This document contains three Contract Data Requirements Lists (CDRLs) for a federal contract opportunity related to an engineering assessment on the F-15E Flight Control Computer (FCC).

The first CDRL is for an Engineering Evaluation Report (EER) that will identify the level of effort for an obsolescence refresh of the F-15E FCC and provide an official quote for the F3I asset. The second CDRL is for Monthly Status Reports on the progress of each funded asset. The third CDRL is for the Official Quote, which will include a detailed cost breakdown for the engineering support, prototype fabrication, technical data, testing, design, and other elements.

The related federal contract opportunity is a sole source solicitation (FA8538-24-Q-0004) for the engineering assessment and EER, which will be awarded as a 12-month Firm Fixed Price contract to BAE Systems Controls Inc. The Air Force Sustainment Center is the requiring office for this effort.

View the file

Other files

File Type Posted
Wage_Determination.pdf PDF
FA8538-24-Q-0004.pdf PDF
Statement of Work.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved

(1 Data Item) 0MB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department ofDefense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision oflaw, no person shall be subject to any penalty for failing to comply with a collection of information ifit does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

0002 A TOP TM OTHER X

D. SYSTEM I ITEM E. CONTRACT I PR NO. F. CONTRACTOR

F-15E/FCC Obsolescence Assessment FD20602400149 BAE Systems Controls Inc

I. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A00I Engineering Evaluation Report (EER) Engineering Evaluation Report (EER)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-NUOR-81411 SOWPara4a 409 SCMSIGUEA

7. DD250REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST 14. DISTRIBUTION

REQUIRED SUBMISSION

DD C See Block 16 See Block 16 b. COPIES

8. APP CODE 11.ASOFDATE 13. DATE OF SUBSEQUENT a. ADDRESSEE SUBMISSION Final

Draft NIA NIA See Block 16 Reg Repro

16.REMARKS

NAME: Choo, Trinity R DATE: 03 APRIL 2024 15. TOTAL

Block 9: Distribution B may be an option for situations where the deliverable includes proprietary data or sensitive information. This determination must be agreed upon by the Air Force prior to any draft or final submittal.

Block 9: Distribution Statement D Distribution authorized to U.S. Government Agencies, Administrative or Operational Use, (insert date of document submission). Other requests for this document shall be referred to US Air Force: WR- ALCl409 SCMSIGUEA, Robins AFB, GA 31098.

Blocks 10, 12. Submit the Report per SOW requirements and delivery schedule. A draft copy shall be submitted to the government in electronic format for review and approval 15 days prior to scheduled delivery.

Tailor of Block 4 DID: All requirements outside of this DID will be specified in the SOW and will be specific to the work required by the task (e.g. needing more description in the report than what is called in paragraph 3 (c) of the DID).

Block 14: Submission shall be delivered electronically to the 409th Logistics Management Specialist and 409th Engineer. Changes to office symbols and/or e-mail addresses, shall be made by letter to the PCO & ACO without further revision to this Contract Data Requirements List (CORL).

COORDINATORS:

G. PREPARED BY H.DATE I. APPROVED BY J.DATE

Choo, Trinity R CHOO.TRINIT Digitally signed by 03 APRIL 2024 STROUD.BRO ~1~~~~i~~~i~E.N_139 CHOO.TRINITY.R.160114 Stroud, Brooke N

Y . R.1601140490493 OKE . N . 139781 1815133 4/9/24

409 SCMS I GUMC 3 Date: 2024.04.0313:50:48 409 SCMS I GUMEA 5133

Date: 2024.04.09 ·04'00' 09:56:24 -04'00'

478-461-5977 312-468-3594

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1 , FEB 2001 Generated by PRPS using Jasper Reports on 28 Mar 2024 Version I Page I of5

