CDRL.pdf

PDF 2 MB Posted

Attached to
Overhaul of the C-130 Winch Motor NSN# 6105-00-904-7464
Solicitation number
FA811825R0002
Issued by

About this file

This is a Contract Data Requirements List (CDRL) DD Form 1423-1 containing four data items related to a C-130 Motor, Alternating Current contract (FD20302400502) for the Air Force Sustainment Center at Tinker AFB. The data items include: 1) Annual Government Property Physical Inventory Report (A001), to be submitted annually with specific distribution requirements to DoD contractors only; 2) Production Surge Plan/Capability Analysis Plan (A002), which requires a delivery schedule showing maximum sustainable production rates within 30 days of contract award; 3) Commercial Asset Visibility Reporting (A003), requiring daily/24-hour reporting of supply and maintenance transactions; and 4) Contract Depot Maintenance Monthly Production Report (A004), to be submitted monthly within 5 business days of the previous month's end.

Each CDRL item contains specific submission requirements, distribution instructions, and security handling requirements including export control warnings. All reports must be submitted in English to designated email addresses, primarily to Chandra.Sparks@us.af.mil. The document was prepared on January 11, 2024, and includes provisions for surge capacity of up to x% increase in production rates without price increases. The requiring office is 423 SCMS/GUME, and all items are marked as "OTHER X" category with distribution restricted to DoD contractors only.

View the file

Other files

File Type Posted
Packaging Requiremenmts.pdf PDF
FA811825R0002.pdf PDF
CAV AF ATTACH.pdf PDF
DID GFP.pdf PDF
PWS.pdf PDF
Transportation Data.pdf PDF
DID Production Surge Plan.pdf PDF
GFP.pdf PDF
DID CAV AF.pdf PDF
DID CDM.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .