 OF 4
\\cha-llp.com\proj\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 01 10 Table of Contents.docx SECTION 000110
Division 21 – Fire Suppression 210000 General Requirements for Fire Protection Systems 210500 Basic Fire Protection Material and Methods 210529 Hangers, Supports, and Anchors 211316 Dry Pipe Sprinkler System
Division 22 – Plumbing 220000 General Requirements for Plumbing Systems 220500 Basic Plumbing Material and Methods 220523 Valves 220529 Hangers, Supports, and Anchors 220700 Plumbing Insulation 221116 Water Distribution Piping 221119 Plumbing Specialties 221316 Drainage and Vent Systems
Division 23 - Heating Ventilating & Air Conditioning 230000 General Requirements for HVAC Systems 230500 Basic Mechanical Materials and Methods 230593 Testing, Adjusting and Balancing 233400 Fans 238200 Terminals Units
Division 26 – Electrical 260010 Electrical Demolition 260500 Basic Electrical Requirements 260501 Basic Electrical Materials and Methods 260510 Temporary Power and Lighting 260519 Building Wire and Cable 260526 Grounding and Bonding for Electrical Systems 260529 Hangers and Supports for Electrical Systems 260533 Raceways and Boxes for Electrical Systems 260553 Electrical Identification 260573 Power System Studies 260583 Equipment Connections
260943.13 Digital-Networking Lighting Controls
262200 Dry Type Transformers 262416 Panelboards and Circuit Breakers 262726 Wiring Devices 262816 Safety Switches 264113 Lightning Protection System
264113.10 Lightning Protection System (Performance)
264313 Surge Protection for Low-Voltage Electrical Power Circuits 265100 Interior Lighting Fixtures 265600 Exterior Lighting
Division 27 – Communications 271513 Communications Copper Horizontal Cabling
TABLE OF CONTENTS PAGE 4 OF 4
\\cha-llp.com\proj\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 01 10 Table of Contents.docx SECTION 000110
Division 28 – Electronic Safety and Security 280000 Electronic Safety & Security 283100 Addressable Fire Alarm and Detection System
Division 31 – Earthwork
310519.13 Geotextiles
311000 Site Clearing 312000 Earth Moving 312333 Trenching and Backfilling 312500 Erosion and Sediment Control
Division 32 – Exterior Improvements 321116 Subbase Courses 321216 Asphalt Paving 321723 Pavement Marking 323115 Sliding Gate Operator System 329200 Turf and Grasses
Division 33 – Utilities 330500 Common Work Results for Utilities 330513 Manholes and Structures 330514 Precast Sanitary Structures 331112 High Density Polyethylene (HDPE) Pipe and Fittings 331120 Water Services 333110 Sanitary Utility Sewerage Piping 333201 Sewage Ejectors
334100.20 High Density Polyethylene Storm Utility Drainage Piping
Appendix Installers Qualification Data Form
ADVERTISEMENT FOR BIDS PAGE 1 OF 2
\\cha-llp.com\proj\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 11 13 Advertisement for Bids.docx SECTION 001113
ADVERTISEMENT FOR BIDS
CITY OF ALBANY
TRANSFER STATION
Sealed bids will be received by the City of Albany Board of Contract & Supply at City Hall, Room 202, 24 Eagle Street, Albany NY 12207 until 12:00 p.m. local time on November 17, 2026 for the City of Albany Transfer Station Project. Bids received will be publicly opened and read at 1:30 p.m. on November 17, 2026 at City Hall, Room 103.
The work site is located at 506 Rapp Road, Albany, NY; a property adjacent to the City of Albany Rapp Road Landfill. The work includes providing all labor, materials, machinery, tools, equipment and other means of construction necessary and incidental to the completion the work shown on the Drawings and described in these Specifications including, but not necessarily limited to, installation of erosion & sediment controls, demolitions, site clearing & grubbing, earthwork, shallow foundation construction, utility installations, stormwater management systems construction, wastewater management systems construction, asphalt concrete paving, construction of fencing & gates, pre-engineered metal transfer station building construction, pre-fabricated scale house building construction, truck scale installations, radiation detector installation, construction of electrical systems, construction of water services, construction of security systems, construction of fire suppression systems and alarm, establishing vegetation, and ancillary construction required for completion of the project.
Drawings and Specifications may be examined at Albany City Hall, Room 202, 24 Eagle Street, Albany NY 12207 from 8:30 a.m. to 5:00 p.m. and on the City of Albany Website at www.albanyny.gov/bids.aspx. Complete sets of the Drawings, Specifications, and Bid Forms may be obtained via Bidnet at www.dibnetdirect.com in accordance with the Instructions to Bidders. Contractors that obtain Contract Documents from a source other than Bidnet must register with Bidnet in order to be placed on the official Plan Holders List, receive Addenda, and receive other bid correspondence. Bids received from Contractors other than those on the official Plan Holders list will not be accepted.
A pre-bid conference will be held at 9:00 a.m. on October 21, 2026, at the project site. Representatives of the Owner and Engineer will be present to discuss the project.
All bids must be made on the official Bid Forms or an exact copy by reproduction thereof and enclosed in a sealed envelope. The following Lump Sum Bids will be received for the project as described in the Instructions to Bidders:
General Construction Prime Contract Plumbing Construction Prime Contract Mechanical Construction Prime Contract Electrical Construction Prime Contract
No Bidder may withdraw their bid within sixty calendar days after the actual date of the opening thereof. Each bid must be accompanied by a bid security in the amount of five percent of the base bid in accordance with the Instructions to Bidders. The successful Bidder will be required to furnish construction performance and payment bonds in the full amount of the contract price.
All contractors submitting bids on public work projects are required to register with the New York State Department of Labor (NYSDOL) under Labor Law Section 220-i. The registration number must be entered in the space provided on the Bid Form. Failure to provide a valid and verifiable registration number from the NYSDOL Registry at the time of bid submission will result in disqualification of the bid.
The successful bidder will be required to comply with all provisions of the Federal Government Equal Employment Opportunity clauses issued by the Secretary of Labor on May 21, 1968 and published in the Federal Register (41CFR Part 60-1, 33 F.2 7804).
ADVERTISEMENT FOR BIDS PAGE 2 OF 2
\\cha-llp.com\proj\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 11 13 Advertisement for Bids.docx SECTION 001113
Owner reserves the right to reject any and all bids, to waive any and all informalities and the right to disregard all nonconforming, non-responsive or conditional bids.
ENGINEER’s CONTACT: OWNER’s CONTACT:
David Foley, P.E. Sergio Panunzio CHA Consulting, Inc. City of Albany III Winners Circle 1 Conners Blvd.
Albany, NY 12205 Albany, NY 12204
(518) 453-4500 (518) 434-5217
INSTRUCTIONS TO BIDDERS PAGE 1 OF 7
\\cha-llp.com\proj\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 21 13 Instructions to Bidders.docx SECTION 002113
INSTRUCTIONS TO BIDDERS
PROJECT IDENTIFICATION:
a) Project Title: City of Albany Transfer Station
b) Owner: City of Albany 24 Eagle Street Albany, NY 12207
c) Engineer: CHA Consulting, Inc.
III Winners Circle Albany, New York 12205 Phone: (518) 453-4500
PARAGRAPH INDEX PAGE
1. Defined Terms
2. Copies of Bidding Documents
3. Qualification of Bidders
4. Examination of Contract Documents and Site
5. Availability of Lands for Work, etc
6. Interpretations and Addenda
7. Bid Security
8. Contract Times
9. Liquidated Damages
10. Substitute and “Or-Equal” Items
11. Subcontractors, Suppliers, and Others
12. Bid Forms
13. Submission of Bids
14. Modification and Withdrawal of Bids
15. Opening of Bids
16. Bids to Remain Subject to Acceptance
17. Award of Contract
18. Contract Security
19. Signing of Agreement
20. Prebid Conference
21. Sales and Use Taxes
22. Retainage
INSTRUCTIONS TO BIDDERS PAGE 2 OF 7
\\cha-llp.com\proj\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 21 13 Instructions to Bidders.docx SECTION 002113
1. Defined Terms.
Terms used in these Instructions to Bidders which are defined in the Standard General Conditions of the Project Manual have the meanings assigned to them in the General Conditions.
Certain additional terms used in these Instruction to Bidders have the meanings indicated below which are applicable to both the singular and plural thereof.
1.1 Bidder – one who submits a Bid directly to Owner
as distinct from sub-bidder, who submits a bid to a Bidder.
1.2 Issuing Office – the office from which the
Bidding Documents are to be issued and where the bidding procedures are to be administered.
1.3 Successful Bidder – the lowest, responsible and
responsive Bidder to whom Owner (on the basis of Owner’s evaluation as hereinafter provided) makes and award.
2. Copies of Bidding Documents
2.1 Complete sets of the Bidding Documents will be
obtained via Bidnet at www.bidnetdirect.com. If the Bidding Documents are obtained from a source other than Bidnet, the Contractor must register with Bidnet in order be placed on the official Plan Holders List, receive Addenda and receive other Bid correspondence. Bids received from Contractors other than those on the official Plan Holders list will not be accepted.
2.2 Complete sets of Bidding Documents must be
used in preparing Bids; neither Owner nor Engineer assume any responsibility for errors or misinter-pretations resulting from the use of incomplete sets of Bidding Documents.
2.3 Owner and Engineer in making copies of Bidding
Documents available on the above terms do so only for the purpose of obtaining Bids for the Work and do not confer a license or grant for any other use.
3. Qualification of Bidders
To demonstrate qualifications to perform the Work, each Bidder must be prepared to submit within five days after Bid opening upon Owner’s request detailed written evidence such as financial data, previous experience, present commitments and other such data as may be called for below (or in the Supplementary Instructions). Each Bid must contain evidence of Bidder’s qualification to do business in the state where the Project is located or covenant to obtain such qualification prior to award of the contract.
All contractors submitting bids on public work projects are required to register with the New York State Department of Labor (NYSDOL) under Labor Law Section 220-i. The registration number must be entered in the space provided on the Bid Form. Failure to provide a valid and verifiable registration number from the NYSDOL Registry at the time of bid submission will result in disqualification of the bid.
4. Examination of Contract Documents and Site.
4.1 It is the responsibility of each bidder before
submitting a Bid:
4.1.1 To examine thoroughly the Contract Docu-
ments and other related data identified in the Bidding Documents (including “technical data” referred to below);
4.1.2 To visit the site to become familiar with and
satisfy Bidder as to the general, local and site condi-tions that may affect cost, progress, performance, or furnishing of the Work;
4.1.3 To consider federal, state, and local Laws and
Regulations that may affect cost, progress, perfor-mance or furnishing of the Work;
4.1.4 To study and carefully correlate Bidder’s
knowledge and observations with the Contract Documents and such other related data; and
4.1.5 To promptly notify Engineer of all conflicts, errors, ambiguities or discrepancies which Bidder has discovered in or between the Contract Documents and such other related documents.
4.2 Reference is made to the Supplementary Condi-
tions for identification of:
4.2.1 Those reports of explorations and tests of
subsurface conditions at or contiguous to the site which have been utilized by Engineer in preparation of the Contract Documents. Bidder may rely upon the general accuracy of the “technical data” contained in
INSTRUCTIONS TO BIDDERS PAGE 3 OF 7
\\cha-llp.com\proj\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 21 13 Instructions to Bidders.docx SECTION 002113 such reports but not upon other data, interpretations, opinions, or information contained in such reports or otherwise relating to the subsurface conditions at the site, nor upon the completeness thereof for the purposes of bidding or construction.
4.2.2 Those drawings of physical conditions in or
relating to existing surface and subsurface structures (except Underground Facilities) which are at or contiguous to the site that have been utilized by Engineer in preparation of the Contract Documents.
Bidder may rely upon the general accuracy of the “technical data” contained in such drawings but not upon other data, interpretations, opinions, or infor-mation shown or indicated in such drawings or otherwise relating to such structures, nor upon the completeness thereof for the purposes of bidding or construction.
Copies of such reports and drawings will be made available by Owner to any Bidder on request. Those reports and drawings are not part of the Contract Documents, but the “technical data” contained therein upon which Bidder is entitled to rely as provided in Paragraph 4.2 of the General Conditions has been identified and established in Paragraph SC-4.2 of the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion drawn from any “technical data” or any such data, interpretations, opinions, or information.
4.3 Information and data shown or indicated in the
Contract Documents with respect to existing Under-ground Facilities at or contiguous to the site is based upon information and data furnished to Owner and Engineer by Owners of such Underground Facilities or others, and the Owner and Engineer do not assume responsibility for the accuracy or completeness thereof unless it is expressly provided otherwise in the Supplementary Conditions.
4.4 Provisions concerning responsibilities for the
adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions and Underground Facilities, and possible changes in the Contract Documents due to differing or unanticipated conditions appear in Paragraphs 4.2 and
4.3 of the General Conditions.
4.5 Before submitting a Bid each Bidder will be
responsible to obtain such additional or supple-mentary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the site or otherwise, which may affect cost, progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences or procedures of construction to be employed by Bidder and safety precautions and programs incident thereto or performing and furnishing the Work in accordance with the time, price, and other terms and conditions of the Contact Documents.
4.6 On request, OWNER will provide each Bidder
access to the site to conduct such examinations, investigations, explorations, tests, and studies as each Bidder deems necessary for submission of a Bid.
Bidder must fill all holes and clean up and restore the site to its former conditions upon completion of such explorations, investigations, tests, and studies.
4.7 Reference is made to the Supplementary
Conditions for the identification of the general nature of work that is to be performed at the site by Owner or others (such as utilities and other prime contractors) that relates to the work for which a Bid is to be submitted. On request, OWNER will provide to each Bidder for examination access to or copies of Contract Documents (other than portions thereof related to price) for such work.
