CDRL_ELIN_A007-Logistics_Product_Data_Provisioning.pdf

PDF 380 KB Posted

Attached to
Next Generation Self-Contained Breathing Apparatus Federal contract opportunity
Solicitation number
FA8534-20-R-0006
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

This is a solicitation for the supply of commercial Self-Contained Breathing Apparatus (SCBA) airpaks, commercial off the shelf masks, Chemical Warfare Component (CWC) masks with military modifications for Chemical, Biological, Radioactive, and Nuclear (CBRN) capability, and Supplied-Air Respirator (SAR) Kits. The Human Systems Division at Robins AFB, Georgia (AFLCMC/WNU) intends to award a firm fixed price requirements contract with a 1 year basic period and four 1 year option periods. The production shall be in accordance with the requirements set forth in the Purchase Description, Statement of Work, and associated data requirements referenced in this solicitation. All assets will be shipped FOB Destination. The Government Master NSN is 4240-01-686-7961.

View the file

Other files for this federal contract opportunity

Other files attached to Next Generation Self-Contained Breathing Apparatus, newest first.
File Type Posted
Solicitation Questions and Answers 5.pdf PDF
FA8534-20-R-0006-0004.pdf PDF
Solicitation Questions and Answers 4.pdf PDF
FA8534-20-R-0006-0003.pdf PDF
CDRL_ELIN_A005-Instructional_Media_Package.pdf PDF
Attachment_4-Field_Assessment_Questionaire.pdf PDF
Attachment_2-Bailment_Agreement.pdf PDF
Statement of Work.pdf PDF
FA8534-20-R-0006-0002.pdf PDF
Purchase Description.pdf PDF
Solicitation Questions and Answers - 3.pdf PDF
TOP 8-2-110.pdf PDF
AFMAN 10-2503.pdf PDF
FA8534-20-R-0006-0001.pdf PDF
Solicitation Questions and Answers - 2.pdf PDF
Solicitation Questions and Answers - 1.pdf PDF
CDRL_ELIN_A008-Conference_Agenda.pdf PDF
CDRL_ELIN_A003-Test_Inspection_Report.pdf PDF
Attachment_1-Cross_Reference_Matrix.xlsx XLSX spreadsheet
CDRL_ELIN_A009-Conference_Minutes.pdf PDF
FOB Destination - Delivery Data by Regions.pdf PDF
Attachment_3-Price_Proposal_Volume.xlsx XLSX spreadsheet
Attachment_4-Field_Assessment_Questionaire.pdf PDF
Purchase Description.pdf PDF
CDRL_ELIN_A005-Instructional_Media_Package.pdf PDF
CDRL_ELIN_A011-System_Safety_Hazard_Analysis_Report.pdf PDF
CDRL_ELIN_A002-Test_Scheduling_Report.pdf PDF
Statement of Work.pdf PDF
CDRL_ELIN_A006-TMCR.pdf PDF
FA8534-20-R-0006.pdf PDF
CDRL_ELIN_A004-Program_Progress_Report.pdf PDF
CDRL_ELIN_A010-Technical_Report_Study_Services.pdf PDF
Contract Security Classification Specification.pdf PDF
Transportation Data.pdf PDF
Packaging Requirements.pdf PDF
CDRL_ELIN_A001-Test_Procedure.pdf PDF
Attachment_2-Bailment_Agreement.pdf PDF
Show all 37

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services and Communications Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

LOGISTICS DATA PRODUCTS WORKSHEET

1. SUMMARY TITLE: Logistics Data Products

2. SPECIFIC INSTRUCTIONS: Types of Logistics Data Products which may be required are listed below and will be specified on the Contract Data Requirement List (CDRL) for DI-SESS-81758A/T.

2.1. PROVISIONING PARTS LIST (PPL): Defined as Hardware Breakdown.

2.1.1. PPL will also include all repairable commercial off the-shelf (COTS) items as a one line entry unless excluded by the PPA.

2.1.2. PPL will not include a breakdown of government furnished equipment unless specified otherwise by the PPA, but shall be listed as a one line entry on the PPL.

2.2. COMMON AND BULK ITEMS LIST: Hardware items such as common nuts, bolts, screws, keys, washers, and fittings, except those of special design. The CBIL can also contain bulk items such as electrical wire and cable, gasket material, tubing, hose, adhesives, paints, oil, grease, solvents, and metal stock (such as rods and sheets). WHEN THE PPL IS A REQUIREMENT, ALL HARDWARE ITEMS WILL APPEAR ON THE PPL, NOT ON THE CBIL.

2.3. DESIGN CHANGE NOTICE (DCN): Identify changes to Logistics Data Products which add to, delete, supersede, or modify items previously listed which are approved for incorporation into the end item, which result from an engineering change requiring approval by a configuration authority. Administrative Change Notices (ACNs) are changes that do not result from an engineering change (ex. typo, additional source, etc.).

2.4. LONG LEAD TIME ITEMS LIST (LLTIL): List of those items which, due to their complexity of design, complicated manufacturing process or limited production, require early ordering to ensure adequate delivery schedules.

2.5. SHORT FORM PROVISIONING PARTS LIST (SFPPL): Identify only those support items recommended for maintenance of the end item, component or assembly.

2.6. STATEMENT OF PRIOR SUBMISSION (SPS): Certify that the contractor/subcontractor has previously furnished the Government Logistics Data Products which may satisfy the Logistics Data Products requirements of this contract.

3. DATA IN LMI SPECIFICATION: Refer to Initial Provisioning Performance Specification (IPPS), LMI Data Product Selection Sheet (Atch 2).

4. DATA NOT IN LMI SPECIFICATION: Refer to IPPS, Atch 2 Notes.

5. SUMMARY LAYOUT: Government Provided. Refer to IPPS, Atch 3.

AFMC FORM 718

PROVISIONING PERFORMANCE SCHEDULE DATE OMB NO. 0704-0188

Public reporting burden for this collection of information is estimated 8 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate of Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please do not return your forms to either of these addresses. Completed form will be included in response to invitation for Bid or Request for Proposal.

SCBA Self Contained Breathing Apparatus CONTRACTOR

END ARTICLE DELIVERY DATES SOLICITATION OR CONTRACT NUMBER TYPE OF CONTRACT

DATE OF FIRST DELIVERY

REVISION

DATE OF LAST DELIVERY NUMBER DATE

NO EVENT ACTION AGENCY TIMING CALENDAR DATE

1 CONTRACT AWARD GOVT CONTRACT MAILING DATE

2 PROVISIONING GUIDANCE CONFERENCE GOVT AND CONTR NLT 45 DAYS AFTER MAILING DATE OF CONTRACT

3 DLIS SCREENING CONTR SUBMIT TO DLSC NOT EARLIER THAN 30 DAYS PRIOR TO SUBMITTING PTD

4 SAIP CONTR NLT 165 DAYS PRIOR TO CONTRACTOR'S ORDER NEED DATE N/A

a. CANDIDATE LIST

b. SELECTED ITEM NOTIFICATION GOVT NLT 30 DAYS AFTER RECEIPT OF CANDIDATE LIST N/A

c. CONTRACTOR PROCUREMENT SCHEDULE LOGISTICS PRODUCT DATA, EDFP SCREENING CONTR NLT 90 DAYS PRIOR TO CONTRACTOR'S ORDER NEED DATE N/A

d. SPARES PROVISIONING CONFERENCE GOVT AND CONTR NLT 60 DAYS PRIOR TO CONTRACTOR'S ORDER NEED DATE START

FINISH

e. PIOs RELEASED TO CONTRACTOR GOVT NLT 30 DAYS PRIOR TO CONTRACTOR'S ORDER NEED DATE

5 LONG LEAD ITEMS LIST (LLIL) WITH EDFP AND DLIS SCREENING RESULTS CONTR NLT 30 DAYS AFTER RELEASE FOR FABRICATION OR PROCUREMENT OF START

FINISH

b. RECOMMENDED ITEMS CONTR 45 DAYS PRIOR TO RELEASE OF PPL

c. SPARES PROVISIONING CONFERENCE GOVT AND CONTR NLT 90 DAYS PRIOR TO CONTRACTOR'S ORDER NEED DATE

d. PIOs RELEASED TO CONTRACTOR GOVT NLT 30 DAYS AFTER RECEIPT OF LLIL FROM CONTRACTOR

6 LOGISTICS PRODUCT DATA/EDFP REQUIREMENTS CONTR NLT 60 DAYS PRIOR TO PROVISIONING CONFERENCE

7 SPARES PROVISIONING CONFERENCE GOVT AND CONTR NLT 60 DAYS AFTER RECEIPT OF PTD/EDFP START

FINISH

8 PIOs w/DELIVERY SCHEDULE GOVT DUE TO CONTRACTOR 60 DAYS AFTER SPARES PROVISIONING CONFERENCE

9 ACCEPTANCE/REVISION OF DELIVERY SCHEDULE CONTR NLT 60 DAYS AFTER RECEIPT OF PIO's

10 SPARES NEED DATE GOVT IAW PROGRAMMING CHECKLIST BUT NLT 90 DAYS PRIOR TO OND

11 TRAINING START DATE GOVT

12 OPERATIONAL NEED DATE GOVT

REMARKS (Continue on reverse)

APPROVED BY

AF PROV CHAIRPERSON CONTRACTOR PROGRAM MANAGER

&L&"Arial,Bold"AFMC FORM 718, APR 94 &"Arial,Bold Italic"(EF - 1 FORMFLOW)&R&"Arial,Bold"&8REPLACES AFMC FORM 18, JUL 92 WHICH IS OBSOLETE

EMD

PROD

EMD W/PROD OPT

ATTACHMENT 2

DATA PRODUCT SELECTION SHEET

LOGISTICS PRODUCT DATA

THIS SHEET DOES NOT SPECIFY PROVISIONING LISTS TO BE DELIVERED. ACTUAL PROVISIONING LISTS TO BE DELIVERED SHALL BE AS SPECIFIED ON CONTRACT. SHEET HAS BEEN COMPLETED TO REFLECT DATA ELEMENT REQUIREMENT BY TYPE OF PTD.

CARD

CC

DATA PRODUCT TITLE

L

L

T

I

PPL

RIB

S

F

P

P

C

B

I

D

C

N

ADDITIONAL

INFORMATION

A-L

1-6

PROVISIONING CONTRACT CONTROL NR (PCCN)

X

X

X

X

X

SEE NOTE 1

A-L

7-11

PROVISIONING LINE ITEM SEQUENCE NR (PLISN)

X

X

X

X

X

SEE NOTE 2

A-L

TYPE OF CHANGE CODE (TOCC)

X

SEE NOTE 3

A

INDENTURE

X

X

Use Option 4

A

14-18

COMMERCIAL AND GOVERNMENT ENTITY (CAGE)

X

X

X

X

X

SEE NOTE 4

A

19-50

REFERENCE NR (FPRN)

X

X

X

X

X

A

REFERENCE NR CATEGORY CODE (RNCC)

X

X

X

X

X

A

REFERENCE NR VARIATION CODE (RNVC)

X

X

X

X

X

A

ESSENTIALITY CODE (EC)

X

X

X

X

X

A

56-74

ITEM NAME

X

X

X

X

X

A

SHELF LIFE

X

X

X

X

X

A-L

78-80

CARD SEQUENCE NR (CSN) & CARD FORMAT INDICATOR (CFI)

X

X

X

X

X

SEE NOTE 5

Not in LMI

B

13-32

NATIONAL STOCK NUMBER (NSN) AND RELATED DATA

X

X

X

X

X

SEE NOTE 6

B

45-46

UNIT OF ISSUE (UI)

X

X

X

X

X

SEE NOTE 7

B

47-56

UNIT OF ISSUE PRICE

X

X

X

X

X

SEE NOTE 7

B

62-64

QUANTITY UNIT PACK (QUP)

X

X

X

X

X

B

65-70

SOURCE/MAINT/RECOVER-

ABILITY (SMR) CODE

X

X

X

X

X

SEE NOTE 8

B

DEMILITARIZATION CODE (DMIL)

B

72-73

PRODUCTION LEAD TIME (PLT)

X

X

X

X

X

B

HARDNESS CRITICAL ITEM (HCI)

B

CONTROLLED ITEM INVENTORY CODE (CIIC)

X

X

X

X

X

B

PRECIOUS METALS INDICATOR CODE (PMIC)

X

X

X

X

X

B

AUTOMATED DATA PROCESS- ING EQUIPMENT CODE (ADPEC)

X

X

X

X

X

C

13-17

NEXT HIGHER ASSEMBLY PLISN (NH PLISN)

X

X

C

19-21

OVERHAUL REPLACEMENT RATE (ORR)

X

X

X

X

X

SEE NOTE 9

C

22-25

QTY PER ASSEMBLY (QPA)

X

X

X

X

X

SEE NOTE 10

C

26-30

QTY PER END ITEM (QPEI)

X

X

X

X

X

SEE NOTE 11

C

31-38

MAINTENANCE REPLACEMENT RATE 1 (MRRI)

X

X

X

X

X

SEE NOTE 9

C

54-59

TOTAL QTY RECOMMENDED

X

X

X

X

X

SEE NOTE 12

C

60-64

SAME AS PLISN (SPLISN)

X

X

SEE NOTE 13

C

65-69

PRIOR ITEM PLISN (PPLISN)

X

X

X

SEE NOTE 14

C

70-73

MAXIMUM ALLOWABLE OPERATING TIME (MAOT)

X

X

X

X

X

C

MAINT ACTION CODE (MAC)

X

X

X

X

C

75-77

NOT REPAIRABLE THIS STATION (NRTS)

X

X

X

X

X

SEE NOTE 9

D

13-20

USEABLE ON CODE (UOC)

X

X

X

X

X

SEE NOTE 15

D

21-52

REFERENCE DESIGNATION

X

X

X

X

SEE NOTE 16

D

REFERENCE DESIGNATION OVERFLOW CODE (RDOC)

X

X

X

X

D

REFERENCE DESIGNATOR CODE (RDC)

X

X

X

X

D

SPECIAL MATERIAL CONTENT CODE (SMCC)

X

X

X

X

X

D

PROVISIONING LIST CATEGORY CODE (PLCC)

X

X

X

X

X

SEE NOTE 17

D

SPECIAL MAINTENANCE ITEM CODE (SMIC)

X

X

X

X

X

E

23-24

CONDEMNATION BELOW DEPOT (CBD)

X

X

X

X

X

SEE NOTE 9

E

25-26

CONDEMNATION AT DEPOT (CAD)

X

X

X

X

X

SEE NOTE 9

E

27-44

REPAIR CYCLE TIME OPTION 1

X

X

X

X

SEE NOTE 18

E

72-73

CONTRACTOR TECHNICAL INFORMATION CODE (CTIC)

X

X

X

X

X

SEE NOTE 19

F

13-27

CHANGE AUTHORITY NUMBER

X

SEE NOTE 20

F

28-29

INTERCHANGEABILITY CODE (IC)

X

F

30-49

SERIAL NUMBER EFFECTIVITY

X

SEE NOTE 21

F

52-56

REPLACED/SUPERSEDING PLISN (R/SPLISN)

X

F

58-63

QUANTITY SHIPPED

X

F

64-69

QUANTITY PROCURED

X

G

28-33

PRORATED EXHIBIT LINE ITEM NR (ELIN)

X

SEE NOTE 22

G

34-39

PRORATED QUANTITY

X

H

33-77

PROVISIONING REMARKS

X

X

X

X

X

J

30-40

WORK UNIT CODE (WUC)

SEE NOTE 23

01L

INITIAL SPARES SUPPORT LISTING (ISSL)

X

X

X

X

X

SEE NOTE 24

01L

SPECIAL ITEM CODE (SI)

X

X

X

X

X

SEE NOTE 25

NOTES:

1. PCCN. To be provided by PPA during PGC and as needed.

2. PLISN. Contractor resequencing of previously submitted PTD to the Government cannot be accepted by the D220 System. A provisioning plan that will preclude resequencing PTD will be decided at the PGC.

3. TOCC. Used with type PTD “D” only. Additional guidance for TOCC will be provided during PGC.

4. CAGE Code. Guidance for obtaining CAGE Code may be provided at the PGC if required.

5. Card Sequence Number (CSN) and Card Format Indicator (CFI). CSN is a two position numeric code, e.g., 01, 02, etc., as required in CC 78-79. CFI is a one position alpha code in CC 80. Mandatory entries.

6. NSN and Related Data. If NSN is unknown, enter a Federal Supply Class (FSC) recommendation in CC 16-19 per Cataloging Handbook H-2/H-6. FSC recommendation is required on all items regardless of SMR code, type PTD, or indenture code.

7. Unit of Issue (UI) Price shall be the best estimated price per unit of issue for each item based on the total recommended quantity, taking into consideration the quantity per unit pack and Programming Checklist (PCL) data. The Contractor shall provide, if known, any existing price break for particular batches or economical order quantities, in the remarks block or as directed by the PPA.

8. Acceptable SMR codes are contained in Technical Order 00-25-195. Handouts for acceptable SMR codes will be provided at PGC.

9. MRRI, ORR, NRTS, CAD, and CBD factors for Federal Supply Groups (FSGs) 53 and 59 (except 5955) are not required when non-repairable SMR codes are recommended.

10. QPA. Option 1 will be used. “V” (variable) and “A” or “AR” (as required) are not acceptable entries for the D220 System. Entry must be numeric and >0.

11. QPEI. Option 1 will be used. “V” (variable) and “AR” (as required) are not acceptable entries. Entry must be numeric and > 0 for first appearance. NOTE: If “REF” is entered in QPEI, CC 26-30, the “Same as PLISN” should be entered in CC 60-64.

12. Total Quantity Recommended. Enter recommended quantity only on the non-stocklisted repairable items which are SMR coded as procurable. Unless advised otherwise by the PPA, when SMR is procurable, field must be blank or filled with a quantity greater than 0. NOTE: If the contractor is aware that a minimum buy quantity exists, the recommended quantity block should reflect the minimum buy. In the remarks block, annotate, “MIN BUY”.

13. SPLISN. If SPLISN is entered, QPEI must reflect “REF” in CC 26-30.

14. PPLISN. When PPLISN is entered, the remarks block should reflect the PCCN and SCC where the PPLISN appears. Entry limited to PLISNS for same reference number previously submitted on LLIL PTD on current contract.

15. UOC. To be determined at PGC. Contractor should be prepared to make recommendations at the PGC.

16. Reference Designation. Compression (gang listing) of reference designators under one PLISN is allowed. Specific details for reference designators to be determined at the PGC.

17. PLCC. Contractor installed Government Furnished Equipment (GFE) will appear in the PTD as a single line item entry without a breakdown and will be identified by an “A” in CC 56 of the “D” card.

18. Repair Cycle Time. Details to be determined at the PGC. Only sixth subfield (CC42-44) used for provisioning. If required, Option 1 will be used unless otherwise directed by the PPA.

19. CTIC. Only first position shall be used to enter Breakout code.

20. Change Authority Number. For design changes which result from an Engineering Change requiring approval of the configuration control authority, change authority block will reflect the approved Engineering Order (EO) number or other applicable approval authority. For changes without such approval, the change authority block in the PTD will be left blank and the reason for the change identified in the remarks block.

21. Serial Number Effectivity. Serial number effectivity FROM (CC 30-39) and TO (CC 40-49) limited to thirty (30) breaks in serial number per basic line item. Additional “F” card required for each break in serial numbers.

22. Prorated ELIN. When authorized by the Government, the contractor may utilize an ELIN suffix on ELINs previously assigned by the PPCO or by the D220 System when submitting DCNs. If the proration is a result of a design change, enter the new “Prorated “TO” ELIN” in the PTD as instructed by the PPA.

23. Work Unit Code. AF uses only CC 30-34. CC 35-49 to be left blank.

24. ISSL. One alpha position (use one of the following codes):

CODE

DEFINITION

X

ISSL

A

Air Training Command

S

Special Purpose Recoverable Authorized to Maintain (SPRAM)

25. Special Item Code. One alpha position:

CODE

DEFINITION

W

Warranty Item

Sheet1

SUBMISSION DATE OF LIST

PCCN PCCN/SPIIN MODEL OR TYPE NUMBER CONTROL DATA PRIME CAGE CONTROL CODE Y R M O D A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

PCCN
1PLISN
2CAGE
3REFERENCE NUMBER AND REFERENCE NUMBER OVERFLOW

ADDITIONAL REFERENCE NUMBER

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

&RFigure 1-2

Sheet1 (2)

SUBMISSION DATE OF LIST

PCCN PIIN / SPIIN MODEL OR TYPE NUMBER CONTROL DATA PRIME CAGE CONTROL CODE YR MO DA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

PCCNPLISNTOCCIND CDCAGEREFERENCE NUMBER AND REFERENCE NUMBER OVERFLOW
ADDITIONAL REFERENCE NUMBERRNCCRNVCECITEM NAMESLCSNA

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

NATIONAL STOCK NUMBER AND RELATED DATA A

T FSC NIIN MMAC D C P D

O M H I M P

C I C I I E

PCCN PLISN C UI UI PRICE QUP SMR L PLT I C C C CSN B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T

O TOTAL PRIOR M

C NHA QTY PER QTY PER QUANTITY SAME AS ITEM A

PCCN PLISN C PLISN ORR ASSY EI MRRI RECOMMENDED PLISN PLISN MAOT C NRTS CSN C

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T S P S

O R M L M

C USABLE ON D C C I

PCCN PLISN C CODE REFERENCE DESIGNATION C C C C CSN D

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T MAINTENANCE TASK DISTRIBUTION REPAIR CYCLE TIME C

O CBD CAD O F H SRA D CON T

C I

PCCN PLISN C C CSN E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

SERIAL NUMBER EFFECTIVITY

T FROM TO

O REPLACED OR

C SUPERCEDING QUANTITY QUANTITY

PCCN PLISN C CHANGE AUTHORITY NUMBER IC PLISN SHIPPED PROCURED CSN F

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T

O

C PRORATED PRORATED

PCCN PLISN C ELIN QUANTITY CSN G

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T

O

C

PCCN PLISN C REMARKS CSN H

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T

O

C

PCCN PLISN C WUC / TM FGC CSN J

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T I

O S

C S S

PCCN PLISN C L I O1 L

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

&C&"Arial,Bold"&14PROVISIONING TECHNICAL DOCUMENTATION (PTD) FORMAT&R&14 &8 Atch 3

Sheet1 (3)

SUBMISSION DATE OF LIST

PCCN PIIN / SPIIN MODEL OR TYPE NUMBER CONTROL DATA PRIME CAGE CONTROL CODE Y R M O D A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

PCCNPLISNTOCCIND CDCAGEREFERENCE NUMBER AND REFERENCE NUMBER OVERFLOW
ADDITIONAL REFERENCE NUMBERRNCCRNVCDACPPSLECITEM NAMESLSLAC

1 2 3 4 5 6 7 8 9 10 11 12 13 14 CSN A

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

A

A

A

T D P P D

O NATIONAL STOCK NUMBER AND RELATED DATA 15 UI M H S M P

C PREFIX FSC NIIN SUFFIX CONVERSION I C P I E

PCCN PLISN C UM UM PRICE UI UI PRICE FACTOR QUP SMR L PLT I C C C

16 17 18 19 20 21 22 23 24 25 26 27 28 CSN B

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

N

H

A

T

O I TOTAL PRIOR M

C NHA N QTY PER QTY PER QUANTITY SAME AS ITEM A

PCCN PLISN C PLISN D ORR ASSY EI MRRI MRRII MRR MOD RECOMMENDED PLISN PLISN MAOT C NRTS CSN

29 30 31 32 33 34 35 36 37 38 39 40 41 42 C

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T R S P S

O D R M L M

C USABLE ON O D C C I AIC RISS RTLL

PCCN PLISN C CODE REFERENCE DESIGNATION C C C C C AIC QTY MRU RMSSL BUY QTY RSR CSN

43 44 45 46 47 48 49 50 51 52 53 54 55 56 D

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T MAINTENANCE TASK DISTRIBUTION 57 REPAIR CYCLE TIME 58 REPLACEMENT TASK DISTRIBUTION 59 DESIGNATED REWORK POINT 60 C A

O O F H SRA D CBD CAD O F H SRA D CON O F H SRA D ONE TWO T A M I R

C I M S M I

PCCN PLISN C C C C C P

61 62 63 64 65 CSN E

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

SERIAL NUMBER EFFECTIVITY 68 R/

T FROM TO S

OREPLACED OR SUPERCEDING PLISN
70I

C SUPERCEDING N QUANTITY QUANTITY

PCCN PLISN C CHANGE AUTHORITY NUMBER IC TIC PLISN D SHIPPED PROCURED DCN UOC

66 67 69 70 71 72 73 74 CSN F

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T

O

C PRORATED PRORATED

PCCN PLISN C CHANGE AUTHORITY NUMBER ELIN QUANTITY

75 76 CSN G

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

O

C

PCCN PLISN C LCN ALC REMARKS

77 78 79 CSN H

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T BASIS OF ISSUE 87 BASIS OF ISSUE 87

M

T C C

O TM I QTY L T L T ITEM L

C TM FIGURE ITEM CHG N PER V R V R C NAME R

PCCN PLISN C CODE NUMBER NUMBER NO. D FIG WUC / TM FGC QTY AUTH EI L L QTY AUTH EI L L C CODE U

80 81 82 83 84 85 86 88 89 90 CSN J

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T

O

C TM FIGURE ITEM

PCCN PLISN C CODE NUMBER NUMBER PROVISIONING NOMENCLATURE

91 CSN K

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T

O

C

PCCN PLISN C MATERIAL

92 CSN M

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80

T M W WRM ATC SPRAM H R I S MOE P M M P MIE

O A R QTY QTY QTY M N S I RULE I O O C CODE REQUISITION

C T M I J S C S S I NUMBER

PCCN PLISN C H C C C L M 1 L

A C D E F G H J K L M N P Q S Z

AA SUBSTITUTE AB SUBSTITUTE

T NATIONAL STOCK NUMBER M CAGE REFERENCE NUMBER

O M

C A

PCCN PLISN C C 2 L

T BB DELIVERY SCHEDULE

O AC YR MTH QTY MTH QTY MTH QTY MTH QTY MTH QTY MTH QTY MTH QTY DESTINATION ELIN

C

PCCN PLISN C BA 3 L

&RFigure 1-2

AIR FORCE

INITIAL PROVISIONING PERFORMANCE SPECIFICATION (IPPS)

3 SEP 2013

1. Initial Provisioning Performance Specification (IPPS). This document provides specifications for contractor’s use in submitting Logistics Product Data compatible with the AFMC D220 Provisioning System and participating in the provisioning process with the Government.

1.1. Initiator and Prime Provisioning Activity (PPA):

406 SCMS/GULAB__

235 Byron St., Suite 19A

ROBINS AFB GA 31098-1670

1.2. Date of Initiation: 1/92020 Revision # and Date: ______________

2. Correspondence:

2.1. Address all correspondence pertaining to spare/repair parts provisioning and related data items to the PPA.

2.2. The PPA shall be the sole Government activity with which the contractor interfaces on initial provisioning matters, unless specifically authorized by the PPA. Pursuant to paragraph 2.1 and this paragraph, correspondence from the PPA shall be accepted and all provisioning actions therein accomplished unless otherwise directed by the Principal Contracting Officer (PCO).

3. Conferences.

3.1. A Provisioning Guidance Conference (PGC) shall be scheduled by the PPA and should be held within 45 days after receipt of the contract by the PPA. The PGC is normally held at the PPA for approximately two days to ensure both the contractor and the government understand the provisioning requirements on contract. If a PGC is not desired, the Contractor shall submit a written request for waiver of the PGC to the PPA. In the event a waiver is approved, a mutual understanding of the Provisioning requirements must be communicated in some forum in which the AFMC Form 718, Provisioning Performance Schedule (PPS), must be documented/completed, signed by both the government and contractor, and a contract modification issued, if required. PGCs by telecom are an option. When done by telecom, minutes and AFMC Form 718 are still required to be completed and signed.

3.2. A Spares Provisioning Conference (SPC) is required. The SPC location, date(s) and time along with specific requirements will be discussed at the PGC or during the completion of the AFMC Form 718 (PPS) if PGC is waived. SPCs may be formal face-to-face conferences or desk top reviews.

3.3. A sample article of the component/end item may or may not be available at the SPC. If available, sample article will be viewed and/or disassembled at the SPC.

4. Manufacturers or Commercial Manuals are/are not required. When required furnish a manufacturer’s or commercial manual to supplement the Short Form Provisioning Parts Lists (SFPPL) or Provisioning Parts Lists (PPL) that have embedded Commercial Off-the-Shelf (COTS) equipment. All publications prepared and printed without regard to Government format and outline but which include a parts list will be acceptable as a manufacturer or commercial manual for the purpose of this requirement. This requirement applies only to available manuals for the end item or components thereof. No manuals will be developed to satisfy this requirement..

5. Interim Release (IR) is not authorized.

6. Statement of Prior Submission (SPS) is required where applicable. The SPS is submitted to certify that the contractor/subcontractor has previously furnished the Government Logistics Product Data for the end item or any component thereof which may satisfy the Logistics Product Data requirements of this contract. The SPS will include identifying information (current procurement or previous submission) such as contract number, contract/exhibit line item number, end item/component type or model number/reference number, item name, manufacturer’s name and Commercial and Government Entity Code, PPA receiving the Logistics Product Data and date prepared, NSN (if available) and other information as required by the PPA. If the Government determines that the previously submitted data is adequate, the SPS may result in reduction or elimination of Logistics Product Data and Engineering Data for Provisioning (EDFP) requirements specified on DD Form 1423 and conference requirements.

7. Provisioning Performance Schedule (PPS), AFMC Form 718. PPS (Atch 1) will be developed by PPA and Contractor at the PGC or in other forum agreed upon.

8. Engineering Data for Provisioning (EDFP): A drawing shall be provided for each first appearance (less drawings for MIL-SPEC CAGE Codes and Part Numbers) non-stocklisted item appearing on the PTD. However, if the end item being provisioned was stock listed on a Support Equipment Recommendation Data (SERD) document, and the type Logistics Product Data is a PPL, an end item drawing with parts list is required to be able to have visibility of the PPL indenture breakdown. For provisioning purposes, EDFP order of precedence shall be:

- Data equivalent to approved product engineering drawings.

- Commercial drawings

- Commercial manuals, when required to provide information on a commercial assembly.

- Catalogs or catalog descriptions.

- Sketches or photographs with brief descriptions of dimensional, materiel, mechanical, electrical, or other descriptive characteristics. When sketches or photographs are provided for an assembly, a bill of material shall also be provided.

During the SPC, in the event an action requires linkage within D043A, it’s possible a drawing would be required for stock-numbered items for the purposes of linking a National Stock Number (NSN) with a Part Number.

8.1 Proper labeling of EDFP: EDFP delivered to the PPA shall be in hard copy, PLISN (Provisioning Line Item Sequence Number) sequence. Each drawing shall be labeled with the PCCN (Provisioning Contract Control Number), SCC (Submission Control Code), PLISN, CAGE (Commercial and Government Entity), P/N (Part Number), and PCC (Provisioning Control Code). EDFP delivered to DLIS, Battle Creek, MI, may be in hard copy, PLISN sequence or electronically submitted. If delivered in hard copy, labeling as stated above applies. If submitted electronically, each drawing should have a file name as follows: PLISN(space)P/N.pdf.

8.2 FSC and Item Name assignments will be in accordance with DLIS' H2 (Federal Supply Classification) and H6 (The Federal Item Name Directory) Handbooks.

9. Design Change Notices (DCN). DCNs will include all changes required to an item previously presented to align spares support with actual production items. Unless specifically instructed otherwise by the PPA, the contractor shall notify the PPA of any and all changes whether of a production or modification type which are approved for incorporation into the system/equipment furnished under the contract. DCNs are to be accompanied by applicable EDFP.

9.1. Changes resulting from omission or correction of data previously submitted are considered administrative changes. This type of change may be submitted in non-standard Logistics Product Data formats to include business letter, computer lists, etc, as directed by the PPA at the PGC or in other forum agreed upon.

9.2. Reference Number Changes. Reference numbers are not to be rolled or changed unless specifically allowed by applicable specifications. New design numbers are not to be assigned strictly for administrative or manufacturing purposes, or to facilitate the production control process.

9.3. Reference Items. Submit DCNs against only the first appearance items, unless specifically instructed otherwise by the PPA.

9.4. DCNs to document changes made during the provisioning process by the Government to previously submitted Logistics Product Data shall not be resubmitted.

9.5. Procurable Type Items. DCNs for procurable type items are required to be submitted within twenty-one (21) days after release for fabrication or procurement for prime contractor design items and forty-two (42) days after release for fabrication and procurement of subcontractor supplied items.

9.5.1. DCNs Requiring Revision to Provisioned Item Orders (PIO). When a design change affects any part ordered by the government, the contractor shall take immediate action to affect the following revisions and incorporate the results on DCNs for approval:

9.5.1.1. Deletions. When a design change reduces or eliminates spare/repair parts requirements for the end item/component, the contractor shall delete or reduce such requirements originally ordered by PIO in the ratio authorized by the program data applicable to the end items on order that are affected by the DCN.

9.5.1.2. Adjustments. When a spare/repair part previously ordered by the Government is replaced by another item, and the replacing part is not stocklisted, the contractor shall fabricate or procure the new item in the same ratio as the number of end items/components affected by the change not to exceed the amount funded for affected items. When the adjustment requires an increase in the total quantity recommended or additional items of support, the increase will be recommended by the contractor in accordance with program data provided by the PPA.

9.6. Nonprocurable Type Items. When required by the PPA, design change data for nonprocurable type items (items not coded as spares) (Source, Maintenance, Recoverability (SMR) Code first position X, A, M, K) will be prepared in accordance with instructions from the PPA . Submittals will be within sixty (60) days after release for fabrication or purchase.

10. PTD Submittal Specifications. The following paragraphs provide specifications for submission of

Logistics Product Data by multiple card image to be compatible with the the AFMC Automated

Provisioning System (hereafter referred to as the D220 System). Strict adherence to these instructions must be applied to ensure Logistics Product Data is accepted by the D220 System. Data elements to be included in the Logistics Product Data are reflected in attachment 2 (LMI Data Product Selection

Sheet – Logistics Product Data).

10.1. Media/Software: Acceptable electronic media file can be compact disk (CD) or e-mail attachment.

10.1.1 Data may be input using Microsoft WORD with the paragraph marker on. This enables the spaces to be seen at all times.

10.1.2. Ensure margins are such that each line is exactly 80 characters as outlined in IPPS para 10.4.1. through 10.6.4.5 of the IPPS. NOTE: Do Not use the tab key.

10.1.3 First line of data will be the actual Logistics Product Data header card as called out in IPPS Para 10.4.1.

10.1.4. Blank lines between entries are not acceptable. Do not put header, footer or page number in the page setup for the document. Data must be saved as a Text (.txt) file.

10.1.5. Do not submit encrypted data. The D220 Provisioning system is for unclassified data only and does not have encryption capabilities.

10.2. Labels. Cite the Contract number, PCCN, and SCC (as a minimum) on the outside of a CD ROM submittal or in the subject line on e-mail submittals.

10.3. Security Classification of Data. Classified data (programs or line item data) cannot be entered into the D220 System. Classified data is processed outside the D220 System using contingency operating procedures as program directed.

10.4. Logistics Product Data Format. Required format for Logistics Product Data is depicted in Attachment 3.

10.4.1. Header Card. Required for all types and submissions of Logistics Product Data. NOTE: All alpha characters must be upper case.

10.4.1.1. CC 1-6, enter PCCN which will be provided at PGC.

10.4.1.2. CC 7-25, enter Procurement Instrument Identification Number (PIIN). Do not use dashes.

10.4.1.3. CC 26-46, enter Model or Type No.

10.4.1.4. CC 47-56, Control Data:

10.4.1.4.1. CC 47, enter appropriate type Logistics Product Data Code. Mandatory entry. This code, peculiar to the Air Force, identifies the type of Logistics Product Data being submitted. Logistics Product Data code must be one of the codes defined below:

Logistics Product Data Code Definition

I Long Lead Time Items List (LLTIL)

Interim Release (IR)

R Long Lead Time Items List (LLTIL)

G Provisioning Parts List (PPL)

F Short Form Provisioning Parts List (SFPPL)

D Design Change Notice (DCN)

C Common/Bulk Items List (CBIL)

B Recoverable Item Breakdown (RIB)

P Post Conference List (PCL)

(Foreign Military Sales or Manual Provisioning)

10.4.1.4.2. CC 48, enter B. Mandatory.

10.4.1.4.3. CC 49-56 - For contractor use, if required, and agreed upon with the PPA.

10.4.1.5. CC 57-61, enter Prime CAGE.

10.4.1.6. CC 62-66, enter appropriate SCC (ex: 00001, 00002, etc).

10.4.1.7. CC 67-72, enter date of list, e.g. “YYMMDD”.

10.4.1.8. CC 73-80, blank.

10.4.2. Basic Line Item Records: Basic line item records shall be completed for each provisioning line item and submitted by Card Format Identifier A, B, C, D, E, F, G, H, J, and L as appropriate. The number of card images that the D220 System is capable of accepting are explained below. These instructions do not, however, impose card count restrictions upon the contractor in the submission of Logistics Product Data to the Government.

10.4.2.1. A Card. A maximum of four "A" cards can be accepted per PLISN. The number will depend upon total number of reference numbers being presented. Reference number are identified on “A” Cards as follows:

01A Card - First Precedent Reference Number (FPRN)

02A Card - Second Precedent Reference Number (SPRN)

03A Card - First Additional Reference Number (FARN)

04A Card - Second Additional Reference Number (SARN)

10.4.2.2. B Card. Only one “B” Card can be accepted per PLISN.

10.4.2.3. C Card. Only one “C” card can be accepted per PLISN.

10.4.2.4. D Card. Two “D” cards can be accepted per PLISN. This will be based on number of cards required to present reference designations.

10.4.2.5. E Card. Only one “E” card can be accepted per PLISN.

10.4.2.6. F Card. Maximum of 30 “F” cards can be accepted depending on serial effectivity. Submitted only on type Logistics Product Data “D”.

10.4.2.7. G. Card. Only one “G” card can be accepted per PLISN. Submitted only on type Logistics Product Data ‘D”.

10.4.2.8. H Card. A total of three “H” cards can be accepted per PLISN with a maximum of 105 characters in the remarks. Only the first fifteen positions of the third “H” card can be accepted by the D220 System.

10.4.2.9. J Card. Only one “J” card can be accepted per PLISN,

10.4.2.10. L Card. Only one “L” card can be accepted per PLISN.

10.4.3. Card Sequence Numbers (CSN). Two position numeric code, cc 78-79. Mandatory entry, 01, 02, 03, etc, as needed.

10.4.4. Card Format Identifiers (CFI). One position alpha code, CC 80. Mandatory entry.

10.5. Data Elements. Specific codes and definitions for data elements can be found in DOD 4100.39M, Volume 10, Federal Logistics Information System (FLIS) Procedures Manual. Specifications for the length, type, positional justification, and decimal placement of a data element field, or subfield, can be found in GEIA-HB-0007B. Data elements not contained in the GEIA-HB-0007B LMI are defined in Atch 2.

10.6. Type Logistics Product Data “D”, DCN. DCN submittals require the following:

10.6.1. Header Card per para 10.4.1.

10.6.2. For Replaced PLISNs:

10.6.2.1. 01A Card with PCCN, PLISN, Type of Change Code (TOCC), CAGE, Reference Number and CSN entered.

10.6.2.2. “F”, “G” and “H” Cards as required.

10.6.3. For Superseding PLISNs: Cards “A” through “L” are required as applicable.

10.6.4. The following information is provided for preparation of DCNs and use of the TOCC. There are five basic types of Logistics Product Data updates which are required when data is added, changed, or deleted affecting provisioning lists (PL) previously delivered. These transactions are required based on data changes in provisioning data baselined by a previous Logistics Product Data submittal.

10.6.4.1. Standard Data Update. For each Logistics Product Data card affected by data which has been added or changed since the previous Logistics Product Data delivery, mandatory data, i.e., PCCN, PLISN, CSN, and CFI, an “M” TOCC and the added/changed data only are required. If data has been deleted, a “G” is required in the TOCC and in the left most position of each field deleted on the appropriate Logistics Product Data card. Data deletions and changes/additions occurring on the same Logistics Product Data card will require both a change and deletion card for the appropriate data.

10.6.4.1.1. If all data on a Logistics Product Data CFI is deleted, a delete transaction is required consisting of the PCCN, PLISN, CSN “01”, CFI (except A), the key data associated with that Logistics Product Data Card, and a “G” TOCC.

10.6.4.1.2. When an entire PLISN record is deleted, a delete transaction is required consisting of the appropriate PCCN, PLISN, CAGE, Reference Number, and a “D” TOCC on the 01A card. Also, if the reference designation exists, it along with the PCCN and PLISN on the 01D card with a “G” TOCC is required. In addition, if any change authority related information is changed, CFIs “F”, “G” and “H” update transactions are also required.

10.6.4.2. Quantity Data Update. If a quantity field is updated, mandatory data, a “Q” TOCC, and the updated quantity data field(s) are required. This will only apply to the following data: Quantity Per Assembly, Quantity Per End Item, Total Quantity Recommended, Quantity Shipped, Quantity Procured and Prorated Quantity. If additional data displayed on the same Logistics Product Data card also changes, only one change card is required with TOCC “Q”. If quantity data is deleted, a change card is required with a zero filled quantity and TOCC “Q”.

10.6.4.3. Key Data Update. Certain provisioning data are considered key and associated data elements and are listed below. Changes to key data requires the submission of both a delete and change card for the appropriate key data. The deletion card should contain a “G” TOCC and the original key data. The change card should contain an “M” TOCC with new key data and applicable associated data. When key data is deleted, deletion of the corresponding associated data is required.

KEY DATA ASSOCIATED DATA

CAGE and Additional RNCC and RNVC

Reference number

NHA PLISN ORR

UOC None

Reference Designation RDOC, RDC

PLCC None

Change Authority Number Serial Number Effectivity

Prorated Exhibit Line Item Number

Prorated Quantity

IC

Replaced or Superseding PLISN

Total Item Changes

Quantity Shipped

Quantity Procured

Serial Number Effectivity None

10.6.4.4. Associated Data Update. Changes to associated data require the submission of a change card consisting of an “M” TOCC with the changed data and entry of the applicable key data. Deletion of associated data requires the submission of a deletion card with a “G” TOCC, a “G” in the left most position of the associated data field and entry of the key data.

10.6.4.5. Design Changes with Limited Serial Effectivity. When Logistics Product Data updates are submitted for these design changes, Change Authority Number and Serial Number Effectivity along with a “L” TOCC for the replaced item are required. If a quantity change occurs on a limited effectivity item, an “L” TOCC is required in lieu of a “Q”. The superseding item is submitted with a “blank” TOCC.

11. Additional Information. Information regarding the following requirements or any other provisioning matter may be requested from the PPA through the PCO by the contractor prior to contract award. Requests for this information must be submitted to the PCO in writing. Detailed guidance on these subjects will be provided at the PGC. This information may also be available in the Bidder’s Library.

11.l. Failure Factors, Consist of Maintenance Replacement Rate 1 (MRR1), Condemnation Below Depot (CBD), Condemnation at Depot (CAD), Overhaul Replacement Rate (ORR), and Not Repairable this Station (NRTS).

11.2. Provisioning Factor Table. This table is used to determine which factors are required for items assigned a procurable SMR code.

11.3. Contractor Notification (CN) Products. These products are generated by the AF in the provisioning process. Media/software for CN products will be returned to the contractor in a format determined at the PGC. Peculiar AF data elements will be included in CN products which will be explained at the PGC. The Government does not require the contractor to develop an Automated Data Processing (ADP) capability to accept Provisioned Item Orders (PIO) and/or the CN products.

3 Atch

1. AFMC Form 718

2. Logistics Product Data

Data Selection Sheet

3. Logistics Product Data Format

A

STANDARD/MODIFIED HAND TOOLS LIST SUMMARY WORKSHEET

DI-SESS-81759A/T

1. SUMMARY TITLE: LOGISTICS PRODUCT DATA SUMMARIES

Summary Sub-Title: STANDARD/MODIFIED HAND TOOLS LIST

2. SPECIFIC INSTRUCTIONS: Identify and prepare a list of standard hand tools (powered and non-powered) normally available in standard sizes, including those that due to their application require some modifications or required to be specific type.

Standard Modified Hand Tool List shall provide:

Item Name

Description (Including Dimensions)

Part Number

CAGE

National Stock Number

Sub-System Application

Level of Maintenance

Recommended Quantity Per Level of Maintenance

Model Designation Applicability

The listing should be in two sections: Section 1, for standard hand tools, and Section 2, for those requiring rework.

Revisions to Hand Tools List shall include a section for supersedure/deletion data.

A sketch or line art drawing of new/modified hand tools is required as part of the list.

If a particular vendor’s item is required when similar items are available from other vendors, provide the reason the item must be reworked.

Special effort for generation of data shall be limited to those elements of data peculiar to any given report format.

3. DATA IN LMI SPECIFICATION: Data Product Worksheet for Standard Modified Hand Tools List attached.

4. DATA NOT IN LMI SPECIFICATION: To be discussed at Provisioning Guidance Conference.

5. SUMMARY LAYOUT: Contractor Provided.

Atch 2 to DD 1423 for DI-ALSS-81530/T

STANDARD/MODIFIED HAND TOOLS LIST

Page____ of_____ Pages

PREVIOUS EDITIONS ARE OBSOLETE

DD Form 1423-1, SEP 97 (EG) (Computer Generated)

1_DATA_ITEM_NO: A007
2_TITLE_OF_DATA_ITEM: Logistics Product Data (Provisioning)
3_SUBTITLE:
4_AUTHORITY_Data_Acquisit: DI-SESS-81758A
5_CONTRACT_REFERENCE: SOW, Paragraph 3.4.2
6_REQUIRING_OFFICE: 406 SCMC/GULAB
7_DID_250_REQ: See Block 16
8_APP_CODE: A
DIST_STATEMENT: A
10_FREQUENCY: AS REQ'D
11_AS_OF_DATE: N/A
12_DATE_OF_FIRST_SUBMISSI: IAW AFMC Form 718
13_DATE_OF_SUBSEQUENT_SUB: AS REQ'D, See Block 16
addressee1: 406 SCMS/GULAB
draft1: 0
reg1: 1
repro1: 0
addressee2: 235 Byron St Ste 19A
draft2:
reg2:
repro2:
addressee3: Robins AFB, GA 31098-1670
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .