This is a Questions and Answers document for the Coronado National Forest Campground Prospectus, addressing inquiries from prospective bidders on a campground concession opportunity.
The concession opportunity involves operating four campgrounds (Rose Canyon, Showers Point, Spencer Canyon, and Whitetail) on the Coronado National Forest. The current permit expires December 31, 2026, with the new permit term beginning January 1, 2027, and operations commencing no earlier than the second Friday in April. The Forest Service anticipates notifying the selected applicant in summer 2026. The 2025 gross revenue for the current operation was $471,579.58, including merchandise, firewood, ice, and related sales. Historical revenues shown in Table 2 of the prospectus include all amphitheater revenue from weddings and group events at Rose Canyon. Occupancy rates for May to October 2025 were: Rose Canyon 41.6%, Showers Point 34.5%, Spencer Canyon 14.8%, and Whitetail 47.5%. Site fees for 2026 remain unchanged from 2025 levels. Currently, no interpretive programs or green initiatives are being offered in the permit areas by the Forest Service, the concessionaire, or external partners. No specific campsites or loops have been identified for infrastructure improvements such as electricity, water, or septic installations. The Forest Service conducted a site tour on April 24, 2025, providing attendees with an agenda, directional information, and logistical details, with a Q&A document posted in early May 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendices 1-10_508.pdf | ||
| Prospectus_RoseCanyon_2025_508.pdf | ||
| Appendices 11-21_508.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA is an equal opportunity provider, employer, and lender.
Original Published Date: December 1, 2025
Version: 1 - March 3, 2026
Coronado National Forest Campground Prospectus
Questions and Answers
1. What is the start date of the term for the new permit?
As stated in the prospectus, page 1, the current permit for this concession expires on 12/31/2026.
The start date of the new permit term will be 1/1/2027, with operations beginning at minimum, the second Friday in April.
2. When does the FS expect to notify applicants of the award?
The Forest anticipates notification of their selection in summer of 2026.
3. What written or printed information was provided to attendees during the April 24th, 2025, site visit? Will the Forest Service please provide these materials?
The participants for the site tour conducted in April 2025 were provided with an agenda that included specific sites to be visited with directional information as well as weather and logistic details (attached below). Additionally, a Q&A document was posted in early May 2025 and can be reviewed here
(https://www.fs.usda.gov/sites/nfs/files/r03/coronado/publication/RFEI_Q%26A_RoseCanyon.pdf).
4. What were 2025 gross revenues for the current operation?
The gross revenue for 2025 was $471,579.58, which includes sales of merchandise, firewood, ice, and other related items.
5. Do the published historical revenues in Table 2 of the prospectus include revenues for weddings and other group events at the amphitheater at Rose Canyon CG?
https://www.fs.usda.gov/sites/nfs/files/r03/coronado/publication/RFEI_Q%26A_RoseCanyon.pdf https://www.fs.usda.gov/sites/nfs/files/r03/coronado/publication/RFEI_Q%26A_RoseCanyon.pdf
Yes, the published historical revenues shown in Table 2 include all revenue generated from the amphitheater at Rose Canyon Campground, including weddings and other group events.
6. Will the FS please provide historical occupancy percentages for all sites on the permit?
Occupancy By Site (May to October 2025)
• Rose Canyon - 41.6%
• Showers Point - 34.5%
• Spencer Canyon - 14.8%
• Whitetail - 47.5%
7. Will the FS please provide the schedule of site fees as approved for the upcoming 2026 season?
The approved fees for the 2026 season remain the same as those for the 2025 season.
8. What interpretive programs are currently being offered in the assigned areas under the permit, whether provided by the Forest, the current concessionaire, or by other outside partners?
No interpretive programs are currently being offered in the assigned permit areas by the Forest
Service, the concessionaire, or any external partners.
9. What recycling or other green initiatives are currently being offered in the assigned areas under the permit, whether provided by the Forest or the current concessionaire?
No recycling or other green initiatives are currently being offered in the assigned permit areas by the Forest Service, the concessionaire, or any external partners.
10. What specific campsites and/or loops and/or host sites have been identified and/or prioritized for adding electricity, water, or septic?
None. Please refer to the prospectus, appendix 9 section 19 and appendix 20 for more information.
Coronado National Forest Rose Canyon Request for Expressed Interest/Prospectus - Forest Led Site Tour – (04/24/25)
All attendees will be responsible for their own transportation during the site tour visits. If multiple individuals are attending from your company, please try to carpool.
Local accommodations can be found in Tucson or in Summerhaven.
Please bring:
- Clothing layers for hot or cool/wet weather at varied elevations
- Sun & rain hat, sunscreen, insect repellent, drinking water, lunch, snacks
- Plan on seeing some of each site on foot, (good shoes, boots, mobility device)
Note: The tour will provide visits to key site locations, but not all sites included in the concession opportunity will be included. The large number of campgrounds and distance between locations would require multiple days to view. If participants are interested in visiting additional sites not included in the tour. Prospective bidders may visit and view the sites on their own any date which the forest and sites are open and operational.
For more information about the tour, please contact Adam Milnor, Recreation, Heritage and Lands Staff Officer at adam.milnor@usda.gov or (520) 528-5480.
Agenda
Time Site Name Other / Logistics Notes
Meet at the intersection the Rose Canyon Access Road and Catalina Highway near mile marker 17
(32.39515488667421, - 110.69180613712038)
• Roughly 15 mins at meeting location for introductions/discussions, 75 minutes for campground complex tour.
• Drive to Rose Canyon group campsites sites and through one or two camping loops
• Park at day use lake access area
• Walk to lakeshore
• Describe water system
• Drive time to next location is 15 mins (depart at 1130).
Allow 40 minutes to travel to this location from the intersection of E Catalina Highway and Tanque Verde Rd.
Campground is currently open to the public.
1145 Sollers Cabin • Roughly 35 mins at this location for discussions / walk-through.
• Drive time to next location is 10 mins (depart at 1200).
Site has been closed to allow for visit.
1230 Palisades Ranger Residence Cabin
• Roughly 15 mins at this location for discussions / walk-through.
• Drive time to next location is 5 mins
Site has been closed to allow for visit.
1250 Showers Point Campground (turn left at Organization Ridge Road)
• Roughly 20 mins at this location for discussions / walk-through.
• Drive time to next location is 10 mins
Campground is currently open to the public.
1320 Whitetail Campground
• Roughly 30 mins at this location for discussions / walk-through.
• Drive time to next location is 10 mins
Campground is currently open to the public.
1430 Spencer Canyon • Drive through Spencer Canyon and Turkey Track loops
• Roughly 45 mins at this location
Campground opens April 24th.
1515 Wrap Up Discussion • Time for overall Q&A
• Depart at 1545
At Turkey Track, within Spencer Canyon Campground.
| Coronado National Forest Campground Prospectus |
| SiteTour_Agenda_Rose Canyon Complex_508.pdf |
| Coronado National Forest |
| Rose Canyon Request for Expressed Interest/Prospectus - Forest Led Site Tour – (04/24/25) |
| Agenda |
Accessibility Report
Filename:
CG Prospectus QA_RoseCanyon_2026 (003).pdf
Report created by:
Organization:
[Enter personal and organization information through the Preferences > Identity dialog.]
Summary
The checker found no problems in this document.
Needs manual check: 2
Passed manually: 0
Failed manually: 0
Skipped: 2
Passed: 28
Failed: 0
Detailed Report
Document
Rule Name Status Description
Accessibility permission flag Passed Accessibility permission flag must be set
Image-only PDF Passed Document is not image-only PDF
Tagged PDF Passed Document is tagged PDF
Logical Reading Order Needs manual check Document structure provides a logical reading order
Primary language Passed Text language is specified
Title Passed Document title is showing in title bar
Bookmarks Skipped Bookmarks are present in large documents
Color contrast Needs manual check Document has appropriate color contrast
Page Content
Rule Name Status Description
Tagged content Passed All page content is tagged
Tagged annotations Passed All annotations are tagged
Tab order Passed Tab order is consistent with structure order
Character encoding Passed Reliable character encoding is provided
Tagged multimedia Passed All multimedia objects are tagged
Screen flicker Passed Page will not cause screen flicker
Scripts Passed No inaccessible scripts
Timed responses Passed Page does not require timed responses
Navigation links Passed Navigation links are not repetitive
Forms
Rule Name Status Description
Tagged form fields Passed All form fields are tagged
Field descriptions Passed All form fields have description
Alternate Text
Rule Name Status Description
Figures alternate text Passed Figures require alternate text
Nested alternate text Passed Alternate text that will never be read
Associated with content Passed Alternate text must be associated with some content
Hides annotation Passed Alternate text should not hide annotation
Other elements alternate text Passed Other elements that require alternate text
Tables
Rule Name Status Description
Rows Passed TR must be a child of Table, THead, TBody, or TFoot
TH and TD Passed TH and TD must be children of TR
Headers Passed Tables should have headers
Regularity Passed Tables must contain the same number of columns in each row and rows in each column
Summary Skipped Tables must have a summary
Lists
Rule Name Status Description
List items Passed LI must be a child of L
Lbl and LBody Passed Lbl and LBody must be children of LI
Headings
Rule Name Status Description
Appropriate nesting Passed Appropriate nesting
Back to Top
File details come from the government source that posted it. Updated .