This document outlines the technical requirements for a federal contract to provide a point-to-point dedicated 10 gigabit Ethernet circuit over commercial transport using wave technology. The awarded contractor must install a circuit with 10 gigabit Ethernet handoff between buildings in Aberdeen Proving Ground, Maryland and Otis Air National Guard Base in Massachusetts. Key requirements include meeting a service date of August 3, 2023 and ensuring the round trip delay does not exceed 10 milliseconds or 10 milliseconds per 350 miles. The circuit must be engineered and provisioned with total physical path and geographic diversity from another related requirement. OpenCape Corporation was awarded contract HC101323PA210 for $309,460 on March 24, 2023 to fulfill this requirement.
1. IN ACCORDANCE WITH INQUIRY HC101322QA452, PROCEED TO PROVIDE, INSTALL, AND MAINTAIN A PT-TO-PT DEDICATED 10GB ETHERNET OVER DEDICATED, NON-ROUTED COMMERCIAL TRANSPORT USING WAVE TRANSPORT TECHNOLOGY WITH 10GB ETHERNET (LAN-PHY) HAND-OFF BETWEEN BLDG 311, ROOM 2, SWITCH ROOM, CORNER OF LONG CORNER ROAD AND PLUMB LOOP, ABERDEEN PROVING GROUND, MD 21005-5001/CCI TO BLDG 104, RM 8, FL 1, 104 JAMES GIAMMALVO ROAD, OTIS ANGB, MA 02542-1330/CCI. A. THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S MISSION. NOTE: FOR LOCATIONS THAT HAVE A TOTAL FIBER ROUTE DISTANCE OVER 600 MILES (ONE WAY), WHERE THE 10 MILLISECONDS RTD SPECIFICATION CANNOT REASONABLE BE MET, THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS PER 350 MILES MEASURED IN A STRAIGHT LINE BETWEEN THE A AND Z LOCATIONS. B. AVOID DISA MPLS/IP TRANSPORT SERVICES. 2. THE SERVICE DATE TO BE MET IS: 03 AUG 23 (SIP). THE GOVERNMENT WILL ASSESS CONSIDERATION IAW STANDARD PROVISION 42 FOR DELAY ON DELIVERY OF CIRCUIT ON CONTRACTED SERVICE DATE. 3. ESTABLISH TSP: TSP0KB8E2-02 4. SEE ATTACHMENTS AND UNIQUE INSTALLATION FACTORS FOR TECHNICAL REQUIREMENTS SPECIFIC TO THIS ORDER. 5. CONTRACTOR MUST UPLOAD NOTICE OF COMPLETION IN IDEAS. 6. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH INQUIRY# HC101322QA451 / TSR# AZ26MAR206605 AND MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END TO END FROM THE GOVERNMENT SERVICE DELIVERY POINTS (SDP) FROM INQUIRY# HC101322QA452 / TSR# AZ26MAR206601; MEANING THE PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING MANHOLES, CONDUIT, CENTRAL OFFICE LOCATIONS, AND FIBER BUILDS. ADDITIONALLY, AS A MINIMUM MUST HAVE 50 METERS PHYSICAL SEPARATION FROM INQUIRY# HC101322QA451 / TSR# AZ26MAR206605.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HC101322QA452_v1.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. TESTING PARAMETERS AND THRESHOLDS: ERROR PERFORMANCE (AVAILABILITY, SES,
DM, EFS) AND LOSS OF BIT COUNT INTEGRITY SHALL BE MEASURED AND RECORDED
OVER THE DURATION OF THE CONTIGUOUS 72 HOUR TESTING INTERVAL AND SHALL BE
MEASURED AND RECORDED PER DEFINITION IN ITU RECOMMENDATION G.826 AND
M.2100.
2. ERROR PERFORMANCE SHALL BE BETTER THAN THE FOLLOWING PARAMETER
THRESHOLDS TO BE ACCEPTABLE: AVAILABILITY SHALL BE GREATER THAN 99.5% OR
BETTER SEVERELY ERRORED SECONDS (SES) SHALL BE LESS THAN 0.02% DEGRADED
MINUTES (DM) SHALL BE LESS THAN 0.2% ERROR FREE SECONDS (EFS) SHALL BE
GREATER THAN 99%
3. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24
HOURS.
4. ROUND TRIP DELAY (RTD): RTD SHALL BE BETWEEN (60-90) MILLISECONDS.
5. THE VENDOR'S FDP INSTALLED IN THEIR COMMERCIAL SUITE. VENDOR MUST SHOW
SITE PERSONNEL LISTED ON THIS ORDER THE EXACT TERMINATION POINT WHEN
SERVICE IS COMPLETE.
6. VENDOR MUST CONDUCT A SATISFACTORY 72 HOUR END TO END TEST IAW ITU
STANDARD M.2101 PRIOR TO TURN OVER TO THE GOVERNMENT FOR ACCEPTANCE
TESTING. THE END-TO-END TEST WILL NOT BE COMPLETED WITH LOOPS.
7. THE VENDOR TEST SET/SETS MUST HAVE THE ABILITY TO PRINT OR ELECTRONICALLY
OUTPUT THE TEST RESULTS AND THOSE RESULTS MUST BE E-MAILED TO THE
ACCEPTING AUTHORITY FOR REVIEW.
8. VENDOR MUST PROVIDE THE LONG-HAUL CIRCUIT NO. AND LEC CKT ID PRIOR TO TURN
UP TO THE GOVERNMENT.
9. AVOID DISA MPLS/IP TRANSPORT SERVICES.
REMARKS:
1. BLACK TRANSPORT LAYER2 ODU-2(E)/CARRIER-ETHERNET CIRCUIT IS REQUIRED TO
SUPPORT MISSION REQUIREMENTS.
2. REQUEST CIRCUIT PROVISIONING TO RIDE VIA THE DISN AT ZERO COST TO THE
CUSTOMER.
3. CUSTOMER DESIRES AND WILL ACCEPT SERVICES SOONER IF POSSIBLE (SIP).
4. THIS CIRCUIT REQUIRES TRUE PHYSICAL PATH DIVERSITY FROM (TBD, NOT SUBMITTED
ATT) TO MEET MISSION REQUIREMENTS.
5. ANY ADDRESSEE ON THE TSO WILL NOTIFY ALL ADDRESSEES IMMEDIATELY BY
MESSAGE IDENTIFYING ANY ISSUES, PROBLEMS, OR SITUATIONS WHICH MAY PREVENT
OR DELAY THE IMPLEMENTATION OF THIS TELECOMMUNICATIONS SERVICE ORDER
(TSO).
6. ALL STATIONS WILL REVIEW THE CONFIGURATION, EQUIPMENT, CONTACT NUMBERS
AND ADDRESSES CONTAINED IN THIS TSO AND PROVIDE UPDATES TO ORIGINATOR OF
TSO ANY ERRORS SO THAT SUBSEQUENT TSOS MAY BE UPDATED.
7. TSR CONTACT POC: PRIMARY: 480 ISR WING/SCX: MR. MICHAEL CHARNECKI;
MICHAEL.CHARNEC KI.CTR@LANGLEY.AF.MIL PRIMARY TECHNICAL: 27IS/SCO: MR.
JOHNNY PAY NE; JOHNNY.PAYNE.CTR@LANGLEY.AF.MIL S. JUSTIFICATION OF SERVICE
REQUESTED: AF1067:DCGS-16-002 T. DD FORM 1368: DD FORM 1368'S (MODIFIED USE OF
LEASED COMMUNICATION FACILITIES), OR EMAIL EQUIVALENT, WILL BE SUBMITTED, AS
REQUIRED, ON THIS CIRCUIT IAW THE PROCUREMENT GUIDE FOR
TELECOMMUNICATIONS BY THE STATION DESIGNATED IN PARAGRAPH 2H AS CCO/CMO.
GUIDANCE ON SUBMISSION IS AVAILABLE AT
HTTP://WWW.DITCO.DISA.MIL/ASP/PUBLICATIONS.ASP.
DIVERSITY/AVOIDANCE INSTRUCTIONS:
1. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END
TO END TO THE GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR
AZ26MAR206601.
2. THIS REQUIREMENT MUST BE WORKED IN CONJUNCTION WITH TSR AZ26MAR206601.
3. THIS REQUIREMENT MUST BE ENGINEERED AND PROVISIONED TOTALLY DIVERSE END
TO END TO GOVERNMENT'S SERVICE DELIVERY POINTS (SDP'S) FROM TSR
AZ26MAR206601, MEANING THAT PHYSICAL PATHS ARE TOTALLY SEPARATE INCLUDING
MANHOLES, CONDUIT, (CENTRAL OFFICE LOCATIONS), AND FIBER BUILDS. ADDITIONALLY,
AS A MINIMUM THERE MUST BE A 50 METER PHYSICAL SEPARATION FROM TSR
AZ26MAR206601.
4. THE TELECOM PROVIDER MUST PROVIDE DITCO COLOR POWERPOINT DRAWINGS FOR
TECHNICAL REVIEW SHOWING THE ROUTES FROM THE COMMERCIAL D EMARCS TO THE
SUPPORTING CENTRAL OFFICES AND/OR WIRING CENTERS. D RAWINGS MUST INCLUDE
SEPARATION DISTANCES BETWEEN DIVERSE REQUIRE MENTS, TOTAL FIBER MILES AND
ROUND-TRIP DELAY (RTD), AND FIBER RO UTES RED LINED END TO END SO THE
GOVERNMENT CAN CONFIRM PHYSICAL END TO END DIVERSITY REQUIREMENTS ARE
MET. ADDITIONALLY, THE VENDOR IS TO PROVIDE DITCO WITH DETAILED CIRCUIT/PATH
CONNECTIVITY DI AGRAMS, IN KMZ OR KML FORMAT, IDENTIFYING ALL POINTS OF
PRESENCE (POP) FOR EVALUATION AND AS A FINAL RECORD OF THE INSTALLED PATH.
THESE DIAGRAMS MUST BE PROVIDED TO DISA HQ IE16 (DISA.MEADE.IE. MBX.IE16-
PROVISIONING-TEAM@MAIL.MIL) FOR HISTORICAL PURPOSES. V. TEST & ACCEPTANCE
INSTRUCTIONS:
TESTING CRITERIA:
1. THE PROVIDER MUST CONDUCT A SATISFACTORY 24-HOUR TEST FROM THE DROP
SIDE OF THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED IN THEIR EQUIPMENT
SUITE AT THE "A" LOCATION TO THEIR OR LOCAL EXCHANGE CARRIERS FDP INSTALLED
IN THEIR EQUIPMENT SUITE AT THE "Z" LOCATION AND MUST INCLUDE THE EXTENSION
BETWEEN THE COMMERCIAL DEMARC AND THE GOVERNMENT'S SDP. VENDOR MUST
ENSURE TEST SETS ARE PLACED AT THE DROP SIDE AT THE "A" LOCATION AND AT THE
"Z" LOCATION. TESTING MUST BE SATISFACTORY PRIOR TO TURN OVER TO THE
GOVERNMENT FOR ACCEPTANCE TESTING. THE VENDOR MUST TEST THE CIRCUIT FOR
24 HOURS IAW THE FULL ITU-T.Y.1564 BENCH MARKING METHODOLOGY FOR NETWORK
INTERCONNECT DEVICES STANDARD, AND AT THE COMMITTED INFORMATION RATE (CIR)
IAW ITU-T-Y.1564.
http://www.ditco.disa.mil/ASP/PUBLICATIONS.ASP
2. THIS CIRCUIT SHALL PASS A FULLY DOCUMENTED, SATISFACTORY, 72 HOUR SOAK
TEST BY DISA GOC AT SCOTT AFB, IL. PRIMARY: (C) 618-418-8627 (D) 418-8627.
3. 1 HOUR RESPONSE TIME TO RESPOND TO CUSTOMER UPON RECEIPT OF TROUBLE.
