CDRL package for Aguada PWSV2.docx
DOCX document 111 KB Posted
- Attached to
- Niscemi MUOS SATCOM
- Solicitation number
- N6817126QN044
About this file
This is a Contract Data Requirements List (CDRL) document that specifies 13 data items the contractor must deliver under the Aguada PWSV2 contract. The requiring office is NCTS Naples, and all deliverables are classified as "OTHER" category technical reports and studies with Distribution Statement F, meaning further dissemination is restricted to the Commanding Officer at NCTS Naples or higher DoD authority. All documents must be distributed via email or as otherwise acceptable to the Contracting Officer's Representative (COR).
The 13 required data items include: A001 Transition Plan (one-time submission at award), A002 Training Plan (as required), A003 Reports and Records (as required), A004 List of On-Site Contractor Personnel (as required), A005 Contractor's Quality Control Plan (as required), A006 Deficiency Correction Plan (as required), A007 Budget Projections (annual, no later than April 30), A008 Meeting Minutes (as required), A009 INFOCON Plan (as required), A010 Safety Plan (as required), A011 Certificate of Insurance (one-time submission at award), A012 Review and Revise SOPs (as required), and A013 Missing Equipment Report (as required). Each data item references specific Performance Work Statement (PWS) paragraphs that detail the substantive requirements. The document was prepared by Jugal Patel and approved by Chris Jensen on July 1, 2021.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachement 2 CAP FFP.doc | DOC document | |
| dd0254_Niscemi_ MUOS_Recompete_FY27 Draft Signed by N00SM.pdf | ||
| Attachment 3 Past Performance Information Form.docx | DOCX document | |
| Solicitation - N6817126QN044.pdf | ||
| Quality Assurance Surveillance PlanV1.docx | DOCX document | |
| Attachment IX PAST PERFORMANCE REPORT FORM.docx | DOCX document | |
| ContractorDiscrepancyReport.pdf | ||
| Attachement 8 NDA template.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
A. CONTRACT LINE ITEM NO.
B. EXHIBIT
A
C. CATEGORY:
TDP _________ TM ________________ OTHER _________X____________
D. SYSTEM/ITEM
E. CONTRACT/PR NO.
To be Assigned
F. CONTRACTOR
1. DATA ITEM
NO.
A001
2. TITLE OF DATA ITEM
TECHNICAL REPORT – STUDY/SERVICES
3. SUBTITLE
TRANSITION PLAN
4. AUTHORITY (Data Acquisition Document No.)
DI-MISC-80508B
5. CONTRACT REFERENCE
PWS PARA. 2.1.4
6. REQUIRING OFFICE
NCTS NAPLES
7. D.D. 250 REQ
DD
9. DISTRIBUTION
STATEMENT
REQUIRED
F
10. FREQUENCY
ONE
12. DATE OF FIRST SUBMISSION
SEE BLOCK 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. A.P. CODE
N/A
11. AS OF DATE
AWARD
13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Final
Reg
Repro
16. REMARKS
Block 9: Mark documents “Distribution F. Further dissemination only as directed by Commanding Officer, NCTS Naples, or higher DoD authority.”
Block 12 and 13: As set forth in Block 5.
Block 14: Distribution by email preferred, or as otherwise acceptable to COR.
COR
15. TOTALS
G. PREPARED BY
Jugal Patel
H. DATE
01 JUL 2021
I. APPROVED BY
Chris Jensen
J. DATE
D.D. Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 13
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
1003, 2003, 3003, 4003, 5003, 6003
B. EXHIBIT
A
A002
TRAINING PLAN
5. CONTRACT REFERENCE
PWS PARA. 3.5.1
REQUIRED
F
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
Block 9: Mark documents “Distribution F. Further dissemination only as directed by Commanding Officer, NCTS Naples, or higher DoD authority.”
Jugal U Patel
H. DATE
01 JUL 2021
I. APPROVED BY
D.D. Form 1423-1, JUN 90 Previous editions are obsolete Page 2 of 13
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
B. EXHIBIT
A
A003
REPORTS AND RECORDS
5. CONTRACT REFERENCE
PWS PARA. 3.6.3
REQUIRED
F
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
Block 9: Mark documents “Distribution F. Further dissemination only as directed by Commanding Officer, NCTS Naples, or higher DoD authority.”
H. DATE
01 JUL 2021
I. APPROVED BY
D.D. Form 1423-1, JUN 90 Previous editions are obsolete Page 3 of 13
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
0003, 1003, 2003, 3003, 4003, 5003, 6003
B. EXHIBIT
A
A004
LIST OF ON-SITE CONTRACTOR PERSONNEL
5. CONTRACT REFERENCE
PWS PARA. 2.4, 2.5, 4.3, and 4.5
REQUIRED
F
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
Block 9: Mark documents “Distribution F. Further dissemination only as directed by Commanding Officer, NCTS Naples, or higher DoD authority.”
