Chery Avenue Sewer Improvement Project.pdf

PDF 42 MB Posted

Attached to
Chery Avenue Sewer Improvement Project
Solicitation number
WD-06-26
Issued by
Orange County, Los Angeles City, California

About this file

This is a project description document for the Chery Avenue Sewer Improvement Project in California. The project involves the installation of approximately 3,100 linear feet of new vitrified clay pipe (VCP) or high density polyethylene (HDPE) sewer line, along with the construction of 12 new 48-inch sewer maintenance holes and 1 new 60-inch drop sewer maintenance hole. The new sewer infrastructure will connect to existing LBUD manholes. The scope of work also includes the removal and replacement or abandonment of existing sewer lines and several existing manholes. Additional work items encompass dewatering, sewer flow bypassing, post-construction video inspection, pavement removal and replacement, trenching, backfilling, and compacting. The project represents a comprehensive sewer system upgrade and rehabilitation effort designed to improve wastewater conveyance capacity and infrastructure integrity in the specified area.

The document does not contain explicit information regarding pricing terms, bid award dates, contract term lengths, specific bidder meeting dates, or funding sources. Potential bidders should refer to the associated state and local contract opportunity posting for details concerning submission deadlines, site visit requirements, bonding requirements, insurance specifications, and any applicable set-asides or incumbent contractor information.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .