Chatham County Parks Improvements_Bid Set_Pro.pdf

PDF 3 MB Posted

Attached to
24-0072-2 Lake Mayer and Rio Vista Parks Multi-Surface Court Improvements
Solicitation number
PE-77548-NONST-2024-000000115
Issued by
Chatham County, Savannah City, Georgia

About this file

This document is a project manual for the Chatham County Parks & Recreation proposed park improvements at Lake Mayer Park and Rio Vista Neighborhood Park. The project consists of work at two sites: at Lake Mayer Park, converting four existing asphalt tennis courts to 12 new pickleball courts and resurfacing four existing asphalt tennis courts; at Rio Vista Neighborhood Park, installing a new multi-use court that includes tennis, basketball, and pickleball. The project is being prepared by CHA Consulting, Inc. and is scheduled for completion by April 30, 2024.

The project manual includes specifications for the outdoor sports equipment, including tennis nets, posts, and windscreens, as well as pickleball nets and basketball standards. It also includes requirements for geotextiles, site clearing, earth moving, subbase courses, and asphalt paving. The document outlines submittal procedures, closeout requirements, and quality assurance standards that the contractor must follow.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT MANUAL

CHATHAM COUNTY PARKS & RECREATION

PROPOSED PARK IMPROVEMENTS PLANS

LAKE MAYER PARK TENNIS & PICKLEBALL COURTS

RIO VISTA NEIGHBORHOOD PARK MULTI-USE COURT

April 30, 2024

CHA PROJECT #: 084147.000

Prepared by:

CHA Consulting, Inc.

317 Tattnall Street

Savannah, Georgia 31401

(912) 721-6999

TABLE OF CONTENTS PAGE 1 OF 1

\\cha-llp.com\proj\ProjectSpecs\084147.000\Final\CD Submittal - Current\0002-01 Table of Contents.docx CHA PROJECT NO. 084147

TABLE OF CONTENTS

Division 1 – General Requirements

011000 Summary 011400 Work Restrictions 013000 Project Management and Coordination 013300 Submittal Procedures 017700 Closeout Procedures

Division 11 – Equipment

116833 Outdoor Sports Equipment

Division 31 – Earthwork

310519.13 Geotextiles

311000 Site Clearing 312000 Earth Moving 312319 Dewatering 312333 Trenching and Backfilling

Division 32 – Exterior Improvements

321116 Subbase Courses

321216.36 Multi-Use Court Asphalt Paving

321630 Concrete Sidewalks

321823.59 Synthetic Court Surfacing

323113 Chain Link Fence and Gates

END OF TABLE OF CONTENTS

SUMMARY PAGE 1 OF 2

CHA PROJECT NO. 084147

SECTION 011000

SECTION 011000 – SUMMARY

PART 1 – GENERAL

1.1 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Identification: Project consists of work at two sites.

1. Project Locations:

a. Lake Mayer Park:

1) Converting four (4) existing asphalt tennis courts to 12 new pickleball courts

2) Resurfacing four (4) existing asphalt tennis courts

b. Rio Vista Neighborhood Park

1) Installing a new multi-use court that includes tennis, basketball and pickleball

2. Owner: Chatham County Parks & Recreation, 7226 Varnedoe Drive, Savannah Georgia

B. Engineer Identification: The Contract Documents, dated April 30, 2024, were prepared for Project by CHA Consulting, Inc., 317 Tattnall Street, Savannah, Georgia 31401.

C. The Work consists of replacement of existing athletic facilities at two county parks,

1. Lake Mayer Park - The Work includes the following:

a. Repair of existing asphalt pads;

b. Removal of existing tennis court posts and net;

c. Removal of existing fence fabric and top rail;

d. Court surfacing systems;

e. Installation of 12 pickleball courts including new posts and nets;

f. Installation of four (4) new tennis courts including new posts and nets; and

g. Fencing

2. Rio Vista Neighborhood Park - The Work includes the following:

a. Demolition of existing muti-use court including tennis posts, basketball standards, fencing and gates;

b. Grading and drainage improvements;

c. Concrete pads;

d. Multi-use court surfacing systems;

e. Fencing; and

f. Athletic equipment

1.2 CONTRACT

A. Project will be constructed under a general construction contract.

1.3 SPECIFICATION FORMATS AND CONVENTIONS

A. Specification Format: The Specifications are organized into Divisions and Sections using the 48-division format and CSI/CSC's "MasterFormat" numbering system.

SUMMARY PAGE 2 OF 2

SECTION 011000

1. Section Identification: The Specifications use section numbers and titles to help cross-referencing in the Contract Documents. Sections in the Project Manual are in numeric sequence; however, the sequence is incomplete. Consult the table of contents at the beginning of the Project Manual to determine numbers and names of sections in the Contract Documents.

B. Specification Content: The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:

1. Abbreviated Language: Language used in the Specifications and other Contract Documents is abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.

2. Imperative mood and streamlined language are generally used in the Specifications.

Requirements expressed in the imperative mood are to be performed by Contractor.

Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.

a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

PART 2 – PRODUCTS (Not Used)

PART 3 – EXECUTION (Not Used)

END OF SECTION

WORK RESTRICTIONS PAGE 1 OF 1

SECTION 011400

SECTION 011400 – WORK RESTRICTIONS

PART 1 – GENERAL

1.1 USE OF PREMISES

A. Use of Site: Limit use of premises to work in areas indicated. Do not disturb portions of site beyond areas in which the Work is indicated.

1. Limits: Confine constructions operations to areas within the contract limits indicated.

2. Owner Occupancy: Allow for Owner occupancy of site and use by the public.

3. Driveways and Entrances: Keep driveways and entrances serving premises clear and available to Owner, Owner's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials.

a. Schedule deliveries to minimize use of driveways and entrances.

b. Schedule deliveries to minimize space and time requirements for storage of materials and equipment on site.

1.2 OCCUPANCY REQUIREMENTS

A. Full Owner Occupancy: Owner will occupy site and existing buildings outside of the limits of construction during entire construction period. Cooperate with Owner during construction operations to minimize conflicts and facilitate Owner usage. Perform the Work so as not to interfere with Owner's operations.

PART 2 – PRODUCTS (Not Used)

PART 3 – EXECUTION (Not Used)

PROJECT MANAGEMENT AND COORDINATION PAGE 1 OF 5

SECTION 013000

SECTION 013000 – PROJECT MANAGEMENT AND COORDINATION

PART 1 – GENERAL

1.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Coordination.

2. Submittals.

3. Administrative and supervisory personnel.

4. Project meetings.

5. General installation provisions.

6. Cleaning and protection.

1.2 COORDINATION

A. Coordination: Coordinate construction activities included under various Sections of these Specifications to assure efficient and orderly installation of each part of the Work. Coordinate construction operations included under different Sections of these Specifications that are dependent upon each other for proper installation, connection, and operation.

1. Where installation of one part of the Work is dependent on installation of other components, either before or after its own installation, cooperate with scheduled construction activities in the sequence required to obtain the best results.

2. Where availability of space is limited, coordinate installation of different components to assure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

4. Coordinate construction activities with public and private utilities.

a. Notify Georgia 811 a minimum of 48 hours prior to excavation.

b. Notify the Owner and Engineer of any utility locations encountered which conflict with the work. Coordinate with the Owner and Utility Company in the protection, removal, relocation, or replacement of conflicting utility locations.

B. Where necessary, prepare memoranda for distribution to each party involved outlining special procedures required for coordination. Include such items as required notices, reports, and attendance at meetings.

1. Prepare similar memoranda for the Owner and separate Contractors where coordination of their

Work is required.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Delivery and processing of submittals.

4. Progress meetings.

5. Pre-installation conferences.

6. Project closeout activities.

PROJECT MANAGEMENT AND COORDINATION PAGE 2 OF 5

SECTION 013000

1.3 SUBMITTALS

A. Staff Names: Within 15 days of starting construction operations, submit a list of principal staff assignments, including superintendent and other personnel in attendance at Project sites. Identify individuals and their duties and responsibilities; list addresses and telephone numbers, including mobile telephone numbers. Provide names, addresses, and telephone numbers of individuals assigned as standbys in the absence of individuals assigned to Project.

1.4 PROJECT MEETINGS

A. General: Schedule and conduct meetings and conferences at Project site, unless otherwise indicated.

1. Attendees: Inform participants and others involved, and individuals whose presence is required, of date and time of each meeting. Notify Owner and Engineer of scheduled meeting dates and times.

2. Agenda: Prepare the meeting agenda. Distribute the agenda to all invited attendees.

3. Minutes: Record significant discussions and agreements achieved. Distribute the meeting minutes to everyone concerned, including Owner and Engineer, within 3 days of the meeting.

B. Preconstruction Conference: Schedule a preconstruction conference and organizational meeting at the Project site or other convenient site prior to commencement of construction activities. Conduct the meeting to review responsibilities and personnel assignments.

1. Attendees: Authorized representatives of Owner, the Engineer, and their consultants; the

Contractor and its superintendent; major subcontractors; manufacturers; suppliers and other concerned parties shall each be represented at the conference. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Discuss items of significance that could affect progress, including the following:

a. Tentative construction schedule.

b. Phasing.

c. Critical work sequencing.

d. Designation of responsible personnel.

e. Procedures for processing field decisions and Change Orders.

f. Procedures for processing Applications for Payment.

g. Distribution of the Contract Documents.

h. Submittal procedures.

i. Preparation of Record Documents.

j. Use of the premises.

k. Responsibility for temporary facilities and controls.

l. Parking availability.

m. Work and storage areas.

n. Equipment deliveries and priorities.

o. Safety procedures.

p. First aid.

q. Security.

r. Progress cleaning.

s. Working hours.

t. Housekeeping.

u. Subcontractors.

v. Preliminary Schedule of Shop Drawings and Samples.

w. Contractor's Schedule of Values.

PROJECT MANAGEMENT AND COORDINATION PAGE 3 OF 5

SECTION 013000

C. Progress Meetings: Conduct progress meetings at the Project Site at regularly scheduled intervals.

Coordinate dates of meetings with preparation of payment requests.

1. Attendees: In addition to representatives of the Owner and Engineer, each contractor, subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings. All participants at the conference shall be familiar with Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. Include topics for discussion as appropriate to the current status of Project.

a. Contractor's Construction Schedule: Review progress since the last meeting. Determine whether each activity is on time, ahead of schedule, or behind schedule, in relation to Contractor's Construction Schedule. Determine how construction behind schedule will be expedited; secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time.

b. Review present and future needs of each entity present, including the following:

1) Interface requirements.

2) Time.

3) Sequence of operations.

4) Status of submittals.

5) Deliveries.

6) Off-site fabrication.

7) Access.

8) Site utilization.

9) Temporary facilities and controls.

10) Work hours.

11) Hazards and risks.

12) Progress cleaning.

13) Quality and work standards.

14) Change Orders.

15) Documentation of information for payment requests.

3. Reporting: No later than 3 days after each progress meeting date, distribute copies of minutes of the meeting to each party present and to parties who should have been present. Include a brief summary, in narrative form, of progress since the previous meeting and report.

a. Schedule Updating: Revise Contractor's Construction Schedule after each progress meeting where revisions to the schedule have been made or recognized. Issue the revised schedule concurrently with the report of each meeting.

PART 2 – PRODUCTS (Not Applicable)

PART 3 – EXECUTION

3.1 GENERAL INSTALLATION PROVISIONS

A. Inspection of Conditions: Require the Installer of each major component to inspect both the substrate and conditions under which Work is to be performed. Do not proceed until unsatisfactory conditions have been corrected in an acceptable manner.

PROJECT MANAGEMENT AND COORDINATION PAGE 4 OF 5

SECTION 013000

B. Manufacturer’s Instructions: Comply with manufacturer’s installation instructions and recommendations, to the extent that those instructions and recommendations are more explicit or stringent than requirements contained in Contract Documents.

C. Inspect materials or equipment immediately upon delivery and again prior to installation. Reject damaged and defective items.

D. Provide attachment and connection devices and methods necessary for securing Work. Secure Work true to line and level. Allow for expansion and building movement.

E. Visual Effects: Provide uniform joint widths in exposed Work. Arrange joints in exposed Work to obtain the best visual effect. Refer questionable choices to the Engineer for final decision.

F. Recheck measurements and dimensions, before starting each installation.

G. Install each component during weather conditions and Project status that will ensure the best possible results. Isolate each part of the completed construction from incompatible material as necessary to prevent deterioration.

H. Coordinate temporary enclosures with required inspections and tests, to minimize the necessity of uncovering completed construction for that purpose.

I. Mounting Heights: Where mounting heights are not indicated, install individual components at standard mounting heights recognized within the industry for the particular application indicated.

Refer questionable mounting height decisions to the Engineer for final decision.

3.2 CLEANING AND PROTECTION

A. During handling and installation, clean and protect construction in progress and adjoining materials in place. Apply protective covering where required to ensure protection from damage or deterioration at Substantial Completion.

B. Clean and maintain completed construction as frequently as necessary through the remainder of the construction period. Adjust and lubricate operable components to ensure operability without damaging effects.

C. Limiting Exposures: Supervise construction activities to ensure that no part of the construction completed or in progress, is subject to harmful, dangerous, damaging, or otherwise deleterious exposure during the construction period. Where applicable, such exposures include, but are not limited to, the following:

1. Excessive static or dynamic loading.

2. Excessive internal or external pressures.

3. Excessively high or low temperatures.

4. Thermal shock.

5. Excessively high or low humidity.

6. Air contamination or pollution.

7. Water or ice.

8. Solvents.

9. Chemicals.

10. Light.

11. Radiation.

12. Puncture.

PROJECT MANAGEMENT AND COORDINATION PAGE 5 OF 5

SECTION 013000

13. Abrasion.

14. Heavy traffic.

15. Soiling, staining and corrosion.

16. Bacteria.

17. Rodent and insect infestation.

18. Combustion.

19. Unprotected storage.

20. Improper shipping or handling.

21. Theft.

22. Vandalism.

SUBMITTAL PROCEDURES PAGE 1 OF 7

SECTION 013300

SECTION 013300 – SUBMITTAL PROCEDURES

PART 1 – GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for submitting Shop Drawings, Product Data, Samples, and other miscellaneous submittals.

1.2 DEFINITIONS

A. Action Submittals: Written and graphic information that requires Engineer's responsive action.

B. Informational Submittals: Written information that does not require Engineer's approval. Submittals may be rejected for not complying with requirements.

C. Portable Document Format (PDF): An open standard file format licensed by Adobe Systems used for representing documents in a device-independent and display resolution-independent fixed-layout document format.

1.3 SUBMITTAL ADMINISTRATIVE REQUIREMENTS:

A. Engineer's Digital Data Files: Electronic digital data files of the Contract Drawings will be provided by Engineer for Contractor's use in preparing submittals.

1. Engineer will furnish Contractor one set of digital data drawing files of the Contract Drawings for use in preparing Shop Drawings and Project record drawings.

a. Engineer makes no representations as to the accuracy or completeness of digital data drawing files as they relate to the Contract Drawings.

b. Digital Drawing Software Program: The Contract Drawings are available in AutoCAD

Release 2020.

c. Contractor shall execute data licensing agreement.

B. Coordination: Coordinate preparation and processing of submittals with performance of construction activities.

1. Coordinate each submittal with fabrication, purchasing, testing, delivery, other submittals, and related activities that require sequential activity.

2. Submit all submittal items required for each Specification Section concurrently unless partial submittals for portions of the Work are indicated on approved submittal schedule.

3. Submit action submittals and informational submittals required by the same Specification

Section as separate packages under separate transmittals.

4. Coordinate transmittal of different types of submittals for related parts of the Work so processing will not be delayed because of need to review submittals concurrently for coordination.

a. Engineer reserves the right to withhold action on a submittal requiring coordination with other submittals until related submittals are received.

C. Processing Time: Allow time for submittal review, including time for resubmittals, as follows. Time for review shall commence on Engineer's receipt of submittal. No extension of the Contract Time will be authorized because of failure to transmit submittals enough in advance of the Work to permit processing, including resubmittals.

SUBMITTAL PROCEDURES PAGE 2 OF 7

SECTION 013300

1. Initial Review: Allow 15 days for initial review of each submittal. Allow additional time if coordination with subsequent submittals is required. Engineer will advise Contractor when a submittal being processed must be delayed for coordination.

2. Intermediate Review: If intermediate submittal is necessary, process it in same manner as initial submittal.

3. Resubmittal Review: Allow 15 days for review of each resubmittal.

D. Electronic Submittals: Identify and incorporate information in each electronic submittal file as follows:

1. Assemble complete submittal package into a single indexed file incorporating submittal requirements of a single Specification Section and transmittal form with links enabling navigation to each item.

2. Name file with submittal number or other unique identifier, including revision identifier.

a. File name shall use project identifier and Specification Section number followed by a decimal point and then a sequential number (e.g., LM-061000.01). Resubmittals shall include an alphabetic suffix after another decimal point (e.g., LM-061000.01.A).

3. Provide means for insertion to permanently record Contractor's review and approval markings and action taken by Engineer.

4. Transmittal Form for Electronic Submittals: Use electronic form acceptable to Owner, containing the following information:

a. Project name.

b. Date.

c. Name and address of Engineer.

d. Name of Contractor.

e. Name of firm or entity that prepared submittal.

f. Names of subcontractor, manufacturer, and supplier.

g. Category and type of submittal.

h. Submittal purpose and description.

i. Specification Section number and title.

j. Specification paragraph number or drawing designation and generic name for each of multiple items.

k. Drawing number and detail references, as appropriate.

l. Location(s) where product is to be installed, as appropriate.

m. Related physical samples submitted directly.

n. Indication of full or partial submittal.

o. Transmittal number, numbered consecutively.

p. Submittal and transmittal distribution record.

q. Other necessary identification.

r. Remarks.

E. Options: Identify options requiring selection by Engineer.

F. Deviations and Additional Information: On an attached separate sheet, prepared on Contractor's letterhead, record relevant information, requests for data, revisions other than those requested by Engineer on previous submittals, and deviations from requirements in the Contract Documents, including minor variations and limitations. Include same identification information as related submittal.

SUBMITTAL PROCEDURES PAGE 3 OF 7

SECTION 013300

G. Resubmittals: Make resubmittals in same form and number of copies as initial submittal.

1. Note date and content of previous submittal.

2. Note date and content of revision in label or title block and clearly indicate extent of revision.

3. Resubmit submittals until they are marked with approval notation from action stamp.

H. Distribution: Furnish copies of final submittals to manufacturers, subcontractors, suppliers, fabricators, installers, authorities having jurisdiction, and others as necessary for performance of construction activities. Show distribution on transmittal forms.

I. Use for Construction: Retain complete copies of submittals on Project site. Use only final action submittals that are marked with approval notation from Engineer's action stamp.

PART 2 – PRODUCTS

2.1 SUBMITTAL PROCEDURES

A. General Submittal Procedure Requirements: Prepare and submit submittals required by individual Specification Sections. Types of submittals are indicated in individual Specification Sections.

1. Submit electronic submittals via email as PDF electronic files.

a. Engineer will return annotated file. Annotate and retain one copy of file as an electronic Project record document file.

2. Certificates and Certifications Submittals: Provide a statement that includes signature of entity responsible for preparing certification. Certificates and certifications shall be signed by an officer or other individual authorized to sign documents on behalf of that entity.

B. Product Data: Collect information into a single submittal for each element of construction and type of product or equipment.

1. If information must be specially prepared for submittal because standard published data are not suitable for use, submit as Shop Drawings, not as Product Data.

2. Mark each copy of each submittal to show which products and options are applicable.

3. Include the following information, as applicable:

a. Manufacturer's catalog cuts.

b. Manufacturer's product specifications.

c. Standard color charts.

d. Statement of compliance with specified referenced standards.

e. Testing by recognized testing agency.

f. Application of testing agency labels and seals.

g. Notation of coordination requirements.

h. Availability and delivery time information.

4. Submit Product Data before or concurrent with Samples.

5. Submit Product Data in the following format:

a. PDF electronic file.

C. Shop Drawings: Prepare Project-specific information, drawn accurately to scale. Do not base Shop Drawings on reproductions of the Contract Documents or standard printed data, unless submittal based on Engineer's digital data drawing files is otherwise permitted.

1. Preparation: Fully illustrate requirements in the Contract Documents. Include the following information, as applicable:

a. Identification of products.

SUBMITTAL PROCEDURES PAGE 4 OF 7

SECTION 013300

b. Schedules.

c. Compliance with specified standards.

d. Notation of coordination requirements.

e. Notation of dimensions established by field measurement.

f. Relationship and attachment to adjoining construction clearly indicated.

g. Seal and signature of professional engineer if specified.

2. Sheet Size: Except for templates, patterns, and similar full-size drawings, submit Shop Drawings on sheets at least 8-1/2 by 11 inches but no larger than 30 by 42 inches.

3. Submit Shop Drawings in the following format:

a. PDF electronic file.

D. Samples: Submit Samples for review of kind, color, pattern, and texture for a check of these characteristics with other elements and for a comparison of these characteristics between submittal and actual component as delivered and installed.

1. Transmit Samples that contain multiple, related components such as accessories together in one submittal package.

2. Identification: Attach label on unexposed side of Samples that includes the following:

a. Generic description of Sample.

b. Product name and name of manufacturer.

c. Sample source.

d. Number and title of applicable Specification Section.

e. Specification paragraph number and generic name of each item.

3. For projects where electronic submittals are required, provide corresponding electronic submittal of Sample transmittal, digital image file illustrating Sample characteristics, and identification information for record.

4. Disposition: Maintain sets of approved Samples at Project site, available for quality-control comparisons throughout the course of construction activity. Sample sets may be used to determine final acceptance of construction associated with each set.

a. Samples that may be incorporated into the Work are indicated in individual Specification

Sections. Such Samples must be in an undamaged condition at time of use.

b. Samples not incorporated into the Work, or otherwise designated as Owner's property, are the property of Contractor.

5. Samples for Initial Selection: Submit manufacturer's color charts consisting of units or sections of units showing the full range of colors, textures, and patterns available.

a. Number of Samples: Submit 1 full set of available choices where color, pattern, texture, or similar characteristics are required to be selected from manufacturer's product line.

Engineer will return submittal with options selected.

6. Samples for Verification: Submit full-size units or Samples of size indicated, prepared from same material to be used for the Work, cured and finished in manner specified, and physically identical with material or product proposed for use, and that show full range of color and texture variations expected. Samples include, but are not limited to, the following: partial sections of manufactured or fabricated components; small cuts or containers of materials;

complete units of repetitively used materials; swatches showing color, texture, and pattern;

color range sets; and components used for independent testing and inspection.

a. Number of Samples: Submit 3 sets of Samples. Engineer will retain 2 Sample sets;

remainder will be returned.

1) Submit a single Sample where assembly details, workmanship, fabrication techniques, connections, operation, and other similar characteristics are to be demonstrated.

SUBMITTAL PROCEDURES PAGE 5 OF 7

SECTION 013300

2) If variation in color, pattern, texture, or other characteristic is inherent in material or product represented by a Sample, submit at least 3 sets of paired units that show approximate limits of variations.

E. Coordination Drawing Submittals: Comply with requirements specified in Division 01 Section "Project Management and Coordination."

F. Closeout Submittals and Maintenance Material Submittals: Comply with requirements specified in Division 01 Section "Closeout Procedures."

G. Qualification Data: Prepare written information that demonstrates capabilities and experience of firm or person. Include lists of completed projects with project names and addresses, contact information of Engineers and owners, and other information specified.

H. Installer Certificates: Submit written statements on manufacturer's letterhead certifying that Installer complies with requirements in the Contract Documents and, where required, is authorized by manufacturer for this specific Project.

I. Manufacturer Certificates: Submit written statements on manufacturer's letterhead certifying that manufacturer complies with requirements in the Contract Documents. Include evidence of manufacturing experience where required.

J. Product Certificates: Submit written statements on manufacturer's letterhead certifying that product complies with requirements in the Contract Documents.

K. Material Certificates: Submit written statements on manufacturer's letterhead certifying that material complies with requirements in the Contract Documents.

L. Material Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting test results of material for compliance with requirements in the Contract Documents.

M. Product Test Reports: Submit written reports indicating that current product produced by manufacturer complies with requirements in the Contract Documents. Base reports on evaluation of tests performed by manufacturer and witnessed by a qualified testing agency, or on comprehensive tests performed by a qualified testing agency.

N. Preconstruction Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of tests performed before installation of product, for compliance with performance requirements in the Contract Documents.

O. Compatibility Test Reports: Submit reports written by a qualified testing agency, on testing agency's standard form, indicating and interpreting results of compatibility tests performed before installation of product. Include written recommendations for primers and substrate preparation needed for adhesion.

P. Field Test Reports: Submit written reports indicating and interpreting results of field tests performed either during installation of product or after product is installed in its final location, for compliance with requirements in the Contract Documents.

2.2 CONTRACTOR’S PROJECT HEALTH & SAFETY PLAN

A. No later than the Pre-construction meeting, the Contractor shall submit to the Engineer a written Project Health & Safety Plan, which states the Contractor’s company policy relative to safety. The

SUBMITTAL PROCEDURES PAGE 6 OF 7

SECTION 013300

plan must also address specific health and safety concerns, which are expected to be encountered on the project. As a minimum this plan shall include:

1. Listing of project and company safety officers.

2. Specific company safety policies.

3. Employee Safety Training Program.

4. Administrative procedures to handle employee health & safety concerns.

5. Procedures for insuring worker compliance with health and safety requirements.

B. The Contractor shall be responsible to ensure that each Subcontractor employed on the project complies with the requirements of this section either by submitting a copy of the subcontractor’s Project Health & Safety Plan or by submitting a letter from the Subcontractor stating that they will comply with the provisions of the Contractor’s Project Health & Safety Plan.

C. Submission of the required Project Health & Safety Plan by the Contractor is primarily for information or record purposes and shall not be construed to imply approval by the Engineer or to relieve the Contractor from the responsibility to adequately protect the health & safety of all workers involved in the project.

PART 3 – EXECUTION

3.1 CONTRACTOR'S REVIEW

A. Review each submittal and check for compliance with the Contract Documents. Note corrections and field dimensions. Mark with approval stamp before submitting to Engineer.

B. Approval Stamp: Stamp each submittal with a uniform, approval stamp. Include Project name and location, submittal number, Specification Section title and number, name of reviewer, date of Contractor's approval, and statement certifying that submittal has been reviewed, checked, and approved for compliance with the Contract Documents.

3.2 ENGINEER'S ACTION

A. General: Engineer will not review submittals that do not bear Contractor's approval stamp and will return them without action.

B. Action Submittals: Engineer will review each submittal, make marks to indicate corrections or modifications required, and return it. Engineer will stamp each submittal with an action stamp and will mark stamp appropriately to indicate action taken, as follows:

1. Final Unrestricted Release: Where submittals are marked “No Exceptions Taken,” that part of the Work covered by the submittal may proceed provided it complies with requirements of the Contract Documents; final acceptance will depend upon that compliance.

2. Final-But-Restricted Release: When submittals are marked “Make Corrections Noted,” that part of the Work covered by the submittal may proceed provided it complies with notations or corrections on the submittal and requirements of the Contract Documents; final acceptance will depend on that compliance.

3. Returned for Resubmittal: When submittal is marked “Revise and Resubmit,” “Rejected,” or “Submit Specified Item,” do not proceed with that part of the Work covered by the submittal, including purchasing, fabrication, delivery, or other activity. Revise or prepare a new submittal in accordance with the notations; resubmit without delay. Repeat if necessary to obtain a different action mark.

SUBMITTAL PROCEDURES PAGE 7 OF 7

SECTION 013300

a. Do not permit submittals marked “Revise and Resubmit,” “Rejected,” or “Submit Specified Item” to be used at the Project site, or elsewhere where Work is in progress.

4. Other Action: Where a submittal is primarily for information or record purposes, special processing or other activity, the submittal will be returned, marked “Action Not Required.”

C. Informational Submittals: Engineer will review each submittal and will not return it or will reject and return it if it does not comply with requirements. Engineer will forward each submittal to appropriate party.

D. Submittals not required by the Contract Documents will not be reviewed and may be discarded.

CLOSEOUT PROCEDURES PAGE 1 OF 4

SECTION 017700

SECTION 017700 – CLOSEOUT PROCEDURES

PART 1 – GENERAL

1.1 SUMMARY

A. This Section includes administrative and procedural requirements for contract closeout, including, but not limited to, the following:

1. Inspection procedures.

2. Project Record Documents.

3. Operation and maintenance manuals.

4. Warranties.

5. Instruction of Owner's personnel.

6. Final cleaning.

1.2 SUBSTANTIAL COMPLETION

A. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.

1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.

2. Submit specific warranties, workmanship bonds, maintenance service agreements, final certifications, and similar documents.

3. Deliver tools, spare parts, extra materials, and similar items to location designated by Owner.

Label with manufacturer's name and model number where applicable.

B. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, Engineer will either proceed with inspection or notify Contractor of unfulfilled requirements.

Engineer will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by Engineer, that must be completed or corrected before certificate will be issued.

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

2. Results of completed inspection will form the basis of requirements for Final Completion.

1.3 FINAL COMPLETION

A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:

1. Submit certified copy of Engineer's Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by Engineer. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.

2. Instruct Owner's personnel in operation, adjustment, and maintenance of products, equipment, and systems.

B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, Engineer will either proceed with inspection or notify Contractor of unfulfilled requirements.

Engineer will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.

CLOSEOUT PROCEDURES PAGE 2 OF 4

SECTION 017700

1. Reinspection: Request reinspection when the Work identified in previous inspections as incomplete is completed or corrected.

1.4 PROJECT RECORD DOCUMENTS

A. General: Do not use Project Record Documents for construction purposes. Protect Project Record Documents from deterioration and loss. Provide access to Project Record Documents for Engineer's reference during normal working hours.

B. Record Drawings: Maintain and submit one set of blue- or black-line white prints of Contract Drawings and Shop Drawings.

1. Mark Record Prints to show the actual installation where installation varies from that shown originally. Require individual or entity who obtained record data, whether individual or entity is Installer, subcontractor, or similar entity, to prepare the marked-up Record Prints.

a. Give particular attention to information on concealed elements that cannot be readily identified and recorded later.

b. Accurately record information in an understandable drawing technique.

c. Record data as soon as possible after obtaining it. Record and check the markup before enclosing concealed installations.

d. Mark Contract Drawings or Shop Drawings, whichever is most capable of showing actual physical conditions, completely and accurately. Where Shop Drawings are marked, show cross-reference on Contract Drawings.

2. Mark record sets with erasable, red-colored pencil. Use other colors to distinguish between changes for different categories of the Work at the same location.

3. Mark important additional information that was either shown schematically or omitted from original Drawings.

4. Note Construction Change Directive numbers, Change Order numbers, alternate numbers, and similar identification where applicable.

5. Identify and date each Record Drawing; include the designation "PROJECT RECORD DRAWING" in a prominent location. Organize into manageable sets; bind each set with durable paper cover sheets. Include identification on cover sheets.

1.5 OPERATION AND MAINTENANCE MANUALS

A. Assemble a complete set of operation and maintenance data indicating the operation and maintenance of each system, subsystem, and piece of equipment not part of a system. Include operation and maintenance data required in individual Specification Sections and as follows:

1. Operation Data:

a. System, subsystem, and equipment descriptions, including operating standards.

b. Operating procedures, including startup, shutdown, seasonal, and weekend operations.

c. Description of controls and sequence of operations.

2. Maintenance Data:

a. Manufacturer's information, including list of spare parts.

b. Name, address, and telephone number of Installer or supplier.

c. Maintenance procedures.

d. Maintenance and service schedules for preventive and routine maintenance.

e. Maintenance record forms.

f. Sources of spare parts and maintenance materials.

g. Copies of maintenance service agreements.

h. Copies of warranties and bonds.

CLOSEOUT PROCEDURES PAGE 3 OF 4

SECTION 017700

B. Organize operation and maintenance manuals into suitable sets of manageable size. Bind and index data in electronic format (PDF) or in a heavy-duty, 3-ring, vinyl-covered, loose-leaf binder, in thickness necessary to accommodate contents, with pocket inside the covers to receive folded oversized sheets. Identify binder on front and spine with the printed title "OPERATION AND MAINTENANCE MANUAL," Project name, and subject matter of contents.

1.6 WARRANTIES

A. Submittal Time: Submit written warranties on request of Engineer for designated portions of the Work where commencement of warranties other than date of Substantial Completion is indicated.

B. Organize warranty documents into an orderly sequence based on the table of contents of the Project Manual.

1. Bind warranties and bonds in electronic format (PDF) or in a heavy-duty, 3-ring, vinyl-covered, loose-leaf binder, thickness as necessary to accommodate contents, and sized to receive 8-1/2-by-11-inch paper.

2. Provide heavy paper dividers with plastic-covered tabs for each separate warranty. Mark tab to identify the product or installation. Provide a typed description of the product or installation, including the name of the product and the name, address, and telephone number of Installer.

3. Identify binder on the front and spine with the typed or printed title "WARRANTIES," Project name, and name of Contractor.

C. Provide additional copies of each warranty to include in operation and maintenance manuals.

PART 2 – PRODUCTS

2.1 MATERIALS

A. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.

PART 3 – EXECUTION

3.1 DEMONSTRATION AND TRAINING

A. Instruction: Instruct Owner's personnel to adjust, operate, and maintain systems, subsystems, and equipment not part of a system.

1. Provide instructors experienced in operation and maintenance procedures.

2. Provide instruction at mutually agreed-on times. For equipment that requires seasonal operation, provide similar instruction at the start of each season.

3. Schedule training with Owner, through Engineer, with at least 7 days advance notice.

4. Coordinate instructors, including providing notification of dates, times, length of instruction, and course content.

3.2 FINAL CLEANING

A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.

CLOSEOUT PROCEDURES PAGE 4 OF 4

SECTION 017700

B. Cleaning: Employ experienced workers or professional cleaners for final cleaning. Clean each surface or unit to condition expected in an average commercial building cleaning and maintenance program. Comply with manufacturer's written instructions.

1. Complete the following cleaning operations before requesting inspection for certification of

Final Completion for entire Project:

a. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.

b. Sweep paved areas broom clean. Remove petrochemical spills, stains, and other foreign deposits.

c. Rake grounds that are neither planted nor paved to a smooth, even-textured surface.

d. Remove tools, construction equipment, machinery, and surplus material from Project site.

e. Clean exposed exterior and interior hard-surfaced finishes to a dirt-free condition, free of stains, films, and similar foreign substances. Avoid disturbing natural weathering of exterior surfaces. Restore reflective surfaces to their original condition.

f. Remove labels that are not permanent.

g. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.

Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.

h. Leave Project clean and ready for occupancy.

C. Comply with safety standards for cleaning. Do not burn waste materials. Do not bury debris or excess materials on Owner's property. Do not discharge volatile, harmful, or dangerous materials into drainage systems. Remove waste materials from Project site and dispose of lawfully.

OUTDOOR SPORTS EQUIPMENT PAGE 1 OF 4

\\cha-llp.com\proj\ProjectSpecs\084147.000\Final\CD Submittal - Current\116833 Outdoor Sports Equipment new.docx SECTION 116833

SECTION 116833 – OUTDOOR SPORTS EQUIPMENT

PART 1 – GENERAL

1.1 WORK INCLUDED

A. Provide equipment and materials and do work necessary and construct or provide the following as indicated on the Drawings and as specified. Work shall include but shall not be limited to:

1. Tennis Equipment:

a. Permanent Netting system.

b. Windscreen.

Pickleball Equipment

a. Removable Netting System

3. Basketball Equipment

a. Basketball Standard

1.2 SUBMITTALS

A. Shop Drawings:

Show application to project.

B. Product Data: Submit manufacturer’s product data and samples as noted for the following:

Tennis Net, posts, anchor.

