This document is a comprehensive bid package for the Central Park Block Project issued by the City of Glendale, California for a major public infrastructure and park renovation. The project involves the construction of a multi-purpose urban park space, including installation of grand steps, entry plazas, an amphitheater and event stage, children's playground with shade structures, splash pad, boardwalk path, restroom building, and Adult Recreation Center (ARC) entry plaza, along with associated drainage appurtenances, landscaping, and tree planting. The project is specified in Specification No. 3951 and Plan No. 22-106, with a bid deadline of June 4, 2025, at 2:00 p.m. The contract duration is estimated at 250 working days from the Notice to Proceed, with an anticipated project start in October 2025.
The project is partially funded through a Community Development Block Grant from the U.S. Department of Housing and Urban Development (HUD), which introduces specific federal requirements including Davis-Bacon wage rates, Small Business Enterprise (SBE), Minority Business Enterprise (MBE), Women's Business Enterprise (WBE), and Disadvantaged Business Enterprise (DBE) participation goals. The total estimated project cost ranges from $13 million to $15 million, with a 10% contract goal for SBE/MBE/WBE/DBE participation. Bidders must be registered with the California Department of Industrial Relations and comply with federal labor standards, equal employment opportunity requirements, and Section 3 hiring provisions that prioritize local, low-income residents for job opportunities generated by the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Central Park Block Project Spec#3951_NIB.doc | DOC document | |
| Central Park Block Construction Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CENTRAL PARK BLOCK PROJECT
SPECIFICATION NO. 3951
CITY OF GLENDALE, CALIFORNIA
ISSUED TO BID
May 2025
Project Manager: Marc David Address: 633 E. Broadway, Room 205, Glendale, CA 91206 Phone: 818-548-3945
Email: mdavid@glendaleca.gov
Central Park Block Project Project Directory Specification No. 3951 D-i
TABLE OF CONTENTS
Project Directory ..............................................................................................................................................D-1 Notice Inviting Bids.............................................................................................................................................NB-1 Instructions to Bidders........................................................................................................................................IB-1 Bid Forms:
Bidder’s Proposal .................................................................................................................................F-1 Schedule of Bid Prices .........................................................................................................................F-6 Incumbency Certificate ........................................................................................................................F-9 Bid Bond ..............................................................................................................................................F-10 Bidder’s Statement of Qualifications ....................................................................................................F-13 Experience Form .................................................................................................................................F-23 Contractor Safety Questionnaire..........................................................................................................F-24 Questionnaire Regarding Bidders (Federally-Funded Projects) ..........................................................F-29 Bidder’s Representations, Certifications, and Other Statements (Federally-Funded Projects) ............F-30 SBE/MBE/WBE/DBE Information Form (Federally-Funded Projects) ..................................................F-34 Bidder Good Faith Effort Worksheet (Federally-Funded Projects) .......................................................F-36 Section 3 Economic Opportunity Plan (Federally-Funded Projects) ....................................................F-38 Designation of Subcontractors .............................................................................................................F-39 Contractor’s Declaration of Noncollusion .............................................................................................F-43 Insurance Requirements Affidavit ........................................................................................................F-44
Standard Form of Contract .................................................................................................................................FA-1 Exhibits to Contract:
Index of Drawings, Specifications, and Reference Documents……………………………... .................Exhibit 1 Insurance Requirements ......................................................................................................................Exhibit 2
Baseline Project Schedule (NOT APPLICABLE) .................................................................................Exhibit 3 Preliminary Schedule of Values ...........................................................................................................Exhibit 4
Forms Required for Federally-Funded Projects ...................................................................................Exhibit 5 Labor Standards Provisions, Form HUD-4010 ....................................................... Attachment A “Anti-Kickback Act” ................................................................................................. Attachment B Davis-Bacon Wages ............................................................................................... Attachment C Federal Equal Opportunity Employment/Affirmative Action Requirements ............. Attachment D SBE/MBE/WBE/DBE Requirements ....................................................................... Attachment E Section 3 Requirements and Forms ....................................................................... Attachment F
Central Park Block Project Project Directory Specification No. 3951 D-ii
Low-Moderate Income Census Tract Map.............................................................. (1 page) Contractor’s Certification under Labor Code § 1861 of Labor Code § 3700 Compliance ................................Exhibit 6 General Conditions
Article 1 - Preliminary Provisions ..................................................................................... GC-1 Article 2 - Performance of the Work ................................................................................ GC-12 Article 3 - Time of Commencement and Completion ....................................................... GC-27 Article 4 - Construction Schedules .................................................................................. GC-31 Article 5 - Suspension or Termination of Contract ........................................................... GC-34 Article 6 - Changes .......................................................................................................... GC-40 Article 7 - Contract Payments and Claims ....................................................................... GC-48 Article 8 - Materials and Equipment ................................................................................. GC-61 Article 9 - Submittals........................................................................................................ GC-64 Article 10 - Safety .............................................................................................................. GC-69 Article 11 - Indemnity ......................................................................................................... GC-74 Article 12 - Insurance......................................................................................................... GC-76 Article 13 - Bonds .............................................................................................................. GC-77 Article 14 - Labor Provisions .............................................................................................. GC-79 Article 15 - Dispute Resolution .......................................................................................... GC-84 Article 16 - Accounting Records ........................................................................................ GC-86 Article 17 - Miscellaneous Provisions ................................................................................ GC-88 Article 18 - Federal Labor Standards Provisions ............................................................... GC-94
Payment Items Payment Items………………………………………………………………………………………..PI-1
Appendices Performance Bond ................................................................................................................ Appendix 1
Payment Bond ...................................................................................................................... Appendix 2 Notice to Proceed ................................................................................................................. Appendix 3 Change Order ....................................................................................................................... Appendix 4 Substitution Form .................................................................................................................. Appendix 5 Statutory Forms of Waiver and Release Upon Payment ...................................................... Appendix 6 DAS Form 140 ...................................................................................................................... Appendix 7
Central Park Block Project Project Directory Specification No. 3951 D-iii
DAS Form 142 ...................................................................................................................... Appendix 8 DLSE Form PW26 ................................................................................................................ Appendix 9 Technical Specifications ..................................................................................................... Appendix 10 Other Technical Specifications ............................................................................................ (On Drawings)
[END OF TABLE OF CONTENTS]
Central Park Block Project Project Directory Specification No. 3951 D-1
PROJECT DIRECTORY
OWNER: City of Glendale Public Works Engineering Department
633 E. Broadway, Room 205 Glendale, CA 91206
Contact: Marc David, Project Manager E-mail: mdavid@glendaleca.gov
CONSULTANTS
Landscape Architect:
Name of Firm: David Volz Design Address: 151 Kalmus Drive, Suite M8
Costa Mesa, CA 92626 Attention: Gary Vasquez
Shaun Johnson Phone: (714) 641-1300
Facsimile:
E-Mail:
Civil Engineer:
Name of Firm: Bowman Address: 3060 Saturn Street, Suite 250
Brea, CA 92821 Attention: Aidan Mousavi
Phone: (714) 940-0100
Structural Engineer:
Name of Firm: Shehzad Khaliq & Associates Address: 3456 Golden Poppy Way
Yorba Linda, CA 92886 Attention: Shehzad Khaliq
Phone: (714) 572-0172
Central Park Block Project Project Directory Specification No. 3951 D-2
Splash pad Consultant:
Name of Firm: Vortex USA Inc.
Address: 3500 South Dupont Highway, Suite EP-101, Dover, Delaware United States 19901 Attention:
Phone: (877) 586-7839
Electrical Engineer:
Name of Firm: Design West Engineering Address: 275 West Hospitality Lane, Suite 100
San Bernardino, CA 92408 Attention: Roy Morales
Phone: (909) 890-3700
Irrigation Engineer:
Name of Firm: Sweeny + Associates Address: 321 N Rampart Street, Suite 209
Orange, CA 92868 Attention: Corey Fox
Phone: (714) 938-0456
Central Park Block Project NOTICE INVITING BIDS Specification No. 3951 NB-1
NOTICE INVITING BIDS
NOTICE is hereby given that the City of Glendale (“City”) will receive sealed Bids, before the Bid Deadline established below for the following work of improvement:
CENTRAL PARK BLOCK PROJECT
SPECIFICATION NO. 3951
Bid Deadline: Submit before 2:00 p.m. on June 4, 2025 (“the Bid Deadline”)
Original Bid to be submitted to:
Office of City Clerk 613 E. Broadway, Room 110
Bid Opening: 2:00 p.m. on Wednesday, June 4, 2025
City Council Chambers 613 E. Broadway, 2nd Floor
NO LATE BIDS WILL BE ACCEPTED.
Bidding Documents Available: Bidding documents are also available to view and download online at:
https://www.glendaleca.gov/government/departments/finance/purchasing/rfp-rfq-page/-fsiteid-1
Additional Bid Document 1. Bid America (951) 677-4819 Procurement Locations: 2 Construct Connect (877) 422-8665
3. Dodge Construction Network (844) 326-3826 x 9110
4. CMD Group (877) 794-0651
5. BidNet Direct (800) 835-4603 Option 2
City of Glendale Contact Person: Marc David, Project Manager Phone: 818-548-3945
Mandatory Qualifications for Bidder and Designated Subcontractors:
A Bid may be rejected as non-responsive if the Bid fails to document that Bidder meets the essential requirements for qualification. As part of the Bidder’s Statement of Qualifications, each Bid must provide satisfactory evidence that:
Bidder satisfactorily completed at least four (4) prevailing wage public contract in California; comparable in scope and scale to this Project; within three (3) years prior to the Bid Deadline. In addition, Bidder satisfactorily completed at least one (1) project that included a Federal Funding source and associated Federal Funding requirements. Bidder shall provide reference(s) for qualifying project(s). Reference(s) shall have current and accurate contact information, must be available to respond by email and phone, and must be able to confirm the details for the project of which they are listed as a reference.
NOTICE: Federally Funded Project Requirements:
Bidders are hereby notified that this Project is funded, in part, with City of Glendale, Community Development Block Grant, through the U.S. Department of Housing and Urban Development (HUD). Federal requirements apply, including: Davis-Bacon Act prevailing wage regulations, Small Business Enterprise (“SBE”), Minority Business https://www.glendaleca.gov/government/departments/finance/purchasing/rfp-rfq-page/-fsiteid-1
Central Park Block Project NOTICE INVITING BIDS Specification No. 3951 NB-2
Enterprise (“MBE”), Women’s Business Enterprise (“WBE”), Disadvantaged Business Enterprise (“DBE”) utilization (see Attachment E to Exhibit 5 for definitions of these business enterprises), Equal Employment Opportunity, and Section 3 Program requirements.
General Scope of Work:
Contractor shall furnish labor, materials, equipment, services, and specialized skills to perform work involved in the Project. The Work included in the Bid is defined in the Specification No. 3951 and Plan No. 22-106, and will generally include Installation of grand steps at the entry plaza, open space including great lawn, amphitheater and event stage, new steps south of the Central Library, activity plaza, children’s playground with shade structures, splash pad, boardwalk path, restroom building, Adult Recreation Center (ARC) entry plaza, entry plaza at Colorado Street, drainage appurtenances, landscaping, and planting new trees as shown on the project plans and specifications, Standard Plans for Public Works Construction (SPPWC 2024 Edition), and the Standard Specifications for Public Works Construction (2024 Edition), including all supplements thereto issued prior to bid opening date.
Other Bidding Information:
Number of Contract Working Days: 250 Working Days Amount of Liquidated Damages: $9,500 per Calendar Day
Other Bidding Information:
1. Bidding Documents: Bids must be made on the Bidder’s Proposal form contained herein. Bidding Documents may be obtained in the Public Works Engineering Department, 633 E. Broadway, Room 205, Glendale, CA 91206 where they may be examined. Electronic copies of bidding documents can be obtained at no cost from:
https://www.glendaleca.gov/government/departments/finance/purchasing/rfp-rfq-page/-fsiteid-1. Future addenda, if any, will be available for download on the same page as the bidding documents. The city will not mail/deliver the addenda to the prospective bidders. It is the bidders’ sole responsibility to check the website to obtain future addenda to this bid document. Prospective bidders shall acknowledge the receipt of the addenda in the bid forms.
2. Engineer’s Estimate. The preliminary cost of construction of this Work has been prepared. The estimate is in the range of $13,000,000 to $ 15,000,000.
3. Completion: This Work must be completed within Two Hundred Fifty (250) Working days from the Date of Commencement as established by the City’s written Notice to Proceed.
4. Acceptance or Rejection of Bids. The City reserves the right to reject any and all Bids, to award all or any individual part/item of the Bid, and to waive any informalities, irregularities or technical defects in such Bids and determine the lowest responsible Bidder, whichever may be in the best interests of the City. No late Bids will be accepted, nor will any oral, facsimile or electronic Bids be accepted by the City.
5. Contractor License. At the time of the Bid Deadline and at all times during performance of the Work, including full completion of all corrective work during the Correction Period, the Contractor must possess a California contractor license or licenses, current and active, of the classification required for the Work, in accordance with the provisions of Chapter 9, Division 3, Section 7000 et seq. of the Business and Professions Code. In compliance with Public Contract Code Section 3300, the City has determined that the Bidder must possess the following license(s):
General B. For federally funded projects, the Contractor shall be properly licensed at the time of award. The successful Bidder will not receive a Contract award if the successful Bidder is unlicensed, does not have all of the required licenses, or one or more of the licenses are not current and active. If the City discovers after the Contract’s award that the Contractor is unlicensed, does not have all of the required licenses, or one or more of the licenses are not current and active, the City may cancel the award, reject the Bid, declare the Bid Bond as forfeited, keep the Bid Bond’s proceeds, and exercise any one or more of the remedies in the Contract Documents.
Central Park Block Project NOTICE INVITING BIDS Specification No. 3951 NB-3
6. Subcontractors’ Licenses and Listing. At the time of the Bid Deadline and at all times during performance of the Work, each listed Subcontractor must possess a current and active California contractor license or licenses appropriate for the portion of the Work listed for such Subcontractor and shall hold all specialty certifications required for such Work. When the Bidder submits its Bid to the City, the Bidder must list each Subcontractor whom the Bidder must disclose under Public Contract Code Section 4104 (Subcontractor Listing Law), and the Bidder must provide all of the Subcontractor information that Section 4104 requires (name, the location (address) of the Subcontractor’s place of business, California Contractor license number, California Department of Industrial Relations contractor registration number, and portion of the Work). In addition, the City requires that the Bidder list the dollar value of each Subcontractor’s labor or services. The City’s disqualification of a Subcontractor does not disqualify a Bidder. However, prior to and as a condition to award of the Contract, the successful Bidder shall substitute a properly licensed and qualified Subcontractor— without an adjustment of the Bid Amount.
7. Permits, Inspections, Plan Checks, Governmental Approvals, Utility Fees and Similar Authorizations: The City has applied and paid for the following Governmental Approvals and Utility Fees:
Building Permit: BCOMM-012056-2024, Plans are Approved (Landscape & More) Building Permit: BCOMM-016853-2024, Plans are Approved (Amphitheater) Building Permit: BCOMM-018077, Plans are Approved (Restroom Building)
Electrical Permit: BE-MFC-020162-2024, Plans are Approved (Restroom Electrical) Plumbing Permit: BP-MFC-020212-2024, Plans are Approved (Restroom Plumbing) Grading Permit: BGRADING-014237-2024, Plans are Approved (Grading & Drainage)
PLAYGROUND EQUIPMENT – DEFERRED SUBMITTAL REQUIRED
SPLASH PAD EQUIPMENT – DEFERRED SUBMITTAL REQUIRED
PLAYGROUND SHADE SAIL STRUCTURE – DEFERRED SUBMITTAL REQUIRED
All other Governmental Approvals and Utility Fees shall be obtained and paid for by Contractor and will be reimbursed based on Contractor’s actual direct cost without markup. See Instructions to Bidders Paragraph 14, and General Conditions Paragraph 1.01 for definitions and Paragraph 1.03 for Contractor responsibilities.
