This is a Request for Quote (RFQ) for grounds maintenance services at Chief Joseph Dam and Rufus Woods Lake, issued by the U.S. Army Corps of Engineers Seattle Contracting Division. The solicitation (W912DW25QA003) is a Women-Owned Small Business (WOSB) set-aside contract for comprehensive grounds maintenance, including mowing, edging, trimming, pruning, and trash removal across 39 acres with 23 acres of lawn. The contract includes a base period from 27 May 2025 to 31 March 2026 and four optional 7-month extension periods through 31 October 2029, with work to be performed seasonally from 1 April through 31 October each year.
Key requirements include maintaining a professional appearance of rural area facilities, outdoor areas, and security buildings, with specific performance standards for mowing (3-4 inch height), edging, trimming, and pruning. The contractor must provide all personnel, equipment, and materials, work between 0700-1600 hours on weekdays, and is not permitted to work on weekends or federal holidays. Contractors must be registered in the System for Award Management (SAM), carry specified insurance levels (including $500,000 general liability), and comply with safety and uniform maintenance regulations. Quotes are due by 10:00 AM PST on 20 May 2025, with award to the lowest-priced, responsive, responsible quoter.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| W912DW25RA001 Amd 0001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3. AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NUMBER
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
29. AWARD OF CONTRACT: REFERENCE OFFER
DATED . . YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3
AND 52.212-5 ARE ATTACHED. ADDENDA
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
calls)
Created On:
05 May 2025, 08:48 AM Central Daylight Time
Solicitation/Contract Form Continuation
Grounds Maintenance - Mowing, Edging, trimming, pruning, trash removal
Instructions to Quoters
1. REPRESENTATIONS AND CERTIFICATIONSCONTAINED HEREIN MUST BE COMPLETED BY QUOTERS AND RETURNED
WITH QUOTES
IF YOUR REPRESENTATIONS AND CERTIFICATIONS AREREGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT (SAM) .IF NOT, YOU CAN REGISTER ONLINE AT CHECK HERE www.sam.gov
2. Request for Quote No.: W912DW25QA003
3. See Performance Work Statement (PWS) for complete description of this requirement.
4. Quotes Due: via email to 10:00 am PST on 20 May 2025 xuejiao.sun@usace.army.mil
5. Anticipated Period of Performance: Per Performance Work statement 1.3 Period of Performance
6. PROSPECTIVECONTRACTORS: Contractors are required to be registered in the System for Awards Management (SAM) for awards resulting from solicitations.
This rule more efficiently implements the Debt Collection Improvement Act of 1996,as it requires contractors to be registered in SAM for consideration of future solicitations, awards, and payment. Registration is required prior to award of any contract, basic agreement, basic ordering agreement, or blanket purchase agreement from a solicitation.
LACK OF REGISTRATION IN THE SAM DATABASE WILL MAKE AQUOTER INELIGIBLE FOR AWARD. The web site may be accessed at www.sam.gov.
7. Award shall be made to the lowest priced; responsive, responsible quoter, whose quote conforms to the requirements of the solicitation.
8. Required Submittals:
a) Completed pricing information on Continuation of Supplies or Services and Prices/Costs page .
b) Required items in #8 below.
9. The following information is with quotation submission:required
Federal Taxpayer's ID Number:
Unique Entity ID:
Cage Code Number
This requires registration in SAM, web site for registration is www.sam.gov.
Remit to Address:
Company Name:
Address:
City/State/Zip:
Phone& Fax Numbers:
Point of Contact:
E-Mail Address:
W912DW25QA003
Small Business (Y/N):_______________________________
The quoter must provide pricing for all items in the solicitation for its quote to be acceptable to the Government.
All quoted items must meet the requirements of the Request for Quote (RFQ) including specifications stated in all attachments.
Multiple quotes are not accepted for this RFQ. If multiple quotes are received only one quote (as determined by the Contracting Officer) will be evaluated by the Government. The quote shall be determined acceptable based on the date and time received.
11. Insurance Required (FAR52.228-5):
In accordance with FAR 28.307-2,"Liability", the contractor shall procure the following minimum insurance:
Type Amount
$100,000Workman's Compensation and Employer's Liability Insurance
$500,000per occurrence General Liability Insurance
And, when automobiles are used in connection with performing the contract:
Type Amount
$200,000 per person Automobile Liability Insurance
$500,000per occurrenceBodily Injury
$20,000per occurrenceProperty Damage
12.State and Local Taxes:
The U.S. Army Corps of Engineers is exempt from paying state and local taxes per Title 4 United States Code 104-107. The U.S. Army Corps of Engineers Tax ID Number is 62-1642142.
Contractors performing services for the U.S. Army Corps of Engineers are not exempt from state and local taxes in transactions with vendors, suppliers or subcontractors.
It is the contractor's responsibility to investigate applicable federal, state, and local taxes, along with any specific exemptions that may exist. This includes any applicable Value-Added Taxes (VAT), sales, use, and excise taxes.
Continuation of Supplies or Services and Prices/Costs
Additional Information/Notes
Item Supplies/Service Quantity Unit Unit Price Amount
Base Period Chief Joseph Dam Grounds Maintenance - Mowing, Edging, trimming, pruning, trash removal See Details in Performance Work Statement PART 5: SPECIFIC TASKS AND
RESPONSIBILITIES.