4.8 The submission of a Bid will constitute an
incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article 4, that without exception of the Bid is premised upon performing and furnishing the Work required by the Contract Documents and applying the specific means, methods, techniques, sequences, or procedures for construction (if any) that may be shown or indicated or expressly required by the Contract Documents, the Bidder has given Engineer written notice of all conflicts, errors, ambiguities and discrepancies that Bidder has discovered in the Contract Documents, and the Contract documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work.
4.9 The provisions of 1-4.1 through 4.8, inclusive, do
not apply to Asbestos, Polychlorinated biphenyls (PCBs), Petroleum, Hazardous Waste, or Radioactive Material covered by Paragraph 4.5 of the General Conditions.
INSTRUCTIONS TO BIDDERS PAGE 4 OF 7
\\cha-llp.com\proj\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 21 13 Instructions to Bidders.docx SECTION 002113
5. Availability of Lands for Work, etc.
The lands upon which the Work is to be performed, rights-of-way and easements for access thereto and other lands designated for use by Contractor in performing the Work are identified in the Contract Documents. All additional land and access thereto required for temporary construction facilities, con-struction equipment, or storage of materials and equipment to be incorporated in the Work are to be obtained and paid for by CONTRACTOR. Easements for permanent structures or permanent changes in existing facilities are to be obtained and paid for by OWNER unless otherwise provided in the Contract Documents.
6. Interpretations and Addenda.
6.1 All questions about the meaning or intent of the
Bidding Documents are to be directed to Engineer.
Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Engineer as having received the Bidding Documents. Questions received less than ten days prior to the date for opening of Bids may not be answered. Only questions answered by formal written Addenda will be binding. Oral and other interpretations or clarifications will be without legal effect.
6.2 Addenda may also be issued to modify the
Bidding Documents as deemed advisable by OWNER or ENGINEER.
7. Bid Security.
7.1 Each bid must be accompanied by Bid security
made payable to OWNER in an amount of five percent of Bidder’s maximum Bid Price and in the form of a certified or bank check or a Bid Bond (on form attached, if a form is prescribed) issued by a surety meeting the requirements of Paragraph 5.1 of the General Conditions.
7.2 The Bid security of Successful Bidder will be
retained until such Bidder has executed the Agree-ment, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be returned. If the Successful Bidder fails to execute and deliver the Agreement and furnish the required contract security within fifteen days after the Notice of Award, OWNER may annul the Notice of Award and the Bid security of that Bidder will be forfeited. The Bid security of other Bidders whom OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of the seventh day after the Effective Date of the Agreement or the thirty-sixth day after the Bid opening, whereupon Bid security furnished by such Bidders will be returned.
Bid security with Bids which are not competitive will be returned within seven days after the Bid opening.
8. Contract Times.
The number of days within which, or the dates by which, the Work is to be substantially completed and also completed and ready for final payment (the term “Contract Times” is defined in paragraph 1.12 of the General Conditions) are set forth in the Agreement (or incorporated therein by reference to the attached Bid Form).
9. Liquidated Damages.
Provisions for liquidated damages, if any, are set forth in the Agreement.
10. Substitute and “Or-Equal” Items.
The Contract, if awarded, will be on the basis of materials and equipment described in the Drawings or specified and equipment described in the Drawings or specified in the Specifications without consideration of possible substitute or “or-equal” items. Whenever it is indicated in the Drawings or specified in the Specifications that a substitute or “or-equal” item of material or equipment may be furnished or used by Contractor if acceptable to Engineer, application for such acceptance will not be considered by ENGINEER until after the Effective Date of the Agreement. The procedure for submission of any such application by CONTRACTOR and consideration by ENGINEER is set forth in Paragraphs 6.7.1, 6.7.2 and 6.7.3 of the General Conditions and may be supplemented in the General Requirements.
11. Subcontractors, Suppliers, and Others
11.1 If the Supplementary Conditions require the
identity of certain Subcontractors, Suppliers and other persons and organizations (including those who are to furnished the principal items of material and equipment) to be submitted to OWNER in advance of a specified date prior to the Effective Date of the Agreement, apparent Successful Bidder, and any
INSTRUCTIONS TO BIDDERS PAGE 5 OF 7
\\cha-llp.com\proj\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 21 13 Instructions to Bidders.docx SECTION 002113 other Bidder so requested, shall within five days after Bid opening submit to OWNER a list of all such Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work for which such identification is required. Such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, person, or organization if requested by OWNER. An OWNER or ENGINEER who, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, other persons, and organization, may before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute in which case apparent Successful Bidder shall submit an acceptable substitute without an increase in Bid Price.
