CDRL A002.pdf
PDF 147 KB Posted
- Solicitation number
- N68335-26-R-1052
About this file
This document is a Contract Data Requirements List (CDRL) appendix that specifies a single data item requirement for a CH-53K helicopter organizational-level support equipment contract.
The required data item is Material Certification (A002), which must include raw material certifications that are DFARS compliant and delivered in Adobe Portable Document Format (PDF). Certifications are required on an as-needed basis and must be submitted to Ed Ceralde, CH-53K Support Equipment Engineer, at (732) 323-4664 or edward.v.ceralde.civ@us.navy.mil. Physical certificates shall be placed in plastic pouches and attached to each corresponding end item that receives a DD-250 (Government Inspection and Acceptance Record), with copies submitted in PDF format to the designated point of contact. All items manufactured under this contract must pass Government final inspection prior to DD-250 issuance, with Government inspection and acceptance occurring at the destination. The distribution statement restricts access to Department of Defense and DoD contractors only, with other U.S. requests referred to Code BL22100. The document was prepared on 10/7/25 and approved the same date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N6833526R10520003 Amended Solicitation 05-13.pdf | ||
| N6833526R10520002 Final 05-01.pdf | ||
| N6833526R10520001 Amended Solicitation 04-22.pdf | ||
| CDRL A003.pdf | ||
| CDRL A006.pdf | ||
| N68335-26-Q-1052 Solicitation FINAL 04-13.pdf | ||
| Section L Attachment L-2 Table PP-1 Past Performance Contract Data.docx | DOCX document | |
| CDRL A007.pdf | ||
| Pricing Matrix Group G - N68335-26-R-1052.xlsx | XLSX spreadsheet | |
| Section L Attachment L-1 Past Performance Questionnaire.docx | DOCX document | |
| CDRL A005.pdf | ||
| CDRL A004.pdf | ||
| CDRL A001.pdf | ||
| PSE LIST GROUP G.xlsx | XLSX spreadsheet |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
APPENDEX A: CONTRACT DATA REQUIREMENTS LIST (CDRL)
17. PRICE GROUP
Group
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. Listed in Block E.
A. CONTRACT LINE ITEM NO.
TBD
B. EXHIBIT
A
C. CATEGORY:
TDP TM OTHER XX
D. SYSTEM/ITEM
CH-53K Organizational Level SE
E. CONTRACT/PR NO.
TBD
F. CONTRACTOR
TBD
1. DATA ITEM NO.
A002
2. TITLE OF DATA ITEM
MATERIAL CERTIFICATION
3. SUBTITLE
See Block 16
4. AUTHORITY (Data Acquisition Document No.)
See Block 16
5. CONTRACT REFERENCE
SOW Paragraph 3.5.2
6. REQUIRING OFFICE
BL22100
7. DD 250 REQ
YES
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
AS REQ
12. DATE OF FIRST SUBMISSION
See Block 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT SUBMISSION
N/A Draft
Final
Reg. Repro
16. REMARKS
Block 3: This submittal shall include: raw material certifications (which must be DFARS Compliant)
Block 4: Certifications Documentation Shall be delivered in Adobe Portable Document Format (PDF) formats.
Block 7: Each item manufactured as part of this contract shall have passed a Government final inspection prior to DD-250. Government Inspection and Acceptance of all production units shall be accomplished at the destination by a Government representative.
Block 9: Use Distribution Statement D. Distribution authorized to DoD and DoD Contractors only, (30 January 2007) other U.S. requests shall be referred to Code BL22100
Block 12: Applicable Certificates shall be placed in a plastic pouch/envelope and attached to each corresponding end item that is DD-250�d to the Government . A copy of all Certificates for each end article shall be submitted to CH-53K Support Equipment Engineer (Ed Ceralde) in Adobe Portable Document Format (PDF) formats.
Block 14: Certificates shall be delivered to POC Ed Ceralde(CH-53K SE Engineering)
(732) 323-4664 Email Address: edward.v.ceralde.civ@us.navy.mil
POC 0 1 1
15. TOTAL 0 1
G. PREPARED BY H. DATE I. APPROVED BY : J. DATE
File details come from the government source that posted it. Updated .