CCSWDC_Phase_I_Gas_Structures.pdf
PDF 10 MB Posted
- Solicitation number
- 262822FB
- Issued by
- Sarasota County, Florida
About this file
This is a Geographic Information System (GIS) map produced by Sarasota County identifying gas extraction structures and associated infrastructure at the Central County Solid Waste Disposal Complex (CCSWDC) located at 4000 Knights Trail Road in Nokomis, Florida. The map depicts Phase I gas structure components across the facility, including 59 gas extraction wells, 3 header valves, 3 air supply valves, 3 condensate discharge valves, 3 condensate U-traps, 5 leachate cleanouts, 5 leachate cleanout risers, 3 access risers, and 4 remote wells. The document provides a comprehensive point table listing all infrastructure elements by type and location, along with detailed aerial imagery at 3-inch resolution based on 2024-2025 photography. Multiple map views are included: a full facility overview, a southeast zoom section highlighting equipment clusters, and a complete point inventory table. The map serves as a reference document for contractors bidding on nuisance and exotic plant management services to identify "Do Not Spray" zones around groundwater monitoring infrastructure that must be protected during herbicide applications.
The GIS map is provided as a supporting exhibit to Sarasota County's Invitation for Bids (IFB #262822FB) for management of nuisance and exotic plants at solid waste properties. The map explicitly disclaims warranty regarding geographic information accuracy and completeness, noting that it is representative information only and should not be used for navigation. The coordinate system is specified as North American Datum 1983 HARN State Plane Florida West (FIPS 0902) in U.S. Survey Feet. Contractors responding to the bid must use this infrastructure inventory to avoid applying herbicides within established protection zones around the gas extraction and leachate management systems, ensuring compliance with the county's Integrated Pest Management Guidelines and protecting critical facility operations during quarterly and as-needed vegetation management work scheduled through the three-year contract term.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This map is produced from Sarasota County GIS, and is representative information only.
The County does not warranty, guarantee, or assume any responsibility for geographic information completeness and/or accuracy.
This map should not be used as guide for navigation.
Copyright © SCGIS 2025
P at h:
N
:\E nv iro nm en ta l\S ol id W as te
\S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s.
ap rx
Map published using ArcGIS Pro 3.X by dlucito on Monday, December 15, 2025
EW-11
EW-12
EW-10
LCO-1N
CT-1LCR-1N
LCR-2N
LCO-2N
EW-9
EW-8
AR-2
EW-6
EW-45A
EW-43
EW-44
EW-56
EW-42 EW-13
LCO-3N
LCR-3N
EW-6
EW-46
EW-47
EW-5
EW-53
EW-52
EW-51A
EW-48A
EW-54A
EW-68
RW-68
EW-69 EW-70
EW-57
RW-75
EW-41 EW-14
EW-15EW-40
EW-39
EW-16
EW-58EW-59
RW-70EW-60EW-61
EW-67
EW-62
EW-63
EW-65A EW-66A
EW-31A
EW-32 EW-34
EW-33
EW-35
EW-64A
EW-30A
EW-4
AR-3
LCO-4N
EW-2
LCR-4N
EW-1
EW-49A
EW-50A
LCR-5N
LCO-5N
HV-4
AV-4CV-4
EW-88
EW-107
EW-124
EW-148 EW-17
EW-18
EW-38
EW-37
EW-36A
EW-55RW-54
EW-2
CT-2CT-3
AR-1
CV-2
CV-3
AV-3HV-3
HV-2
Legend Type
Access Riser
Gas Extraction Well
Leachate Cleanout
Leachate Cleanout Riser
Header Valve
Air Supply Valve
Condensate U-Trap
Remote Well
Condensate Discharge Valve
Aerial Imagery Provided by Pictometry International (EagleView):
Sarasota County, FL December 1, 2024 – January 13, 2025 3" Resolution N.A.D. 1983 HARN State Plane Florida West FIPS 0902 (U.S. Survey Feet)
WKID: 2882 ¯ 0 175 35087.5
US Feet
CCSWDC - Phase I - Gas Structures 4000 Knights Trail Road, Nokomis, FL 34275
The County does not warranty, guarantee, or assume any responsibility for geographic information completeness and/or accuracy.
This map should not be used as guide for navigation.
Copyright © SCGIS 2025
P at h:
N
:\E nv iro nm en ta l\S ol id W as te
\S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s.
ap rx
Map published using ArcGIS Pro 3.X by dlucito on Monday, December 15, 2025
EW-39
EW-16
EW-17
EW-18
EW-38
CV-2
CV-3
AV-2
AV-3
HV-3
HV-2
Legend Type
Gas Extraction Well
Header Valve
Air Supply Valve
Condensate Discharge Valve
Aerial Imagery Provided by Pictometry International (EagleView):
Sarasota County, FL December 1, 2024 – January 13, 2025 3" Resolution N.A.D. 1983 HARN State Plane Florida West FIPS 0902 (U.S. Survey Feet)
WKID: 2882 ¯ 0 40 8020
US Feet
CCSWDC - Phase I - Gas Structures (Southeast Zoom) 4000 Knights Trail Road, Nokomis, FL 34275
The County does not warranty, guarantee, or assume any responsibility for geographic information completeness and/or accuracy.
This map should not be used as guide for navigation.
Copyright © SCGIS 2025
P at h:
N
:\E nv iro nm en ta l\S ol id W as te
\S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s.
ap rx
Map published using ArcGIS Pro 3.X by dlucito on Monday, December 15, 2025
LCO-1N
CT-1
LCO-2N
EW-14
EW-30A
EW-1
LCO-5N
HV-4
EW-18
CV-2
Aerial Imagery Provided by Pictometry International (EagleView):
Sarasota County, FL December 1, 2024 – January 13, 2025 3" Resolution N.A.D. 1983 HARN State Plane Florida West FIPS 0902 (U.S. Survey Feet)
WKID: 2882 ¯ 0 2,500 5,0001,250
US Feet
Type Name Type Name
Access Riser AR-2
Access Riser AR-3
Access Riser AR-1
Air Supply Valve AV-4
Air Supply Valve AV-2
Air Supply Valve AV-3
Condensate Discharge Valve CV-4
Condensate Discharge Valve CV-2
Condensate Discharge Valve CV-3
Condensate U-Trap CT-1
Condensate U-Trap CT-2
Condensate U-Trap CT-3
Gas Extraction Well EW-11
Gas Extraction Well EW-12
Gas Extraction Well EW-10
Gas Extraction Well EW-9
Gas Extraction Well EW-8
Gas Extraction Well EW-6
Gas Extraction Well EW-45A
Gas Extraction Well EW-43
Gas Extraction Well EW-44
Gas Extraction Well EW-56
Gas Extraction Well EW-42
Gas Extraction Well EW-13
Gas Extraction Well EW-6
Gas Extraction Well EW-46
Gas Extraction Well EW-47
Gas Extraction Well EW-5
Gas Extraction Well EW-53
Gas Extraction Well EW-52
Gas Extraction Well EW-51A
Gas Extraction Well EW-48A
Gas Extraction Well EW-54A
Gas Extraction Well EW-68
Gas Extraction Well EW-69
Gas Extraction Well EW-70
Gas Extraction Well EW-57
Gas Extraction Well EW-41
Gas Extraction Well EW-14
Gas Extraction Well EW-15
Gas Extraction Well EW-40
Gas Extraction Well EW-39
Gas Extraction Well EW-16
Gas Extraction Well EW-58
Gas Extraction Well EW-59
Gas Extraction Well EW-60
Gas Extraction Well EW-61
Gas Extraction Well EW-67
Gas Extraction Well EW-62
Gas Extraction Well EW-63
Gas Extraction Well EW-65A
Gas Extraction Well EW-66A
Gas Extraction Well EW-31A
Gas Extraction Well EW-32
Gas Extraction Well EW-34
Gas Extraction Well EW-33
Gas Extraction Well EW-35
Gas Extraction Well EW-64A
Gas Extraction Well EW-30A
Gas Extraction Well EW-4
Gas Extraction Well EW-2
Gas Extraction Well EW-1
Gas Extraction Well EW-49A
Gas Extraction Well EW-50A
Gas Extraction Well EW-17
Gas Extraction Well EW-18
Gas Extraction Well EW-38
Gas Extraction Well EW-37
Gas Extraction Well EW-36A
Gas Extraction Well EW-55
Gas Extraction Well EW-2
Header Valve HV-4
Header Valve HV-3
Header Valve HV-2
Leachate Cleanout LCO-1N
Leachate Cleanout LCO-2N
Leachate Cleanout LCO-3N
Leachate Cleanout LCO-4N
Leachate Cleanout LCO-5N
Leachate Cleanout Riser LCR-1N
Leachate Cleanout Riser LCR-2N
Leachate Cleanout Riser LCR-3N
Leachate Cleanout Riser LCR-4N
Leachate Cleanout Riser LCR-5N
Remote Well RW-68
Remote Well RW-75
Remote Well RW-70
Remote Well RW-54
CCSWDC - Phase I - Gas Structures Point Table 4000 Knights Trail Road, Nokomis, FL 34275
Type Location FREQUENCY
Access Riser Phase I 3
Air Supply Valve Phase I 3
Condensate Discharge Valve Phase I 3
Condensate U-Trap Phase I 3
Gas Extraction Well Phase I 59
Header Valve Phase I 3
Leachate Cleanout Phase I 5
Leachate Cleanout Riser Phase I 5
Remote Well Phase I 4
| CC Phase I Final |
| CC Phase I Final SE Zoom |
| CC Phase I Final Point Table |
File details come from the government source that posted it. Updated .