If apparent Successful Bidder declines to make any such substitution, OWNER may award the contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, and other persons and organizations. The declining to make requested substitutions will not constitute grounds for sacrificing the Bid security of any Bidder. Any subcontractor, Supplier, other person, or organization listed and to whom OWNER or ENGINEER does not make written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to revocation of such acceptance after the Effective Date of the Agreement as provided in paragraph 6.8.2 of the General Conditions.
11.2 In contracts where the Contract Price is on the
basis of Cost-of-the-Work Plus a Fee, apparent Successful Bidder, prior to the Notice of Award, shall identify in Writing to OWNER those portions of the Work that Such Bidder proposes to subcontract and after the Notice of Sward may only subcontract other portions of the Work with OWNER’s written consent.
11.3 No CONTRACTOR shall be required to employ
any Subcontractor, Supplier, other person, or organization against whom CONTRACTOR has reasonable objection.
12. Bid Forms.
12.1 The Bid Forms are included with the Bidding
Documents; additional copies may be obtained from Engineer (or the Issuing Office).
12.2 All blanks on the Bid Forms must be completed
by printing in black ink or by typewriter.
12.3 Bids by corporations must be executed in the
corporate name by the president or a vice-president (or other corporate officer accompanied by evidence of authority to sign) and the corporate seal must be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation must be shown below the signature.
12.4 Bids by partnerships must be executed in the
partnership name and signed by a partner, whose title must appear under the signature and the official address of the partnership must be shown below the signature.
12.5 All names must be typed or printed in black ink
below the signature.
12.6 Bids shall contain an acknowledgment of receipt
of all Addenda (the numbers of which must be filled in on the Bid Form).
12.7 The address and telephone number for
communications regarding the Bid must be shown.
12.8 Evidence of authority to conduct business as an
out-of-state business entity in the state where the Work is to be performed shall be provided in accor-dance with Paragraph 3 above. State contractor license number, if any, must also be shown.
13. Submission of Bids.
Bids shall be submitted at the time and place indicated in the Advertisement or Notice to Bidders and shall be enclosed in an opaque sealed envelope, marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted) and name and address of Bidder and accompanied by the Bid security and other required documents. If the Bid is sent through the mail or other delivery system, the sealed envelope shall be enclosed in a separate envelope with the notation “BID ENCLOSED” on the face of it.
14. Modification and Withdrawal of Bids.
14.1 Bids may be modified or withdrawn by an
appropriate document duly executed (in the manner that a Bid must be executed) and delivered to the place where Bids are to be submitted at any time prior to the opening of Bids.
INSTRUCTIONS TO BIDDERS PAGE 6 OF 7
\\cha-llp.com\proj\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 21 13 Instructions to Bidders.docx SECTION 002113
14.2 If, within twenty-four hours after Bids are
opened, any Bidder files a duly signed, written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of OWNER that there was a material and substantial mistake in the preparation of its Bid, that bidder may withdraw its Bid and bid security will be returned. Thereafter, that Bidder will be disqualified from further bidding on the Work to be provided under the Contract Documents.
15. Opening of Bids.
Bids will be opened and (unless obviously non-responsive) read aloud publicly at the place where Bids are to be submitted. An abstract of the amounts of the base Bids and major alternates (if any) may be made available to Bidders after the opening of Bids.
16. Bids to Remain Subject to Acceptance.
All Bids will remain subject to acceptance for sixty
(60) days after the day of the Bid opening, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to that date.
17. Award of Contract.
17.1 OWNER reserves the right to reject any or all
Bids, including without limitation the rights to reject any or all nonconforming, non-responsive, unbalanced, or conditional Bids and to reject the Bid of any Bidder if OWNER believes that it would not be in the best interest of the Project to make an award to that Bidder, whether because the Bid is not responsible or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by OWNER. OWNER also reserves the right to waive all informalities not involving price, time, or changes in the Work and to negotiate contract terms with the Successful Bidder.
Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.
Discrepancies between words and figures will be resolved in favor of the words.
17.2 In evaluating Bids, OWNER will consider the
qualifications of Bidders, whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices and other data, as may be requested in the Bid Form or prior to the Notice of Award.
17.3 OWNER may consider the qualifications and
experience of Subcontractors, Suppliers, and other persons and organizations proposed for those portions of the Work as to which the identity of Subcontractors Suppliers, and other persons and organizations must be submitted as provided in the Supplementary Conditions. OWNER also may consider the operating costs, maintenance requirements, performance data and guarantees of major items of materials and equipment proposed for incorporation in the Work when such data is required to be submitted prior to the Notice of Award.
17.4 Owner may conduct such investigations as
OWNER deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, pro-posed Subcontractors, Suppliers, and other persons and organizations to perform and furnish the Work in accordance with the Contract Documents to OWNER’s satisfaction within the prescribed time.
17.5 If the contract is to be awarded, it will be
awarded to lowest Bidder whose evaluation by OWNER indicates to OWNER that the award will be in the best interests of the Project.
17.6 If the contract is to be awarded, OWNER will
give Successful Bidder a Notice of Award within sixty
(60) days after the day of the Bid opening.
18. Contract Security.
Paragraph 5.1 of the General Conditions and the Supplementary Conditions sets forth OWNER’s requirements as to performance and payment Bonds.
When the Successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by the required performance and payment Bonds.
19. Signing of Agreement.
When OWNER gives a Notice of Award to the Successful Bidder, it will be accompanied by the required number of unsigned counterparts of the Agreement with all other written Contract Documents attached. Within fifteen days thereafter CONTRACTOR shall sign and deliver the required number of counterparts of the Agreement and attached documents to OWNER with the required Bonds.
Within ten days thereafter OWNER shall deliver one fully signed counterpart to CONTRACTOR. Each counterpart is to be accompanied by a complete set of the Drawings with appropriate identification.
INSTRUCTIONS TO BIDDERS PAGE 7 OF 7
\\cha-llp.com\proj\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 21 13 Instructions to Bidders.docx SECTION 002113
20. Prebid Conference.
A prebid conference will be held at 9:00 a.m. on the twenty-first day of October 2026 at the project site.
Representatives of OWNER and ENGINEER will be present to discuss the Project. Bidders are encouraged to attend and participate in the conference.
ENGINEER will transmit to all prospective Bidders of record such Addenda as Engineer considers necessary in response to questions arising at the conference. Oral statements may not be relied upon and will not be binding or legally effective.
21. Sales and Use Taxes.
OWNER is exempt from New York State Sales and Use Taxes on materials and equipment to be incorporated in the Work (Exemption No. 14- 6002058). Said taxes should not be included in the Contract Price. Refer to Supplementary Conditions SC-6.15 for additional information.
22. Retainage
Provisions concerning retainage and CONTRAC- TOR’s rights or deposit securities in lieu of retainage are set forth in the Agreement.
BID FORM – ELECTRICAL CONSTRUCTION PRIME CONTRACT PAGE 1 OF 5
V:\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 41 00 Bid Form - Electrical Construction Prime Contract.docx SECTION 004100
BID FORM – ELECTRICAL CONSTRUCTION PRIME CONTRACT
PROJECT IDENTIFICATION: City of Albany Greater Albany Landfill Stormwater Management & Surface Stabilization
CONTRACT IDENTIFICATION
AND NUMBER:
NA
THIS BID IS SUBMITTED TO:
(Name and Address of Owner)
City of Albany Board of Contract & Supply City Hall, Room 202 24 Eagle Street, Albany, NY 12207
1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Bid Times indicted in this Bid and in accordance with the other terms and conditions of the Contract Documents.
2. BIDDER accepts all of the terms and conditions of the Advertisement or Notice to Bidders and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for forty-five (45) days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within fifteen days after the date of OWNER’s Notice of Award.
3. In submitting this Bid, BIDDER represents as more fully set forth in the Agreement, that:
a. BIDDER has examined and carefully studied the Bidding Documents and the following Addenda receipt of all which is hereby acknowledged: (List Addenda by Addendum Number and Date)
b. BIDDER has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, and furnishing of the Work.
c. BIDDER is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work.
d. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except underground facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the “technical data” contained in such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the General Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not be complete for BIDDER’s purposes. BIDDER acknowledges that OWNER and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicted in the Bidding Documents with respect to underground facilities at or contiguous to the site. BIDDER has obtained and carefully studied (or assumes responsibility for having done so) all such additional
BID FORM – ELECTRICAL CONSTRUCTION PRIME CONTRACT PAGE 2 OF 5
V:\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 41 00 Bid Form - Electrical Construction Prime Contract.docx SECTION 004100 or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and underground facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price, and other terms and conditions of the Contract Documents.
e. BIDDER is aware of the general nature of Work to be performed by OWNER and others at the site that relates to Work for which this Bid is submitted as indicated in the Contract Documents.
f. BIDDER has correlated the information known to BIDDER, information and observation obtained from visits to the site, reports and drawings identified in the Contract Documents and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents.
g. BIDDER has given ENGINEER written notice of all conflicts, errors, ambiguities or discrepancies that BIDDER has discovered in the Contract Documents and the written resolution thereof by ENGINEER is acceptable to BIDDER, and the Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performing and furnishing the Work for which this Bid is submitted.
h. This Bid is genuine and not made in the interest of or on behalf of any undisclosed person, firm, or corporation and is not submitted in conformity with any agreement or rules of any group, association, organization, or corporation; BIDDER has not directly or indirectly induced or solicited any other BIDDER to submit a false or sham Bid; BIDDER has not solicited or induced any person, firm or corporation to refrain from bidding; and BIDDER has not sought by collusion to obtain for itself any advantage over any other BIDDER or over OWNER.
4. BIDDER will complete Electrical Construction Work in accordance with the Contract Documents for the following price(s):
LUMP SUM BASE BID PRICE:
(use words)
(use figures)
CONTINGENCY ALLOWANCE: $25,000.00
TOTAL LUMP SUM BID PRICE (Base Bid Plus Allowance):
(use words)
(use figures)
All specific cash allowances are included in price(s) set forth above and have been computed in accordance with paragraph 11.8 of the General Conditions.
BID FORM – ELECTRICAL CONSTRUCTION PRIME CONTRACT PAGE 3 OF 5
V:\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 41 00 Bid Form - Electrical Construction Prime Contract.docx SECTION 004100
5. BIDDER agrees that the Work will be substantially completed and completed and ready for final payment in accordance with paragraph 14.13 of the General Conditions on or before the dates or within the number of calendar days indicated in the Agreement.
BIDDER accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the times specified in the Agreement.
6. The following documents are attached to and made a condition of this Bid:
a. Resolution of Board of Directors
b. Non-Collusion Form
c. Required Bid Security in the form of a certified check or a bid bond issued by a surety
d. Required BIDDER’s Qualification Statement with supporting data
e. City of Albany MBE/WBE Participation Requirements & Plan
f. City of Albany Living Wage Certification & Documents
7. In accordance with New York State Labor Law Section 220-i, the bidder certifies that it is registered with the New York State Department of Labor (NYSDOL) for public work projects. By submission of this bid and providing the registration number in the space indicated on this bid form, the bidder affirms that its registration is current and valid as of the date of bid submission.
NYSDOL CONTRACTOR REGISTRATION NO. (per NYS LABOR LAW 220-i): _________________
Is your firm a NYS-Certified Minority and Women-Owned Business Enterprise (MWBE)? Yes☐ No☐
MWBE CERTIFICATION FILE NO. ____________________
8. Prior Performance: No bid shall be accepted from or contract awarded to any person who is in arrears to the OWNER, upon debt or contract, or who is in default as surety or otherwise upon any obligation to the said OWNER, nor shall a bid be accepted or contract awarded to any BIDDER whose performance of any previous contract was unsatisfactory.
9. Statement of Non-Investment in the Iranian Energy Sector: Pursuant to General Municipal law § 103-g, by submitting this Bid, each BIDDER and each person signing on behalf of any BIDDER certifies, and in the case of a joint Bid each party thereto certifies as to its own organization, under penalty of perjury, that to the best of its knowledge and belief that each BIDDER is not on the list created pursuant to paragraph (b) of subdivision 3 of section 165-a of the state finance law.
The list in question is maintained by the New York State Office of General Services. For further information and to view this list please go to: http://www.ogs.ny.gov/about/regs/ida.asp.
If in any case the BIDDER cannot make the foregoing certification, the BIDDER shall so state and shall furnish with the Bid a signed statement which sets forth in detail the reasons therefor. A political subdivision may award a bid to a bidder who cannot make the certification pursuant to paragraph a of N.Y. General Municipal Law § 103-g on a case-by-case basis.
10. Living Wage Ordinance: All BIDDERS who enter a Contract with the OWNER must comply with the Living Wage Ordinance 50.61.05 as adopted by the OWNER’s Common Council on September 8, 2005.
See Living Wage Certification/Declaration & Documents.
BID FORM – ELECTRICAL CONSTRUCTION PRIME CONTRACT PAGE 4 OF 5
V:\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 41 00 Bid Form - Electrical Construction Prime Contract.docx SECTION 004100
11. Apprenticeship Requirements: BIDDERS, prior to being awarded a construction Contract in excess of $250,000 shall demonstrate that it has an apprenticeship program or an apprenticeship agreement with an apprenticeship program registered with the Commissioner of the New York State Department of Labor that is appropriate to the type and scope of work to be performed. The OWNER’s Engineer, in consultation with the members of the OWNER’s Board of Contract and Supply, shall make the necessary determination as to the availability and type of apprenticeship programs appropriate to the scope of the work to be performed.
12. Communications concerning this Bid shall be sent to the following address:
13. Terms used in this Bid which are defined in the General Conditions or Instructions will have the meanings indicated in the General Conditions or Instructions.