8. Bid Forms and Bid Security: Each Bid must be made on the Bid Forms obtainable at the Public Works Engineering Department. Each Bid shall be accompanied by a cashier’s check or certified check drawn on a solvent bank, payable to “City of Glendale,” for an amount equal to ten percent (10%) of the total maximum amount of the Bid. Alternatively, a satisfactory corporate surety Bid Bond for an amount equal to ten percent (10%) of the total maximum amount of the Bid may accompany the Bid. Said security shall serve as a guarantee that the successful Bidder, within fourteen (14) calendar days after the City’s Notice of Award of the Contract, will enter into a valid contract with the City for said Work in accordance with the Contract Documents.
9. Bid Irrevocability. Bids shall remain open and valid for ninety (90) calendar days after the Bid Deadline.
10. Substitution of Securities. Pursuant to California Public Contract Code Section 22300, substitution of securities for withheld funds is permitted in accordance therewith.
11. SBE/MBE/WBE/DBE Participation. The U.S. Dept. of Housing & Urban Development (HUD) Regulations found that 24 CFR Part 85.36 shall apply to this contract. The City encourages the use of SBE/MBE/WBE/DBE and labor surplus area firms. Contractor must take affirmative steps to assure that SBE/MBE/WBE/DBE firms are utilized as subcontractors. Affirmative steps include: (1) Placing qualified SBE/MBE/WBE/DBE firms on solicitation lists; (2) Assuring that SBE/MBE/WBE/DBE firms are solicited whenever they are potential sources; (3) Dividing total requirements, when economically feasible, into smaller tasks or quantities to permit maximum participation by SBE/MBE/WBE/DBE firms; (4) Establishing delivery schedules, where the requirement permits, which encourage participation by SBE/MBE/WBE/DBE firms; and (5) Using the services and assistance of the Small Business Administration and the Minority Business Development Agency of the Department of Commerce. A SBE/MBE/WBE/DBE contract goal of 10% has been established for this contract. This goal must be met or good
Central Park Block Project NOTICE INVITING BIDS Specification No. 3951 NB-4 faith efforts to meet this goal must be demonstrated in order for a Bid to be considered responsive. This goal may be met using a combination of certified SBE/MBE/WBE/DBE firms (e.g. 5% DBE and 5% WBE). SBEs are certified through the State of California. MBEs and WBEs are certified through various local agencies in California. DBEs are certified through the California Unified Certification Program. The Bidder’s attendance at the pre-Bid conference shall be considered in determining good faith efforts. Bidder shall ensure that all SBE/MBE/WBE/DBE firms be afforded full opportunity to compete for subcontract Work and shall not be discriminated against on the grounds of race, color, or national origin.
12. Prevailing Wage Resolution. Bidders are hereby notified that in accordance with the provisions of the Labor Code of the State of California, the City Council of the City has ascertained and determined by Resolution No.
18,626 (as amended), the general prevailing rate of per diem wages of a similar character in the locality in which the Work is performed and the general prevailing rate for legal holiday and overtime Work for each craft or type of worker needed in the execution of agreements with the City. Said resolution is on file in the Office of the City Clerk and is hereby incorporated and made a part hereof by the same as though fully set forth herein. Copies of said resolution may be obtained at the Office of the City Clerk.
13. Prevailing Wages. This Project is funded, in part, with state and federal funds and is therefore a “public work” subject to the provisions of California Labor Code Section 1720 and Federal Labor Standards Provisions.
Contractor awarded this Contract and all Subcontractors of any tier shall not pay less than the minimum prevailing rate of per diem wages for each craft, classification, or type of worker needed to perform the Work. The Director of Industrial Relations of the State of California, pursuant to the California Labor Code, and the United States Secretary of Labor, pursuant to the Davis-Bacon Act, have determined the general prevailing rates of wages in the locality in which the Work is to be performed. The rates determined by the California Director of Industrial Relations are available online at www.dir.ca.gov/DLSR/PWD/. Davis-Bacon wage rates are included in this Specification and are available online at https://sam.gov/content/wage-determinations. To the extent that there are any differences in the federal and state prevailing wage rates for similar classifications of labor, Contractor and its Subcontractors shall pay the highest wage rate.
14. California Department of Industrial Relations ― Public Works Contractor Registration.
Beginning July 1, 2014, under the Public Works Contractor Registration Law (California Senate Bill No. 854 – See Labor Code Section 1725.5), contractors must register and meet requirements using the online application https://www.dir.ca.gov/Public-Works/Contractor-Registration.html before bidding on public works contracts in California. The application also provides agencies that administer public works programs with a searchable database of qualified contractors. Application and renewal are completed online with a non-refundable fee of $400. More information is available at the following links:
https://www.dir.ca.gov/public-works/PublicWorksSB854.html http://www.dir.ca.gov/Public-Works/PublicWorks.html Beginning April 1, 2015, the City must award public works projects only to contractors and subcontractors who comply with the Public Works Contractor Registration Law.
