CDRL REPORT - FD20302100894.pdf

PDF 111 KB Posted

Attached to
B-2 Engineering Services Application Programs and Indentures (API) Data Cleanse Project
Solicitation number
FA811922R0002
Issued by

View the file

Other files

File Type Posted
PKGRQMT_REPORT.pdf PDF
DID 81022D.pdf PDF
DID 80227.pdf PDF
DID 81249B.pdf PDF
FA811922R0002 23NOV2021.pdf PDF
TRNSPDATA_REPORT.pdf PDF
DID 81250B.pdf PDF
PWS 21Jan2021.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved OMB No. 0704-0188(1 Data Item)

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to Department of Defense, Executive Services Directorate (0704-0188).

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-2 / Applications/Programs/Indentures (API)

E. CONTRACT / PR NO.

FD20302100894

F. CONTRACTOR

1. DATA ITEM NO.

A001

2. TITLE OF DATA ITEM

Conference Agenda

3. SUBTITLE

Applications/Programs/Indentures (API)

4. AUTHORITY

DI-ADMN-81249B

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

OASIS SOW Paragraphs 3.1, 3.7

6. REQUIRING OFFICE

424 SCMS/GUEAA

7. DD 250 REQ

SS

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

1 XTIME

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 22 JAN 2021DATE:

Blks 11, 12, & 13: Five work days prior to the conference

Blk 14: Secure e-mail to: roderick.diehl@us.af.mil and upload to the applicable area on the CATS Engineering SharePoint Site:

https://eide-pgm.myngc.com/sites/cats-engineering/Production/SitePages/Home.aspx

Blk 14a: 424 SCMS/GUEAA 3001 Staff Drive, STE 1AE1 93A Tinker AFB, OK 73145

Contractor's format is acceptable.

See Statement of Work for more details.

COORDINATORS:

424 SCMS/GUEAA 0 1 0

PCO 0 1 0

0 2 015. TOTAL

G. PREPARED BY

Tate, Anthony D

424 SCMS / GUBAB

405-739-2266

H. DATE

26 JAN 2021

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Robertson, Laurie A

421 SCMS / GUMAB 405-736-5050 / 886-5050

J. DATE

22-JAN-21

Page 1 of 4DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Sep 2021

PREVIOUS EDITION MAY BE USED.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-2 / Applications/Programs/Indentures (API)

E. CONTRACT / PR NO.

FD20302100894

F. CONTRACTOR

1. DATA ITEM NO.

A002

2. TITLE OF DATA ITEM

Conference Minutes

3. SUBTITLE

Applications/Programs/Indentures (API)

4. AUTHORITY

DI-ADMN-81250B

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

OASIS SOW Paragraphs 3.1, 3.7

6. REQUIRING OFFICE

424 SCMS/GUEAA

7. DD 250 REQ

SS

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

1 XTIME

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 22 JAN 2021DATE:

Blks 11, 12, & 13: Ten work days after the conference.

Blk 14: Secure e-mail to: roderick.diehl@us.af.mil and upload to the applicable area on the CATS Engineering SharePoint Site:

https://eide-pgm.myngc.com/sites/cats-engineering/Production/SitePages/Home.aspx

Blk 14a: 424 SCMS/GUEAA 3001 Staff Drive, STE 1AE1 93A Tinker AFB, OK 73145

Contractor's format is acceptable.

See Statement of Work for more details.

COORDINATORS:

424 SCMS/GUEAA 0 1 0

PCO 0 1 0

0 2 015. TOTAL

G. PREPARED BY

Tate, Anthony D

424 SCMS / GUBAB

405-739-2266

H. DATE

26 JAN 2021

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Robertson, Laurie A

421 SCMS / GUMAB 405-736-5050 / 886-5050

J. DATE

22-JAN-21

Page 2 of 4DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Sep 2021

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-2 / Applications/Programs/Indentures (API)

E. CONTRACT / PR NO.

FD20302100894

F. CONTRACTOR

1. DATA ITEM NO.

A003

2. TITLE OF DATA ITEM

Contractor's Progress, Status, and Management Report

3. SUBTITLE

Applications/Programs/Indentures (API)

4. AUTHORITY

DI-MGMT-80227

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

OASIS SOW Paragraphs 3.4, 6

6. REQUIRING OFFICE

424 SCMS/GUEAA

7. DD 250 REQ

SS

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

1 XTIME

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 22 JAN 2021DATE:

Blks 11, 12, & 13: No later than the 15th day of each Month (the next working day if the 15th falls on a weekend or holiday).

Blk 14: Secure e-mail to: roderick.diehl@us.af.mil and upload to the applicable area on the CATS Engineering SharePoint Site:

https://eide-pgm.myngc.com/sites/cats-engineering/Production/SitePages/Home.aspx

Blk 14a: 424 SCMS/GUEAA 3001 Staff Drive, STE 1AE1 93A Tinker AFB, OK 73145

Contractor's format is acceptable.

See Statement of Work for more details.

COORDINATORS:

424 SCMS/GUEAA 0 1 0

PCO 0 1 0

0 2 015. TOTAL

G. PREPARED BY

Tate, Anthony D

424 SCMS / GUBAB

405-739-2266

H. DATE

26 JAN 2021

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Robertson, Laurie A

421 SCMS / GUMAB 405-736-5050 / 886-5050

J. DATE

22-JAN-21

Page 3 of 4DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Sep 2021

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY

TDP TM OTHER X

D. SYSTEM / ITEM

B-2 / Applications/Programs/Indentures (API)

E. CONTRACT / PR NO.

FD20302100894

F. CONTRACTOR

1. DATA ITEM NO.

A004

2. TITLE OF DATA ITEM

Configuration Audit Summary Report and Certification

3. SUBTITLE

IPB MPL Applications/Programs/Indentures (API)

4. AUTHORITY

DI-SESS-81022D

(Data Acquisition Document No.) 5. CONTRACT REFERENCE

OASIS SOW Paragraphs 3.3

6. REQUIRING OFFICE

424 SCMS/GUEAA

7. DD 250 REQ

SS

8. APP CODE

N/A

9. DIST STATEMENT

REQUIRED

D

10. FREQUENCY

1 XTIME

11. AS OF DATE

See Block 16

12. DATE OF FIRST

SUBMISSION

See Block 16

13. DATE OF SUBSEQUENT

SUBMISSION

See Block 16

a. ADDRESSEE

Draft Final

ReproReg

b. COPIES

14. DISTRIBUTION

16. REMARKS

Tate, Anthony DNAME: 22 JAN 2021DATE:

Block 3. (with attached electronic file, AFTO Forms 22)

Blks 11, 12, & 13: As each End Item (e.g., a National Stock Number (NSN)/Part Number and indentured piece part Bill of Materials), is completed.

Blk 14: Secure e-mail to: roderick.diehl@us.af.mil and upload to the applicable area on the CATS Engineering SharePoint Site:

https://eide-pgm.myngc.com/sites/cats-engineering/Production/SitePages/Home.aspx

Blk 14a: 424 SCMS/GUEAA 3001 Staff Drive, STE 1AE1 93A Tinker AFB, OK 73145

Contractor's format is acceptable.

See Statement of Work for more details.

COORDINATORS:

424 SCMS/GUEAA 0 1 0

PCO 0 1 0

0 2 015. TOTAL

G. PREPARED BY

Tate, Anthony D

424 SCMS / GUBAB

405-739-2266

H. DATE

26 JAN 2021

I. APPROVED BY

//ELECTRONICALLY SIGNED//

Robertson, Laurie A

421 SCMS / GUMAB 405-736-5050 / 886-5050

J. DATE

22-JAN-21

Page 4 of 4DD FORM 1423-1, FEB 2001 Version 1Generated by PRPS using Jasper Reports on 24 Sep 2021

File details come from the government source that posted it. Updated .