CCSWDC_Phase_I_Gas_Structures.pdf
PDF 10 MB Posted
- Solicitation number
- 262822FB
- Issued by
- Sarasota County, Florida
About this file
This is a Geographical Information System (GIS) map document produced by Sarasota County depicting the Phase I gas extraction and management infrastructure at the Central County Solid Waste Disposal Complex (CCSWDC) located at 4000 Knights Trail Road, Nokomis, Florida. The map identifies 59 gas extraction wells, 3 header valves, 3 air supply valves, 3 condensate discharge valves, 3 condensate U-traps, 3 access risers, 5 leachate cleanouts, 5 leachate cleanout risers, and 4 remote wells distributed across the facility. The map was generated on December 15, 2025, using aerial imagery from December 1, 2024 through January 13, 2025, at 3-inch resolution, and includes three detailed views: a comprehensive overview map, a southeast zoom section, and a complete point table listing all infrastructure elements by type and location. The document serves as a reference document for contractors bidding on the management of nuisance and exotic plants at solid waste properties, as the maps establish "Do Not Spray" zones around groundwater monitoring infrastructure that must be protected during herbicide application activities.
The GIS map is provided as a supporting exhibit to establish baseline infrastructure reference information for bid preparation and compliance purposes. Contractors responding to the plant management solicitation (IFB #262822FB) must use these maps to identify protected areas where herbicide applications cannot occur, ensuring that all pesticide and chemical treatments remain at least the minimum required distance from gas extraction structures, leachate management systems, and other critical operational infrastructure. The disclaimer notes that this map is representative information only and that Sarasota County GIS does not warrant completeness or accuracy; therefore, bidders should not rely exclusively on this map for navigation or final infrastructure identification but should use it in conjunction with on-site inspections and additional supporting documentation provided in the full solicitation package.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
This map is produced from Sarasota County GIS, and is representative information only.
The County does not warranty, guarantee, or assume any responsibility for geographic information completeness and/or accuracy.
This map should not be used as guide for navigation.
Copyright © SCGIS 2025
P at h:
N
:\E nv iro nm en ta l\S ol id W as te
\S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s.
ap rx
Map published using ArcGIS Pro 3.X by dlucito on Monday, December 15, 2025
EW-11
EW-12
EW-10
LCO-1N
CT-1LCR-1N
LCR-2N
LCO-2N
EW-9
EW-8
AR-2
EW-6
EW-45A
EW-43
EW-44
EW-56
EW-42 EW-13
LCO-3N
LCR-3N
EW-6
EW-46
EW-47
EW-5
EW-53
EW-52
EW-51A
EW-48A
EW-54A
EW-68
RW-68
EW-69 EW-70
EW-57
RW-75
EW-41 EW-14
EW-15EW-40
EW-39
EW-16
EW-58EW-59
RW-70EW-60EW-61
EW-67
EW-62
EW-63
EW-65A EW-66A
EW-31A
EW-32 EW-34
EW-33
EW-35
EW-64A
EW-30A
EW-4
AR-3
LCO-4N
EW-2
LCR-4N
EW-1
EW-49A
EW-50A
LCR-5N
LCO-5N
HV-4
AV-4CV-4
EW-88
EW-107
EW-124
EW-148 EW-17
EW-18
EW-38
EW-37
EW-36A
EW-55RW-54
EW-2
CT-2CT-3
AR-1
CV-2
CV-3
AV-3HV-3
HV-2
Legend Type
Access Riser
Gas Extraction Well
Leachate Cleanout
Leachate Cleanout Riser
Header Valve
Air Supply Valve
Condensate U-Trap
Remote Well
Condensate Discharge Valve
Aerial Imagery Provided by Pictometry International (EagleView):
Sarasota County, FL December 1, 2024 – January 13, 2025 3" Resolution N.A.D. 1983 HARN State Plane Florida West FIPS 0902 (U.S. Survey Feet)
WKID: 2882 ¯ 0 175 35087.5
US Feet
CCSWDC - Phase I - Gas Structures 4000 Knights Trail Road, Nokomis, FL 34275
The County does not warranty, guarantee, or assume any responsibility for geographic information completeness and/or accuracy.
This map should not be used as guide for navigation.
Copyright © SCGIS 2025
P at h:
N
:\E nv iro nm en ta l\S ol id W as te
\S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s.
ap rx
Map published using ArcGIS Pro 3.X by dlucito on Monday, December 15, 2025
EW-39
EW-16
EW-17
EW-18
EW-38
CV-2
CV-3
AV-2
AV-3
HV-3
HV-2
Legend Type
Gas Extraction Well
Header Valve
Air Supply Valve
Condensate Discharge Valve
Aerial Imagery Provided by Pictometry International (EagleView):
Sarasota County, FL December 1, 2024 – January 13, 2025 3" Resolution N.A.D. 1983 HARN State Plane Florida West FIPS 0902 (U.S. Survey Feet)
WKID: 2882 ¯ 0 40 8020
US Feet
CCSWDC - Phase I - Gas Structures (Southeast Zoom) 4000 Knights Trail Road, Nokomis, FL 34275
The County does not warranty, guarantee, or assume any responsibility for geographic information completeness and/or accuracy.
This map should not be used as guide for navigation.
Copyright © SCGIS 2025
P at h:
N
:\E nv iro nm en ta l\S ol id W as te
\S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s\
S ol id W as te
S ol ic ita tio nM ap s.
ap rx
Map published using ArcGIS Pro 3.X by dlucito on Monday, December 15, 2025
LCO-1N
CT-1
LCO-2N
EW-14
EW-30A
EW-1
LCO-5N
HV-4
EW-18
CV-2
Aerial Imagery Provided by Pictometry International (EagleView):
Sarasota County, FL December 1, 2024 – January 13, 2025 3" Resolution N.A.D. 1983 HARN State Plane Florida West FIPS 0902 (U.S. Survey Feet)
WKID: 2882 ¯ 0 2,500 5,0001,250
US Feet
Type Name Type Name
Access Riser AR-2
Access Riser AR-3
Access Riser AR-1
Air Supply Valve AV-4
Air Supply Valve AV-2
Air Supply Valve AV-3
Condensate Discharge Valve CV-4
Condensate Discharge Valve CV-2
Condensate Discharge Valve CV-3
Condensate U-Trap CT-1
Condensate U-Trap CT-2
Condensate U-Trap CT-3
Gas Extraction Well EW-11
Gas Extraction Well EW-12
Gas Extraction Well EW-10
Gas Extraction Well EW-9
Gas Extraction Well EW-8
Gas Extraction Well EW-6
Gas Extraction Well EW-45A
Gas Extraction Well EW-43
Gas Extraction Well EW-44
Gas Extraction Well EW-56
Gas Extraction Well EW-42
Gas Extraction Well EW-13
Gas Extraction Well EW-6
Gas Extraction Well EW-46
Gas Extraction Well EW-47
Gas Extraction Well EW-5
Gas Extraction Well EW-53
Gas Extraction Well EW-52
Gas Extraction Well EW-51A
Gas Extraction Well EW-48A
Gas Extraction Well EW-54A
Gas Extraction Well EW-68
Gas Extraction Well EW-69
Gas Extraction Well EW-70
Gas Extraction Well EW-57
Gas Extraction Well EW-41
Gas Extraction Well EW-14
Gas Extraction Well EW-15
Gas Extraction Well EW-40
Gas Extraction Well EW-39
Gas Extraction Well EW-16
Gas Extraction Well EW-58
Gas Extraction Well EW-59
Gas Extraction Well EW-60
Gas Extraction Well EW-61
Gas Extraction Well EW-67
Gas Extraction Well EW-62
Gas Extraction Well EW-63
Gas Extraction Well EW-65A
Gas Extraction Well EW-66A
Gas Extraction Well EW-31A
Gas Extraction Well EW-32
Gas Extraction Well EW-34
Gas Extraction Well EW-33
Gas Extraction Well EW-35
Gas Extraction Well EW-64A
Gas Extraction Well EW-30A
Gas Extraction Well EW-4
Gas Extraction Well EW-2
Gas Extraction Well EW-1
Gas Extraction Well EW-49A
Gas Extraction Well EW-50A
Gas Extraction Well EW-17
Gas Extraction Well EW-18
Gas Extraction Well EW-38
Gas Extraction Well EW-37
Gas Extraction Well EW-36A
Gas Extraction Well EW-55
Gas Extraction Well EW-2
Header Valve HV-4
Header Valve HV-3
Header Valve HV-2
Leachate Cleanout LCO-1N
Leachate Cleanout LCO-2N
Leachate Cleanout LCO-3N
Leachate Cleanout LCO-4N
Leachate Cleanout LCO-5N
Leachate Cleanout Riser LCR-1N
Leachate Cleanout Riser LCR-2N
Leachate Cleanout Riser LCR-3N
Leachate Cleanout Riser LCR-4N
Leachate Cleanout Riser LCR-5N
Remote Well RW-68
Remote Well RW-75
Remote Well RW-70
Remote Well RW-54
CCSWDC - Phase I - Gas Structures Point Table 4000 Knights Trail Road, Nokomis, FL 34275
Type Location FREQUENCY
Access Riser Phase I 3
Air Supply Valve Phase I 3
Condensate Discharge Valve Phase I 3
Condensate U-Trap Phase I 3
Gas Extraction Well Phase I 59
Header Valve Phase I 3
Leachate Cleanout Phase I 5
Leachate Cleanout Riser Phase I 5
Remote Well Phase I 4
| CC Phase I Final |
| CC Phase I Final SE Zoom |
| CC Phase I Final Point Table |
File details come from the government source that posted it. Updated .