Certification.pdf
PDF 378 KB Posted
- Solicitation number
- IFB-080-2914301-MG (PQ)
- Issued by
- Orange County, San Francisco City, California
About this file
This certification document is a public works plans and specifications approval form for the County of Orange, California, administered by OC Public Works. The project, IFB-080-2914301-MG, concerns Modjeska Grade Road Road and Drainage Improvements extending from Santiago Canyon Road (Station 10+18) to Santiago Creek Bridge (Station 79+80). The work encompasses pavement reconstruction, construction of concrete ditches, inlets, junction structures, storm drain lines, and retaining walls, removal and installation of guardrail systems, installation of erosion control measures, adjustment of utilities and appurtenances, and striping. The document was prepared under the responsible charge of OC Public Works located at 601 N. Ross Street, Santa Ana, California 92701, and was approved by Kevin Onuma, P.E., Director of OC Public Works, and Edward Frondoso, P.E., Assistant Director/County Engineer. The document was digitally signed and certified through DocuSign on September 4, 2026, with approvals finalized at 10:08 AM PDT.
No pricing terms, bidding deadlines, contract award information, or funding sources are specified in this certification document. The file serves solely as formal approval documentation for the project plans and specifications, confirming that the work has been reviewed and approved as to form by the Deputy County Counsel and by the designated OC Public Works officials with appropriate engineering authority.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
County of Orange, OC Public Works IFB-080-2914301-MG Modjeska Grade Road, Road and Drainage Improvements
2914301 Page 1 of 1
PUBLIC WORKS PLANS AND SPECIFICATIONS
PROJECT NAME: Modjeska Grade Road, Road and Drainage Improvements
PROJECT LOCATION: Santiago Canyon Road (STA 10+18) to Santiago Creek Bridge (STA 79+80)
APPROVED AS TO FORM:
Deputy County Counsel
Date
Prepared under the responsible charge of:
County of Orange/ OC Public Works 601 N. Ross Street Santa Ana, CA 92701
Approved by:
Kevin Onuma, P.E
Director, OC Public Works
Administered By:
OC Public Works 601 N. Ross St., Santa Ana, CA 92701
Approved by:
Edward Frondoso, P.E
Asst. Director/County Engineer, OC Public Works
Docusign Envelope ID: 9F74B963-A5BC-8272-83CA-C92306647611
9/3/2026 | 5:30 PM PDT9/4/2026 | 7:13 AM PDT
9/4/2026 | 10:08 AM PDT
| 2026-09-04T17:08:46+0000 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .