Centreville Gym Audio RFP.pdf

PDF 228 KB Posted

Attached to
Centreville Public Schools Gym Audio RFP
Solicitation number
RFP - CNTV - 240000001809
Issued by
St. Joseph County, Chesaning Village, Michigan

About this file

This document is a Request for Proposal (RFP) issued by Centreville Public Schools in Centreville, Michigan for the expansion of the IP Video Surveillance System at the Jr./Sr. High School and Elementary School gymnasiums. The selected vendor will be responsible for providing and installing new audio systems, including amplifiers, speakers, mixers, Bluetooth capabilities, digital interface controls, wireless microphones and receivers, and connecting to existing equipment as required. There is a mandatory bidder's conference/walkthrough scheduled for April 16, 2024, and proposals are due by April 30, 2024 at 11:50 am Eastern. The project must be completed by August 2, 2024. Vendors must submit one original proposal, two bound copies, and one electronic copy, as well as provide a bid bond of at least 5% of the total bid amount. The district will award a contract based on the most advantageous proposal and reserves the right to award to multiple vendors.

The RFP outlines detailed requirements for the audio systems, including warranty, billing, payment, closeout documentation, and labeling/identification standards. Vendors must provide all materials, labor, and consumables necessary for a complete and functional system. Pricing must be provided on an itemized basis for each gymnasium. The successful vendor(s) will be required to obtain appropriate insurance coverage, and the district will retain 10% of the total contract amount until final acceptance of the completed project.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Centreville Public Schools Gym Audio

Request for Proposal

April 2024

Centreville Public Schools Gym Audio RFP Page 2 of 36

TABLE OF CONTENTS

REQUEST FOR PROPOSAL 3

SECTION A: TERMS AND CONDITIONS 4

SECTION B: PROJECT REQUIREMENTS AND SPECIFICATIONS 19

45. ENVIRONMENT 20

46. SCOPE OF WORK 20

47. SYSTEM WARRANTY 24

48. BILLING AND PAYMENT 24

49. CLOSEOUT DOCUMENTS / DOCUMENTATION 25

50. SUBMITTAL FORMAT 25

SECTION C: ATTACHMENTS, FORMS, AND DRAWINGS 29

ATTACHMENT A - BID RESPONSE FORMAT AND CHECKLIST 30

ATTACHMENT B - REFERENCES 31

ATTACHMENT C - PUBLIC DISCLOSURE 32

ATTACHMENT D - CONTACT INFORMATION 33

ATTACHMENT E - FAMILIAL DISCLOSURE AFFIDAVIT 34

ATTACHMENT F - IRAN ECONOMIC SANCTIONS ACT FORM 35

LOCATION DRAWINGS 36

Centreville Public Schools Gym Audio RFP Page 3 of 36

REQUEST FOR PROPOSAL

DOCUMENT TITLE: Centreville Public Schools Gym Audio RFP

DOCUMENT NUMBER: 2024-CEN-GYM-RFP

QUESTIONS: Please submit ALL questions via email to rfp-response@cpschools.org

SUMMARY: Centreville Public Schools (hereafter referred to as “Owner, the District or CEN”) hereby solicits proposals from qualified vendors (hereafter referred to as “Vendor or Bidder”) for an expansion of their IP Video Surveillance System. The design and implementation shall meet or exceed all industry best practices, CEN standards, and all State of Michigan policies.

FISCAL AGENCY: Centreville Public Schools, Centreville, Michigan

RFP RECEIPT DEADLINE: April 30 2024 @ 11:50 AM EST (note earlier time than opening)

RFP OPENING DATE: April 30 2024 @ 12:00 PM EST

OPENING LOCATION: Centreville Public Schools - Jr./Sr. High School 190 Hogan St., Centreville, MI 49032

RFP OPENING TIME: 12:00 pm Eastern

BOND REQUIREMENT: Each bid shall be accompanied by good and sufficient bid security or bid bond in an amount not less than 5% of the Bid amount and shall secure the Owner from loss or damage by reason of the withdrawal of the Bid by a Bidder or by failure of the successful Bidder to enter into a Contract with the Owner if his Bid is accepted by the Owner.

CONTACT PERSON: Brian Calkins & Jeff Evans Email Address: rfp-response@cpschools.org RFP Contact Phone: 269.467.5315

ADVERTISEMENT DATE: April 2, 2024

NUMBER OF PAGES: 36

Centreville Public Schools Gym Audio RFP Page 4 of 36

SECTION A: TERMS AND CONDITIONS

Centreville Public Schools Gym Audio RFP Page 5 of 36

1. SUBMISSION OF RFP

1.1. In response to this RFP, Bidders shall submit one (1) original proposal marked “Original”, two

(2) identical bound copies and one (1) identical electronic response in PDF or other standard format stored on a flash drive and/or USB Media Device. Clearly label and index binders with appropriate section and subsection numbers as referred to herein. Number each page individually and provide a table of contents.

1.2. Neither the CEN nor any official, employee or representative thereof shall be responsible for the pre/post-opening of, or failure to open an RFP not properly addressed, identified or mislabeled.

1.3. Proposals submitted by telephone, telegraphic notice, e-mail or facsimile will not be accepted.

1.4. RFP and any addenda shall be submitted in a sealed envelope or box and labeled using the following format:

Company: Centreville Public Schools RFP TITLE: Centreville Public Schools Gym Audio RFP

RFP #: 2024-CEN-GYM-RFP

Opening Date: April 30 2024 at address below.

Receipt Time: 11:50 am Mail / deliver To: Brian Calkins & Jeff Evans

Technology Department Centreville Public Schools 190 Hogan St. Centreville Centreville, Michigan 49032

1.5. In order for an RFP to be considered, it is mandatory that the RFP documents be received and time-stamped at 190 Hogan St. Centreville, MI 49032, prior to the receipt time specified in this RFP document (see page 3). This shall be local time at the receiving address.

1.6. Information should be prepared to provide a straightforward, concise delineation of capacities to satisfy requirements of the RFP. Emphasis should be placed on conformance to RFP instructions, responsiveness to RFP requirements, completeness and clarity of content.

1.7. Any irregularities or lack of clarity in the RFP should be brought to the attention of CEN for correction or clarification.

1.8. Addenda or revisions issued may become an integral part of this RFP. All addenda shall be posted on the websites referenced in Section 1.8.2.

1.8.1. Bidders must acknowledge receipt of addenda by signing and returning with the original RFP documents. It is the Bidder’s responsibility to insure receipt of any addenda. Failure to submit a signed addendum may result in rejection of a proposal.

Centreville Public Schools Gym Audio RFP Page 6 of 36

1.8.2. Bidder shall receive any addenda issued on a bid from one of the following websites:

www.cpschools.org / www.sjcisd.org

1.8.3. Bidders may contact Information Services at (269) 467-5315 or email rfp-response@cpschools.org with name, address, phone, E-Mail address and request.

Upon receipt of that request, CEN shall send any addenda documents relating to this proposal to the requested contact.

1.9. An authorized representative of Bidder’s firm must sign this RFP document. An unsigned proposal shall be disqualified.

1.10. Prices quoted shall be F.O.B. destination and exclusive of federal, state and local taxes. No shipping charges shall be allowed.

1.11. All costs incurred in the preparation and submission of responses to the RFP shall be the responsibility of the Bidder.

1.12. Bidder assumes any and all risks involved with the method of dispatch chosen. CEN assumes no responsibility for Bidder’s failure to deliver RFP in accordance with the specified receiving point and time stated herein.

1.13. All proposals and accompanying documentation become the property of CEN and shall not be returned.

1.14. Exceptions to the Terms, Conditions and Specifications of this proposal must be noted in the space provided at the end of this proposal. Failure to note said exceptions shall be interpreted to convey that Bidder shall propose to perform in the manner described and/or specified. The Centreville Public Schools reserves the right to accept or reject any exceptions based on the best interest of the CEN.

2. PROPOSALS ARRIVING AFTER RECEIPT DEADLINE

2.1. Note that the RFP Receipt Deadline is local time, Centreville, Michigan 49032.

2.2. Late proposals will not be accepted. A proposal arriving after the deadline will be rejected, unopened.

3. WITHDRAWAL OF PROPOSAL

3.1. A proposal may be withdrawn by written notification delivered by mail, delivery service or e-mail provided such notice is received prior to the date and time set for the delivery deadline.

3.2. A request for withdrawal of a proposal received after the scheduled delivery shall not be

Centreville Public Schools Gym Audio RFP Page 7 of 36 considered.

4. PROPRIETARY INFORMATION

4.1. Centreville Public Schools is a public entity. Thus CEN is subject to all State of Michigan laws regarding Public Records. Unless identified by law as confidential, ALL records are public and subject to inspection and copying by any person.

4.2. Upon selection of a successful bidder, the contents of all proposals will become public record.

Bidders shall not include any proprietary content that they would not want to be released to the public.

5. MANDATORY BIDDER’S CONFERENCE / WALKTHROUGH

5.1. A MANDATORY Bidders’ Conference / walkthrough will be held on April 16, 2024 11:00 am Local Time EST. Check-in with the main office at Centreville Jr./Sr. High School, 190 Hogan St., Centreville, MI 49032. At this time representatives of CEN will be available to answer questions regarding this RFP, you will have an opportunity to inspect the installation locations and receive drawings.

5.2. Prospective Bidders (or a representative) MUST be present at the Walkthrough.

5.3. Building Drawings with specific locations will be provided at this time. (can be requested electronically following the walkthrough by vendors with a representative present at the walkthrough.)

6. INTERVIEWS

6.1. CEN reserves the right to require any or all Bidder(s) to make a presentation either in person, by conference call or by web conferencing that illustrates the Bidder’s abilities relative to this effort and/or attend an interview session to gauge its suitability to provide services for this project. If so requested, the Bidder shall make its personnel available at a time to be scheduled if needed. No cost allowance shall be permitted for this requirement.

7. GOVERNING LAW

7.1. Should there be a contract, Bidder agrees that it shall be governed by and created in accordance with the laws of the State of Michigan. Subject to Paragraph 29, no action involving this contract agreement may be brought except in a state court located in St.

Joseph County, Michigan, USA.

8. SUSPENSION AND RESPONSIBILITIES

Centreville Public Schools Gym Audio RFP Page 8 of 36

8.1. Bidder must certify that it and its principals are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from transactions with any state or federal department or agency.

8.2. Submission of a signed proposal in response to this solicitation is certification that Bidder’s firm (or any Sub-Bidder) is not currently debarred, suspended, proposed for debarment, declared ineligible, or voluntarily excluded from participation in this transaction by any state or federal department or agency. Submission is also an agreement that CEN will be notified of any change in this status.

8.3. Loss of Agreement and/or Inability to Fulfill Requirements

8.3.1. If Bidder has had an agreement terminated, or has a pending termination, or a settlement to avoid litigation or termination for default during the past five (5) years, all such incidents must be described.

8.3.2. Termination for default is defined as notice to stop performance due to Bidder’s non-performance or poor performance, and the issue was either: (a) not litigated; or

(b) litigated and such litigation determined Bidder to be in default.

8.3.3. Bidder shall submit full details of all terminations for default, settlements, or pending terminations experienced in the past five (5) years including the other party’s name, address, and telephone number. Bidder shall also present its position on the matter.

8.3.4. CEN shall evaluate the facts and at its sole discretion may reject the Bidder’s response if the facts discovered indicate that completion of an agreement resulting from this RFP may be jeopardized by selection of Bidder.

8.3.5. If Bidder has experienced no such settlement or terminations for default in the past five (5) years, and has no pending terminations, it must affirmatively declare this to be so.

9. TERMINATION OF CONTRACT

9.1. This contract may be terminated in whole or in part by CEN for its convenience, but only after the Bidder is given not less than thirty (30) calendar days written notice of intent to terminate and an opportunity for consultation with CEN prior to termination.

10. AMERICANS WITH DISABILITIES

10.1. CEN acknowledges its responsibilities under the Americans with Disabilities Act (ADA) of 1990. CEN expects all Bidders to be knowledgeable about and comply with the requirements of the ADA.

Centreville Public Schools Gym Audio RFP Page 9 of 36

11. INSTALLATION

11.1. The successful Bidder shall make good and at their expense any damage to the work of other trades caused by the installation to the satisfaction of the CEN.

12. REQUIRED INSURANCE COVERAGE

12.1. The successful Bidder shall, at the Bidder’s sole expense, procure, maintain and keep in force for the duration of the contract insurance conforming to the minimum limits as specified in this document. The required insurance shall be in effect prior to the commencement of work by the successful Bidder and shall continue in force as appropriate until final acceptance by CEN of the completion of this contract.

12.2. Certificate of Insurance: The ACORD 25 Certificate of Insurance form or a form substantially similar must be submitted to Centreville Public Schools to evidence the insurance policies and coverage required of the successful Bidder. The certificate must name Centreville Public Schools as the certificate holder. The certificate should be signed by a person authorized to bind coverage on its behalf. Upon renewal of the policies listed, successful Bidder shall furnish the Centreville Public Schools with replacement certificates.

13. WORKERS COMPENSATION COVERAGE

13.1. Successful Bidders shall have Workers Compensation coverage as required by law for the duration of the contract to include Employer’s Liability Coverage with minimum limits of one million dollars ($1,000,000).

14. GENERAL LIABILITY INSURANCE

14.1. During the project, the successful Bidder shall maintain Comprehensive General Liability Insurance (occurrence form) with the following coverage through an insurance carrier(s) licensed to do business in the State of Michigan and having a current A.M. Best rating of A-:VII or better and approved by the Centreville Public Schools:

14.1.1. Premises-Operations

14.1.2. Independent Contractor’s Protection

14.1.3. Products and Completed Operations

14.1.4. Broad Form Property Damage

14.1.5. Personal Injury (with Employee Exclusion deleted)

14.1.6. Blanket Contractual Liability

Centreville Public Schools Gym Audio RFP Page 10 of 36

14.1.7. Property Damage Liability

14.2. Limits shall be equal to the amount carried by the successful Bidder, but shall not be less than two million dollars ($2,000,000) per occurrence combined with single limits.

14.3. By endorsement to the required general liability policy and automobile liability policy, Centreville Public Schools must be named as additional insured for all liability arising from this contract. The Additional Insured Document (CG 20 10 11 85 or CG 20 26 11 85) should reference the RFP number.

15. COMPREHENSIVE AUTOMOBILE LIABILITY INSURANCE

15.1. During the project, Bidder shall maintain Comprehensive Automobile Liability Insurance to include all owned autos, non-owned autos, and hired autos coverage through an insurance carrier(s) licensed to do business in the State of Michigan and having current A.M. Best rating of A-:VII or better and approved by the Centreville Public Schools.

15.2. Limits shall be equal to the amount carried by the successful Bidder, but shall not be less than one million dollars ($1,000,000) per occurrence combined with single limits.

16. PROFESSIONAL LIABILITY INSURANCE

16.1. During the project, Bidder shall maintain Professional Liability (Errors & Omissions) Insurance with minimum limits of at least one million dollars ($1,000,000) per occurrence.

The insurance required above may be provided under primary policies or by a combination of primary and excess policies.

17. LICENSE AND CERTIFICATION

17.1. Bidders must be licensed or incorporated to do business in the State of Michigan.

17.2. Bidder shall possess all applicable licenses and/or certifications to perform this type of service.

18. VESTED INTEREST

18.1. Bidders chosen cannot receive any benefits (directly or indirectly) or be party to other agreements that may emanate from recommendations, contracting actions, and or activities related to this effort.

18.2. The only benefit Bidder may derive from this project is payment for the identified work and optional tasks contained herein, including identified deliverables in Bidder’s initial RFP

Centreville Public Schools Gym Audio RFP Page 11 of 36 response.

19. WARRANTY

19.1. Bidder warrants that the work shall be performed with the degree of skill, care, and judgment customarily accepted as sound quality practice and procedure.

19.2. Bidder further warrants that the work fulfills the requirements and intent of the entire contractual agreement inclusive of Bidder’s RFP response.

19.2.1. If work fails to meet the aforementioned criteria and/or is deemed to be inadequate in the judgment of CEN, Bidder shall re-perform the work or portion of the work that is unsatisfactory at no additional expense to CEN.

19.2.2. All electronics and equipment requested in this project may not be refurbished or used.

The district reserves the right to reject refurbished or used equipment.

20. ASSIGNMENT

20.1. Any attempt by Bidder to assign or otherwise transfer any interest in this agreement without the prior written consent of CEN shall be void.

21. ATTORNEY’S FEES

21.1. The parties agree that in the event of a dispute, each party will bear its own costs of arbitration, litigation and attorney’s fees.

22. COMPLIANCE WITH LAW

22.1. Bidder shall comply with all applicable federal, state and local statutes, regulations, ordinances and other legal requirements which may apply.

23. CONFIDENTIAL TREATMENT OF INFORMATION

23.1. Bidder shall preserve any information obtained, assembled or prepared in connection with the performance of this agreement in strict confidence.

24. COVENANT

24.1. Bidder covenants that it presently has no interest and that it will not acquire any interest, direct or indirect, which would conflict in any manner or degree with the performance of services required under this agreement. Further, Bidder covenants to its knowledge and

Centreville Public Schools Gym Audio RFP Page 12 of 36 ability that in performance of said services no person having any such interest shall be employed.

25. DISPUTE RESOLUTION

25.1. Any controversy or claim arising out of or related to the agreement or the breach thereof shall be settled by arbitration unless Centreville Public Schools, at its sole option, rejects arbitration by notifying Bidder.

25.2. If Centreville Public Schools reject arbitration, Bidder shall have thirty (30) days from the date of receipt of rejection to send notice to commence litigation by the service of a summons and complaint upon the Centreville Public School District.