Notice to Bidders and Subcontractors:
• No contractor or subcontractor may be listed on a Bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)].
• No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5.
• This Project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
http://www.dir.ca.gov/DLSR/PWD/ https://www.dir.ca.gov/Public-Works/Contractor-Registration.html http://www.dir.ca.gov/Public-Works/PublicWorks.html
Central Park Block Project NOTICE INVITING BIDS Specification No. 3951 NB-5
• The prime contractor must post job site notices prescribed by regulation. (See 8 Calif. Code Reg.
Section 16451(d) for the notice that previously was required for projects monitored by the DIR Compliance Monitoring Unit.)
Furnishing of Electronic Certified Payroll Records to Labor Commissioner. For all new projects awarded on or after April 1, 2015, contractors and subcontractors must furnish electronic certified payroll records directly to the Labor Commissioner (aka Division of Labor Standards Enforcement).
Dated this ____ day of _______, 20___, City of Glendale, California.
Dr. Suzie Abajian, Ph.D., City Clerk of the City of Glendale.
Central Park Block Project INSTRUCTIONS TO BIDDERS Specification No. 3951 IB-1
INSTRUCTIONS TO BIDDERS
1. CONTRACTOR LICENSE
The Bidder must possess the valid State of California Contractor License(s) in the classification(s) specified in the Notice Inviting Bids at the time of the Bid Deadline and at all times during the performance of the Work, except as otherwise provided in California Business and Professions Code Section 7028.15.
2. INTERPRETATION OF BIDDING DOCUMENTS, SPECIFICATIONS AND ADDENDA
A. If any Bidder contemplating submitting a Bid is in doubt as to the true meaning of any part of the Bidding Documents, or who finds discrepancies, errors or omissions therein or who finds variances in any of the Bidding Documents with applicable law, such Bidder shall at once submit a written request for an interpretation or correction thereof to the City’s representative identified in the Notice Inviting Bids, or other designated individual. All Bidders shall submit such written requests to City, preferably on the Bidder’s Question Form provided at the end of these Instructions to Bidders, not less than ten (10) calendar days prior to the Bid Deadline. The person or entity submitting the request shall be responsible for its prompt delivery to City’s Contact Person identified in the Notice Inviting Bids. Any interpretation or correction will be made only by Addendum issued by the City and a copy of such Addendum will be delivered to all Interested Bidders of record, as defined in Paragraph 3 below. Any Addenda so issued must be acknowledged in the Bid and the cost of performing Work described in the Addenda shall be included in the Bid. Bidder’s failure to acknowledge receipt of all Addenda may result in rejection of the Bid as nonresponsive. No person is authorized to render an oral interpretation or correction of any Bidding Documents and no Bidder may rely on any such oral interpretation or correction issued by the City. The City shall not be responsible for any other explanation or interpretation of the Drawings or Specifications, or for any oral instructions. City reserves the right to extend the Bid Deadline by issuing an Addendum to Interested Bidders no later than 72 hours prior to the Bid Deadline. Bidders shall use complete sets of Bidding Documents in preparing Bids; City shall not assume responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.
B. Copies of Addenda will be made available for inspection wherever Bidding Documents are on file for that purpose. Each Bidder shall ascertain prior to submitting a Bid that the Bidder has received all Addenda issued and the Bidder shall acknowledge their receipt in the Bid.
3. OBTAINING DRAWINGS AND DOCUMENTS
Bidder may secure Bidding Documents ONLY from the location specified in the Notice Inviting Bids. Future addenda, if any, will be available for download at the same place as the bidding documents. The City will not mail/deliver the addendums to the prospective bidders. It is the bidders’ sole responsibility to check the website to obtain future addenda to this bid document.
4. BID FORMS – SUBMITTAL
A. The Bids shall be made on the forms provided herein with all blank spaces properly filled in. All forms required to be submitted with the Bid are listed in the Bid Proposal at page F-1.
B. The phraseology shall not be changed, and no additions shall be made to the items mentioned herein. Unauthorized conditions, exemptions, limitations, or provisions attached to a Bid will render it informal and may cause its rejection. All forms requiring specific information shall be completed
Central Park Block Project INSTRUCTIONS TO BIDDERS Specification No. 3951 IB-2 with all applicable information for a Bid to be considered responsive. Special attention should be given to completing:
1. Bidder’s Statement of Qualifications; and
2. Designation of Subcontractors
3. Schedule of Bid Values (Page F-6)
4. SBE/MBE/WBE/DBE Information Form (Federally-Funded Projects)
5. Schedule of Values (Exhibit 4)
6. Notice Inviting Bids Mandatory Qualifications for Bidder and Designated Subcontractors
C. Include all Bid Forms, properly executed, and intact on forms provided. Enclose the Bid Forms in a sealed envelope; type or print on the envelope “BIDS for” followed by the title and Specification Number and the date and time of the Bid Deadline as they appear on the cover of this Specification book, and the Bidder’s name and address. The envelope may be mailed, hand delivered, or delivered by courier or package delivery service.
D. Bids hand delivered, delivered by courier or package delivery service shall be presented to:
City Clerk City of Glendale 613 E. Broadway, Room 110
The Bid Opening will take place at the City Clerk’s Office, located at 613 E. Broadway, Room 110, Glendale, California 91206.
E. Bids received after the Bid Deadline or at any place other than the Office of the City Clerk will not be considered.
5. BID FORMS – AUTHORIZED SIGNATURES
The Bidder shall sign the Bid Forms. If the Bid Forms are submitted by:
A. A Sole Proprietorship, the signature must be the full name of the individual, whose address must be given.
B. Partnership, it must be signed by each partner or accompanied by proof that the person(s) signing is/are authorized to bind the partnership. The name and address of the partnership and the address of person signing must be provided.
C. Corporation, it must be signed by an officer. The corporate name must be attested by the corporate seal. A signature other than a corporate officer’s will be accepted only if signature authority is conferred in the Incumbency Certificate submitted with the Bid.
D. A Limited Liability Company, it must be signed by the managing member(s), and the name and address of the limited liability company and the address of each person signing must be provided.
E. Joint Venture, it must be signed in accordance with A-D above, based on the applicable situation, and the names and address of the joint venture and the address of each person signing must be provided.
Central Park Block Project INSTRUCTIONS TO BIDDERS Specification No. 3951 IB-3
6. BID FORMS – SCHEDULE OF BID PRICES
A. The Bidder shall include in his/her Bid price(s) any and all expense or costs that may be necessary to complete the project in accordance with the requirements of the Contract.
B. The Bidder shall state for each item on the Schedule of Bid Prices form, in clearly legible figures, the Base Bid, the alternates, and the unit price and item total or lump sum, as the case may be, for which he/she proposes to supply labor, materials, and equipment and to perform the Work. Bids must not contain any erasures, interlineations, strike-throughs or other corrections unless the same are suitably authenticated by affixing in the margin immediately opposite such erasure or correction the initials of the person(s) signing the Bid. If any Bid, or portions thereof, is determined by the City to be illegible, ambiguous or inconsistent, City may reject such a Bid as being non-responsive.
C. In the case of a unit price item, the amount set forth, as the item total shall be the product of the estimated quantity times the unit price Bid. In the event of a discrepancy between the unit price Bid and the item total, the unit price shall prevail; however, if the unit price is ambiguous, unintelligible, or uncertain for any cause, or is omitted, or is the same amount as the entry for the item total, then the item total shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained shall be the unit price. Where so indicated by the makeup of the Bid Form, sums shall be expressed in both words and figures, and in case of discrepancy between the two, the amount written in words shall govern.
D. Post Bid Interviews. The apparent low, second low, and third low Bidders may be asked to attend a Post Bid Interview to review the completeness and accuracy of their Bids and qualifications to perform the Work.
7. BID SECURITY
A. Each Bid shall be accompanied by cash or a cashier’s check or a certified check, drawn on a responsible bank doing business in the United States payable to the City, or a satisfactory Bid Bond in favor of the City executed by the Bidder as a principal and a California admitted surety company (as defined by California Code of Civil Procedure Sections 995.120 and 995.311) as surety (“Bid Security”).
B. A Bid Bond must be issued by a California admitted surety insurer with the minimum A.M Best Company Financial strength rating of “A:VII” or better. A Bid Bond issued by a California admitted surety not listed on Treasury Circular 570 will be deemed accepted unless specifically rejected by the City. A Bid Bond issued from an admitted surety insurer not listed in Treasury Circular 570 must be accompanied by all documents enumerated in California Code of Civil Procedure Section 995.660.
C. Bid Security shall be in an amount not less than 10% of the Base Bid. Any Bid submitted without Bid Security will be rejected as non-responsive. The Bid Security shall be given as a guarantee that the successful Bidder shall execute the Construction Contract and shall provide the insurance, bonds and other required forms within fourteen (14) calendar days after the City’s Notice of Award of the Contract. Bidders will be entitled to return of Bid Security provided, however, that a successful Bidder will forfeit Bid Security in the event that the successful Bidder withdraws its Bid prior to the expiration of ninety (90) calendar days after the Bid Deadline; or attempts to withdraw its Bid when the requirements of Public Contract Code Section 5101 et seq. are not met; or refuses or fails to execute said Contract and provide the required bonds, insurance or certificates within fourteen (14) calendar days after the City’s Notice of Award of the Contract. In such event, if City
Central Park Block Project INSTRUCTIONS TO BIDDERS Specification No. 3951 IB-4 awards the Contract for the Work to the next lowest responsible Bidder, the amount of the lowest responsible Bidder’s Bid Security shall be applied to the Contract Price differential between the lowest Bid and the second lowest Bid and the surplus, if any, will be returned to the lowest Bidder.
If the City rejects all other Bids presented and re-advertises, the lowest Bidder’s Bid Security may be used to offset the City’s cost of re-advertising and receiving new Bids and the surplus, if any, will be returned to the lowest Bidder.
D. The Bid Security shall be held for ninety (90) calendar days after Bid Deadline or until posting by the successful Bidder of the payment and performance bonds, proof of insurance, return of executed copies of the Contract and necessary certification(s), whichever first occurs, at which time the Bid Security will be returned to all Bidders.
E. If a Bid Bond will be submitted, Bidder shall use the form entitled “Bid Bond” contained in the Bidding Documents at page F-8, which Bid Bond must be properly executed and acknowledged by the Bidder and by a corporate surety authorized to transact such business in the State of California.
F. The Bid Bond must be accompanied by a power of attorney from the surety company authorizing the person executing the bond to sign on behalf of the company. If the Bid Bond is executed outside the State of California, all copies of the bond must be countersigned by a California representative of the surety. The signature of the person executing the bond on behalf of Surety must be acknowledged by a Notary Public as the signature of the person designated in the power of attorney.
G. Any alteration of the form of Bid Bond, or imperfection in the execution thereof, as herein required, will render it informal and may, at the option of the City, result in the rejection of the Bid under which the Bid Bond is submitted.
8. BIDDER’S AND SPECIALTY CONTRACTOR’S STATEMENT OF QUALIFICATIONS
A. Each Bidder shall be required to complete, execute and submit with its Bid, the form entitled “Bidder’s Statement of Qualifications.” Notwithstanding the provisions of Paragraph 22 herein, the Bidder’s Statement of Qualifications and financial statements shall not be public records. All information required by a Bidder’s Statement of Qualifications shall be completely and fully provided. If no information is to be filled in a blank space, then write “none.” Any Bid not accompanied by a Bidder’s Statement of Qualifications form completed with all information required may render the Bid non-responsive. If the City determines that any information provided by a Bidder in the Bidder’s Statement of Qualifications is false or misleading, or is incomplete so as to be false or misleading, the City may reject the Bid submitted by such Bidder as being non-responsive.
B. A responsible Bidder is a Bidder who has demonstrated the attribute of trustworthiness, as well as quality, fitness, capacity and experience to satisfactorily perform fully the requirements of the contract documents. In selecting the lowest responsible Bidder, consideration will be given not only to the financial standing but also to the general competency of the Bidder for the performance of the work covered by the Bid including, but not limited to, the experience of the Bidder in construction of public buildings for public agencies. By submitting a Bid, each Bidder agrees that the City, in determining the successful Bidder and its eligibility for the award, may consider the Bidder’s experience with similar types of construction projects and facilities, conduct and performance under other contracts, financial condition, reputation in the industry, and other factors which could affect the Bidder’s performance of the work.
Central Park Block Project INSTRUCTIONS TO BIDDERS Specification No. 3951 IB-5
C. Glendale Ordinance No. 5544 adds Chapter 4.14 to the Glendale Municipal Code, 1995, establishing standards of responsibility and grounds for debarment for contractors who bid on public works contracts. Chapter 4.14 applies to all contracts awarded by, executed by or entered into by the City. Each Bidder is advised that the standards of Chapter 4.14 will be strictly enforced by the City.
9. DESIGNATION OF SUBCONTRACTORS
A. Subcontractor Listing. On the Designation of Subcontractors form (page F-37), the Bidder shall list each Subcontractor whom the Bidder must disclose under the Subletting and Subcontracting Fair Practice Act, Public Contract Code Section 4104. The Bidder shall provide each Subcontractor’s name, identify the trade and type of work that the Subcontractor will perform, state the location (address) of the Subcontractor’s place of business, and list the Subcontractor’s California Contractor license number. In addition, on the form the Bidder shall list the dollar value of each Subcontractor’s labor or services. If additive Alternate Bid Items are included in the Bidding Documents, the Bidder shall identify each Subcontractor performing additive Alternate Bid Items, when such Work — or the combination of base Contract Work and Alternate Work — exceeds one-half of one percent of the total Bid Amount.
B. Subcontractors’ Licenses. At the time of the Bid Deadline and at all times during performance of the Work, each listed Subcontractor must possess a current and active California Contractor license appropriate for the portion of the Work listed for such Subcontractor and shall hold all specialty certifications required for such Work. An inadvertent error in listing the California contractor license number of a listed Subcontractor shall not be grounds for filing a bid protest or grounds for considering the Bid nonresponsive if the corrected contractor license number is submitted to the City by the Bidder within 24 hours after bid opening and provided the corrected contractor license number corresponds to the submitted name and location for that listed Subcontractor.
C. Disqualification of a Subcontractor. The City has the right to review the suitability and qualifications of any Subcontractor proposed by the Bidder. As part of this review, the City may request a Bidder to submit additional information about one or more of the listed Subcontractors—including, but not limited to—an experience statement with pertinent information as to similar projects and other evidence of qualification for the Subcontractor. If requested, the Bidder shall provide the information to the City within the time specified in the City’s written request. After due investigation, if the City has reasonable objection to any proposed Subcontractor, the City may, before giving the notice of award, require the apparent successful Bidder to submit an acceptable substitute. The City’s disqualification of a Subcontractor does not disqualify a Bidder.
However, prior to and as a condition to award of the Contract, the successful Bidder shall substitute a properly licensed and qualified Subcontractor— without an adjustment of the Bid Price.
D. Work of Subcontractors. The organization or arrangement of the Specifications and Drawings do not limit the extent of the Work for the Contract Documents. Accordingly, all Bidders are encouraged to disseminate all of the Specifications, Drawings and other Contract Documents to all persons or entities submitting sub-bids to the Bidder. The omission of any portion or item of Work from the Bid or from sub-bids, which is reasonably inferable from the Contract Documents, will not be a basis for adjustment of the Contract Price or the Contract Time.
