CDRL DD1423.pdf

PDF 130 KB Posted

Attached to
Rail-Pusher Set NSN:1440-00-462-6353 AH
Solicitation number
FA820625Q0842
Issued by

About this file

The document appears to be a technical loading page for Adobe Reader, displaying instructions for resolving PDF viewing issues. The page contains guidance on upgrading Adobe Reader for Windows, Mac, or Linux platforms and provides download links. It also includes trademark disclaimers for Windows (Microsoft), Mac (Apple), and Linux (Linus Torvalds). No substantive contract or solicitation details are present in this file.

The associated federal contract opportunity involves a solicitation (FA820625Q0842) by the Department of the Air Force Materiel Command Air Force Sustainment Center for a Rail Assembly - Hydraulic Pusher Set. Specific details include: Product Part Number 8631599-10, CAGE Code 98747, NIIN 004626353, with a first article quantity of 1 and production quantity of 16. Contractors must submit current JCP certification to arthur.gumushyan@us.af.mil to access controlled documents. Quote submission is due no later than 31 August 2025 Mountain Standard Time.

View the file

Other files

File Type Posted
Electronic Data List.pdf PDF
Packagin.pdf PDF
PKGRQMT_REPORT.pdf PDF
QAIRQMT_REPORT.pdf PDF
FA820625Q0842.pdf PDF
Packagin SOW.pdf PDF
TRNSPDATA_REPORT.pdf PDF
Unmarked Eng Data 2022.pdf PDF
FA260.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

PREVIOUS EDITION MAY BE USED.

DD FORM 1423, FEB 2024

Page of

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoDM 5010.12 for detailed instructions.)

DD FORM 1423, FEB 2024

Page of

CONTRACT DATA REQUIREMENTS LIST

C. CATEGORY:

14. DISTRIBUTION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES Draft Final Reg Repro

16. REMARKS

14. DISTRIBUTION

15.TOTAL

Image of arrow pointing towards totals

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package; TM - Technical Manual; Other - other category of data, such as "Provisioning," "Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support (e.g., Mission Design Series (MDS) designator).

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Name of preparer of CDRL.

Item H. Date CDRL was prepared and signature of preparer of CDRL.

Item I. Name of CDRL approval authority.

Item J. Date CDRL was approved and signature of CDRL approval authority.

Item 1. See DFARS Subpart 204.71 for proper numbering. To add or delete additional data items, point and click the plus or minus sign to the right of Block J.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Identify only one Data Acquisition Document No. If a single work task generates more than one deliverable data product, prepare a separate data item for each deliverable data product.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work/Performance Work Statement paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data and computer software, specify the contractor's requirement to mark the appropriate distribution statement on the technical data or computer software (ref. DoDI 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15. Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14; Desired medium for delivery of the data item.

Identify for which data item additional remarks are provided. When tailoring the Data Acquisition Document invoked in Item 4, identify which portions of that Document are being tailored.

Identify any referenced attachments to the form. Attachments can be added using the button at the bottom of page 1.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government’s rights to use the data shall be governed by the pertinent provisions of the contract.

9.0.0.2.20120627.2.874785 DD Form 1423, "Contract Data Requirements List" Controlled by: MMIII Program Office CUI Category: Distribution D Distribution/Dissemination Control: Disseminate in accordan POC: Caleb Gatrell (801.586.3691)

CurrentPage:
PageCount:
Select Classification from drop-down list.: 2
CUI Indicator Information:
Click on this button to attach a file(s).:
A. CONTRACT LINE ITEM NUMBER:
exhibit: A
C. CATEGORY: Select for "TDP.": 0
C. CATEGORY: Select for "TM.": 0
C. CATEGORY: Select for "OTHER.": 1
C. CATEGORY: Enter specification for "Other.": X-NDTI
System: LCD Rail Assy
ContractNum: FD20202500842
Contractor:
1. DATA ITEM NUMBER: A001
titleDataItem: TEST / INSPECTION REPORT
subtitle: FIRST ARTICLE INSPECTION REPORT
4. AUTHORITY (Data Acquisition Document Number): DI-NDTI-80809
contractRef:
reqOffice: 414 SCMS/GUEAB
7. DD 250 REQUIREMENT: LT
8. APPROVAL CODE : A
9. DISTRIBUTION STATEMENT REQUIRED: D See Block 16
freq: See Block 16
asOfDate: See Block 16
dateFirstSub: See Block 16
dateSubseqSub: See Block 16
16. REMARKS: Block 4:

1)The contractor shall produce a report on the subject item with all dimensions and tolerances specified on the manufacturing data listed in one column and the actual corresponding reading obtained from the inspection of the part listed in another column.

2)Materials utilized in the manufacture of "First Article" items shall be identified and certified along with a copy of material purchase requests as confirming to applicable data requirements.

3) Material processing, including finish requirements (plating, casting, forging, heat treatment, welding, inspection, anodize, painting, etc.) utilized in the manufacture of "First Article" items shall be identified and certified along with a copy of material purchase requirements.

Block 9:

Data submittal shall be marked with the following on the cover page:

DISTRIBUTION STATEMENT D: Distribution authorized to Department of Defense and U.S. DoD contractors only for Controlled Technical Information & Export Controlled: Determined XX/XX/XXXX (insert date). Other requests for this document must be referred to Minuteman III Program Office, Hill AFB, UT. 84056.

WARNING: This document contains technical data whose export is restricted by the Arms Export Control Act (Section 2751 Of Title 22, United States Code) or the Export Control Reform Act Of 2018 (Chapter 58 Sections 4801-4852 Of Title 50, United States Code). Violations of these export-control laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DoD directive 5230.25 and DoD instruction 2040.02.

DESTRUCTION: Destroy by any method that will prevent disclosure of contents or reconstruction of the document.

Blocks 10, 11, 12, & 13:

Contractor shall submit initial draft of First Article Inspection report no later than (NLT) 15 calendar days following completion of first article inspection. The government will have 30 calendar days to provide comments on the draft inspection report. Final submittal shall be delivered NLT 30 calendar days following receipt of government comments.

Block 14: Submit electronically in Wide Area Work Flow (WAWF). Upload as an attachment during the invoice process.

Provide notification of delivery to:

414scms.gumc.buycontracts@us.af.mil eric.ellington.2@us.af.mil alfredo.armendariz.1@us.af.mil

Click to add continuation field for Remarks:
14. DISTRIBUTION - a. ADDRESSEE, new line: See Block 16
15.TOTAL - Total draft copies is automatically calculated.:
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final regular copies is automatically calculated.: 1
15.TOTAL - Total final reproducible copies is automatically calculated.:
priceGrp: NSP
estTotalPrice: 0.00
remarks:
preparedBy: Alfredo Armendáriz
J. SIGNATURE: H. SIGNED ON 20250603
J. SIGNATURE: J. SIGNATURE
J. SIGNATURE:
approvedBy: Eric Ellington
Click to add additional data items.:
Click to delete additional data items.:

File details come from the government source that posted it. Updated .