| SCOPE | OF | WORK | |
| CONSTRUCT | DESIGN‐BUILD | ||
| ROPE | CORRAL | TRAINER | |
| BUILDING | NUMBER: | TBD |
| RANGER | TRAINING | BRIGADE | ||
| CAMP | FRANK | MERRILL, | DAHLONEGA | GA |
| PROJECT | NUMBER: | RA | 52701 | 8 | J | ||
| ENVIRONMENTAL | NUMBER: | TBD | |||||
| DATE: | 27 | SEPTEMBER | 2018 |
1. GENERAL DESCRIPTION/CONDITIONS:
This project shall be executed in the following phases:
1.1. Design Phase: Contractor shall design and provide the Government a complete set of drawings and specifications. This shall be but not limited to: civil, architectural, soil erosion plan, site plan, and specification for project approval and permitting. Design and specifications shall mirror the existing four corral structures as per USACE Savannah Contract No.
W912HN-10-D-0033 to 0005 as built drawings. The soil erosion plan shall include all labor, material, design fee (s), permitting fees, and monitoring cost for Designers to visit site IAW with governing standards and laws.
1.2. Permitting and Project Approval Phase: The contractor shall provide all documentations, labor, materials, equipment, and plant deemed necessary by the Contract Officer to obtain Project Approval.
1.3. Construction Phase: Upon approval and notification by the Contracting Officer or designated representative the contractor shall construct two each Rope Corral Trainers as approved during design phase. General conditions are but not limited to:
1.4. Construction shall be on grade
1.5. Corrals shall be Octagon with 20’ unless otherwise approved
1.6. Corrals shall be approximate 1,935 sf
1.7. Roofs shall be standing seam with 10 foot eave height, 15 foot peak height, with 12 inch roof over hang
1.8. Floor shall be on grade using washed pea gravel with concrete curb and gutters to avoid migration to supporting area. Curbing will consist of drainage.
| SCOPE | OF | WORK | |
| CONSTRUCT | DESIGN‐BUILD | ||
| ROPE | CORRAL | TRAINER | |
| BUILDING | NUMBER: | TBD |
| RANGER | TRAINING | BRIGADE | ||
| CAMP | FRANK | MERRILL, | DAHLONEGA | GA |
| PROJECT | NUMBER: | RA | 52701 | 8 | J | ||
| ENVIRONMENTAL | NUMBER: | TBD | |||||
| DATE: | 27 | SEPTEMBER | 2018 |
1.9. Metal roofs shall have lightning protection
1.10. Site Restoration: Contractor is shall restore all disturbed areas IAW governing NEPA and/or AHJ guidance.
2. Project Completion Date: TBD.
3. Design and Engineering: The Contractor shall provide to the government for review and approval a work-plan for the completion of this project. This shall include a timeline schedule for work to be completed in this project. The timeline shall include major benchmarks and milestones to provide knowledge of the project and objectives to be completed within the construction time scheduled.
3.1. Upon completion of the work the contractor shall submit a complete set of as-built drawings (hard copy and electronic).
4. All work shall be in accordance with (IAW) all applicable codes and standards including but not limited to:
4.1.1. International Building Code
4.1.2. Unified Building Code (Most recent edition).
4.1.3. Installation Design Guide.
4.1.4. Fort Benning Environmental Considerations as listed on the projects
FB-144R.
4.1.5. US Forest Service Design Criteria as deemed necessary
5. Preparation: Contractor shall be responsible for field/site visit to obtain and verify measurements, site conditions and to determine correct site conditions, dimensions and structural support requirements IAW with accepted local, state and federal building practices. All drawings provided to the contractor are for
| SCOPE | OF | WORK | |
| CONSTRUCT | DESIGN‐BUILD | ||
| ROPE | CORRAL | TRAINER | |
| BUILDING | NUMBER: | TBD |
| RANGER | TRAINING | BRIGADE | ||
| CAMP | FRANK | MERRILL, | DAHLONEGA | GA |
| PROJECT | NUMBER: | RA | 52701 | 8 | J | ||
| ENVIRONMENTAL | NUMBER: | TBD | |||||
| DATE: | 27 | SEPTEMBER | 2018 |
reference/information only and may or may not be current or to scale.
Contractor shall provide any/all deviations to accepted local, state and federal building practices/codes to the attention of the Construction Inspector and Contracting Officers Representative for review/consideration by the government. Contractor shall be responsible for obtaining utility spotting/location and permits that maybe required by Environmental Considerations FB-144R.
6. Soil Erosion Plan and Protection of State Water: The shall provide all services, fees, submitting guidelines to State of Georgia as directed in the Fort Benning 144R.
7. Disposal of Construction Waste: The Contractor shall be responsible for removing and disposal of all debris created by this project IAW local, state and federal guidelines and laws. The contractor shall dispose of all debris created by this project in Georgia/Alabama approved Landfill at the contractor’s expense. Contractor shall maintain and provide upon request by the KO or the designed representative receipts and haul tickets or bill of laden that construction debris from this contract has been disposed of IAW with local, state and federal guidelines and laws.
8. Safety: The contractor shall comply with all governing codes and standards.
Contractor shall comply with Fort Benning Safety, Environmental laws, regulations and United States Corps of Engineers EM 385-1-1 edition current during construction. The contractor shall perform all work IAW government procedures for entering and working at Fort Benning. The government reserves the right to stop work at any time for safety, security reasons, and for national defense at no cost to the government.
9. Utilities Spottings and Dig Permits: Contractor shall be responsible for obtaining approval for all utility spotting and dig permitting. Contractor shall provide to the COR copies of approval for spottings and digging. Contractor shall be responsible for cost associated with digging and/or utility/cable repairs if proper approval is obtain by the contractor.
| SCOPE | OF | WORK | |
| CONSTRUCT | DESIGN‐BUILD | ||
| ROPE | CORRAL | TRAINER | |
| BUILDING | NUMBER: | TBD |
| RANGER | TRAINING | BRIGADE | ||
| CAMP | FRANK | MERRILL, | DAHLONEGA | GA |
| PROJECT | NUMBER: | RA | 52701 | 8 | J | ||
| ENVIRONMENTAL | NUMBER: | TBD | |||||
| DATE: | 27 | SEPTEMBER | 2018 |
10. Requested for Utilities: Contractor shall be responsibe for completing and supplying to the COR with applicable information. Government will provide forms upon request.
11. Accessibility to Work Site and Hours of Operation: Monday-Friday, 0800 to
1730, excluding Federal Holidays or as approved KO.
12. Daily Housekeeping: The Contractor shall keep work area clean and remove all unneeded construction debris daily and/or as directed by the Construction Inspector.
13. Supporting Project Data:
13.1. As referenced above.
14. CUSTOMER APPROVAL;
14.1. .
14.2. Date: .