SUBMITTED on 20 .
BID FORM – ELECTRICAL CONSTRUCTION PRIME CONTRACT PAGE 5 OF 5
V:\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 41 00 Bid Form - Electrical Construction Prime Contract.docx SECTION 004100
If BIDDER is:
An Individual By (SEAL)
(Individual’s Name) doing business as Business address:
Phone No.:
A Partnership By (SEAL)
(Firm Name)
(general partner) Business address:
Phone No.:
A Corporation By (SEAL)
(Corporation Name)
(state of incorporation) By (SEAL)
(name of person authorized to sign)
(Title) (Corporate Seal) Attest
(Secretary) Business address:
Phone No.:
Date of Qualification to do business is
A Joint Venture By (SEAL)
(Name)
(Address) By (SEAL)
(Name)
(Address) Phone Number and Address for receipt of official communications
(Each joint venturer must sign. The manner of signing for each individual, partnership and corporation that is a party to the joint venture should be in the manner indicated above).
BID FORM – GENERAL CONSTRUCTION PRIME CONTRACT PAGE 1 OF 5
V:\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 41 00 Bid Form - General Construction Prime Contract.docx SECTION 004100
BID FORM – GENERAL CONSTRUCTION PRIME CONTRACT
PROJECT IDENTIFICATION: City of Albany Greater Albany Landfill Stormwater Management & Surface Stabilization
CONTRACT IDENTIFICATION
AND NUMBER:
NA
THIS BID IS SUBMITTED TO:
(Name and Address of Owner)
City of Albany Board of Contract & Supply City Hall, Room 202 24 Eagle Street, Albany, NY 12207
1. The undersigned BIDDER proposes and agrees, if this Bid is accepted, to enter into an agreement with OWNER in the form included in the Contract Documents to perform and furnish all Work as specified or indicated in the Contract Documents for the Bid Price and within the Bid Times indicted in this Bid and in accordance with the other terms and conditions of the Contract Documents.
2. BIDDER accepts all of the terms and conditions of the Advertisement or Notice to Bidders and Instructions to Bidders, including without limitation those dealing with the disposition of Bid security. This Bid will remain subject to acceptance for forty-five (45) days after the day of Bid opening. BIDDER will sign and deliver the required number of counterparts of the Agreement with the Bonds and other documents required by the Bidding Requirements within fifteen days after the date of OWNER’s Notice of Award.
3. In submitting this Bid, BIDDER represents as more fully set forth in the Agreement, that:
a. BIDDER has examined and carefully studied the Bidding Documents and the following Addenda receipt of all which is hereby acknowledged: (List Addenda by Addendum Number and Date)
b. BIDDER has visited the site and become familiar with and is satisfied as to the general, local, and site conditions that may affect cost, progress, performance, and furnishing of the Work.
c. BIDDER is familiar with and is satisfied as to all federal, state, and local Laws and Regulations that may affect cost, progress, performance, and furnishing of the Work.
d. BIDDER has carefully studied all reports of explorations and tests of subsurface conditions at or contiguous to the site and all drawings of physical conditions in or relating to existing surface or subsurface structures at or contiguous to the site (except underground facilities) which have been identified in the Supplementary Conditions as provided in paragraph 4.2.1 of the General Conditions. BIDDER accepts the determination set forth in paragraph SC-4.2 of the Supplementary Conditions of the extent of the “technical data” contained in such reports and drawings upon which BIDDER is entitled to rely as provided in paragraph 4.2 of the General Conditions. BIDDER acknowledges that such reports and drawings are not Contract Documents and may not be complete for BIDDER’s purposes. BIDDER acknowledges that OWNER and ENGINEER do not assume responsibility for the accuracy or completeness of information and data shown or indicted in the has obtained and carefully studied (or assumes responsibility for having done so) all such additional
BID FORM – GENERAL CONSTRUCTION PRIME CONTRACT PAGE 2 OF 5
V:\ProjectSpecs\087279.000\Final\100% Submittal - Current\00 41 00 Bid Form - General Construction Prime Contract.docx SECTION 004100 or supplementary examinations, investigations, explorations, tests, studies, and data concerning conditions (surface, subsurface, and underground facilities) at or contiguous to the site or otherwise which may affect cost progress, performance or furnishing of the Work or which relate to any aspect of the means, methods, techniques, sequences, and procedures of construction to be employed by BIDDER and safety precautions and programs incident thereto. BIDDER does not consider that any additional examinations, investigations, explorations, tests, studies or data are necessary for the determination of this Bid for performance and furnishing of the Work in accordance with the times, price, and other terms and conditions of the Contract Documents.
e. BIDDER is aware of the general nature of Work to be performed by OWNER and others at the site that…