Payment will only be for work performed. No payment will be made for months of paused services.
Pricing Arrangement: Firm Fixed Price
6 Months
Option Line Item
Option Period 1 Chief Joseph Dam Grounds Maintenance - Mowing, Edging, trimming, pruning, trash removal See Details in Performance Work Statement PART 5: SPECIFIC
TASKS AND RESPONSIBILITIES
Payment will only be for work performed. No payment will be made for months of paused services.
Product Service Code: S208 Pricing Arrangement: Firm Fixed Price
7 Months
Option Line Item
Option Period 2 Chief Joseph Dam Grounds Maintenance - Mowing, Edging, trimming, pruning, trash removal See Details in Performance Work Statement PART 5: SPECIFIC
TASKS AND RESPONSIBILITIES
Payment will only be for work performed. No payment will be made for months of paused services.
Product Service Code: S208 Pricing Arrangement: Firm Fixed Price
7 Months
Option Line Item
Option Period 3 Chief Joseph Dam Grounds Maintenance - Mowing, Edging, trimming, pruning, trash removal See Details in Performance Work Statement PART 5: SPECIFIC
TASKS AND RESPONSIBILITIES
Payment will only be for work performed. No payment will be made for months of paused services.
7 Months
Product Service Code: S208 Pricing Arrangement: Firm Fixed Price
Option Line Item
Option Period 4 Chief Joseph Dam Grounds Maintenance - Mowing, Edging, trimming, pruning, trash removal See Details in Performance Work Statement PART 5: SPECIFIC
TASKS AND RESPONSIBILITIES
Product Service Code: S208 Pricing Arrangement: Firm Fixed Price
7 Months
Continuation of Description
Requirements This is a non-personal services contract to provide grounds maintenance services at Chief Joseph Dam (CJD) and Rufus Woods Lake. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform grounds maintenance services at Chief Joseph Dam and Rufus Woods Lake as defined in the Performance Work Statement (PWS).
Product Service Code: S208
Performance Work Statement
Grounds Maintenance
Chief Joseph Dam, Bridgeport, WA. 98813-1120
5/2/2025
PART 1: GENERAL INFORMATION
1. Introduction/Description of Services: This is a non-personal services contract to provide grounds maintenance services at Chief Joseph Dam (CJD) and Rufus Woods Lake. The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform grounds maintenance services at
Chief Joseph Dam and Rufus Woods Lake as defined in the Performance Work Statement (PWS).
The Government shall not exercise any supervision or control over the contract service providers performing the service herein. Such contract service provided shall be accountable solely to the
Contractor who, in turn is responsible to the Government. The contractor shall perform to the standards in this contract.
1.1 Background: Chief Joseph Dam is the second-largest hydropower project in the United States.
The Dam sustains fifty-one-mile-long Rufus Woods Lake which offers a bounty of recreational opportunities. The rural area facilities, outdoor areas, project, and security building need grounds maintenance services to maintain a satisfactory facility condition and present a clean, neat, and professional appearance.
1.2 Objectives: The Contractor shall meet all the requirements of this Performance Work Statement
(PWS) to perform the general grounds maintenance services objectives. Provide grounds maintenance at Chief Joseph Dam and related facilities along Rufus Woods Lake.
1.3 Period of Performance: The period of performance shall be for one (one) base period and four
(4) options periods. The services under this contract shall be required during the period:
Base Period: 27 May 2025 –31 March 2026
Option Period 1: 1 April 2026 – 31 March 2027
Option Period 2: 1 April 2027 – 31 March 2028
Option Period 3: 1 April 2028 – 31 March 2029
Option Period 4: 1 April 2029 – 31 October 2029
Work Schedule: This is seasonal work that shall be performed from 1 April thru 31 October of each performance period. See each task under section 5.1 of this Performance Work Statement for the days and frequencies the work is required to be completed.
1.4 Hours of Operation: The work shall be accomplished between the hours of 0700 – 1600 weekdays. No work will be permitted on Saturdays, Sundays, and Federal Holidays. The
Contractor will not be reimbursed when the Government facility is closed for holidays or when due to local or national emergencies, administrative closings, or similar Government directed facility closing. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS. When hiring personnel, the
Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.5 Recognized Federal Holiday:
New Years’s Day Independence Day
Martin Luther King Jr.’s Birthday Labor Day
President’s Day Columbus Day
Memorial Day Veteran’s Day
Juneteenth Day Thanksgiving Day
Christmas Day
1.6 Place of Performance: The work to be performed under this contract will be performed at Chief
Joseph Dam, Highway 17 and Pearl Hill Rd. and U.S. Army Corps of Engineers (USACE) fee owned areas in association with the Dam and developed recreation areas along Rufus Woods
Lake. Chief Joseph Dam is located 1.5 miles upriver from Bridgeport, Washington and 70 miles upriver from Wenatchee Washington. It is 124 miles from Spokane Washington and 210 miles upriver from Seattle Washington.
1.7 Direct Costs: all const incurred by the contractor related to the performance of contract work are the responsibility of the Contractor. All travel costs that may be required during the duration of this contract will be the responsibility of the Contractor.
1.8 Safety Requirements: The Contractor shall conform to applicable OSHA, and State of
Washington, standards, as well as the Corps of Engineers Safety Requirements Manual (EM 385-
1-1), available here:
https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-
1. pdf. It is the Contractor’s responsibility to be familiar and comply with all applicable safety standards.
1.9 Accident Prevention Plan: Prior to commencement of work, the contractor shall provide the COR a written plan of the Contractor’s overall safety program. The plan must address policies and procedures for safe operation and compliance with OSHA, EM 385-1-1 and other applicable safety requirements. The plan shall include, but not be limited to, employee training and orientation, vehicle operations, public safety, level and manner of supervision, and a Job Hazard
Analysis. Safety Exposure Report; in accordance with the provisions of EM 385-1-1, Section 01
Program Management, Paragraph 01.D Accident Report and Recording, sub- paragraph 01.D.05, the Prime Contractor shall report all accidents and shall provide a monthly record of all exposure and accident experience incidental to the work. The Safety Exposure Report shall be submitted along with the monthly invoice.
1.10 Equal Opportunity for Veterans: The following resources are available to assist
USACE contractors in their outreach efforts:
U.S. Department of Labor Veterans employment: www.vets.gov/
Federal Veteran employment information: www.fedshirevets.gov/index.aspx
Veterans’ Employment and Training Service (VETS): http://www.dol.gov/vets/
Veterans Opportunity to Work (VOW) Program: http://benefits.va.gov/vow/
U.S. Army Warrior Transition Command Employment Index:
https://wtc.army.mil/modules/employers/index.html
Hiring Our Heroes initiative: www.uschamberfoundation.org/hiring-our-heroes
Guide to Hiring Veterans:
www.whitehouse.gov/sites/default/files/docs/white_house_business_council guide_to_hiring_v eterans_0.pdf https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_385-1-1.pdf http://www.vets.gov/ http://www.fedshirevets.gov/index.aspx http://www.dol.gov/vets/ http://benefits.va.gov/vow/ https://wtc.army.mil/modules/employers/index.html http://www.uschamberfoundation.org/hiring-our-heroes http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council__guide_to_hiring_veterans_0.pdf http://www.whitehouse.gov/sites/default/files/docs/white_house_business_council__guide_to_hiring_veterans_0.pdf
PART 2: SECURITY AND TRAINING REQUIREMENTS
2. Security and Training Requirement:
2.1 Security: Contractor and all associated sub-contractors’ employees shall comply with adjudication standards and procedures using the National Crime Information Center Interstate Identification
Index (NCIC-III) and Terrorist Screening Database (TSDB) (Army Directive 2014-05/AR 190-
13), applicable installation, facility and area commander installation/facility access and local security policies and procedures (provided by government representative, as NCIC and TSDB are available)
(1) For all potential new hires, the contractor first shall pre-screen candidate using the E-Verify
Program (http://www.uscis.gov/e-verify) as part of establishing the candidates’ employment eligibility. The contractor mush ensure that personnel candidates have two valid forms of
Government issued identification prior to enrollment to ensure the correct information is entered into the E-Verify system. An initial list of verified personnel candidates must be provided to the COR no later than 10 calendar days after contract award. All contractor employees working under this contract having assess to CJD will be listed on a company letterhead in alphabetical order by last name. This letter will be submitted to the COR and subsequently provided before the start of the contract and every time new personnel are hired or no longer employed by the contractor. All contractor personnel performing work under this contract must have a favorable local records and credit check (complete prior to assuming duties at CJD). Contractor shall submit the following documentation for all contractor employees working under the contract.
SF-85 Signature page.
Copy of Drivers ID
Visitor Access Roster
(2) Employee Identification. The Contractor shall be responsible for coordinating with the COR to obtain an identification badge/card for each employee prior to the employee work on site, and for requiring each employee engaged on the work to display identification. All prescribed identification shall immediately be delivered to the COR for cancellation upon the release of the employee.
2.2 Training:
AT Level 1 training: All contractor employees, to include subcontractor employees, requiring access to Army installation, facilities, controlled access area, or required network access, shall complete AT
Level 1 awareness training within 15 Calendar days after contract start date or effective date of incorporation of this requirement into the contract, whichever is applicable. Upon request, the contractor shall submit certificates of completion for each affected contractor employees and subcontractor employee, to the COR within 5 calendar days after completion of training by all employees and subcontractor personnel. AT Level I awareness training is available at the following website: https://atlevel1.dtic.mil/at/ or it can be provided by the RA ATO in presentation form which shall be documented via memorandum.
iWatch, CorpsWatch Training: The contractor and all associated sub-contractors shall receive a brief/training (provided by the RA) on the local suspicious activity reporting program. This locally developed training shall be used to inform employees of the types of behavior to watch for and http://www.uscis.gov/e-verify https://atlevel1.dtic.mil/at/ instruct employees to report suspicious activities to the project manager, security representative or law enforcement entity. This training shall be completed within 15 calendar days of contract award and within 15 calendar days of new employees commencing performance with the results reported to the COR NLT 5 calendar days after the completion of the training.
