Request for Proposal Summary

This is a Request for Proposal issued by Copper Island Academy, a tax-exempt entity located in Calumet, Michigan, for the supply and delivery of four classroom yurt kits. The Academy seeks yurt units available in 30, 32, 35, or 40 foot diameters, each equipped with two ADA-compliant doors, four windows, one skylight, and all structural components necessary for assembly. Each unit must include a sealed engineered plan set designed by a Michigan-licensed engineer, along with floor and foundation system designs. The Academy will handle site and base preparation, assembly, electrical, and heating work separately. The RFP was released November 11, 2026, with a proposal questions deadline of November 18, 2026, and a proposal submission deadline of 4:00 p.m. on November 24, 2026. No voluntary walk-through is scheduled. Deliverables include the sealed plan set within 30 business days of notice to proceed, Unit 1 delivery by February 26, 2027, and Units 2, 3, and 4 by April 16, 2027. All bids must remain valid for 30 days following the submission deadline.

Pricing must be submitted on Attachment A and include the per-unit kit cost, delivery of all four units, the Michigan-sealed engineered plan set with floor/foundation design, and energy code-compliant insulation if offered. Bidders must submit one sealed paper proposal to the Academy and one electronic copy via email. Required documentation includes Prevailing Wage Compliance Certification, Familial Disclosure Statement, School Safety Initiative Affidavit, Iran Economic Sanctions Act Certification, and three customer references. All bidders must carry motor vehicle liability insurance with $1,000,000 per occurrence limits and Commercial General Liability insurance with $1,000,000 per occurrence and $2,000,000 annual aggregate limits. Proposals are evaluated on price (35%), technical compliance and quality (25%), delivery schedule confidence (15%), experience and references (15%), and warranty coverage (10%). The successful bidder must provide a one-year workmanship warranty in addition to specified component minimums, including 10 years on the structural frame and roof/wall covers. The Academy reserves the right to reject any or all proposals and is not obligated to accept the lowest cost bid. Late withdrawal from the contract after selection will result in liquidated damages equal to 5 percent of the proposal amount.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

Copper Island Academy

Classroom Yurts 2026

REQUEST FOR PROPOSAL: THIS IS NOT AN ORDER OR OFFER

IF FOR ANY REASON YOU CANNOT RETURN THIS BID, PLEASE RETURN THIS FORM INDICATING

SO TO ENSURE THAT YOUR NAME MAY BE RETAINED ON OUR BIDDER LIST.

SCHEDULE

RFP RELEASE November 11, 2026

VOLUNTARY WALK-THRU N/A

PROPOSAL QUESTIONS DEADLINE November 18, 2026

PROPOSAL SUBMITTAL DEADLINE 4:00 p.m., November 24, 2026

SUBMIT PROPOSAL TO:

Copper Island Academy

52125 Industrial Dr. N.

Calumet, MI 49913 mlaho@copperislandacademy.org

MARK PROPOSAL:

Copper Island Academy

Classroom Yurts 2026 52125 Industrial Dr. N.

Calumet, MI 49913

ATTN: Matthew Laho

The Academy is soliciting sealed proposals for the supply and delivery of four (4) classroom yurt kits, each with a plan set signed and sealed by an engineer licensed in the State of Michigan.

COPPER ISLAND ACADEMY

CLASSROOM YURTS 2026

SCOPE OF SERVICES (SOS)

GENERAL SPECIFICATIONS:

1. Furnish and deliver four (4) yurt kits for use as classrooms, in 30, 32, 35, or 40 ft diameter. Each unit includes two (2) ADA-compliant doors, four (4) windows, and one (1) skylight.

2. This is a kit-only purchase with delivery. The Academy will complete site and base preparation.

Yurt assembly, electrical, and heating work are not included and will be contracted separately.

3. See EXHIBIT “A” for the written specification requirements.

4. See EXHIBIT “B” for an aerial view of the school campus and proposed yurt locations.

REQUIREMENTS OF BIDDER:

1. Each bidder shall complete and submit the Prevailing Wage, Familial Relationships, School Safety and the Iran Sanctions forms with the bid packet. Failure to include these documents will result in bid rejection.

2. (3) References must be provided by all prospective Bidders.

3. Successful bidder shall deliver the sealed engineered plan set no later than 30 business days after issuance of notice to proceed.

4. This project SHALL be completed by April 16, 2027, with the first unit delivered by February 26, 2027. See Exhibit A, Section 1.5.0.

5. All bids shall be good for thirty (30) days after the proposal submittal deadline.

6. Successful bidder will be required to coordinate delivery dates, site access, and unloading with the Academy.

7. The Academy will submit the sealed plan set for plan review by Houghton County and the Bureau of Fire Services (BFS). Successful bidder shall respond to plan review comments and revise the sealed plan set at no added cost to the Academy.

8. All State of Michigan and local building codes shall be strictly followed.

9. All proposals to be backed by a 1-year workmanship warranty from the contractor, in addition to the warranty minimums in Exhibit A, Section 1.6.0.

10. Successful bidder shall fully restore any damage to grass or landscaping caused by materials being delivered to the construction area(s).

CONTENTS OF PROPOSAL PACKET:

1. Proposal Cover & Schedule Document

2. Scope of Services Document

3. Pricing (ATTACHMENT A)

4. Specifications (EXHIBIT A)

5. Aerial Map of Work Limits (EXHIBIT B)

6. Various Documents (ATTACHMENT B)

GENERAL INFORMATION:

1. CHANGES TO RFP: All additions, corrections or changes to the solicitation documents will be made in the form of a written Change Form as issued by the Academy only. Bidders shall not rely upon interpretations, corrections, or changes made in any other manner, whether by telephone or in person. Additions, corrections, and changes shall not be binding unless made by such a written, signed Change Form. All written, signed Change Forms issued shall become part of the Agreement documents. Change Forms will be sent to all known potential bidders by e-mail.

2. CONTACT INFORMATION: To receive future communications related to this RFP, possible bidders are asked to immediately send contact information by email to Matthew Laho, mlaho@copperislandacademy.org; failure to do so may limit your ability to submit a complete, competitive Proposal.

3. RIGHT TO WITHDRAW BIDS: By submitting a Proposal in response to this RFP, Bidder agrees to be bound by this RFP’s terms and conditions. Proposals may be withdrawn by the Bidder without penalty at any time before notification that the Bidder’s Proposal has been selected.

However, if the Bidder withdraws after selection of its Proposal but before executing the Contract for any reason (“Late Withdrawal”), Bidder shall pay liquidated damages to the Academy in an amount equal to five percent (5%) of the amount of the Proposal (“Liquidated Damages”). The Academy and Bidder intend these Liquidated Damages to constitute compensation and not a penalty. Bidder’s payment of the Liquidated Damages shall be Bidder’s sole liability and entire obligation and the Academy’s exclusive remedy for Late Withdrawal of Bidder’s Proposal.

4. RFP, PROPOSALS AND ACCEPTANCE DO NOT OBLIGATE: The parties agree that they will not consider either distribution of this RFP or receipt of Proposals by the Academy or even notification of Proposal acceptance by the Academy as an obligation or commitment by the Academy to either purchase equipment from the Bidder or to enter into a contractual agreement. Rather, the parties understand that the Academy will have no binding obligation until it signs the Contract approved by its legal counsel.

5. TAX-EXEMPT STATUS: The Academy is a tax-exempt entity. A tax-exempt form will be provided to the successful bidder.

6. FOIA: All bids are confidential until bid opening; however, as a public entity, the Academy is subject to the Michigan Freedom of Information Act (FOIA). Information contained in proposals may be subject to FOIA requests.

7. RESPONSIBILITY: Bidder is solely responsible for ensuring its bid is received by the Academy in accordance with the solicitation requirements, before the date and time specified in this Request, and at the place specified.

8. INSURANCE: The Bidder shall purchase and maintain insurance sufficient to protect it from any and all claims which may arise out of or result from the Bidder’s services related to this RFP.