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved

0MB No. 0704-0188

A. CONTRACT LINE ITEM NO.

B.EXHIBIT

A

C. CATEGORY

IDP TM

D. SYSTEM I ITEM E. CONTRACT I PR NO.

FD20602400149

F. CONTRACTOR

F-15E/FCC Obsolescence Assessment BAE Systems Controls Inc

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Monthly Status Reports

3. SUBTITLE

Monthly Status Reports

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80368A

5. CONTRACT REFERENCE

SOWPara4b

6. REQUIRING OFFICE

409 SCMSIGUEA

7. DD250REQ

LT

8. APP CODE

NIA

16.REMARKS

NAME: Choo, Trinity R

9. DIST STATEMENT

REQUIRED

C

10. FREQUENCY

MTHLY

11.ASOFDATE

NIA

DATE: 03 APRIL 2024

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

The contractor shall submit a monthly report informing the program office of the status of each funded asset.

Block 12 and 13: The contractor shall deliver the initial report 30 days after start of appropriate delivery order.

Subsequent reports shall be delivered every 30 days until end of appropriate delivery order. The Contractor shall identify progress made and schedule status per deliverable, deliverables completed within the previous monthly reporting period, and will indicate what deliverables are scheduled to be delivered during the upcoming monthly reporting period. At a minimwn the report shall consist of cost, schedule, and performance at the end of each month. The Contractor shall make this information available to the Government monthly and provided electronically via email to 409th Logistics Management Specialist and 409th Engineer. There shall be no more than one late submission of data/document(s) per contract year. The Contractor shall notify the Government if the delivery of any data/docwnent will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by a revised delivery date acceptable to the Government.

Block 14: Submission shall be delivered electronically to the 409th Logistics Management Specialist and 409th Engineer. Changes to office symbols and/or e-mail addresses, shall be made by letter to the PCO & ACO without further revision to this Contract Data Requirements List (CDRL).

COORDINATORS:

14. DISTRIBUTION

a. ADDRESSEE

15. TOTAL

OTHER X

b. COPIES

Final Draft

Reg Repro

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

CHOO TRINIT Digitallysignedby

Choo, Trinity R • CHOO.TRINITY.R.160114 03 APRIL 2024 Stroud, Brooke N STROUD.BRO ~1~~~;;i~ii~rn13 Y.R.160114049 0493

409 SCMS I GUMC 3 Date: 2024.04.0313:51:04 -04'00'

409 SCMS I GUMEA OKE.N.139781 91a15133 4/9/24 5133 Da_te: _2024.°,4-~9

478-461-5977 312-468-3594 09.57.10 -0400

DD FORM 1423-1 , FEB 2001 Generated by PRPS using Jasper Reports on 28 Mar 2024 Version I Page 3 of5

Form Approved

0MB No. 0704-0188

A. CONTRACT LINE ITEM NO.

B.EXHIBIT

A

C.CATEGORY

IDP TM

D. SYSTEM I ITEM E. CONTRACT I PR NO.

FD20602400149

F. CONTRACTOR

F-15E/FCC Obsolescence Assessment BAE Systems Controls Inc

I. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Program Costs and Technical Data Reports

3. SUBTITLE

Official Quote

4. AUTHORITY (Data Acquisition Document No.)

DI-FNCL-80166

5. CONTRACT REFERENCE

SOWPara4c

6. REQUIRING OFFICE

409 SCMSIGUEA

7. DD250REQ

DD

8. APP CODE

NIA

16.REMARKS

NAME: Choo, Trinity R

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

See Block 16

11.ASOFDATE

NIA

DATE: 03 APRIL 2024

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

NIA

Block 9: Distribution B may be an option for situations where the deliverable includes proprietary data or sensitive information. This determination must be agreed upon by the Air Force prior to any draft or final submittal.

Block 9: Distribution Statement D Distribution authorized to U.S. Government Agencies, Administrative or Operational Use, (insert date of document submission). Other requests for this document shall be referred to US Air Force: WR ALCl409 SCMSIGUEA, Robins AFB, GA 31098.

