CCSWDC_Phase_I_Gas_Structures.pdf
PDF 10 MB Posted
- Solicitation number
- 262822FB
- Issued by
- Sarasota County, Florida
About this file
This is a GIS mapping document produced by Sarasota County for the Central County Solid Waste Disposal Complex (CCSWDC) Phase I gas extraction infrastructure located at 4000 Knights Trail Road, Nokomis, Florida. The map identifies the spatial distribution and identification of 59 gas extraction wells across the Phase I area, along with associated infrastructure components including three header valves, three air supply valves, three condensate discharge valves, three condensate U-traps, five leachate cleanouts with five corresponding risers, four remote wells, and three access risers. The document provides multiple map views at varying scales, including a comprehensive site overview and a detailed southeast zoom section, with all features precisely identified through an alphanumeric labeling system. The aerial imagery used to create the map was provided by Pictometry International (EagleView) and captures conditions from December 1, 2024 through January 13, 2025 at 3-inch resolution using NAD 1983 HARN State Plane Florida West coordinate system.
The map serves as supporting documentation for the Sarasota County Invitation for Bids #262822FB for management of nuisance and exotic plants at solid waste properties. Specifically, the gas structure locations depicted establish "Do Not Spray" zones around groundwater monitoring infrastructure where herbicide applications are restricted. This GIS reference material is essential for qualified bidders preparing proposals for the three-year contract, as contractors must avoid treating vegetation within designated buffers around the identified gas extraction wells, header valves, and leachate management systems to protect operational integrity of the landfill's gas management and groundwater monitoring systems. The map explicitly disclaims warranty of completeness and accuracy and is identified as representative information only, intended for reference purposes rather than navigation guidance.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This map is produced from Sarasota County GIS, and is representative information only.
The County does not warranty, guarantee, or assume any responsibility for geographic information completeness and/or accuracy.
This map should not be used as guide for navigation.
Copyright © SCGIS 2025
P at h:
N
:\E nv iro nm en ta l\S ol id W as te
\S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s.
ap rx
Map published using ArcGIS Pro 3.X by dlucito on Monday, December 15, 2025
EW-11
EW-12
EW-10
LCO-1N
CT-1LCR-1N
LCR-2N
LCO-2N
EW-9
EW-8
AR-2
EW-6
EW-45A
EW-43
EW-44
EW-56
EW-42 EW-13
LCO-3N
LCR-3N
EW-6
EW-46
EW-47
EW-5
EW-53
EW-52
EW-51A
EW-48A
EW-54A
EW-68
RW-68
EW-69 EW-70
EW-57
RW-75
EW-41 EW-14
EW-15EW-40
EW-39
EW-16
EW-58EW-59
RW-70EW-60EW-61
EW-67
EW-62
EW-63
EW-65A EW-66A
EW-31A
EW-32 EW-34
EW-33
EW-35
EW-64A
EW-30A
EW-4
AR-3
LCO-4N
EW-2
LCR-4N
EW-1
EW-49A
EW-50A
LCR-5N
LCO-5N
HV-4
AV-4CV-4
EW-88
EW-107
EW-124
EW-148 EW-17
EW-18
EW-38
EW-37
EW-36A
EW-55RW-54
EW-2
CT-2CT-3
AR-1
CV-2
CV-3
AV-3HV-3
HV-2
Legend Type
Access Riser
Gas Extraction Well
Leachate Cleanout
Leachate Cleanout Riser
Header Valve
Air Supply Valve
Condensate U-Trap
Remote Well
Condensate Discharge Valve
Aerial Imagery Provided by Pictometry International (EagleView):
Sarasota County, FL December 1, 2024 – January 13, 2025 3" Resolution N.A.D. 1983 HARN State Plane Florida West FIPS 0902 (U.S. Survey Feet)
WKID: 2882 ¯ 0 175 35087.5
US Feet
CCSWDC - Phase I - Gas Structures 4000 Knights Trail Road, Nokomis, FL 34275
The County does not warranty, guarantee, or assume any responsibility for geographic information completeness and/or accuracy.
This map should not be used as guide for navigation.
Copyright © SCGIS 2025
P at h:
N
:\E nv iro nm en ta l\S ol id W as te
\S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s.
ap rx
Map published using ArcGIS Pro 3.X by dlucito on Monday, December 15, 2025
EW-39
EW-16
EW-17
EW-18
EW-38
CV-2
CV-3
AV-2
AV-3
HV-3
HV-2
Legend Type
Gas Extraction Well
Header Valve
Air Supply Valve
Condensate Discharge Valve
Aerial Imagery Provided by Pictometry International (EagleView):
Sarasota County, FL December 1, 2024 – January 13, 2025 3" Resolution N.A.D. 1983 HARN State Plane Florida West FIPS 0902 (U.S. Survey Feet)
WKID: 2882 ¯ 0 40 8020
US Feet
CCSWDC - Phase I - Gas Structures (Southeast Zoom) 4000 Knights Trail Road, Nokomis, FL 34275
The County does not warranty, guarantee, or assume any responsibility for geographic information completeness and/or accuracy.
This map should not be used as guide for navigation.
Copyright © SCGIS 2025
P at h:
N
:\E nv iro nm en ta l\S ol id W as te
\S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s.
ap rx
Map published using ArcGIS Pro 3.X by dlucito on Monday, December 15, 2025
LCO-1N
CT-1
LCO-2N
EW-14
EW-30A
EW-1
LCO-5N
HV-4
EW-18
CV-2
Aerial Imagery Provided by Pictometry International (EagleView):
Sarasota County, FL December 1, 2024 – January 13, 2025 3" Resolution N.A.D. 1983 HARN State Plane Florida West FIPS 0902 (U.S. Survey Feet)
WKID: 2882 ¯ 0 2,500 5,0001,250
US Feet
Type Name Type Name
Access Riser AR-2
Access Riser AR-3
Access Riser AR-1
Air Supply Valve AV-4
Air Supply Valve AV-2
Air Supply Valve AV-3
Condensate Discharge Valve CV-4
Condensate Discharge Valve CV-2
Condensate Discharge Valve CV-3
Condensate U-Trap CT-1
Condensate U-Trap CT-2
Condensate U-Trap CT-3
Gas Extraction Well EW-11
Gas Extraction Well EW-12
Gas Extraction Well EW-10
Gas Extraction Well EW-9
Gas Extraction Well EW-8
Gas Extraction Well EW-6
Gas Extraction Well EW-45A
Gas Extraction Well EW-43
Gas Extraction Well EW-44
Gas Extraction Well EW-56
Gas Extraction Well EW-42
Gas Extraction Well EW-13
Gas Extraction Well EW-6
Gas Extraction Well EW-46
Gas Extraction Well EW-47
Gas Extraction Well EW-5
Gas Extraction Well EW-53
Gas Extraction Well EW-52
Gas Extraction Well EW-51A
Gas Extraction Well EW-48A
Gas Extraction Well EW-54A
Gas Extraction Well EW-68
Gas Extraction Well EW-69
Gas Extraction Well EW-70
Gas Extraction Well EW-57
Gas Extraction Well EW-41
Gas Extraction Well EW-14
Gas Extraction Well EW-15
Gas Extraction Well EW-40
Gas Extraction Well EW-39
Gas Extraction Well EW-16
Gas Extraction Well EW-58
Gas Extraction Well EW-59
Gas Extraction Well EW-60
Gas Extraction Well EW-61
Gas Extraction Well EW-67
Gas Extraction Well EW-62
Gas Extraction Well EW-63
Gas Extraction Well EW-65A
Gas Extraction Well EW-66A
Gas Extraction Well EW-31A
Gas Extraction Well EW-32
Gas Extraction Well EW-34
Gas Extraction Well EW-33
Gas Extraction Well EW-35
Gas Extraction Well EW-64A
Gas Extraction Well EW-30A
Gas Extraction Well EW-4
Gas Extraction Well EW-2
Gas Extraction Well EW-1
Gas Extraction Well EW-49A
Gas Extraction Well EW-50A
Gas Extraction Well EW-17
Gas Extraction Well EW-18
Gas Extraction Well EW-38
Gas Extraction Well EW-37
Gas Extraction Well EW-36A
Gas Extraction Well EW-55
Gas Extraction Well EW-2
Header Valve HV-4
Header Valve HV-3
Header Valve HV-2
Leachate Cleanout LCO-1N
Leachate Cleanout LCO-2N
Leachate Cleanout LCO-3N
Leachate Cleanout LCO-4N
Leachate Cleanout LCO-5N
Leachate Cleanout Riser LCR-1N
Leachate Cleanout Riser LCR-2N
Leachate Cleanout Riser LCR-3N
Leachate Cleanout Riser LCR-4N
Leachate Cleanout Riser LCR-5N
Remote Well RW-68
Remote Well RW-75
Remote Well RW-70
Remote Well RW-54
CCSWDC - Phase I - Gas Structures Point Table 4000 Knights Trail Road, Nokomis, FL 34275
Type Location FREQUENCY
Access Riser Phase I 3
Air Supply Valve Phase I 3
Condensate Discharge Valve Phase I 3
Condensate U-Trap Phase I 3
Gas Extraction Well Phase I 59
Header Valve Phase I 3
Leachate Cleanout Phase I 5
Leachate Cleanout Riser Phase I 5
Remote Well Phase I 4
| CC Phase I Final |
| CC Phase I Final SE Zoom |
| CC Phase I Final Point Table |
File details come from the government source that posted it. Updated .