E. Ineligible Subcontractors. The successful Bidder is prohibited from performing Work on the Project with any Subcontractor who is ineligible to perform work on a public works project pursuant to
Central Park Block Project INSTRUCTIONS TO BIDDERS Specification No. 3951 IB-6
California Labor Code Sections 1777.1 or 1777.7. In submitting its Bid, the Bidder certifies that it has investigated the eligibility of each and every listed Subcontractor and has determined that none is ineligible to perform work pursuant to the above code provisions.
10. CONTRACTOR’S NONCOLLUSION DECLARATION
Using the form provided by the City, the Bidder shall sign, under penalty of perjury, the Contractor’s Declaration of Noncollusion, certifying that the Bid is not the result of and has not been influenced by collusion. Bidder shall submit this form with its Bid. Any Bid made without such declaration, or believed to be made in violation of the requirements set forth in the declaration form, may be rejected.
11. INSURANCE REQUIREMENTS AFFIDAVIT
The Bidder shall submit to its insurance company or insurance agent the Insurance Requirements in this Specification and the Contract Documents. The insurance company’s underwriter or agent must complete the Insurance Requirements Affidavit which states that the insurer’s underwriter or agent will furnish the City with the required insurance documents within fourteen (14) calendar days after the City’s Notice of Award of the Contract. The Bidder shall submit this form with its Bid. Any Bid made without this affidavit, or made with an incomplete affidavit form, may be rejected.
12. EXAMINATION OF DRAWINGS, SPECIFICATIONS, AND SITE OF WORK
A. The Bidder shall examine carefully the site of the Work contemplated and the Drawings and Specifications. The submission of a Bid will be conclusive evidence that the Bidder has investigated and is satisfied as to the conditions to be encountered, as to the character, quality, and quantities of Work to be performed and materials to be furnished, the difficulties to be encountered, and to the requirements of the Drawings, Specifications, and other Contract Documents. The Bidder shall ascertain the locations of the existing utility services, and other underground facilities, and to provide for carrying out his/her operations so as to cause the minimum possible inconvenience to the occupants of property along any streets affected. All Work and costs involved in the safeguarding of the property of others shall be at the expense of the Bidder to whom the Contract may be awarded.
B. The Bidder hereby certifies that he has examined the local conditions, has read each and every clause of the Contract Documents, and that he/she has included all costs necessary to complete the specified Work in his/her Bid prices, and the Bidder agrees that if he/she is awarded the Contract he/she will make no claim against the City based upon ignorance of local conditions or misunderstanding of any of the provisions of the Contract. Should the conditions turn out otherwise than anticipated by him/her, the Bidder agrees to assume all risks incident thereto.
13. PRICES AND PAYMENTS
Approximate quantities listed in the Notice to Contractors and quantities if listed for unit price items on the Bid Forms, are estimates given for comparing Bids, will be used to determine the lowest bid and for pricing changes to the Work. No claim shall be made against the City for excess or deficiency therein, actual or relative. Payment at the prices agreed upon will be in full for the completed Work and will cover materials, supplies, labor, tools, equipment, and all other expenditures incident to a satisfactory compliance with the Contract, unless otherwise specifically provided.
Central Park Block Project INSTRUCTIONS TO BIDDERS Specification No. 3951 IB-7
14. PERMIT FEES
City will pay directly for all City issued permits. Bidder shall exclude the cost of City Permit Fees from Bidder’s Base Bid sum and from Bid Alternate prices. The Base Bid sum and Bid Alternate prices shall include the cost of administration and coordination for all Governmental Approvals and Utility Fees.
15. SUBSTITUTIONS
No requests for substitution of any material, device, product, equipment, fixture, form, or type of construction shall be considered by City prior to award of the Contract. Bidders shall submit all requests for substitution and substantiating data, on “Substitution Form” (Appendix 5), within fourteen (14) calendar days from the date of the Notice to Proceed. Bidder shall refer to the appropriate provisions of the General Conditions for additional information regarding substitutions. Authorization of a substitution is solely within the discretion of the City.
16. RETURN OF IMPROPER BIDS
Bids submitted after the Bid Deadline are non-responsive and shall be returned to the Bidder unopened.
Oral, telephonic, telegraphic, facsimile or electronically transmitted Bids shall not be considered unless the Notice Inviting Bids expressly permits such means of transmittal.
17. WITHDRAWAL OF BIDS
Bidder may withdraw its Bid either personally or by written request any time prior to the scheduled Bid Deadline by notice to the City’s Contact Person designated in the Notice Inviting Bids. If such notice is written, it shall be signed by the Bidder and shall be date-stamped and time-stamped by the City upon receipt. Withdrawn Bids may be resubmitted before the Bid Deadline provided that they are in full conformance with these Instructions to Bidders. Once submitted, all Bids are irrevocable, except as otherwise provided by law. Requests for withdrawal of Bids after the Bid Deadline shall be made only in accordance with California Public Contract Code Sections 5100, et seq. Bidder agrees by submitting a Bid that such Bid shall remain open, is irrevocable, and may not be modified, withdrawn, or cancelled for a period of ninety (90) days after Bid Deadline.
18. OPENING AND EVALUATION OF BIDS
A. Bid Opening and…