Blocks 10, 12. Submit the Official quote per SOW requirements and delivery schedule. A draft copy shall be submitted to the government in electronic format for review and approval 15 days prior to scheduled delivery.

Tailor of Block 4 DID: All requirements outside ofthis DID will be specified in the SOW and will be specific to the work required by the task (e.g. needing more description in the report than what is called in paragraph 3 (c) of the DID).

Block 14: Submission shall be delivered electronically to the 409th Logistics Management Specialist and 409th Engineer. Changes to office symbols and/or e-mail addresses, shall be made by letter to the PCO & ACO without further revision to this Contract Data Requirements List (CDRL).

COORDINATORS:

H. DATE I. APPROVED BY

14. DISTRIBUTION

a. ADDRESSEE

15. TOTAL

OTHER X

b. COPIES

Final Draft

Reg Repro

J.DATE G. PREPARED BY

Choo, Trinity R 03 APRIL 2024 STROUD BR Digitally signed by Stroud, Brooke N ' STROUD.BROOKE.N.

4/9/24 409 SCMS I GUMC

478-461-5977

DD FORM 1423-1, FEB 2001

409 SCMS I GUMEA OOKE.N.139 1397815133

Date: 2024.04.09

312-468-3594 7815133 09:57:42-04'00'

Generated by PRPS using Jasper Reports on 28 Mar 2024 Version 1 Page 4 of5

Form Approved

0MB No. 0704-0188

A. CONTRACT LINE ITEM NO.

D. SYSTEM I ITEM

F-15E/FCC Obsolescence Assessment

1. DATA ITEM NO.

A004

4. AUTHORITY (Data Acquisition Document No.)

DI-MGMT-80004A

7. DD250REQ

DD

8. APP CODE

A

16.REMARKS

9. DIST STATEMENT

REQUlRED

C

B.EXHIBIT

A

E. CONTRACT I PR NO.

FD20602400149

2. TITLE OF DATA ITEM

Management Plan

5. CONTRACT REFERENCE

SOWPara4d

10. FREQUENCY

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

C. CATEGORY

IDP TM

F. CONTRACTOR

BAE Systems Controls Inc

3. SUBTITLE

Management Plan

6. REQUlRING OFFICE

409 SCMSIGUEA

14. DISTRIBUTION

11.ASOFDATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

NIA NIA

NAME: Choo, Trinity R DATE: 03 APRIL 2024 15. TOTAL

Block 4: Contractor format is acceptable on electronic media (CD/DVD). Data item to be used as a guide for content.

Block 12 and 13: The contractor shall deliver the initial report 30 days after start of appropriate delivery order.

Block 14: Submission shall be delivered electronically to the 409th Logistics Management Specialist and 409th Engineer. Changes to office symbols and/or e-mail addresses, shall be made by letter to the PCO & ACO without further revision to this Contract Data Requirements List (CDRL).

Note: Data will be delivered electronically in Rich Text Format, and/or other govt. approved word processing format.

COORDINATORS:

G. PREPARED BY H.DATE I. APPROVED BY

Choo, Trinity R CHOO.TRINIT g~~~:r~~~~/~_1601

03 APRIL 2024

409 SCMS I GUMC Y.R.16011404 140493

Stroud, Brooke N STROUD.B

409 SCMS I GUMEA ROOKE.N.1

93 Date: 2024.04.03 478-461-5977 13:51:28-04'00' 312-468-3594 397815133

PREVIOUS EDITION MAY BE USED.

DD FORM 1423-1 , FEB 2001 Generated by PRPS using Jasper Reports on 28 Mar 2024 Version I

Digitally signed by

STROUD.BROOKE.

N.1397815133 Date: 2024.04.09 09:58:10 -04'00'

OTHER X

b. COPIES

Final Draft

Reg Repro

J.DATE

4/9/24

Page 5 of5