Insurance policies purchased and maintained shall include, but are not limited to, the following:

a. Motor vehicle liability insurance required by Michigan law including no-fault coverage for claims arising from ownership, maintenance or use of a motor vehicle with liability limits of not less than $1,000,000 per occurrence. Coverage shall include all owned vehicles, all non-owned vehicles, and all hired vehicles.

b. Commercial General Liability insurance for claims for damages because of bodily injury or death of any person, other than the Bidder’s employees, or damage to tangible property of others, including loss of use, which provides coverage for contractual liability, with a limit of not less than $1,000,000 each occurrence and a mandatory $2,000,000 annual aggregate.

Insurance required shall be in force through delivery and written acceptance by the Academy of all units. Products and completed operations coverage shall be maintained for the duration of the warranty periods in Exhibit A, Section 1.6.0. Certificates of insurance, acceptable to the Academy, shall be provided to the Academy no less than ten (10) working days prior to the first delivery.

All Certificates of Insurance shall contain the following clause:

1. “It is understood and agreed that the following are listed as additional insureds: The Academy, including all elected and appointed officials, all employees and volunteers, all boards, commissions, departments and/or authorities and their board members, employees and volunteers and CS Partner, its management consultant firm.”

9. NON-DISCRIMINATION: In the performance of the proposal and resultant contract, bidder agrees not to discriminate against or grant preferential treatment to any individual or group on the basis of race, sex, color, ethnicity, or national origin in the operation of public employment, public education, or public contracting. Bidder shall not discriminate against any employee or applicant for employment to be employed in the submission of this Proposal or in performance of the duties necessitated by an award of the proposed contract with respect to his or her hire, tenure, terms, conditions or privileges of employment, or any matter directly or indirectly related to employment, because of his or her race, color, religion, national origin, ancestry, gender, height, weight, marital status, age, except where a requirement as to age is based on a bona fide occupational qualification, or disability that is unrelated to the individual's ability to perform the duties of a particular job or position. Any breach of this provision will be regarded as a material breach of the contract.

10. PROPOSAL DELIVERY: Proposals must be returned no later than 4:00 p.m., November 24, 2026 (No Proposals will be accepted after this time) in a sealed envelope clearly marked:

Copper Island Academy Classroom Yurts 2026 52125 Industrial Dr. N.

Calumet, MI 49913 Attn: Matthew Laho

DELIVER TO:

Copper Island Academy 52125 Industrial Dr. N.

Calumet, MI 49913

One (1) emailed electronic copy must be submitted to mlaho@copperislandacademy.org by the deadline. The Academy will accept proposals sent only by Email under extenuating circumstances as approved by the Academy only.

11. PROPOSAL REJECTION/ACCEPTANCE: The Academy reserves the right to accept or reject any or all proposals, to waive any irregularities and to make the final determination as to the best low qualified proposal.

The Academy is not required to accept the lowest cost proposal in all or in part. The proposal award will not be based solely upon cost, but will be evaluated based upon criteria formulated around the most important features of the services, of which qualifications, experience or capacity may be overriding factors. Evaluation criteria and weights are listed in Exhibit A, Section 1.7.0.

The Academy reserves the right to waive any informalities or immaterial omissions or defects not involving prices, time or changes in the work and to reject any or all proposal, if to do so is deemed in the best interest of the Academy. In no event will an award be made until all necessary investigations are made as to the responsibility and qualification of the bidder to whom is it proposed to make such an award. Any contract awarded to a person or company who is discovered to have been in default or disqualified at the time of the awarding of the contract shall be voidable at the discretion of the Academy.

12. PROPOSAL AWARD: In the event the proposal is awarded by the Academy, a Notice of Intent to Award will be used to notify all bidders of its intent to award the proposal to the Bidder providing the best value to the Academy.

13. CONTRACT: The Academy’s award of any proposal is subject to and conditioned upon execution of a formal agreement for products and services between the successful bidder and the Academy. In submitting a proposal, the bidder acknowledges that the contents of the RFP will become incorporated within any formal agreement. This RFP does not include every term and provision which shall be included in the formal agreement. In the event that the bidder fails to execute the formal agreement within 14 days of its presentment by the Academy, the Academy may reject the selected bidder, and proceed to accept another qualified proposal, or reject all proposals.

A copy of a bidder’s suggested terms and conditions may be submitted with bidder’s proposal, however, neither the Academy’s acceptance of any proposal nor award of any contract pursuant to this RFP shall be construed as any definitive acceptance by the Academy of Bidder’s suggested terms and conditions. In the event of a conflict in terms, the order of precedence to resolve the conflict will be as follows: Michigan State law, the terms and mailto:mlaho@copperislandacademy.org conditions of the signed contract, the terms and conditions of the RFP, and last, the Bidder’s Proposal.

14. DISPUTES: In the event a bidder disagrees with the recommendation of the Academy concerning this award, the bidder is required to submit their concern(s) in writing to the Board Attorney within ten (10) business days from the date of the notice of intent to award.

15. QUESTIONS: All questions about this RFP must be received by 4:00 p.m. on November 18, 2026 in writing, via email, to:

Matthew Laho Copper Island Academy mlaho@copperislandacademy.org

Correspondence or inquiries made directly to bidders regarding their proposals from all other persons are to be directed to the person(s) designated above for appropriate review and response. Contact with other Academy staff or School Board members could be reason for disqualification.

Any significant explanation desired by a proposer, regarding the meaning or interpretation of the Request for Proposals must be requested with sufficient time allowed for a reply to reach all prospective proposers to submit their proposals. Any information given to a prospective bidder concerning the Request for Proposal will be furnished to all prospective bidders as an amendment or addendum to the Request for Proposal, if such information would be of significance to uninformed bidders. The Academy shall make the sole determination as to the significance to uninformed bidders.

ADA ASSISTANCE:

The Academy will provide necessary and reasonable auxiliary aids and services, such as signers for the hearing impaired and audio tapes of printed materials being considered, to individuals with disabilities upon two days’ notice to the Academy. Individuals with disabilities requiring auxiliary aids or services should contact the Academy by writing or calling.

ATTACHMENT A

PROJECT PRICING

Proposal Sheet for: Copper Island Academy

Contract Price for: Classroom Yurts 2026

Proposal Deadline: 4:00 p.m., November 24, 2026

Complete the column for each size offered. Leave a column blank if that size is not offered. Prices include all items in Exhibit A.

ITEM DESCRIPTION OPTION 1:

30 FT

OPTION 2:

32 FT

OPTION 3:

35 FT

OPTION 4:

40 FT

1) Price per complete yurt kit $ $ $ $

2) Quantity 4 4 4 4

3) Subtotal for four (4) kits $ $ $ $

4) Delivery of all four (4) units to the Academy $ $ $ $

5) Michigan-sealed engineered plan set, including floor/foundation system

6) Energy code compliant insulation $ $ $ $

7) Other ________________________ $ $ $ $

GRAND TOTAL $ $ $ $

Lead time from notice to proceed to sealed plans days days days days

Lead time from notice to proceed to Unit 1 delivery days days days days

Addenda / Change Forms acknowledged: No. ____ No. ____ No. ____

VENDOR INFORMATION

Company Name: ______________________________________________ Address/City/State/Zip: ______________________________________________ Email Address: ______________________________________________ Company website: ______________________________________________

Printed name and title of Authorized Company Representative:

Name

Title

Signature of Authorized Company Representative:

Date: _______________________

EXHIBIT A

1.0 CLASSROOM YURTS SPECIFICATIONS:

1.1.0 GENERAL DESCRIPTION:

1.1.1 Supply and deliver four (4) complete yurt kits for use as classrooms at Copper Island Academy, Houghton County, Michigan. Bidders may offer 30, 32, 35, or 40 ft diameter units, priced separately on Attachment A.

1.1.2 This is a kit-only purchase with delivery. A sealed engineered plan set, including the floor and foundation system design, must be included. Work by the Academy and others, not included in this scope: site preparation, kit assembly, electrical, and heating.

1.2.0 EACH UNIT INCLUDES, AT MINIMUM:

1.2.1 Two (2) doors compliant with the accessibility requirements of the Michigan Building Code and the 2010 ADA Standards for Accessible Design

1.2.2 Four (4) windows

1.2.3 One (1) skylight

1.2.4 All structural components, covers, hardware, and fasteners needed for a complete structure

1.2.5 Assembly manual and drawings

1.2.6 Base anchorage requirements, connection details, and design reactions so the Academy can build a compatible base

1.2.7 If offered with kit, energy code compliant insulation

1.3.0 STRUCTURAL DESIGN CRITERIA:

1.3.1 Every unit must meet the following design criteria. These are pass/fail requirements; a proposal that does not meet them will not be scored.

Criterion Requirement

Ground snow load 80 psf, no reductions allowed

Roof snow load 80 psf, no reductions allowed

Risk Category III

Basic wind speed 111 mph

Exposure category C

MWFRS, walls +/- 20 psf

MWFRS, roof +/- 25 psf

Internal pressure coefficient +/- 0.18

Seismic No noteworthy seismic loads

1.4.0 ENGINEERED PLAN SET:

1.4.1 The successful bidder shall provide a complete plan set signed and sealed by an engineer licensed in the State of Michigan, including structural calculations, connection and anchorage details, and design reactions at the base. The plan set must be suitable for plan review by Houghton County and the Bureau of Fire Services (BFS). The plan set shall include the design of the floor and foundation system supporting each unit, with materials, dimensions, and construction details sufficient for the Academy to build it.

1.4.2 Each proposal shall include the name and Michigan license number of the engineer who will seal the plan set, a sample sealed plan set from a prior project, and a statement confirming compliance with every Section 1.3.0 criterion or listing any exceptions.

1.5.0 DELIVERY SCHEDULE:

Deliverable Required By

Sealed plan set and anchorage details Thirty (30) business days after notice to proceed

Unit 1 delivered February 26, 2027

Units 2, 3, and 4 delivered April 16, 2027

1.5.1 Delivery is to Copper Island Academy, 52125 Industrial Dr. N., Calumet, MI 49913. Bidders shall state whether unloading labor or equipment is included and any site access requirements.

1.5.2 Bidders shall confirm they can meet these dates and coordinate delivery dates with the Academy at least ten (10) business days in advance.

1.6.0 WARRANTY:

Component Minimum

All materials and workmanship 1 year, full replacement

Structural frame (rafters, lattice, compression ring, tension cable) 10 years

Roof and wall covers, including UV degradation 10 years; any prorated terms must be stated

Doors, windows, and skylight Manufacturer warranty, terms stated

1.6.1 Warranty periods begin on the delivery date of each unit. Bidders shall attach their full written warranty, name the party responsible for claims, and state their claim response time. Warranty coverage shall not be voided by snow and wind loads within the Section 1.3.0 criteria.

1.7.0 EVALUATION CRITERIA:

1.7.1 Proposals that meet Section 1.3.0 will be scored on the following weighted criteria to determine best value.

Criterion What the Academy Evaluates Weight

Price Total cost for four units, delivery, and plans 35%

Technical compliance and quality

Completeness of specifications, materials, and engineering documentation 25%

Delivery schedule Confidence in meeting both delivery dates 15%

Experience and references Cold-climate and school or public installations 15%

Warranty Length and strength of coverage beyond minimums 10%

EXHIBIT B

ATTACHMENT B (#1): Proposed Yurt Locations

Prevailing Wage Compliance Certification

Under Michigan law, MCL 408.1101 et seq., Public Act 10 of 2023, contractors and subcontractors are required to pay prevailing wage and benefit rates to employees on state funded construction projects. These rates are set by the Michigan Department of Labor and Economic Opportunity.

This requirement does not change compliance with the Davis-Bacon Act, 40 USC 3121 et seq., for prevailing wage rates applying to federally funded or assisted projects.

I, _____________________ (bidder), certify that _______________ (company name) will follow all the requirements under Michigan law described on form WHD 9918 DTMB form.

***The current prevailing wages are located at the State of Michigan website here https://www.michigan.gov/leo/-/media/Project/Websites/leo/Documents/WAGE-HOUR/WHD-99xx-Information-Sheets/WHD-9918-PW-REQUIREMENTS-INFO-SHEET/WHD-9918-DTMB-PW-rates-1-31-2022_ad-jf_.pdf?rev=d6d173da37ed451c9da6027ef1b0c54c&hash=89C157647352E20578EFB6C578C810A8 https://www.michigan.gov/leo/bureaus-agencies/ber/wage-and-hour/prevailing-wage

ATTACHMENT B (#2)

FAMILIAL DISCLOSURE STATEMENT

All bidders must complete the following familial disclosure form in compliance with MCL 380.1267 (Public Act 232 of 2004) and attach this information to the bid.

By the attached sworn and notarized statement we are disclosing the following familial relationship(s) that exists between the owner or any employee of the bidder and any member of the school or academy board, the superintendent, executive officer, school leader or principal of the school or academy, or employee of the educational service provider. The school or academy shall not accept a bid that does not include this sworn and notarized disclosure statement.

Disclose any familial relationship and complete the form below in its entirety:

The following are familial relationships as described above (provide employee name, family contact name, family contact position, and familial relationship or NONE.)

Signature(s) ________________________________ Title: ____________________

Name of Firm: ______________________________________________

State of ____________________ County of ____________________

On this ________ day of ______________, 20____, before me a Notary Public in and for said county, personally appeared ______________________________, agent of the said firm ______________________________ and who acknowledge the same to be his free act and deed as such agent.

Notary Public Commission Expires

ATTACHMENT B (#3)

Affidavit of Bidder: Compliance with School Safety Initiative Legislation

The undersigned, the owner or authorized officer of _____________________________ (the “Bidder”), certifies to the School or Academy, that any and all persons who will work directly or indirectly for the Bidder, including, but not limited to, Bidder’s employees, agents, vendors, subcontractors or consultants, and who will work at or on any School or Academy property, shall at all times be in compliance with MCL 380.1230, 380.1230a, 380.1230c, 380.1230d, and 380.1230g and have not been convicted of any “listed offenses”. The Bidder further warrants and represents that all persons who will work directly or indirectly for the Bidder, including, but not limited to, Bidder’s employees, agents, vendors, subcontractors or consultants, and who will work at or on any School or Academy property, shall at all times be in compliance with MCL 380.1230, 380.1230a, 380.1230c, 380.1230d, and 380.1230g. In this regard, Bidder agrees, without limitation, to report within 3 business days to the School or Academy when any such person is charged with a crime listed in Section 1535a(1) of the Revised School Code or a substantially similar law, and to immediately report to the School or Academy if that person is subsequently convicted, plead guilty or plead no contest to that crime.

BIDDER: __________________________________

By: _______________________________________

Its: _______________________________________

ATTACHMENT B (#4)

Iran Economic Sanctions Act Certification

I am the __________________ (insert title) of _________________________ (insert bidder company name), or I am bidding in my individual capacity ("Bidder"), with authority to submit a binding bid for the provision of contracted services to the School. I have personal knowledge of the matters described in this Certification, and I am familiar with the Iran Economic Sanctions Act, MCL 129.311, et seq.

("Act"). I am fully aware that the School will rely on my representations in evaluating bids.

I certify that Bidder is not an Iran-linked business, as that term is defined in the Act. I understand that submission of a false certification may result in contract termination, ineligibility to bid for three (3) years, and a civil penalty of $250,000 or twice the bid amount, whichever is greater, plus related investigation and legal costs.

Signature ____________________________________

ATTACHMENT “B” (#5)

REFERENCES

1. Customer Name: Contact: Title:

Project: Phone Number:

Address: Project Date:

2. Customer Name: Contact: Title:

3. Customer Name: Contact: Title:

File details come from the government source that posted it. Updated .