H. DATE
01 JUL 2021
I. APPROVED BY
D.D. Form 1423-1, JUN 90 Previous editions are obsolete Page 4 of 13
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
B. EXHIBIT
A
A005
CONTRACTOR’S QUALITY CONTROL (QC) PLAN
5. CONTRACT REFERENCE
PWS PARA. 5.0
REQUIRED
F
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
Block 9: Mark documents “Distribution F. Further dissemination only as directed by Commanding Officer, NCTS Naples, or higher DoD authority.”
H. DATE
01 JUL 2021
I. APPROVED BY
CHRIS JENSEN
D.D. Form 1423-1, JUN 90 Previous editions are obsolete Page 5 of 13
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
B. EXHIBIT
A
A006
DEFICIENCY CORRECTION PLAN
5. CONTRACT REFERENCE
PWS PARA. 7.1
REQUIRED
F
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
Block 9: Mark documents “Distribution F. Further dissemination only as directed by Commanding Officer, NCTS Naples, or higher DoD authority.”
JUGAL PATEL
H. DATE
01 JUL 2021
I. APPROVED BY
D.D. Form 1423-1, JUN 90 Previous editions are obsolete Page 6 of 13
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
B. EXHIBIT
A
A007
BUDGET PROJECTIONS
5. CONTRACT REFERENCE
PWS PARA. 10.5
REQUIRED
F
10. FREQUENCY
ANNUAL
(NLT 30APR)
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
Block 9: Mark documents “Distribution F. Further dissemination only as directed by Commanding Officer, NCTS Naples, or higher DoD authority.”
H. DATE
01 JUL 2021
I. APPROVED BY
D.D. Form 1423-1, JUN 90 Previous editions are obsolete Page 7 of 13
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
B. EXHIBIT
A
A008
MEETING MINUTES
5. CONTRACT REFERENCE
PWS PARA. 10.9
REQUIRED
F
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
Block 9: Mark documents “Distribution F. Further dissemination only as directed by Commanding Officer, NCTS Naples, or higher DoD authority.”
H. DATE
01 JUL 2021
I. APPROVED BY
D.D. Form 1423-1, JUN 90 Previous editions are obsolete Page 8 of 13
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
B. EXHIBIT
A
A009
INFOCON PLAN
5. CONTRACT REFERENCE
PWS PARA. 11.1.7.6
REQUIRED
F
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
Block 9: Mark documents “Distribution F. Further dissemination only as directed by Commanding Officer, NCTS Naples, or higher DoD authority.”
H. DATE
01 JUL 2021
I. APPROVED BY
D.D. Form 1423-1, JUN 90 Previous editions are obsolete Page 9 of 13
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
B. EXHIBIT
A
A010
SAFETY PLAN
5. CONTRACT REFERENCE
PWS PARA. 11.2.1
REQUIRED
F
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
Block 9: Mark documents “Distribution F. Further dissemination only as directed by Commanding Officer, NCTS Naples, or higher DoD authority.”
H. DATE
01 JUL 2021
I. APPROVED BY
D.D. Form 1423-1, JUN 90 Previous editions are obsolete Page 10 of 13
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
B. EXHIBIT
A
A011
CERTIFICATE OF INSURANCE
INSURANCE REQUIREMENT
NOT APPLICABLE
5. CONTRACT REFERENCE
PWS PARA. 16.1
REQUIRED
F
10. FREQUENCY
ONE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
Block 9: Mark documents “Distribution F. Further dissemination only as directed by Commanding Officer, NCTS Naples, or higher DoD authority.”
Block 14: Distribution by email preferred, or as otherwise acceptable to PCO.
PCO
H. DATE
01 JUL 2021
I. APPROVED BY
D.D. Form 1423-1, JUN 90 Previous editions are obsolete Page 11 of 13
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
B. EXHIBIT
A
A012
REVIEW AND REVISE SOPs
5. CONTRACT REFERENCE
PWS PARA. 3.6.1
REQUIRED
F
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
Block 9: Mark documents “Distribution F. Further dissemination only as directed by Commanding Officer, NCTS Naples, or higher DoD authority.”
Block 14: Distribution by email preferred, or as otherwise acceptable to PCO.
H. DATE
01 JUL 2021
I. APPROVED BY
D.D. Form 1423-1, JUN 90 Previous editions are obsolete Page 12 of 13
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in block E.
B. EXHIBIT
A
A013
MISSING EQUIPMENT REPORT
5. CONTRACT REFERENCE
PWS PARA. 8.2.12
REQUIRED
F
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
Block 9: Mark documents “Distribution F. Further dissemination only as directed by Commanding Officer, NCTS Naples, or higher DoD authority.”
Block 14: distribution by email preferred, or as otherwise acceptable to PCO.
H. DATE
01 JUL 2021
I. APPROVED BY
D.D. Form 1423-1, JUN 90 Previous editions are obsolete Page 13 of 13
File details come from the government source that posted it. Updated .