OPSEC Training: All new contractor employee shall complete Level I OPSEC Training within 30 calendar days of their reporting for duty. Additionally, all contractor employees must complete annual OPSEC awareness training. The contractor shall submit certificates of competition for each affected contractor and subcontractor employee, to the COR or other Government Representative within 5 calendar days of training completion. OPSEC awareness training is available at the following website: https://www.iad.gov/ioss/ or http://www.cdse.edu/catalog/operationssecurity.html;
or it can be provided by the RA OPSEC officer in presentation form which shall be documented via memorandum.
PART 3: DEFINITIONS & ACRONYMS
Army Regulation (AR): A United States Army Regulation. Army Regulations applicable to this contract. http://www.apd.army.mil/productmaps/administrative/armyregulation.aspx
Contactor: A supplier or vendor awarded a contract to provide specific supplies or service to the government. The term used in this contract refers to the prime.
Contracting Manager (CM): Within the context of this PWS, CM refers to the Contractor’s person with overall management responsibility for this contract. The CM shall be the Contractor’s primary point of contact between the Contracting Officer and the COR.
Contracting Officer (KO): A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
Defective Service: A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable: Anything that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
Federal Acquisition Regulation (FAR): The Federal Acquisition Regulation (FAR), 48 CFR Chapter
1, is the principal set of rules in the Federal Acquisition Regulation System. The FAR System governs the “acquisition process” by which the federal government purchase (acquires) goods and services.
Physical Security: Actions that prevent the loss or damage of Government property.
Quality Control Plan (QCP): The methodology to be used by the Contractor for surveillance to ensure services are performed in accordance with the requirements in the PWS.
Subcontractor: One that enters into a contract with a prime contractor. The Government does not have privity of contractor with the subcontractor.
Work Day: The number of hours per day the Contractor provides services in accordance with the contract.
Work Week: Monday Through Friday, unless specified otherwise.
https://www.iad.gov/ioss/ http://www.cdse.edu/catalog/operationssecurity.html http://www.apd.army.mil/productmaps/administrative/armyregulation.aspx
PART 4: CONTRACT ADMINISTRATION
4. Contract Administration and Quality Assurance
4.1 On-Site Key Personnel
4.1.1 Contracting Officer’s Representative (COR): The COR monitors all technical aspects of the contract and assists in contract administration. The COR is authorized to perform the following functions: assure that the Contractor performed the technical requirements of the contract:
perform inspections necessary in connection with contract performance: maintain written and oral communications with the Contractor concerning technical aspects of the contract: issue written interpretation of technical requirements, including Government drawings, designs, specification:
monitor Contractor’s performance and notifies both the Contracting Officer and Contractor of any deficiencies: coordinate availability of government furnished property, and provide site entry of
Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the
Contractor, State the responsibilities and limitations of the COR. The COR is not authorized to change any of the terms and conditions of the resulting order.
4.1.2 Contract Personnel: The Contractor shall notify the COR no later than one workday after any personnel changes or access requirements occur. The notice shall provide the employee’s full name, employment change effect date See 2.1.
4.1.3 Contract Manager (CM): The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operation of this contract. The contract manager or alternate shall be available between [0800-1600], Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
4.2 Quality Control / Assurance General Information
4.2.1 Quality Assurance: The Government will evaluate the Contractor’s performance under this contract in accordance with the Quality Assurance Surveillance Plan (QASP). This plan is primarily focused on what the Government will do to ensure that the Contractor has performed in accordance with the performance standards. It defines how the performance standards will be applied, the frequency of surveillance and the minimum acceptable defect rate (S). If the
Government requires the Contractor to re-do unsatisfactory work, it would be at no additional cost to the Government.
4.2.2 Quality Control: The Contractor shall develop and maintain an effective Quality Control
Program (QCP) to ensure services are performed in accordance with the PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor’s quality control program is the means by which he assures himself that his work complies with the requirements of the contract.
4.2.3 Meeting Requirements and Performance Criteria: Post Award Conference/Periodic Progress
Meetings: The Contractor agrees to attend any post award conference convened by the contracting activity or contact administration office in accordance with Federal Acquisition
Regulation Subpart 42.5. The COR and the other Government personnel, as appropriate, may meet periodically with the contractor to review the Contractor’s performance. A these meeting the Contracting Officer will apprise the Government of problems, if any, being experienced.
Appropriate action shall be taken to resolve outstanding issues. These meeting shall be at no additional cost to the Government.
PART 5: SPECIFIC TASKS AND RESPONSIBILITIES
5. Scope of Work/General Information: The Contractor is advised not to perform any services under this contract resulting in a change of work or services that affects the price of a task order unless previously negotiated and/or approved by the Contracting Officer (KO).
Area Quality/Presentation: There are 39 acres identified in Figures 1-13 that are to be maintained by the contractor, including litter pickup, edging, trimming, and pruning. Additionally, within these areas there are 23 acres of lawn to be maintained by the Contractor. All lawns shall always look well-manicured and grass clippings shall be removed, when visible, after each mowing.
Mowing in all areas shall be accomplished in a manner that will prevent tearing up or scalping the turf. The Contractor shall take precautions to prevent scalping, uneven mowing, rutting, and damage to trees, shrubs, building, parked vehicles/equipment, and utility services. The
Contractor shall be responsible for replacing or repairing turf, tree, shrubs, or irrigation sprinklers damaged by contractor operations within 10 working days of the damage occurring at no additional cost to the Government.