Basketball Standard

1.3 QUALITY ASSURANCE

A. Installer of outdoor sports equipment the playing field shall be the same Contractor. All installed equipment shall be under the supervision of Owner’s groundskeeper.

B. Welding: Qualify procedures and personnel according to AWS D1.1, “Structural Welding Code- Steel,” and AWS D1.3, “Structural Welding Code – Sheet Steel.”

1.4 WARRANTY

A. General Warranty: Special warranties specified in this Section shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the Contract Documents.

B. Special Warranties:

Equipment: Written warranties, executed by the manufacturer of each piece of equipment specified agreeing to repair or replace equipment or components that fail in materials or workmanship with specified warranty period.

Windscreen Warranty: Minimum of 3 years.

OUTDOOR SPORTS EQUIPMENT PAGE 2 OF 4

\\cha-llp.com\proj\ProjectSpecs\084147.000\Final\CD Submittal - Current\116833 Outdoor Sports Equipment new.docx SECTION 116833

PART 2 – PRODUCTS

2.1 TENNIS EQUIPMENT

A. Tennis Posts and ground sleeve: 3.5-inch OD Posts with net tightener, top pulley and ground sleeve by the following or approved equal. Removable or folding winder handle.

Model No. 2201-20, PW Athletic.

Model No. 63005, Sidewinder Net Post, Douglas.

Model No. 41055, Palos Sports.

Finish: Black, Powder Coated.

B. Tennis Net: Heavy Duty Net, #36 Nylon, Weather resistant vinyl topped binding, vinyl coated cable, Nylon bindings on sides and bottom by the following or approved equal.

Hercules Tennis Net, Model No. 20100, PW Athletic.

Model TN-36, Douglas.

Color: Black.

C. Tennis Net Anchor Pin to be galvanized steel ground staple, bent.

D. Center Strap: Nylon, adjustable with snap hook.

E. Supplier:

PW Athletic Mfg. Co (800) 687-5768, www.pwathletic.com.

Douglas Sport Nets and Equipment, (800) 553-8907, www.douglas-sports.com.

Palos Sports, (800) 233-5484, www.palossports.com.

Or approved equal.

F. Tennis Windscreen:

General: Vinyl Coated polyester panels, weather resistant, woven open mesh curtain, weight approximately 9 ounces per square yard.

Borders: 1-1/2-inch wide reinforced band with brass grommets spaced 18 inches on center on all four sides, center reinforcement center fastening.

Color: Manufacturers standard green or as approved by Owner.

Attachment: Manufacturers standard self-locking tie wraps. Provide following or approved equal. Total height and width as shown on the Drawings.

Products:

a. 9-foot height with air vents.

b. 70%-80% visibility blockage

c. Air vents reinforced with webbing at edges.

d. VCP Windscreen, Closed mesh.

Suppliers:

a. Putterman Athletics, lputtermanathletics.com

b. Carron Net Co., (888) 289-6387, www.carronnet.com.

c. Douglas Sport Nets and Equipment, (800) 553-8907, www.douglas-sports.com.

d. Or approved equal.

OUTDOOR SPORTS EQUIPMENT PAGE 3 OF 4

\\cha-llp.com\proj\ProjectSpecs\084147.000\Final\CD Submittal - Current\116833 Outdoor Sports Equipment new.docx SECTION 116833

2.2 PICKLEBALL EQUIPMENT

A. Portable Pickleball Net: 2” O.D. heavy duty aluminum frame, stainless steel hardware and wheels that lock in place by the following:

Dominator Rolling Portable Pickleball Net System pb-frame PickleNet Deluxe Portable Pickleball Net Or approved equal.

2.3 BASKETBALL EQUIPMENT

A. Backboard and post with upright pad:

General

a. Backboard:

1) Rectangular steel.

2) 11-gauge steel, 1/4 perforations.

3) Size: 3 feet 6 inches by 6 feet.

b. Vertical Post Upright:

1) 5-9/16-inch OD heavy wall galvanized steel pipe capped at top end.

2) Center strut support, 3-1/2-inch OD galvanized steel.

c. Extension:

1) 6 foot.

d. Rim:

1) Heavy Duty Playground Goal: Double 5/8-inch diameter solid rim design with heavy 3/16-inch steel side and center support gussets.

e. Upright Pad:

1) Upright protective padding in standard Porter colors for Owner selection Product:

a. Porter No. 00166 -540.

b. Or approved equal.

Goal Suppliers:

a. Porter Athletic, (800) 947-6783.

1) www.gillporter.com.

2) Or approved equal.

PART 3 – EXECUTION

3.1 INSTALLATION

A. General: Install in accordance with manufacturers recommendations and approved shop drawings.

B. Tennis Equipment:

Tennis Net System:

a. Install per instructions of the manufacturer.

b. Footing installation included. Review drawings for location and layout.

c. Install one complete set for each tennis court.

OUTDOOR SPORTS EQUIPMENT PAGE 4 OF 4

\\cha-llp.com\proj\ProjectSpecs\084147.000\Final\CD Submittal - Current\116833 Outdoor Sports Equipment new.docx SECTION 116833

C. Basketball Equipment:

Basketball Standard

a. Install per instructions of the manufacturer.

b. Footing installation included. Review drawings for location and layout.

c.