4. THE VENDOR MUST PROVIDE LIGHT LEVEL READINGS (SIGNAL STRENGTH IN DBM) ON
THE EXTENSION FROM COMMERCIAL POP TO THE GOVERNMENT SERVICE DELIVERY
POINT (SDP) AT THE "A" AND "Z" LOCATION PRIOR TO CIRCUIT TURN OVER TO THE
GOVERNMENT ENSURING LEVELS ARE WITHIN SPECS. LIGHT LEVELS MUST BE ADJUSTED
TO -3 TO -9 DBM. W.
CIRCUIT SPECIFICATIONS: SPECIFIC FORMAT TO BE USED IS: LINE RATE: 10.3125
GIGABITS/S, +- 100 PPM LINE CODE: ETHERNET
1. FIBER TERMINATION FRAME FORMAT OF ETHERNET, 802.3AE, 1310NM
2. THROUGHPUT SHALL BE REPORTED AS LAYER 2 (L2) CIR. CIR: 10G LEASED CIRCUITS,
THE VENDOR/TP IS REQUIRED TO DELIVER THE LAYER 2 CIR THROUGHPUT OF 9884.9
MBPS USING THE SPECIFIED EMIX FRAME PATTERN ABCDEFGH OF CORROSPONDING
FRAME SIZES OF 64, 128, 256, 512, 1024, 1280, 1518 AND 9000 BYTES
3. RTD: ROUND TRIP DELAY (RTD) FOR THIS DISA TRANSPORT TRUNK WILL BE MEASURED
IN MILLISECONDS FROM THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-A TO
THE CUSTOMER'S SERVICE DELIVERY POINT (SDP) SITE-Z. THE RTD SHALL BE LESS THAN
OR EQUAL TO 10 MILLISECONDS TO EFFECTIVELY SUPPORT THE GOVERNMENT'S
MISSION. NOTE: FOR LOCATIONS THAT HAVE A TOTAL FIBER ROUTE DISTANCE OVER 600
MILES (ONE WAY), WHERE THE 10 MILLISECONDS RTD SPECIFICATION CANNOT
REASONABLE BE MET, THE RTD SHALL BE LESS THAN OR EQUAL TO 10 MILLISECONDS
PER 350 MILES MEASURED IN A STRAIGHT LINE BETWEEN THE A AND Z LOCATIONS.THE
GOVERNMENT ACCEPTING AUTHORITY WILL CONFIRM THE RTD DURING THE TURN-UP
AND TEST PHASE AND IF IT DOES NOT ALIGN WITH THE CONTRACTORS PROPOSAL, DISA
IE161 WILL NOTIFY DITCO IMMEDIATELY IN WRITING.
4. ERROR PERFORMANCE: ERROR PERFORMANCE SHALL BE BETTER THAN THE
FOLLOWING PARAMETER THRESHOLDS TO BE ACCEPTABLE:
(A) AVAILABILITY SHALL BE GREATER THAN 99.5% OR BETTER.
(B) FRAME LOSS SHALL BE EQUAL TO ZERO WHEN TESTING AT 10 GIGABIT HIGHEST
FRAME RATE, AND SHALL MEET ITU-T-Y.1564 STANDARDS.
(C) JITTER SHALL BE LESS THAN 3 MSEC. DELAY SHALL BE BETTER THAN 10 MSEC.
5. MEAN TIME TO LOSS OF BIT COUNT INTEGRITY (MTTLBCI) SHALL BE GREATER THAN 24
HOURS.
6. ETHERNET FRAME SIZE WILL BE CONFIGURED TO SUPPORT MAXIMUM TRANSMISSION
UNIT (MTU) OF 9000 OCTETS (BYTES) JUMBO FRAMES. THE VENDOR MUST CONDUCT
WALK-THROUGH SITE SURVEY PRIOR TO INSTALLATION AT BOTH LOCATIONS.
7. VENDOR MUST HAVE A 24X7 NETWORK OPERATIONS CENTER
8. VENDOR REQUIRED TO HAVE CIRCUIT VISIBILITY TO ASSIST IN ANY CIRCUIT OUTAGES.
9. TELECOM PROVIDER MUST MAINTAIN OPERATIONS, MAINTENANCE AND
ADMINISTRATION MONITORING OF ETHERNET CIRCUIT.