CDRLCPP.pdf

PDF 906 KB Posted

Attached to
CONTROL UNIT, ANTISKID (27-R-0003)
Solicitation number
SPRHA1-27-R-0003
Issued by

About this file

This is a Contract Data Requirements List (DD Form 1423) that specifies delivery requirements for a Counterfeit Prevention Plan (CPP) data item under contract FD20202700003 with the U.S. Air Force 417 SCMS (Supply Chain Management Squadron).

The contractor must deliver the CPP within 30 days of contract award in accordance with Data Item Description DI-MISC-81832 and SAE AS5553 standards. The CPP shall be submitted electronically to two Air Force email workflows: 417SCMS.GUEA-ETAR.WORKFLOW@us.af.mil and AFSC.OUI.PZA.Work@us.af.mil. Government approval of the submitted plan is required within 14 days of receipt, with contractor resubmission due within 7 days if revisions are necessary. The document format is at contractor discretion. The estimated total contract price is $0.00, indicating this is a data deliverable requirement with no separate pricing component.

The underlying DI-MISC-81832 specification requires the CPP to include minimum elements: procurement practices ensuring parts sourced from OEMs or authorized distributors; procedures for non-OEM sourcing exceptions with qualification/certification processes; monitoring and surveillance procedures for supply chain integrity; receiving inspector training and certification; counterfeit verification processes; identification, storage, and reporting procedures for counterfeit parts; subcontractor flow-down requirements; self-audits; and on-site compliance verification. The plan must establish a six-step notification procedure for suspect items, including quarantine, customer notification through the supply chain to the prime contractor and contracting officer, evidence documentation, determination of counterfeit status, isolation of confirmed counterfeit parts pending law enforcement direction, and provision of information to the government investigation team.

View the file

Other files

File Type Posted
Statement of Work.pdf PDF
SPRHA1-27-R-0003 CUI.pdf PDF
EDL.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UNCLASSIFIED [3

CONTRACT DATA REQUIREMENTS LIST

A. CONTRACT LINE ITEM NO. B.EXHIBIT C. CATEGORY:

OT1DP Om � OTHER Proc:uremeat

D. SYSTEM/ITEM IE. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITl£0FDATAITEM 3. SUBTITl.E COUllle.tfe.it-PlaD CPP

'-AUTHORITY {OalaAcqui,mon DocunenlAb./

I

s. COHTRACT REFERENCE 6 . REQUIRING OFACE

Dl-MISC-81832 417SMCS 7.00250REQ 9. DIST STAT8ENT 10. FREQUEHCY 12. DATE OF FIRST SUBMISSION 1'- DISTRIBUTION

LT

REQUIRED 1 b.oa>!ESPer contract reqs

8.APPCOOE B 11.ASOFOATE 13. DATE OF SUBSEQUENT a.. AOORESSEE Fnal

NIA Per coobact reqs SUBMISSION ll!afl

NIA Reg -

16.REMARKS 417SCMS 1

BLOCK 9: AFSCOL 1

Distnoorion autbooz,d to U.S Go,.........,, Ageocies only, proprietary bmmess imotmaticm, 26 March 2025. Other requests for this documeut shall be ref med to 417 SCMS.

BLOCKS 10, 12, AND 13:

�, shall deliver the CPP within 30 da>� of coatract .rward. H RqUi:ed, Go,...,,....,. approv.il Oil commenb provided to tbe cootractor within 14 days after receipt. If re,,"i.sion is requ:ired, coutrator re-submittal due 7 days after receipt of Gown.....,,..,,.,..,._

BLOCK 14:

CPP shall beinaccardatice mth "DI-MISC-81832" (attacbed) md SAE ASS553. Doc:umeatfORDal shall be at c:onlr.!dor discre6ou. Submit� to die following 2 email wod<Rows:

417SCMS:

417SCMS.GUEA-ETAR.WORKFLO\V@us..t:mil

AFSCOL:

AFSC.OUI.PZA. Wod<@us.af.mil add continualion 15.TOTAL 2

G. PREPARED BY H. SIGNED ON 20250326 I. APPROVED BY J. SIGNATURE

l.«i Gryper GRYGIERLORI.D --• Brad:M,rtin MARTINBRAD. =.:t;'

Lead JM, 417 SCMS/GUMD EBBIE.1231508100:!':::=:.:..- PriDcip,J Engin,er, 417 SCMSIGUEA H.1256609564 --.s...11a.». .. -

DD FORM 1423, FEB 2024

! Show Attachment Bar

UNCLASSIFIED [3

PREVIOUS EDmON MAY BE USED.

17. PRICE GROUP

NSP

18. ESTIMATED

TOTAL PRICE

0.00

[!JD

I

I

FD20202700003

DATA ITEM DESCRIPTION

TITLE: COUNTERFEIT PREVENTION PLAN

Number: DI-MISC-81832 Approval Date: 20110121 AMSC Number: 9181 Limitation:

DTIC Applicable: No GIDEP Applicable: No Office of Primary Responsibility: NRO Applicable Forms: N/A

Use/Relationship: The Counterfeit Prevention Plan will be used by the procurement activity to determine and evaluate the effectiveness of the contractor’s counterfeit protection plan and award fee.

a. This Data Item Description contains the format and content preparation instructions for the data product generated by the specific and discrete task requirements delineated in the statement of work.

b. This DID is related to Parts, Materials and Processes Selection List (PMPSL).

c. This DID is related to “As Designed” and “As Built” Parts List.

d. The Counterfeit Prevention Plan will be updated as counterfeiting methods evolve to include any new indicators, as well as new prevention processes needed (either discovered directly or provided by the Government).

Requirements:

1. The Counterfeit Prevention Plan shall be in contractor format and shall include the following, as a minimum:

a. Procurement practices and procedures to include procurement of all parts and materials from original qualified parts/materials equipment manufacturer (OEM) or it franchised/authorized distributor.

b. Procurement practices and internal processes used for exceptions to buying from OEM or OEM franchised distributors in cases where items are no longer available including a process to qualify/certify non-OEM parts & materials.

c. Monitoring procedures to include the delivery of test results from random sampling and supply chains surveillance that does not assume any source is safe to identify possible penetration of OEM supply chain.

d. Training/certification program for receiving inspectors.

e. Process to verify counterfeit.

DI-MISC-81832

- 2 -

f. Processes to identify, store, and report counterfeit parts.

g. Process to ensure subcontracts contain the following requirements (As a minimum):

(1) Requirements to procure only from Original Equipment Manufacturer (OEM) or OEM franchised distributors

(2) Procurement practices and internal processes used for exceptions to buying from OEM or OEM franchised distributors including a process to qualify/certify non-OEM parts & materials obtained

(3) Requirements to monitor supply (including delivery of test results from random sampling and supply chain surveillance that does not assume any source is safe) to identify possible penetration of OEM supply chain

(4) Training/certification program for receiving inspectors

(5) Process to verify counterfeit

(6) Processes to identify, store, and report counterfeit parts.

(7) Notification procedure (tailored to specific sub-contractor based on following Notification Procedure)

h. Self-audit of internal processes.

i. Monitor processes at all subcontractor levels processes and verify compliance through on-site audits.

j. Notification Procedure:

(1) Step 1: The contractor shall quarantine all suspect products pending further direction. The contractor shall provide a statement, with problem description, justifying why this is considered suspect and how it was detected. The contractor shall NOT notify the supplier that the items are suspected as being counterfeit items. However, consultation with the OEM is authorized. Make certain the parts and all members of the lot procured for use on this contract are stored in correct environmental controls. These parts need to be protected as evidence.

(2) Step 2: Contractors that identify suspect items shall immediately notify their customer that is the next link toward the prime contractor.

Notification shall be passed up the customer chain until reaching the prime contractor. The prime contractor shall immediately notify the cognizant Contracting Officer (CO) and Contracting Office Technical Representative (COTR) of all suspect items identified.

DI-MISC-81832

- 3 -

(3) Step 3: The contractor shall make certain that the original documentation is secured as evidence and maintain any and all documentation associated with the part to include:

a. Part information such as part identifying number, lot date code, manufacturer information and originator/point of contact information

b. Any information reflecting part procurement/acquisition traceability which should include a copy of the purchase order, any and all correspondence between the buyer and the supplier to include: e-mails, records of phone conversations and paper letters of correspondence

c. Part documentation from the purported original manufacturer, distributors and suppliers (certificate of compliance and certificate of conformance)

d. All visual examination and physical analysis/testing results and the technical data package showing that the parts passed the required screening and qualification tests

e. List of company products affected

(4) Step 4: Determine that the part is or is not counterfeit (Usually accomplished as part of root cause analysis of non-conforming parts and/or materials)

(5) Step 5: If the parts are found to be counterfeit, they shall be isolated and controlled pending direction from law enforcement.

(6) Step 6: The contractor shall provide any additional required information to the government’s investigation team

END OF DI-MISC-81832