25.3. Failure to effect service upon the Centreville Public School District within said time period shall act as a bar to litigation of the claim, which was the subject of the request for arbitration.

25.4. If the matter is arbitrated, Centreville Public Schools shall designate whether the rules of the American Arbitration Association or the rules of the Michigan Arbitration Association shall apply. Michigan courts may enter judgment on such awards.

25.5. The parties agree that any arbitrator may not award attorney’s fees in any case.

25.6. Unless specifically stated herein, if there exists any conflict or inconsistency between terms set forth in this proposal, the successful Bidder’s response, and any agreement submitted by the successful Bidder, the language in this RFP shall take precedence.

26. FORCE MAJEURE

26.1. Neither party shall be liable for failure or delay in performance under any agreement anticipated by this order in whole or in part to an act of God, strike, lockout or other labor dispute, civil commotion, sabotage, fire, flood, explosion, acts of any government, unforeseen shortages or unavailability of fuel, power, transportation, raw materials or supplies, inability to obtain or delay in obtaining governmental approvals, permits, licenses or allocations, and any other causes which are not within such party’s reasonable control, whether or not the kind is specifically enumerated above. During any period of Bidder’s inability to perform, CEN may acquire from others said goods or services without incurring liability to Bidder.

27. PATENT INDEMNITY

27.1. Bidder agrees to indemnify and hold the CEN harmless from any claim, including court costs and actual attorney fees, involving patent infringement or copyrights on goods or services supplied.

Centreville Public Schools Gym Audio RFP Page 13 of 36

28. PENALTIES / DEFAULT

28.1. In the event that the Bidder defaults on the contract entered into pursuant to this RFP, the CEN shall have the unilateral right, at its discretion, to terminate or cancel the contract entered into between the parties.

28.2. Additionally, if the bidder defaults on the contract entered into pursuant to this RFP, the CEN is entitled to recover any upfront or non-recurring charges paid to Bidder pursuant to any contract.

29. INDEMNITY

29.1. Bidder agrees to indemnify and hold harmless CEN, its officers, employees, agents, and volunteers from and against all liability, claims, demands, and expenses including court costs and actual attorney’s fees on account of any injury, loss, or damage which arises out of the work performed under this agreement if such injury, loss, or damage is due to the negligence of Bidder, any Sub-Bidder of Bidder, or any officer, employee, or agent of Bidder.

29.2. The obligation of this section shall not apply to damages for which CEN is/shall become liable by final judgment to pay to a third party as the result of the negligence of CEN. Nothing herein shall constitute a waiver by CEN of any and all rights and privileges under any governmental immunity act or related statute.

30. INTELLECTUAL PROPERTY

30.1. CEN may request copies of the Bidder’s drawings, written reports, or other works related to this project for the sole purpose of verifying that the Bidder is in compliance with the relevant specifications required in this RFP. The documents provided by the Bidder shall at all times remain the property of the Bidder.

31. NO THIRD-PARTY RIGHTS

31.1. Any contract entered into between the CEN and the Bidder shall be for the sole benefit of CEN and the Bidder.

32. NON-ENDORSEMENT

32.1. As a result of the selection of a Bidder to supply services, CEN is neither endorsing nor suggesting that the Bidder’s service is the best or only solution. Bidder agrees to make no reference to CEN in any literature, promotional material, brochures, sales presentations, or the like, without the express written consent of Centreville Public Schools.

Centreville Public Schools Gym Audio RFP Page 14 of 36

33. RECORDS

33.1. Records shall be maintained as required by a successful Bidder in compliance with applicable municipal, federal or state laws, ordinances, codes, and as prescribed by CEN.

33.2. At any time during normal business hours when CEN deems it necessary, all records shall be made available to St. Joseph County educational agencies at a location in St. Joseph County, Michigan for examination with respect to all matters covered by any subsequent agreement.

33.3. Referenced educational agencies may audit, examine and/or take excerpts or transcripts from such records including, but not limited to, invoices, materials, payrolls, records of personnel, conditions of employment or any other data as may be pertinent to this RFP.

34. SEVERABILITY

34.1. If a competent court or arbitrator holds any of the terms, covenants, provisions and agreements contained herein invalid, illegal or unenforceable, this agreement shall be interpreted as if such invalid terms, covenants, provisions, or agreements were not contained herein and the remaining provisions shall be valid and enforceable.

35. EXPENSES

35.1. In the event that CEN agrees to pay for any of Bidder’s expenses directly related to this work, the following parameters shall apply:

35.1.1. No overhead and/or profit shall be permitted.

35.1.2. Bidders shall only receive reimbursement in amounts that are consistent with applicable travel guidelines established by CEN policy, regulations, and procedures for its own employees.

36. REJECTION OF PROPOSALS

36.1. CEN reserves the right to reject any and all proposals received, or any part thereof.

Proposals may be rejected for any of, but not limited to, the following causes:

36.1.1. Proposal lacks signature by an authorized representative of the Bidder.

36.1.2. Evidence of collusion among Bidders exists.

36.1.3. Bidder fails to meet terms and conditions as specified in the RFP.

36.1.4. Evidence submitted by Bidder leads CEN to believe that Bidder will be unable to carry

Centreville Public Schools Gym Audio RFP Page 15 of 36 out the obligations of the agreement and complete the work described.

36.1.5. CEN investigation determines that Bidder is not qualified to meet the obligations of the agreement and complete work described.

36.1.6. Cost of services exceeds budgetary constraints.

36.1.7. Bidder lacks proper system certification.

36.1.8. Proposals with answers deemed by the District’s evaluation committee to be incomplete will not be considered for an award.

37. REFERENCES

37.1. CEN reserves the right to investigate information supplied by Bidder to determine its accuracy.

37.2. Bidder supplied reference or customer list authorizes the CEN to contact firms listed and understand that any information gathered may be used in evaluation of the proposal.

38. PROPOSAL NEGOTIATIONS

38.1. CEN may open negotiations with responsive Bidders after submission of proposals and prior to award.

38.2. At its sole discretion the Centreville Public Schools reserves the right to award an agreement without negotiation based upon written proposals.

