This is a Statement of Work (SOW) for supplying and delivering seawater valves to the USCGC Healy (WAGB 20), a U.S. Coast Guard icebreaker. The contract addresses the replacement of valves throughout the cutter's main and auxiliary seawater systems that provide cooling water to chiller skids, reefer skids, and scientific stations. Timely completion is critical to maintain the vessel's operational readiness and ability to execute assigned missions and scientific research in Arctic climates.

The required parts consist of three Milwaukee Valve models totaling 25 units: nine Figure 1041 globe valves (2-1/2" NPS, ANSI B16.5 150# flat face, aluminum bronze ASTM B-148 material); five Figure 161A globe valves (1" NPS union end, aluminum bronze ASTM B-148 material); and eleven Figure 1146 gate valves (1/2" NPS, 400 PSI WOG, bronze ASTM B-61 material). All valves are specified with NAVSEA drawing numbers. Delivery must be completed by January 5, 2027, to SFLC PE Staff at 1519 Alaskan Way South, Seattle, WA 98134, ATTN: LCDR Josh Martin. The point of contact for SOW questions is Derek Raymond at derek.k.raymond@uscg.mil. The PR number is 52000PR260027752, last updated August 13, 2026.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR #: 52000PR260027752

STATEMENT OF WORK

LAST UPDATED: 08/13/2026 PAGE 1/1

STATEMENT OF WORK (SOW)

FOR

CGC Healy DS FY27 Sea Water Valves

1.0 SCOPE

This contract specifically addresses supply and delivery of multiple valves throughout USCGC HEALY (WAGB 20)’s main and auxiliary seawater systems, providing cooling water to chiller skids, reefer skids, and multiple different scientific stations throughout the ship, supporting HEALY’s ability to operate for extended periods and perform scientific research in Arctic climates. Timely completion of this maintenance is critical to ensure the cutter remains fully operational and can successfully execute all assigned missions.

2.0 OBJECTIVE

The objective of this contract is the supply and delivery of the components listed in Section 3.0.

3.0 REQUIRED PARTS

Qty Description

MILWAUKEE VALVE FIGURE 1041

VALVE, GLOBE, 2-1/2” NPS, ANSI B16.5 150# FLAT FACE, BRONZE BODY, NI-CU

ALLOY INTERNALS, NAVSEA Dwg 803-1385541

MATERIAL: ALUM BRONZE ASTM B-148

MILWAUKEE VALVE FIGURE 161A

VALVE, GLOBE, 1” NPS, UNION END, BRONZE BODY, NI-CU ALLOY INTERNALS,

NAVSEA Dwg 803-4384536

MATERIAL: ALUM BRONZE ASTM B-148

MILWAUKEE VALVE FIGURE 1146

VALVE, GATE, 1/2” NPS, SIL-BRZ UNION END X 1/2” FPT, 400 PSI WOG, NON-

RISING STEM, THREADED BONNET, NITRILE O-RING, SOLID WEDGE, NAVSEA

Dwg 803-1385714

MATERIAL: BRONZE ASTM B-61

4.0 LOGISTICS

Delivery Address:

SFLC PE Staff – LCDR Josh Martin

ATTN: HEALY DS FY27

1519 Alaskan Way S.

Seattle, WA 98134

Deliver By Date: January 5, 2027

Please contact Derek Raymond at derek.k.raymond@uscg.mil with questions regarding this SOW.