CCU-22 Shear - SOW.pdf
PDF 667 KB Posted
- Attached to
- CCU-22 Shear Pins Federal contract opportunity
- Solicitation number
- N0017422Q0037
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CCU-22 Shear - Form 16 (Signed).pdf | ||
| CCU-22 Shear - Form 43.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
CCU-22 SHEAR PIN W/O 1146
MANUFACTURING OF HARDWARE USING NSWC IHD DRAWINGS
1.0 Scope of Work
The requirements in this document contain the information necessary to manufacture hardware for assembly in fleet-deliverable Aviation Critical Safety Items (ACSIs) at Naval Surface
Warfare Center Indian Head Division (NSWC IHD).
2.0 Applicable Documents
CDRL_A001_Inspection
CDRL_A002_CoA
CDRL_A003_CoC
5184324 REV F – Pin, Shear
5184324 REV F Pin, Shear Form 16 QA REQ MD
5184324 Form 43
2.1 General Specifications
American National Standards Institute (ANSI)/American Society for Quality (ASQ)
Standards:
ANSI/ASQ Z1.4 Sampling Procedures and Tables for Inspection by Attributes
Code of Federal Regulations (CFR):
22 CFR 121 The United States Munitions List
22 CFR 122 Registration of Manufacturers and Exporters
Department of Defense (DoD) Directives:
5230.25 Withholding of Unclassified Technical Data From Public Disclosure
International Organization for Standardization (ISO)/International Electrotechnical
Commission (IEC) Standards:
ISO 9001 Quality Management Systems
ISO/IEC 17025 General Requirements for the Competence of Testing and Calibration
Laboratories
2.2 Technical Drawings
Department of Defense Drawings:
5184324 REV F Pin, Shear
2.3 Conflicting Document Requirements
If there are any conflicts between specifications, drawings, or requirements listed herein, the contractor shall notify the Contracting Officer (KO) and the Technical Point of Contact (TPOC), in writing for interpretation, clarification, and resolution.
3.0 Requirements
3.1 General Manufacturing
The Contractor shall fabricate, inspect, test, and deliver components in accordance with the applicable drawings and specifications. Components shall be packaged by part number and ready for use. The Contractor shall provide, design, and fabricate all necessary tooling to manufacture and dimensionally inspect the components, and provide data as detailed herein.
The Prime Contractor shall bear the ultimate responsibility for all deliveries and performance of all requirements under this contract. The Prime Contractor shall monitor and maintain all subcontractor relationships. At the Government’s sole discretion, the Government may apply quality and/or on-time delivery issues stemming from the work of a subcontractor to the Prime
Contractor’s quality performance metrics.
3.2 Test and Inspection
3.2.1 The delivery time for line item #1, specified in section 4.1, must be specified separately from the delivery time of line item #2.
3.2.2 Before commencing work on line item #2, the incumbent vendor shall produce a
20-piece run in accordance with line item #1 and the requirements of Dwg. 5184324 Rev. F. All manufacturing processes must be completed per drawing requirements, including any coatings or plating.
3.2.3 Prior to submitting line item #1 to NSWC IHD the vendor shall complete shear testing of the first 10 pieces at their facility. The test apparatus shall meet Requirement 3.2.4 of this SOW.
3.2.4 All shear pins tested at the vendor facility shall be conducted using the test setup described below. The test shall be instrumented to record maximum shear force data for each test sample, as well as the load vs. displacement trace.
Shear Style: Single Shear Value: 23-25.5 lbs Head Speed: See Dwg. 5184324 Rev. F Fixture Hole Diameter: See Dwg. 5184324 Rev. F Recommended fixture drawing: 5185084 Rev. A
3.2.5 The vendor shall submit the remaining 10 items from line item #1 to NSWC IHD.
See below for complete address. Copies of all test data (maximum shear force for each test sample, and load vs. displacement trace) and certifications specified in 3.4 are required to be submitted with the first article sample.
NOTE: This sample must be delivered within the quoted delivery time for line item #1 following successful completion of testing at the vendor’s facility.
3.2.6 NSWC IHD will perform the required dimensional inspections and subject the remaining 10 units from line item #1 to the shear testing Requirement 3.2.4 of this SOW within 14 days of receipt of samples. After completing these tests, NSWC IHD shall notify the incumbent vendor, in writing, of the results. The time for producing line item #1 should be quoted separately, and will not be counted against the vendors quoted delivery time for line item #2.
3.2.7 No variances from the materials, tooling, processing methods or subcontractors used in manufacturing line item #1 are allowed for line item #2; any variances will result in a re-submission of line item #1.
3.2.8 The vendor may proceed with line item #2 following notification from the
Government of acceptance of line item #1. All manufacturing processes must be completed in accordance with the requirements of Dwg. 5184324 Rev. F, including the coatings or plating prior to shear testing.
3.2.9 Following completion of line item #2, and prior to lot submission to NSWC IHD, the vendor shall complete shear testing of a 20-piece sample from the production lot at their facility. The test apparatus shall meet Requirement 3.2.4 of this SOW.
3.2.10 The vendor shall submit line item #2 to NSWC IHD. See below for complete address. Copies of all test data (maximum shear force for each test sample, and load vs.
displacement trace) and certifications specified on the Form 16 are required to be submitted with the production lot.
3.3 Dimensional Inspection
The Contractor is responsible for performing in-house inspections to ensure each first article or production component and dimension conforms 100% to the contract, PWS, and product dimensional requirements. The Contractor shall provide copies of in-process dimensional data and/or proof of inspections, such as floor shop travelers or final QA inspections, as requested by the Government.
The Contractor shall submit a Final Dimensional Inspection Report in accordance with DI-
NDTI-80809 per CDRL A001 for each deliverable line item. The final dimensional inspection report shall include either a list of all drawing dimensions and tolerances, and their actual measured values, or a marked-up copy of the drawing with actual measured values written in red next to the corresponding dimension.
3.4 Product Certification
The Contractor shall submit a Certificate of Compliance in accordance with DI-QCIC-81356 per
CDRL A003 to accompany the shipment of each first article and production lot, as required by
Table 3. The certificate shall state compliance of the material with its respective drawing or specification, and contract/order requirements. The certificate shall as a minimum state the company name, contract/order number, drawing or specification number, and date.
The Contractor shall submit a certificate of analysis/test in accordance with DI-MISC-80678 per
CDRL A002 showing the first article or production material has been sampled and/or tested and found to be within the minimum requirements of the specification/drawing/contract, as required by Table 1. The certificate shall be forwarded to the Government; one (1) copy to accompany the shipment (in the packing list envelope), and one (1) copy mailed to arrive at time of receipt of the shipment (mark the certificate to the attention of the designated POC above). Each certificate must be traceable to the material covered by the certificate. The certificate shall state, above the signature of a legally authorized representative of the company the following:
Both Certificates of Analysis and Compliance shall state, above the signature of a legally authorized representative of the company, the following:
“This certification concerns a matter within the jurisdiction of an agency of the United States and making a false, fictitious, or fraudulent certification may render the maker subject to prosecution under Title 18, United States Code 1001.”
Test Requirement
Certificate Dwg Location
Material 5184324 Rev F Note 6 Analysis
Hardness 5184324 Rev F Note 6 Analysis
Plating 5184324 Rev F Note 5 Compliance
Other 5184324 Rev F Note 4 & Section 3.2 Analysis
Table 1: Certification Requirements
3.5 Quality Control
3.5.1 Quality System and Quality Control Processes
The Contractor shall maintain a quality system which adheres, at minimum, to the requirements of ISO 9001:2015 standards.
The Contractor quality management system shall ensure products are in compliance with the applicable drawings, specifications, and contract. The quality management system shall outline processes to identify, record, and disposition nonconforming material or other characteristic discrepancies for the entire duration of this contract. Procedures, planning, and all other relevant documentation and data which comprise the quality management system, if requested, shall be made available to the Government for review.
3.5.2 Calibration of Measuring and Testing Equipment
Measuring and testing equipment used by the contractor shall, at a minimum, adhere to the requirements of ISO/IEC 17025:2017.
3.5.3 Acceptance of Product
Final acceptance of first article samples and production deliverables will be determined by
Government dimensional inspection and certification verification at Government destination for each deliverable line item. The Government shall complete sample testing within 60 days of receipt of all documentation and deliverables relevant to the relevant line item. Unless otherwise stated, the Government sampling plan shall be in accordance with Table 2. The Government reserves the right to perform additional inspection and testing of hardware to verify acceptability.
This may include testing at other facilities.
ASQ Z1.4 [ANSI/ASQ Z1.4-2003 (R2013) – October 2013]:
Critical: 100%
Major: Level II
Minor: Level I
Table 2: ACSI Sampling Plan
3.5.4 Government-Identified Nonconformity Reporting Procedures
The Government shall alert the Contractor to any nonconforming deliverables within one (1) working day of identifying the nonconformity. The Contractor shall respond with their recommended disposition on the deliverables within one (1) working day.
3.6 Export Control
The Contractor shall comply with either one, or both, of the export control options below.
3.6.1 International Trafficking in Arms Regulations (ITAR) Compliance
The Contractor shall maintain ITAR compliance through registration in accordance with 22 CFR
122 to export Category III and IV munitions components, as defined by 22 CFR 121.
3.6.2 Joint Certification Program (JCP) Registration
The Contractor shall maintain JCP registration and a DD Form 2345 to comply with DoD
Directive 5230.25.
3.7 Preservation
The Contractor shall be responsible for packing and packaging of deliverables to prevent any potential damage during transport. The Contractor shall label completed parts packaging to include component name, quantity, contract number, drawing number, revision, and manufacturer name and date. Packaging quantities and methods shall be in accordance with applicable Form 43.
4.0 Deliverables
The Technical Point of Contact and Contracting Officer (KO) for this contract will approve all deliverables as specified. The following Certificates shall include the signature of the Contractor’s representative authorized to make such certification.
CDRL Spec Section Title
A001 DI-NDTI-80809 3.3 Final Dimensional Inspection Report
A002 DI-MISC-80678 3.4 Certificate of Analysis
A003 DI-QCIC-81356 3.4 Certificate of Compliance
4.1 Hardware Delivery
The Contractor shall notify the Contracting Officer 30 days in advance if the Contractor cannot meet the contract delivery schedule.
The Contractor shall be responsible for coordinating and shipping all the units below to the required destination.
Item Year Drawing Rev Nomenclature Qty. UOI
1 Base 5184324 F Pin, Shear (FAT) 20 EA
2 Base 5184324 F Pin, Shear 1,000 EA
Delivery address provided below:
Naval Surface Warfare Center Indian Head Division
ATTN: Luccien Fitzpatrick/Karnia Ramos Ortiz
4522 McMahon Road
Bldg. 116, Suite 100
Indian Head, MD 20640
File details come from the government source that posted it. Updated .