Debris Collection: All Surfaces contained within the Contractor Work Areas as shown in Figures
1-13 shall be maintained free of organic litter, grass clippings, weeds, gravel, dirt, and other materials. All weed and grasses growing in parking lot islands, river rock beds, and through cracks or expansion joints shall be removed. Grass clippings, dirt, leaves gravel, etc., which accumulate around wheel stops and curbs, shall be removed as necessary. Hand raking and/or mechanical sweeping will be required to remove surface accumulation of twigs, leaves, and other organic material on developed lawn areas. This work shall be done in a manner that will not damage the turf or dislodge the grass from the soil. No debris shall be left in piles at the worksites.
Equipment: Tractor mowing may be used where practical. Ruf type flotation tires or other approved type tires will be required to prevent tearing up of the turf. Hand mowing equipment shall be required to mow all areas inaccessible to tractor mowing. The Contactor shall have available sufficient mowing equipment to ensure that all areas are mowed when the available time for mowing during the week is reduced to 4 days by either Federal holidays or inclement weather.
Disposal: Natural debris (refuse) shall be transported and deposited at an appropriate landfill and the cost will be borne by the Contractor. Non-organic debris (litter) and pet waste shall be transported and deposited in on of two dumpsters supplied by the Contractor. The two dumpsters supplied by the Contractor shall be designated for contactor use only. The Government agrees to provide space for the dumpsters at Willow Flats recreation area.
Visibility: The Contractor shall wear a bright florescent vest with reflective stripes) similar to that worn by federal, state, and local agencies when performing roadside work) at all times.
5.1 Specific Tasks:
5.1.1 Trash Cans: The Contractor shall perform trash removal at all work areas and along access roads, as identified in Figures 1- 13, three days per week on Mondays, Wednesdays, and Fridays during the performance period of 1 April thru 31 October. Trash cans, pet waste cans and recycle cans shall be emptied and new plastic liners be put into them along Rufus Woods Lake areas covered under this contract which includes, but is not limited to trail heads, viewpoints, fishing areas, boat ramps and day use sites. Plastic liners for trash cans, pet waste station cans, and must have a minimum 0.002-millimeter thickness. There is a total of sixty (60) fifty-five (55) gallon trash cans, four (4) pet waste stations. Pet waste station shall have plastic liners for trash cans and the Contractor shall refill pet waste bags.
5.1.1.1 Litter Pickup: The Contractor shall pick-up all non-organic litter within 30 feet from the edges of all paved and graveled access roadway, parking lot, or path, and within six (6) playgrounds areas as identified in the Figures attached. Additionally, all picnic areas and benches will be patrolled for trash. Litter patrol and pickup will occur no less than 3 times per week.
5.1.2 Mowing: Mowing shall be performed as needed during the performance period of 1 April thru 31 October. Lawn areas shall be mowed and trimmed at frequencies necessary to maintain the lawns at a height between 3 and 4 inches, but each area will not be mowed less than once weekly. No mowing shall be required during the time period 1 November thru 31 March.
Mowing shall not occur during times when grass is wet due to irrigation, dew, or rainfall.
5.1.3 Edging: Edging shall be performed once each month during the performance period of 1
April thru 31 October. All concrete, asphalt or paved trail edges and roads located in improved areas of identified Work Areas shall be edged concurrent with each mowing. Along less defined edges, mow to the edge of the lawn or primary grass vegetation; tracks, shrubs, rip rap or fences.
Edging is the cutting and removing of all grasses and weeks which have grown and extended beyond the soil surface onto the asphalt or concrete surfaces within the developed lawn areas. All such growth shall be removed from the sidewalks, curbs, flagpole, light standards, parking lots and roads, providing a neat, even line of grass flush with the asphalt or concrete edge. All accumulation shall be swept up and removed.
5.1.4 Trimming: All areas shall be trimmed, as needed, during the performance period of 1 April thru 31 October. Vegetation shall be trimmed around trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lot bumper blocks, boulders, and other fixed obstacles. Trimming height shall match the surrounding area.
5.1.5 Pruning: Pruning shall be accomplished during the performance period 1 April thru 31
October in accordance with industry (ANSI) American National Standards Institute standards:
(ANSI Z133.1 (2017)) Arboricultural Operations – Safety Requirements, (ANSI A300 (2027)
Part 1) Pruning Standard, (ANSI A300 (2012) Part 5) Best Management practices Tree Pruning, Minimum safety clearance is 14 feet over streets, 12 feet over driveways, 8 feet over walk areas, and 4 feet from buildings. Other tree shall be pruned on an as-required bases to provide safety, clearances and/or to prevent structural damage. Topping and de-horning shall not be permitted.
The Contractor shall notify the Government when trimming/pruning around utility poles/power lines is needed. Shrubs, small trees, and other plants shall be maintained according to the
American Society of Landscape Architects’ standards. They shall be pruned as required to maintain their natural growth characteristics. Shrubs and small trees shall be trimmed and pruned to enhance the beauty and health of the plant. Hedges shall be maintained to their natural mature height and shape. Broadleaf evergreens and flowerbeds shall all be pruned annually or as required during the growth season in order to maintain a neat and uniform appearance.
PART 6: ATTACHMENT/TECHNICAL EXHIBIT LISTING:
Attachment and Figures: (Provided under Separate Cover)
Attachment 1 – Figures 1 thru 13 – Estimated Contractor Workload/ Total Work Area
Figure 1, Overview Map 1
Figure 2, Overview Map 2
Figure 3, Birding Trail/Commons Map
Figure 4, Brandt’s Landing Map
Figure 5, Buttonhook Map
Figure 6, Debris Basin Map
Figure 7, Foster Creek (Powerhouse/Security/Warehouse) Map
Figure 8, Information and Rest Area Map
Figure 9, North Shore Trailheads Map (Dunes Trailhead/ Tower Trailhead)
Figure 10, North Viewpoint/ Spillway (Upper and Lower) Map
Figure 11, Admin/ South Viewpoint Map
Figure 12, Willow Flats Map
Figure 13, Contractor Driving Routes/Area Overview
Attachment 2 – Quality Assurance Surveillance Plan (QASP)
Grounds Maintenance Contract Work Area - Overview Map 1
0 0.1 0.2
Miles µ DISCLAIMER - While the United States Army Corps of Engineers, (hereinafter referred to USACE) has made a reasonable effort to insure the accuracy of the maps and associated data, its should be explicitly noted that USACE makes no warranty, representation or guaranty, either express or implied, as to the content, sequence, accuracy, timeliness or completeness of any of the data provided herein. The USACE, its officers, agents, employees, or servants shall assume no liability of any nature for any errors, omissions, or inaccuracies in the information provided regardless of how caused.
The USACE, its officers, agents, employees or servants shall assume no liability for any decisions made or actions taken or not taken by the user of the maps and associated data in reliance upon any information or data furnished here. By using these maps and associated data the user does so entirely at their own risk and explicitly acknowledges that he/she is aware of and agrees to be bound by this disclaimer and agrees not to present any claim or demand of any nature against the USACE, its officers, agents, employees or servants in any forum whatsoever for any damages of any nature whatsoever that may result from or may be caused in any way by the use of the maps and associated data.
9/19/2024 2:34 PM
Legend
Location Map
Service Layer Credits: Hybrid Reference Layer: Esri Community Maps Contributors, WA State Parks GIS, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, USFWS
Bridgeport State Park
Half Sun Way
Foster Creek Rd
P earl Hill Rd
NE
H ayden Rd
Chief Joseph St
S ta te H ig h w ay
State R oute
N
E
Bridgeport State Park
B rid g e p o rt S ta te
P a rk
Bridgeport State Park
Bridgeport State Park
H al f Sun Way
IRA Work Area
Admin Work Area
Birding Trail Work Area
South Viewpoint Work Area
North Viewpoint Work Area
Security Lawn
Warehouse Work Area
Foster Creek Spit Work Area
Powerhouse Work Area Buttonhook Work Area
Lower Spillway
Work Area Upper
Spillway Work Area
Commons Work Area
Grounds Maintenance Work Areas
Playgrounds
Access Roads
Attachment 1: Figures 1-13, Estimated Contractor Workload/ Total Work Area Figure 1: Overview Map
Grounds Maintenance Contract Work Area - Overview Map 2
0 0.1 0.2
Miles µ DISCLAIMER - While the United States Army Corps of Engineers, (hereinafter referred to USACE) has made a reasonable effort to insure the accuracy of the maps and associated data, its should be explicitly noted that USACE makes no warranty, representation or guaranty, either express or implied, as to the content, sequence, accuracy, timeliness or completeness of any of the data provided herein. The USACE, its officers, agents, employees, or servants shall assume no liability of any nature for any errors, omissions, or inaccuracies in the information provided regardless of how caused.
The USACE, its officers, agents, employees or servants shall assume no liability for any decisions made or actions taken or not taken by the user of the maps and associated data in reliance upon any information or data furnished here. By using these maps and associated data the user does so entirely at their own risk and explicitly acknowledges that he/she is aware of and agrees to be bound by this disclaimer and agrees not to present any claim or demand of any nature against the USACE, its officers, agents, employees or servants in any forum whatsoever for any damages of any nature whatsoever that may result from or may be caused in any way by the use of the maps and associated data.
9/19/2024 2:28 PM
Legend
Location Map
Service Layer Credits: Hybrid Reference Layer: Esri Community Maps Contributors, WA State Parks GIS, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, USDA, USFWS
Bridgeport State Park B ri d g e p o rt S ta te
P ar k
B rid g e p o rt S ta te
P a rk
Bridgeport State Park
Bridgeport State ParkBrid geport St ate Park
B rid geport State Park
H a lf S un Way
Pearl Hill Rd NE
Pearl Hill Rd NE
Pearl Hill
Rd NE
Dunes TH Work Area
Willow Flats Work Area
Debris Basin Work Area (W)
Debris Basin Work Area (C)
Debris Basin Work Area (E)
Buttonhook Work Area
Lower Spillway
Work Area Upper
Spillway Work Area
Tower TH Work Area
Grounds Maintenance Work Areas
Playgrounds
Figure 2: Overview Map 2
Grounds Maintenance Contract Work Area - Birding Trail/ Commons
0 0.025 0.05
Miles µ DISCLAIMER - While the United States Army Corps of Engineers, (hereinafter referred to USACE) has made a reasonable effort to insure the accuracy of the maps and associated data, its should be explicitly noted that USACE makes no warranty, representation or guaranty, either express or implied, as to the content, sequence, accuracy, timeliness or completeness of any of the data provided herein. The USACE, its officers, agents, employees, or servants shall assume no liability of any nature for any errors, omissions, or inaccuracies in the information provided regardless of how caused.
The USACE, its officers, agents, employees or servants shall assume no liability for any decisions made or actions taken or not taken by the user of the maps and associated data in reliance upon any information or data furnished here. By using these maps and associated data the user does so entirely at their own risk and explicitly acknowledges that he/she is aware of and agrees to be bound by this disclaimer and agrees not to present any claim or demand of any nature against the USACE, its officers, agents, employees or servants in any forum whatsoever for any damages of any nature whatsoever that may result from or may be caused in any way by the use of the maps and associated data.
9/19/2024 1:24 PM
Legend
Location Map
Service Layer Credits: Hybrid Reference Layer: Esri Community Maps Contributors, WA State Parks GIS, © OpenStreetMap, Microsoft, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, Pearl Hill Rd NE
H a y d e n
R d
S ta te H ig h w ay
Hayden R d
State Route 17 NE
Foster Creek Rd
Pearl H ill R d N
E Birding Trail Work Area
Commons Work Area
Grounds Maintenance Work Areas
Playgrounds
Figure 3: Birding Trail/Commons Map
Grounds Maintenance Contract Work Area - Brandt's Landing
0 0.055 0.11
Miles µ DISCLAIMER - While the United States Army Corps of Engineers, (hereinafter referred to USACE) has made a reasonable effort to insure the accuracy of the maps and associated data, its should be explicitly noted that USACE makes no warranty, representation or guaranty, either express or implied, as to the content, sequence, accuracy, timeliness or completeness of any of the data provided herein. The USACE, its officers, agents, employees, or servants shall assume no liability of any nature for any errors, omissions, or inaccuracies in the information provided regardless of how caused.
The USACE, its officers, agents, employees or servants shall assume no liability for any decisions made or actions taken or not taken by the user of the maps and associated data in reliance upon any information or data furnished here. By using these maps and associated data the user does so entirely at their own risk and explicitly acknowledges that he/she is aware of and agrees to be bound by this disclaimer and agrees not to present any claim or demand of any nature against the USACE, its officers, agents, employees or servants in any forum whatsoever for any damages of any nature whatsoever that may result from or may be caused in any way by the use of the maps and associated data.
9/19/2024 1:20 PM
Legend
Location Map
Service Layer Credits: Hybrid Reference Layer: Esri Community Maps Contributors, WA State Parks GIS, © OpenStreetMap, Microsoft, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, Hig hla nd Orc hard Rd
NE
Brandts Landing
Grounds Maintenance Work Areas
Playgrounds
Figure 4: Brandt's Map
Grounds Maintenance Contract Work Area - Buttonhook
0 0.05 0.1
Miles µ DISCLAIMER - While the United States Army Corps of Engineers, (hereinafter referred to USACE) has made a reasonable effort to insure the accuracy of the maps and associated data, its should be explicitly noted that USACE makes no warranty, representation or guaranty, either express or implied, as to the content, sequence, accuracy, timeliness or completeness of any of the data provided herein. The USACE, its officers, agents, employees, or servants shall assume no liability of any nature for any errors, omissions, or inaccuracies in the information provided regardless of how caused.
The USACE, its officers, agents, employees or servants shall assume no liability for any decisions made or actions taken or not taken by the user of the maps and associated data in reliance upon any information or data furnished here. By using these maps and associated data the user does so entirely at their own risk and explicitly acknowledges that he/she is aware of and agrees to be bound by this disclaimer and agrees not to present any claim or demand of any nature against the USACE, its officers, agents, employees or servants in any forum whatsoever for any damages of any nature whatsoever that may result from or may be caused in any way by the use of the maps and associated data.
9/19/2024 1:35 PM
Legend
Location Map
Service Layer Credits: Hybrid Reference Layer: Esri Community Maps Contributors, WA State Parks GIS, © OpenStreetMap, Microsoft, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, Chief Joseph Powerhouse
Bridgeport State Park
Buttonhook Work Area
Lower Spillway
Work Area
Upper Spillway
Work Area
Grounds Maintenance Work Areas
Playgrounds
Figure 5: Buttonhook Map
Grounds Maintenance Contract Work Area - Debris Basin
Miles µ DISCLAIMER - While the United States Army Corps of Engineers, (hereinafter referred to USACE) has made a reasonable effort to insure the accuracy of the maps and associated data, its should be explicitly noted that USACE makes no warranty, representation or guaranty, either express or implied, as to the content, sequence, accuracy, timeliness or completeness of any of the data provided herein. The USACE, its officers, agents, employees, or servants shall assume no liability of any nature for any errors, omissions, or inaccuracies in the information provided regardless of how caused.
The USACE, its officers, agents, employees or servants shall assume no liability for any decisions made or actions taken or not taken by the user of the maps and associated data in reliance upon any information or data furnished here. By using these maps and associated data the user does so entirely at their own risk and explicitly acknowledges that he/she is aware of and agrees to be bound by this disclaimer and agrees not to present any claim or demand of any nature against the USACE, its officers, agents, employees or servants in any forum whatsoever for any damages of any nature whatsoever that may result from or may be caused in any way by the use of the maps and associated data.
9/19/2024 1:30 PM
Legend
Location Map
Service Layer Credits: Hybrid Reference Layer: Esri Community Maps Contributors, WA State Parks GIS, © OpenStreetMap, Microsoft, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, Sand Hill Rd
Pearl Hill Rd NE
Pearl Hill Rd NE
M u rp h y R d
Debris Basin Work Area (W)
Debris Basin Work Area (C) Debris Basin
Work Area (E)
Grounds Maintenance Work Areas
Playgrounds
Figure 6: Debris Basin Map
Grounds Maintenance Contract Work Area - Foster Creek
0 0.015 0.03
Miles µ DISCLAIMER - While the United States Army Corps of Engineers, (hereinafter referred to USACE) has made a reasonable effort to insure the accuracy of the maps and associated data, its should be explicitly noted that USACE makes no warranty, representation or guaranty, either express or implied, as to the content, sequence, accuracy, timeliness or completeness of any of the data provided herein. The USACE, its officers, agents, employees, or servants shall assume no liability of any nature for any errors, omissions, or inaccuracies in the information provided regardless of how caused.
The USACE, its officers, agents, employees or servants shall assume no liability for any decisions made or actions taken or not taken by the user of the maps and associated data in reliance upon any information or data furnished here. By using these maps and associated data the user does so entirely at their own risk and explicitly acknowledges that he/she is aware of and agrees to be bound by this disclaimer and agrees not to present any claim or demand of any nature against the USACE, its officers, agents, employees or servants in any forum whatsoever for any damages of any nature whatsoever that may result from or may be caused in any way by the use of the maps and associated data.
9/19/2024 1:23 PM
Legend
Location Map
Service Layer Credits: Hybrid Reference Layer: Esri Community Maps Contributors, WA State Parks GIS, © OpenStreetMap, Microsoft, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, W e s t F o st e r C re e k
Foster Creek Rd
Foster Creek Rd
Foster Cre e k R d
Foster Creek Rd
Security Lawn
Warehouse Work Area
Foster Creek Spit Work Area
Powerhouse Work Area
Grounds Maintenance Work Areas
Playgrounds
Figure 7: Foster Creek Map
Grounds Maintenance Contract Work Area - Information and Rest Area
0 0.025 0.05
Miles µ DISCLAIMER - While the United States Army Corps of Engineers, (hereinafter referred to USACE) has made a reasonable effort to insure the accuracy of the maps and associated data, its should be explicitly noted that USACE makes no warranty, representation or guaranty, either express or implied, as to the content, sequence, accuracy, timeliness or completeness of any of the data provided herein. The USACE, its officers, agents, employees, or servants shall assume no liability of any nature for any errors, omissions, or inaccuracies in the information provided regardless of how caused.
The USACE, its officers, agents, employees or servants shall assume no liability for any decisions made or actions taken or not taken by the user of the maps and associated data in reliance upon any information or data furnished here. By using these maps and associated data the user does so entirely at their own risk and explicitly acknowledges that he/she is aware of and agrees to be bound by this disclaimer and agrees not to present any claim or demand of any nature against the USACE, its officers, agents, employees or servants in any forum whatsoever for any damages of any nature whatsoever that may result from or may be caused in any way by the use of the maps and associated data.
9/19/2024 1:26 PM
Legend
Location Map
Service Layer Credits: Hybrid Reference Layer: Esri Community Maps Contributors, WA State Parks GIS, © OpenStreetMap, Microsoft, Esri, TomTom, Garmin, SafeGraph, GeoTechnologies, Inc, METI/NASA, USGS, Bureau of Land Management, EPA, NPS, US Census Bureau, S ta te H ig h w a y
S ta te H ig h w ay
Half Sun Way
Half Sun Way
IRA Work Area
Grounds Maintenance Work Areas
Playgrounds
Figure 8: IRA Map
Grounds Maintenance Contract Work Area - N. Shore Trailheads
Miles µ DISCLAIMER - While the United States Army Corps of Engineers, (hereinafter referred to USACE) has made a reasonable effort to insure the accuracy of the maps and associated data, its should be explicitly noted that USACE makes no warranty, representation or guaranty, either express or implied, as to the content, sequence, accuracy, timeliness or completeness of any of the data provided herein. The USACE, its officers, agents, employees, or servants shall assume no liability of any nature for any errors, omissions, or inaccuracies in the information provided regardless of how caused.
The USACE, its officers, agents, employees or servants shall assume no liability for any decisions made or actions taken or not taken by the user of the maps and associated data in reliance upon any information or data furnished here. By using these maps and associated data the user does so entirely at their own risk and explicitly acknowledges that he/she is aware of and agrees to be bound by this disclaimer and agrees not to present any claim or demand of any nature against the USACE, its officers, agents, employees or servants in any forum whatsoever for any damages of any nature whatsoever that may result from or may be caused in any way by the use of the maps and associated data.
9/19/2024 1:29 PM
Legend
Location Map
Service Layer Credits: Hybrid Reference Layer: Esri Community Maps Contributors, WA State Parks GIS, © OpenStreetMap, Microsoft, Esri, TomTom,…