38.3. The Centreville Public Schools reserves the right to accept any proposal which it deems most favorable to the District and to reject any or all proposals or any portion of any proposal submitted which is not in the CEN district’s best interest.

39. CONTRACT AWARD GUIDELINES

39.1. CEN reserves the right to waive any minor irregularities in proposals and/or agreements deemed to be in its best interest.

39.2. Centreville Public Schools reserves the right to award an agreement on the basis of cost, individual scope of work elements, groups of elements or all elements to a winning Bidder. At CEN discretion, elements of the project could be assigned to multiple Bidders. Taking into consideration the specified evaluation criteria, CEN will select the Bidder/s whose proposal is most advantageous to the CEN.

Centreville Public Schools Gym Audio RFP Page 16 of 36

39.3. All agreements are subject to approval by Centreville Public Schools Board and may require approval of their legal counsel.

39.4. Once awarded, this contract will be the final expression of agreement between the parties and may not be altered, changed, or amended except by mutual written approval agreement.

39.5. Unless specifically stated herein, if there exists any conflict or inconsistency between terms set forth in this RFP document, the successful Bidder’s proposal, and any agreement submitted by the successful Bidder, the language in this RFP document shall take precedence.

39.6. CEN reserves the right to hold proposals for a period of ninety (90) days from date of opening before awarding or rejecting said proposals.

40. RECOMMENDATION FOR AWARD POSTING

40.1. It is the responsibility of the interested Bidder to obtain the Recommendation for Award.

40.2. The Recommendation for Award is posted on the following websites: www.cpschools.org or www.sjcisd.org

40.3. Bidder may also obtain the Recommendation for Award by contacting CEN by calling 269-467-5315 or E-Mail request to rfp-response@cpschools.org

41. APPEAL BY UNSUCCESSFUL BIDDER

41.1. Any unsuccessful Bidder may appeal a pending Recommendation for Award.

41.2. Appellant must submit a written protest to the Centreville Public Schools Superintendent no later than six (6) calendar days after Recommendation for Award is posted. The notice of protest must include a written statement setting forth with specificity the reasons the person filing the notice believes the applicable provisions of the law were violated.

41.3. Appellant may be required to post a bond with a good and solvent surety company authorized to do business in the State of Michigan or submit other security in a form approved by Centreville Public Schools, which will hold the bond or other security until a determination is made on the appeal. Such a bond must be submitted with the written protest to the Superintendent.

41.4. The bond or other security shall be in the amount of twenty five percent (25%) of the total dollar value of Appellant’s proposal, up to a maximum bond or other security amount of two hundred fifty thousand ($250,000).

41.5. If Appellant is not satisfied with the response, Appellant may then appeal to an appeals

Centreville Public Schools Gym Audio RFP Page 17 of 36 committee designated by the Centreville Public Schools. If Appellant is not satisfied with the appeals committee’s response, Appellant may then appeal to the Board of Education, who will render the final decision.

41.6. Appellant will not seek any type of judicial intervention until Centreville Public Schools has rendered its final decision on the protest.

41.7. The Centreville Public Schools is not liable for any costs, expenses, attorney’s fees, loss of income or other damages sustained by Appellant in the proposal appeal process.

41.8. Centreville Public Schools will stay any award action until after the Board of Education renders a final decision.

41.9. If an appeal is granted and a bond was required, the full amount of the posted bond will be returned to Appellant. If the appeal is denied or not upheld, a claim may be made against the bond for expenses suffered by Centreville Public Schools because of the unsuccessful appeal.

42. BID BOND

42.1. Every RFP shall be accompanied by a surety company certified bid bond or cashier’s check made payable to Centreville Public Schools, 190 Hogan St. Centreville, MI 49032.

42.2. The amount of surety shall not be less than five percent (5 %) of the total RFP submitted.

Said amount to be forfeited to Centreville Public Schools should the Bidder, to whom the contract is awarded, fail to enter into the contract in accordance with the RFP.

42.3. Surety of the successful Bidder shall be retained by Centreville Public Schools until replaced by a Performance Bond.

42.4. The successful Bidder will be required to secure Performance, Labor and Material bonds for all contracts at or exceeding $50,000, from a surety company having a rating of A- or better, for the full amount of the Contract.

43. TERM OF AGREEMENT

43.1. Upon receiving approval from the CEN Board of Education, it shall be the intention of the Centreville Public Schools to award a contract for the project identified in the scope defined in SECTION B: PROJECT REQUIREMENTS AND SPECIFICATIONS.

43.2. All required design, implementation and construction must be completed before August 2, 2024, given potential part delays are not excessively hindering progress.

Centreville Public Schools Gym Audio RFP Page 18 of 36

44. TIMELINE OF EVENTS

44.1. The following is the tentative schedule of events for the RFP submittal and selection process.

CEN reserves the right to change the schedule at any time.

RFP EVENT DATE

RFP Advertised April 2, 2024

MANDATORY Bidders’ Conference / Walkthrough (Address)

April 16, 2024 11:00 pm Eastern

Responses to Questions Posted as “Addendum” (if any) TBD (if applicable)

Proposals DUE @ 190 Hogan St. Centreville, MI 49032 April 30, 2024 11:50 am Eastern

Bid Opening @ 190 Hogan St. Centreville, MI 49032 April 30, 2024 12:00 pm Eastern

Finalist Interviews / Presentations (if applicable) TBD (if applicable)

Board Approval May 13, 2024

Bid Awards May 14, 2024

Project Completion Date August 2, 2024

Start of Owner Certification and Approval Upon Completion

Centreville Public Schools Gym Audio RFP Page 19 of 36

SECTION B: PROJECT REQUIREMENTS

AND SPECIFICATIONS

Centreville Public Schools Gym Audio RFP Page 20 of 36

45. ENVIRONMENT

45.1. Centreville Public Schools work shall be done at facilities located in Centreville, Michigan.

This project shall consist of providing and installing new audio systems at the Jr./Sr. High School Gymnasium, as well as the Elementary Gymnasium.

45.2. Work shall be completed in coordination with district schedules and district administrative directive in an effort to minimize disruption during school in-session hours.

46. SCOPE OF WORK

46.1. Approved vendors shall provide, install, configure and warranty audio systems at Jr./Sr. High School, and Elementary School Gymnasiums.

46.2. Owner Responsibilities

46.2.1. Owner shall be defined as Centreville Public Schools or its designee.

46.2.2. Owner shall provide physical location maps and placement information upon the scheduled mandatory bidder’s conference/walkthrough, and in digital form afterwards.

46.2.3. Owner shall provide all necessary IP addresses for new hardware.

46.2.4. Owner shall provide a username and password to be used for the new equipment.

46.2.5. Owner shall configure all PoE data drops for proper VLAN assignment and work with Vendor on any operational issues.

46.3. Vendor Responsibilities

46.3.1. Vendor shall be defined as the selected bid applicant.

46.3.2. Vendor shall provide all hardware and associated materials necessary for a functional system.

46.3.3. Vendor shall not connect any network cables into Network Switches unless authorized by a network engineer representing the Owner.

46.3.4. Vendor shall ONLY connect to ORANGE modular Panduit Minicom jacks that are compatible with current rack/panel.

46.3.4.1. Vendor shall provide patch panels if there is an inadequate number of available patch panel ports in the existing rack to accommodate new drops.

46.3.4.2. Vendor shall provide 1ft ORANGE CAT6A patch cables for the switch side of the connection, and the appropriate length of ORANGE CAT6A patch cable for the system side connection.

46.3.5. Vendor shall communicate with the Owner’s project manager on a weekly basis at minimum.

Centreville Public Schools Gym Audio RFP Page 21 of 36

46.3.6. Vendor shall install hardware in locations specified on the drawings provided at the walk through.

46.3.7. Vendor shall itemize parts and costs for each gym in their bid response.

46.3.8. Vendor shall configure audio systems with IP address, Subnet Mask, Gateway, and password information.

46.3.9. Vendor shall document MAC address for each audio system in owner provided spreadsheet.

46.3.10. Vendor shall remove existing speakers and system racks.

46.3.11. Vendor shall provide end-user training on how to use the systems for district staff, and technician training on how to configure the systems for district technology team.

46.3.12. Vendor shall ensure audio systems are tuned for their prospective environments to the satisfaction of the district staff.

46.4. Hardware Requirements

46.4.1. All components shall be NEW, not Refurbished, Factory Rebuilt, or equivalent.

46.5. Jr/Sr High School Gym Components and Considerations

46.5.1. Wall mounted rack

46.5.2. Amplifier

46.5.3. Speakers

46.5.4. Mixer

46.5.5. Bluetooth capability throughout the entire gym or equivalent

46.5.6. Digital interface controls w/ remote capability

46.5.7. Input junction box

46.5.8. Two (2) wireless mic and two (2) lapel mic & receiver (Shure preferred)

46.6. Elementary School Gym Components and Considerations

46.6.1. Amplifier

46.6.2. Speakers

46.6.3. Mixer

46.6.4. Bluetooth capability throughout entire gym or equivalent

46.6.5. Digital interface controls w/ remote capability

Centreville Public Schools Gym Audio RFP Page 22 of 36

46.6.6. Input junction box

46.6.7. Two (2) wireless mic and two (2) lapel mic & receiver (Shure preferred)

46.6.8. Connect new system to existing monitor speakers

46.6.9. Connect new system to existing ceiling mounted microphones

46.7. Optional Add-On

46.7.1. This section was left blank intentionally.

46.8. Testing

46.8.1. The Vendor shall verify and demonstrate to the District that all hardware, software, cabling and all other system components are functioning according to RFP specifications.

46.9. Identification and Labeling

46.9.1. Labeling shall clearly identify all components of the system, cables and panels.

46.9.2. The labeling system shall designate a unique identifier for the cable.

46.9.3. Vendor shall work with the Owner on identification details.

46.9.4. All label printing shall be machine-generated. NO handwritten labels shall be allowed (cables may be hand-identified for installation purposes but must be re-labeled with a machine-generated label prior to acceptance)

46.9.5. All cabling shall be labeled within 6 inches of its origin and termination point.

46.9.6. All labeling information shall be recorded on the As-Built drawings.

46.9.7. All test documents shall reflect the appropriate labeling scheme.

46.10. Ethernet Cabling

46.10.1. Commscope, General or equivalent Tier 1 grade.

46.10.2. Riser-Rated Category 6A solid ethernet cable (unless otherwise specified).

46.10.3. Color shall be determined by installer except RED (reserved for Fire).

46.10.4. Wire color does NOT need to match jack color which shall be ORANGE.

46.10.5. All cables shall be terminated as T568B-TSB.

46.10.6. Cabling shall never reticulate over sharp edges without appropriate protection and

Centreville Public Schools Gym Audio RFP Page 23 of 36 must follow proper bend radius per the manufacturer.

46.10.7. Cabling installed to data closet patch panels shall have sufficient slack to facilitate potential future relocation of that termination up or down by 4U and re-termination a minimum of two (2) times.

46.10.8. Coiling excess cable underneath racks or cabinets shall be deemed unacceptable.

46.10.9. Cables shall not be attached to equipment mounting rail of any rack.

46.10.10. J-Hook cable supports shall be suitable for use in ceiling space.

46.10.10.1. The cable support must maintain a complete horizontal and vertical 1” bend radius.

46.10.10.2. Cable shall be supported every five (5) feet.

46.10.10.3. Fill shall not exceed 75%.

46.11. Consumables

46.11.1. Installer shall provide all consumables (J-hooks, Trapezes, Innerduct, Velcro Cable Ties, Grid Wire, Cable Ties, Ceiling Screws, Cables Saddles, Electrical Tape, Label maker Tape,) and any other not specifically mentioned but, necessary for the acceptable completion and delivery of the project.

46.11.2. Cable ties (ty-wraps) shall NOT be used.

46.11.2.1. Note that cable ties (ty-wraps, zip ties, etc.) are permitted during installation, but MUST be replaced with velcro-style cable ties prior to project certification.

46.12. Demolition / Preservation

46.12.1. Ceiling Preservation

46.12.1.1. Vendor shall preserve all existing ceiling tiles.

46.12.1.2. Ceiling pad or tiles which are cracked, chipped, smudged, or otherwise damaged shall be replaced and re-installed at Vendor’s expense in coordination with the Owner.

46.12.1.3. All ceiling tiles moved or removed by Vendor shall be reset by the Vendor.

46.12.1.4. The building and work area shall be returned to its original condition prior to final sign off of the project.

46.12.2. Wall Preservation

46.12.2.1. Installer shall coordinate with Owner regarding any raceway that shall be removed.

Centreville Public Schools Gym Audio RFP Page 24 of 36

46.12.2.2. Vendor shall be responsible for Filling and Painting wall or ceiling spaces damaged due to Vendor actions. This shall not apply to items covered by newly installed conduit or surface boxes. Vendor shall coordinate paint type and color with the Owner and all Filling and Painting due to Vendor damage shall be at the expense of the Vendor.

46.12.3. The building and work area shall be returned to its original condition prior to final sign off of the project.

46.13. Alternates (Not Required)

46.13.1. This section left blank intentionally.

47. SYSTEM WARRANTY

47.1.1. Vendor shall warrant all materials and equipment furnished under the contract are in good working order, free from defects and in conformance with system specifications.

All installed equipment must conform to the manufacturer’s official published specifications.

47.1.2. Vendor shall detail what is included and defined if provided by manufacturer or by Vendor in the standard warranty for each item proposed.

47.1.3. Vendor shall warrant all system components and mountings for a minimum of one (1) year.

47.1.4. Telephone support and on-site support for warranty issues (as required)

47.1.5. Vendor shall provide warranty coverage hours and days.

47.1.6. Specify emergency warranty response service with a guaranteed response time for crisis events.

47.1.7. Specify equipment replacement procedures and schedules (onsite and depot parts repair and replacement).

48. BILLING AND PAYMENT

48.1.1. Billing (progress) may be submitted monthly for equipment delivered and installed.

48.1.2. Total payments shall not exceed ninety (90) percent of the total Project Cost and ten

(10) percent of the total Project Cost shall be retained.

48.1.3. Monthly billing shall reflect the 10% retained.

48.1.4. The ten (10) percent retainage shall be payable within thirty (30) days of receipt of all documentation and the final acceptance of the completed system by the Owner.

Centreville Public Schools Gym Audio RFP Page 25 of 36

49. CLOSEOUT DOCUMENTS / DOCUMENTATION

49.1.1. Vendor shall provide the following:

49.1.1.1. A copy of manufacturer’s warranties for all system components including cabling.

49.1.1.2. Operation manuals and specification sheets for all hardware and cabling.

49.1.1.3. Operation manuals and training materials for all software.

49.1.1.4. One (1) copy of test results for installed UTP Ethernet cabling (if applicable)

49.1.1.5. Two (2) copies of As-Builts in hard copy.

49.1.1.6. One (1) electronic copy of As-Builts in AutoCad or Visio format.

49.1.1.7. One (1) electronic copy of As-Builts in PDF format.

49.1.2. As-Built Documentation shall include:

49.1.2.1. Building drawings showing the location of all installed hardware components.

49.1.2.2. Cabling documentation showing cables associated with hardware installed.

50. SUBMITTAL FORMAT

50.1. Response shall be organized in the following format:

50.1.1. Cover Sheet including:

50.1.1.1. Document Name

50.1.1.2. Document Number

50.1.1.3. Bidding Organization

50.1.2. Transmittal letter on Bidder’s letterhead including:

50.1.2.1. Bidder’s full name

50.1.2.2. Address of Bidder

50.1.2.3. Telephone number

50.1.2.4. E-Mail Address

50.1.2.5. Bidder’s legal status (sole proprietor, partnership, corporation or other)

Centreville Public Schools Gym Audio RFP Page 26 of 36

50.1.2.6. Identification as a Local, Regional or National company

50.1.2.7. Description and History of the Bidder’s Organization

50.1.3. Bid Response Format and Checklist - Attachment A

50.1.3.1. This form shall be used as a guideline for response assembly and verification of all required bid material.

50.1.4. Complete Table of Contents

50.1.5. Reference Form - Attachment B - List K-12 Educational organizations first.

50.1.6. Signed Public Disclosure Form - Attachment C (REQUIRED for Bid Acceptance)

50.1.7. Contacts / Exceptions / Proposal Signature Form - Attachment D

50.1.8. Familial Disclosure Affidavit - Attachment E

50.1.8.1. Bids shall be accompanied by a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the Board or the Superintendent of the District.

The Board shall not accept a bid that does not include this sworn and notarized disclosure statement.

50.1.9. Iran Economic Sanctions Act Form - Attachment F (REQUIRED for Bid Acceptance)

50.1.10. Bid Bond

50.1.10.1. Include the surety bond issued for the project (Section 42)

50.1.11. Certificate of Insurance

50.1.11.1. Include Certificate of Insurance for the project (Section 12)

50.1.12. Experience

50.1.12.1. Discuss Bidder’s Experience with requested services and products.

50.1.12.2. Discuss Bidder’s Experience working with K-12 Educational organizations.

50.1.12.3. Bidder shall list their applicable licenses and certifications pertaining to this project.

50.1.13. Personnel

Centreville Public Schools Gym Audio RFP Page 27 of 36

50.1.13.1. Identify Bidder’s Personnel and their experience and certifications.

50.1.13.2. Do you have background checks for your Employees?

50.1.13.3. Do you have any Employees restricted from K-12 student contact?

50.1.13.4. Do you have Employees that live or pay taxes in St. Joseph County, MI?

50.1.14. Contractor and Subcontractor Listing

50.1.14.1. Submit the names, addresses, phone numbers, and applicable licenses of all firms that will provide services in conjunction with the performance of this agreement.

50.1.15. Project Approach

50.1.15.1. Describe the approach to be taken including, but not limited to, how the project will be organized, number and types of staff involved.

50.1.16. Proposed Scheduling

50.1.16.1. Provide a schedule of events that clearly indicates the time sequence for tasks that are required to perform major components of the scope of work.

50.1.17. Costs - Provide the following cost information

50.1.17.1. Schedule of fees applicable to this effort to achieve the desired results.

50.1.17.2. Itemize materials and costs as defined in the scope of work.

50.1.17.3. Itemize costs as related to significant events that are identified in the Bidder’s schedule and indicate a grand total.

50.1.17.4. Any proposed material or equipment is to be included F.O.B. destination and freight shall be included in the price of the item(s).

50.1.17.5. Rate chart applicable for potential expansion of scope of work.

50.1.17.6. If travel is required, non-local firms shall indicate estimated travel expenses applicable to this effort. Bidders shall indicate if any travel will be required.

50.1.17.7. Bidder shall provide an hourly rate for future unidentified criteria, support services and consulting services when requested.

50.1.17.8. Define unit of measure, if applicable.

50.1.18. Signed Copy of Addendums

Centreville Public Schools Gym Audio RFP Page 28 of 36

50.1.18.1. Provide a copy of all issued addendums with signature of receipt to indicate compliance.

50.1.19. Proposed Agreement - OPTIONAL

50.1.19.1. Provide a copy of any proposed agreement form.

50.1.19.2. CEN cannot accept any agreement that includes a specific cancellation clause that is in conflict with Section 9.0 TERMINATION OF CONTRACT.

50.1.19.3. Unless otherwise identified as such, CEN’s contract / RFP language takes precedence in all cases.

50.1.20. Miscellaneous Vendor Documentation - OPTIONAL

50.1.20.1. This may include any information about the proposed project including but not limited to:

50.1.20.1.1. Product Information

50.1.20.1.2. Vendor Information in addition to what was requested

50.1.20.1.3. Detailed and annotated copy of the RFP

49 - 59 LEFT INTENTIONALLY BLANK

Centreville Public Schools Gym Audio RFP Page 29 of 36

51. a

52. a

53. a

54. a

55. a

56. a

57. a

58. a

59. a

60. a

61.

62.

SECTION C: ATTACHMENTS, FORMS, AND

DRAWINGS

Centreville Public Schools Gym Audio RFP Page 30 of 36

ATTACHMENT A - BID RESPONSE FORMAT AND

CHECKLIST

Cover Letter

Bid Response Format and Checklist (ATTACHMENT A)

Table of Contents

Reference Form (ATTACHMENT B)

Public Disclosure Form (ATTACHMENT C)

Contact Person Form/Proposal Signature (ATTACHMENT D)

Familial Disclosure Affidavit (ATTACHMENT E)

Iran Sanctions Form (ATTACHMENT F)

Bid Bond

Certificate of Insurance

Experience / Personnel

Contractor / Subcontractor Listing

Project Approach

Proposed Schedule

Detailed Materials & Costs Listing

Signed Copy of Addendum(s)

Proposed Agreement (Optional)

Miscellaneous Vendor Documentation (Optional)

Centreville Public Schools Gym Audio RFP Page 31 of 36

ATTACHMENT B - REFERENCES

Company Name

Contact Person

Address

Phone

Fax Number

Email / website

Description of service provided

Company Name

Contact Person

Address

Phone

Fax Number

Email / website

Description of service provided

Company Name

Contact Person

Address

Phone

Fax Number

Email / website

Description of service provided

Centreville Public Schools Gym Audio RFP Page 32 of 36

ATTACHMENT C - PUBLIC DISCLOSURE

Firm Name:__________________________________________________________________

I hereby certify that I understand:

● CEN employees shall not receive unlawful compensation, commission or personal profit in the course of performing CEN duties.

● CEN positions may not be used for unlawful purposes or personal gain.

● I further certify that I have listed all personal relationships and financial interests between the company, company officers, and key employees with current and former Centreville Public School District board or staff members and current and former Centreville Public School District authorizing officials. Please complete the form below. Additional sheets may be attached if necessary. Write in N/A if non-applicable.

Company/Employee Position Date of Hire District Official / Board Member

Relationship / Interest

I hereby acknowledge that failure to disclose all facts relative to a conflict or potential conflict of interest with regard to my contract/agreement with CEN may result in termination of said contract/agreement.

Signature: _____________________________________________________________ Authorized Firm Representative

Title: ___________________________________________ Date: _________________

Centreville Public Schools Gym Audio RFP Page 33 of 36

ATTACHMENT D - CONTACT INFORMATION

Firm Name: __________________________________________________________________

Contract Point-of-Contact Name: __________________________________________________

Address: _____________________________________________________________________

City: ___________________________________ State: _______ Zip Code: _____________

Phone: ________________________________ Fax: ________________________________

E-Mail: _______________________________________________________________________

EXCEPTIONS TO THE TERMS, CONDITIONS AND SPECIFICATIONS

Exceptions to the Terms, Conditions and Specifications of this RFP must be noted in the space provided.

Failure to note said exceptions shall be interpreted to convey that Bidder shall propose to perform in the manner described and/or specified. If more space is required, please attach additional sheet(s) referencing RFP title and number. This form must be signed whether or not there are exceptions noted.

PROPOSAL SIGNATURE

By signing this Proposal, I acknowledge the following:

● I am an authorized agent for Bidder.

● Bidder has read, understands and agrees to the terms and conditions in this RFP and accompanying documents.

● Bidder intends to supply the materials and/or services specified herein.

● Bidder shall provide, execute, and maintain insurance policies as specified herein.

● Bidder shall comply with all federal, state, city, local, county, Centreville Public School statutes, other regulations and requirements.

Authorized Signature Print Name

Title Date

Centreville Public Schools Gym Audio RFP Page 34 of 36

ATTACHMENT E - FAMILIAL DISCLOSURE AFFIDAVIT

The undersigned,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .