Appendix_A_-_Deliverable_Descriptions.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Financial Statement Audit & Federal Information Security Management Act of 2002 Evaluation
Solicitation number
CCR-14-0001
Issued by

About this file

Appendix A

View the file

Other files

File Type Posted
Responses_to_Questions__3_for_USCCR_Proposal_6_3_14.xlsx XLSX spreadsheet
QUESTIONS_FOR_SOLICITATION__2.docx DOCX document
QUESTIONS_FOR_SOLICITATION__1.docx DOCX document
Final_SOW_5_8_14.docx DOCX document
APPENDIX_C_-_Nondisclosure_Agreements.docx DOCX document
APPENDIX_B_-_PRICE_PROPOSAL.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Appendix A

No.TitleSOW Ref.DescriptionDistributionDelivery Instructions
Detailed Audit Planning Documents2.1.1Detailed Audit Planning Documents shall include the following elements:

• A schedule of milestones for completing each section of the audit – These sections shall include (at a minimum) planning, internal control, testing, and reporting. This schedule should take IT control environment audit work into consideration.

• A schedule of budgeted hours by labor category for each section of the audit

• Crosswalk of the FAM methodology and deliverables to the Contractor’s audit methodology and deliverables

• The entity profile, audit strategy, and account risk analysis and cycle matrix or equivalents as described in the FAM 200

• The sampling plan to be used during the internal control and substantive testing

• Planning and design materiality and tolerable misstatement, including the basis for determination

• A schedule of the proposed site visits

• A fraud risk assessment which documents the brainstorming meeting(s) about potential fraud risks, including how and when the discussion(s) occurred, the audit team members who participated, the general matters discussed and the impact to the auditor’s planned approach

Electronic copy submitted to the COR30 calendar days from award date
002Audit Programs2.1.1Detailed audit programs that describe the nature, timing and extent of planned procedures for each material class of transactions, account balances, and disclosure shall include the following elements:

• A section on tests of significant internal controls identified during the planning phase

• A section on tests of compliance with applicable laws and regulations, and a list of the laws and regulations to be tested, including FFMIA

• A section on substantive testing procedures to be applied to the individual account balances

• A section on the procedures to be performed on Other Accompanying Information, RSSI, and RSI

• A section on tests of the IT control environment – The program shall, at a minimum, require the evaluation of general controls and shall be performed in accordance with the GAO FISCAM. If general controls are determined to be properly designed, testing shall be done to determine if they are operating effectively.

Electronic copy submitted to the COR45 calendar days from award date
003Internal Control Phase Documents2.1.2Internal Control Phase Documents shall include the following:

• Cycle memorandums for each significant cycle identified that demonstrates the auditor’s understanding of the five components of internal controls (control environment, entity risk assessment, information and communication, control activities, and monitoring), including relevant information systems

• Flowcharts that document the process flow of significant cycles

• Specific control evaluation (SCE) or the equivalent document that demonstrates an evaluation of specific control activities

• Account risk analyses or equivalent documents which have been updated for the internal control phase

Electronic copy submitted to the CORDelivery dates will be negotiated at the time of contract award or exercise of options.
004Interim Audit Documentation2.1.2Interim Audit Documentation shall include all workpapers that document the testing performed as described in Data Item 002, and results and conclusions reached related to the internal control, substantive and compliance testing performed as of the interim period agreed upon between the contractor and COR.

Interim Audit Documentation shall include, as necessary, documentation of findings based on testing performed and which include the elements of a finding as described in FAM 580 and GAGAS.

Electronic copy submitted to the CORDelivery dates will be negotiated at the time of contract award or exercise of options.
005Final Audit Documentation2.1.2Final Audit Documentation shall include all workpapers that document the testing performed as described in Data Item 002, and results and conclusions reached related to the internal control, substantive and compliance testing performed subsequent to the interim period agreed upon between the Contractor and COR, and completion of the audit.

Final Audit Documentation shall include, as necessary, documentation of findings based on testing performed and which include the elements of a finding as described in FAM 580 and GAGAS.

Electronic copy submitted to the CORDue NLT 15 Nov to the COR
006Audit Reports (Draft and Final)2.1.3The Contractor shall develop and submit audit reports that include the conclusions on the following:

• The financial statements,

• Internal control,

• Whether the agency was substantially compliance with the requirements of FFMIA,

• Compliance with applicable laws and regulations, and

• Other unaudited information.

These reports may be combined into a single report or drafted as separate reports but must include the elements and report language described in FAM 595 A and consistent with OMB Bulletin 14-02. As applicable, the draft reports shall be cross-referenced to supporting findings and audit documentation.

The Contractor shall document its evaluation of misstatements, both known and likely, in a Schedule of Uncorrected Misstatements or equivalent document that is consistent with FAM section 540 guidance.

The Contractor shall submit the draft report(s) to the COR and the COR will provide comments within five (5) business days of receipt.

Electronic copy submitted to the COR, ACOR, OM and Staff DirectorBase Year: Draft due NLT 6 Nov Final Due NLT 10 Nov Option Years: TBD
007Management Letter Financial Statement Audit2.1.3The Contractor shall develop a report that includes internal control deficiencies that were not already included in the report on internal controls, but may include these deficiencies if the Contractor so chooses. The draft report shall be cross-referenced to supporting findings. This report shall be inclusive of financial and IT matters identified during the financial statement audit. As applicable, the report shall include a summary update of the status of prior year findings and recommendations.

The report shall include the elements of a finding as described in FAM section 580 and GAGAS.

The Contractor shall submit the draft report to the COR and the COR will provide comments within five (5) business days of receipt.

Electronic copy submitted to the COR, ACOR, OM and Staff DirectorBase Year: Draft due NLT 24 Nov Final Due NLT 8 Dec Option Years: TBD
008FISMA Evaluation Program2.2.1The Contractor shall develop a FISMA evaluation program that meets the objectives of applicable OMB/DHS guidance.

The evaluation program shall include a description of the nature, timing and extent of procedures the Contractor will perform.

As applicable, the evaluation program shall identify when and how sampling will be used to execute testing procedures.

The evaluation program shall include the Contractor’s planned milestone schedule for completion of the FISMA evaluation, including reporting of results.

Electronic copy submitted to the ACORDelivery dates will be negotiated at the time of contract award
009FISMA Evaluation Documentation2.2.2FISMA Evaluation Documentation shall include the completed DHS questionnaire which has been cross-referenced to supporting workpapers. FISMA Evaluation Documentation shall include documentation of procedures performed, as described in the FISMA Evaluation Program, results obtained and conclusions reached. Documentation shall comply with the CIGIE Quality Standards on Inspection and Evaluation.

As necessary, FISMA Evaluation Documentation shall also include documentation of findings based on testing performed and which include the following elements: condition, cause, criteria, effect and recommendation.

Electronic copy submitted to the ACORNLT 1 Aug to the COR and ACOR
010FISMA Evaluation Final2.2.3The Contractor shall develop a draft FISMA Evaluation Report based on the results of evaluation procedures and which complies with the CIGIE Quality Standards on Inspection and Evaluation.

The Contractor shall prepare the draft evaluation report in accordance with the guidance provided by OMB/DHS. The Commission is a micro-agency and must file reports via cyberscope utilizing the metrics for micro-agencies. The draft reports for Cyberscope should be two separate reports. One utilizing the IG Metrics and one utilizin ghe CIO metrics. The Contractor shall submit the draft report to the ACOR and the ACOR will provide comments within five (5) business days of receipt. Upon receipt of the ACOR’s comments, the Contractor shall submit the draft evaluation report to Commission management for written comments.

The report shall include a section that describes findings identified during performance of FISMA evaluation procedures, including recommendations for management. The report shall also include a section that describes the current status of prior year findings and recommendations.

The draft report shall be cross-referenced to supporting workpapers and documentation.

The Contractor and Commission management shall agree upon a reasonable timeframe for solicitation and receipt of comments not to exceed the overall submission deadline for the Commission to report FISMA results.

Electronic copy submitted to the ACOR, OM and Staff DirectorNLT 1 Aug to the ACOR Final due NLT 5 Sep
011Network Scan2.2.4The contractor shall delevop a report on the findings of their automated vulnerabliltiy scans against USCCR's network including serviers, firewalls, routers and workstations and report of their findings.Electronic copy submitted to the ACORNLT 1 Aug to the ACOR Final due NLT 5 Sep
012Firm Memorandum for Independence and Quality Control, Peer Review Report and PCAOB Inspection Report2.3.2.2The Contractor Firm shall submit a memorandum that includes the following:

• A statement that the firm is independent with respect to this reporting entity

• Any existing, ongoing or planned non-audit services with respect to this reporting entity

• Any lawsuits with this reporting entity

• Any relationships with this reporting entity that could impair independence

• Explanation of the firm’s current internal quality control system, including such items as audit documentation review procedures, staff independence requirements, and continuing professional education requirements The Contractor shall also submit the following:

• A copy of the firm’s most recent internal inspection report or equivalent, external Peer Review, Letter of Comments, and management’s response

• Results or a copy of the firm’s most recent Inspection Report prepared by the Public Company Accounting Oversight Board (PCAOB) and the firm’s response

Hard copy submitted to the COR10 calendar days from award date
013Statements of Independence and GAOCPE Compliance2.3.2.2, 2.3.2.3All Contractor personnel shall submit a signed Statement of Independence and certification of CPE Compliance.Hard copy submitted to the COR10 calendar days from award date
014Non-Disclosure Agreements2.3.2.4All Contractor personnel shall submit a signed Non-Disclosure Agreement form.Hard copy submitted to the COR10 calendar days from award date
015Monthly Progress Reports2.3.3The FSA portion of the progress reports shall contain the following elements at a minimum:

• Progress to date compared with the overall audit plan and timeline

• Significant accounting and auditing issues, including audit findings

• Potential scope limitations

• Matters that could impact deliverable due dates

• Staffing Plan to include labor hours incurred by individual (by month and cumulative), job title, and audit areas

The FISMA portion of the progress reports shall contain the following elements at a minimum:

• Progress to date compared with the overall evaluation plan and timeline

• Significant issues and discrepancies identified to date and any proposed resolution, including all matters that could impact the evaluation report

• Recommended adjustments to data provided by the Commission

• Matters that could impact deliverable due dates

• Staffing Plan to include labor hours incurred by individual (by month and cumulative), job title, and audit areas

Electronic copy submitted to the Staff Director, CO, OM, COR and ACOR10 calendar days from award date
016Technical Status Meeting Agendas2.3.4The Contractor shall prepare an agenda for the technical status meetings that addresses the following, at a minimum:

• Significant accomplishments/results of work performed since the last status meeting

• Outstanding documentation requests and potential delays

• Findings identified to date

• Proposed audit adjustments (FSA only)

• Significant issues/concerns

• Planned work to be performed/completed by the next status meeting Electronic copy submitted CO, OM, COR and ACOR Due NLT 24 hours prior to the meeting

Appendix A - Deliverable Descriptions

Appendix A Page &P

Simmary

No.TitleRef.
001Detailed Audit Planning Documents22.1.1
002Audit Programs2.1.1
003Internal Control Phase Documents2.1.2
004Interim Audit Documentation2.1.2
005Final Audit Documentation2.1.2
006Audit Reports (Draft and Final)2.1.3
007Management Letter Financial Statement Audit2.1.3
008FISMA Evaluation Program2.2.1
009FISMA Evaluation Documentation2.2.2
010FISMA Evaluation Final2.2.3
011Network Scan2.2.4
012Firm Memorandum for Independence and Quality Control, Peer Review Report and PCAOB Inspection Report2.3.2.2
013Statements of Independence and GAOCPE Compliance2.3.2.2, 2.3.2.3
014Non-Disclosure Agreements2.3.2.4
015Monthly Progress Reports2.3.3
016Technical Status Meeting Agendas2.3.4

File details come from the government source that posted it. Updated .