About this file
This file is a State Clearinghouse Recommendation letter and supporting documentation from the Maryland Department of Planning regarding the Greensboro Stormwater Management, Restoration and Resilience Project Phase II, a collaborative effort between the Maryland Department of the Environment and Caroline County. The project entails planning, design, and construction of the relocation of an existing wastewater pump station and its demolition in the Town of Greensboro to a nearby location outside the floodplain, located at 13500 Greensboro Road, Greensboro, Maryland. The State Clearinghouse coordinated intergovernmental review in accordance with Presidential Executive Order 12372 and Code of Maryland Regulation 34.02.01.04-.06, with review comments requested from the Maryland Departments of Natural Resources, Transportation, and the Environment, and the Maryland Department of Planning including the Maryland Historical Trust. The recommendation is valid for three years from October 24, 2025.
The project received a recommendation of "Consistent with Qualifying Comments" from the State Clearinghouse. Total project funding consists of $2,454,000.00 in state funds and $598,763.00 in local funds. The Maryland Board of Public Works serves as the approving authority. Supporting agencies provided confirmatory assessments: the Maryland Department of Natural Resources and Maryland Department of Planning found the project consistent with their plans and programs; the Maryland Historical Trust determined the project will have "no effect" on historic properties; and the Maryland Department of Environment found the project generally consistent with applicable plans but identified Tier II anti-degradation waterbodies and flood zones in the project area, requiring additional caution and compliance with floodplain ordinances, Federal Emergency Management Agency guidelines, and consideration of climate resiliency measures. The project site is located within the Town of Greensboro Priority Funding Area and qualifies as a categorical exception.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| CCDPC2027-02 Information for Bidders.pdf | ||
| CCDPC2027-02 Bid Affidavit.pdf | ||
| CCDPC2027-02 Pictures.pdf | ||
| CCDPC2027-02 Invitation to Bid.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENTS
CAROLINE COUNTY DEPARTMENT OF PLANNING AND CODES
GREENSBORO STORMWATER MANAGEMENT, RESTORATION AND RESILIENCE
PROJECT PHASE II
RFP# CCDPC027-02
Attachments:
• Sketch of the project site including general location for pump station relocation (1 page)
• Aerial image of the pump station site (1 page)
• Maryland Clearinghouse comments (7 pages)
Sketch of the project site including general location for pump station relocation
Aerial image of the pump station site
Maryland Department of Planning • 120 E. Baltimore St., 20 th Floor • Baltimore • Maryland • 21202
Tel: 410.767.4500 • Toll Free: 1.877.767.6272 • TTY users: Maryland Relay • Planning.Maryland.gov
October 24, 2025
Mrs. Sunita Boyle, P.E.
Division Chief, Region II Project Management Division
Maryland Department of the Environment
Engineering and Capital Projects Program
1800 Washington Blvd, Suite 545
Baltimore, MD 21230
STATE CLEARINGHOUSE RECOMMENDATION
State Application Identifier: MD20250912-0595
Applicant: Maryland Department of the Environment and Caroline County
Project Description: Stormwater Management, Restoration and Resiliency Project: Proposed Project Entails Planning, Design, and Construction of the Relocation of an Existing Wastewater Pump Station/Demolition in the Town of Greensboro to a nearby location Outside of the Floodplain
Project Address: 13500 Greensboro Road, Greensboro, MD 21639
Project Location: Caroline County
Approving Authority: Maryland Board of Public Works BPW
Funds: State: $2,454,000.00 Local: $598,763.00
Recommendation: Consistent with Qualifying Comments
Dear Mrs. Boyle:
In accordance with Presidential Executive Order 12372 and Code of Maryland Regulation 34.02.01.04-.06, the State
Clearinghouse has coordinated the intergovernmental review of the referenced project. This letter constitutes the State process review and recommendation. This recommendation is valid for a period of three years from the date of this letter.
Review comments were requested from the Maryland Departments of Natural Resources, Transportation, and the
Environment; and the Maryland Department of Planning including the Maryland Historical Trust (MHT). The Maryland
Department of Transportation did not have comments.
The Maryland Department of Natural Resources (DNR); and the Maryland Department of Planning (MDP) including the
Maryland Historical Trust (MHT) found this project to be consistent with their plans, programs, and objectives.
MDP commented that this project site is located within the Town of Greensboro Priority Funding Area and is a categorical exception.
MHT has determined that the project will have "no effect" on historic properties and that the federal and/or State historic preservation requirements have been met.
October 24, 2025
State Application Identifier: MD20250912-0595
The Maryland Department of Environment (MDE) found this project to be generally consistent with their plans, programs, and objectives, but included certain qualifying comments summarized in the zipped file. Please be advised that MDE has identified Tier II anti-degradation waterbodies and/or flood zones in the project area and additional caution and/or requirements apply.
Any statement of consideration given to the comments should be submitted to the approving authority, with a copy to the State Clearinghouse.
The State Application Identifier Number must be placed on any correspondence pertaining to this project. The State
Clearinghouse must be kept informed if the approving authority cannot accommodate the recommendation.
Please remember, you must comply with all applicable state and local laws and regulations. If you need assistance or have questions, contact the State Clearinghouse staff person noted above at 410-767-4490 or through e-mail at rita.pritchett@maryland.gov. Also please complete the attached form and return it to the State Clearinghouse as soon as the status of the project is known. Any substitutions of this form must include the State Application Identifier
Number. This will ensure that our files are complete.
Thank you for your cooperation with the MIRC process.
Sincerely, Christopher Witt, Assistant Director
Research, Review and Policy Division
CW:RP
Enclosure(s) cc: Leslie Grunden - Caroline Co. Blanche Chenault - MDE
Brittany Brothers - MDOT
Nicole Eisenstein - MDE
Tony Redman - DNR
Clyde Drayton - MDPLR
David Dahlstrom - MDPLU
Dixie Henry - MHT
25-0595_CRR.CLS.docx
Maryland Department of Planning • 120 E. Baltimore St., 20 th Floor • Baltimore • Maryland • 21202
Tel: 410.767.4500 • Toll Free: 1.877.767.6272 • TTY users: Maryland Relay • Planning.Maryland.gov
PROJECT STATUS FORM
Please complete this form and return it to the State Clearinghouse at mdp.clearinghouse@maryland.gov upon receipt of notification that the project has been approved or not approved by the approving authority.
TO: Maryland State Clearinghouse DATE: ______________________
Maryland Department of Planning (Please fill in the date form completed)
FROM: _______________________________ PHONE: _____-____-_________
(Name of person completing this form.) (Area Code & Phone number)
RE: State Application Identifier: MD20250912-0595
Project Description: Stormwater Management, Restoration and Resiliency Project: Proposed Project Entails
Planning, Design, and Construction of the Relocation of an Existing Wastewater Pump
Station/Demolition in the Town of Greensboro to a nearby location Outside of the Floodplain
PROJECT APPROVAL
This project/plan was:
Approved
Approved with Modification
Disapproved
Name of Approving Authority:
Date Approved:
FUNDING APPROVAL
The funding (if applicable) has been approved for the period of:
___________________________, 202____ to ___________________________, 202____ as follows:
Federal $:
Local $:
State $:
Other $:
OTHER
Further comment or explanation is attached
MDPCH-1F
Division Chief, Region II Project Management Division
Maryland Department of the Environment Engineering and Capital Projects Program
1800 Washington Blvd, Suite 545
Baltimore, MD 21230
Ms. Leslie Grunden
Assistant Director Of Planning, Caroline County Dept. of Planning and Codes
Caroline County 403 S. Seventh Street, Suite 210
Denton, MD 21613
Blanche Chenault - MDE
Stormwater Management, Restoration and Resiliency Project: Proposed Project Entails Planning, Design, and Construction of the Relocation of an Existing
Wastewater Pump Station/Demolition in the Town of Greensboro to a nearby location Outside of the Floodplain
Maryland Department of the Environment – WSA/WPRPP
REVIEW FINDING: R1 Consistent with Qualifying Comments
(MD20250912-0595)
Please be advised, the property or properties in MD20250912-0595 is/are in close proximity to Flood Zone AE (100-year Floodplain) and X (500-year Floodplain). The project coordinator(s) should follow local floodplain ordinances and Federal Emergency Management Agency’s guidelines and standards.
It is advised that the coordinator(s) consider climate resiliency, which could include but not limited to the following steps (https://toolkit.climate.gov/):
● Explore Hazards: Identify climate and non-climate stressors, threats, and hazards and how they could affect assets (people and infrastructure).
● Assess vulnerability and risks: Evaluate assets vulnerability and estimate the risk to each asset.
● Investigate options: Consider possible solutions for your highest risks, check how others have responded to similar issues, and reduce your list to feasible actions.
● Prioritize and plan: Evaluate costs, benefits, and capacity to accomplish each action integrating the highest value actions into a stepwise plan.
● Take action: Move forward with your plan and check to see if your actions are increasing your resilience with monitoring.
The coordinator(s) is advised to contact Dave Guignet, State National Flood Insurance Program Coordinator, of MDE’s Stormwater, Dam Safety, and Flood Management Program, at
(410) 537-3775 for additional information regarding the regulatory requirements for Floodplains and Storm Surges.
The coordinator(s) is advised to contact Matthew C. Rowe, CC-P, Deputy Director of MDE’s Water and Science Administration, at (410) 537-3578 for additional information regarding Climate Change and Resiliency.
Maryland Department of the Environment
MDE Comments for Environmental Clearinghouse Project
MD20250912-0595
Response Code: R-1
1. If the applicant suspects that asbestos is present in any portion of the structure that will be renovated/demolished, then the applicant should contact the Community Environmental Services Program, Air and Radiation Management Administration at (410) 537-3215 to learn about the State's requirements for asbestos handling.
2. Construction, renovation and/or demolition of buildings and roadways must be performed in conformance with State regulations pertaining to "Particulate Matter from Materials Handling and Construction" (COMAR 26.11.06.03D), requiring that during any construction and/or demolition work, reasonable precaution must be taken to prevent particulate matter, such as fugitive dust, from becoming airborne.
3. During the duration of the project, soil excavation/grading/site work will be performed; there is a potential for encountering soil contamination. If soil contamination is present, a permit for soil remediation is required from MDE's Air and Radiation Management Administration. Please contact the New Source Permits Division, Air and Radiation Management Administration at
(410) 537-3230 to learn about the State's requirements for these permits.
4. Any above ground or underground petroleum storage tanks, which may be utilized, must be installed and maintained in accordance with applicable State and federal laws and regulations.
Underground storage tanks must be registered and the installation must be conducted and performed by a contractor certified to install underground storage tanks by the Land and Materials Administration in accordance with COMAR 26.10. Contact the Oil Control Program at
(410) 537-3442 for additional information.
5. If the proposed project involves demolition – Any above ground or underground petroleum storage tanks that may be on site must have contents and tanks along with any contamination removed. Please contact the Oil Control Program at (410) 537-3442 for additional information.
6. Any solid waste including construction, demolition and land clearing debris, generated from the subject project, must be properly disposed of at a permitted solid waste acceptance facility, or recycled if possible. Contact the Solid Waste Program at (410) 537-3315 for additional information regarding solid waste activities and contact the Resource Management Program at
(410) 537-3314 for additional information regarding recycling activities.
7. The Resource Management Program should be contacted directly at (410) 537-3314 by those facilities which generate or propose to generate or handle hazardous wastes to ensure these activities are being conducted in compliance with applicable State and federal laws and regulations. The Program should also be contacted prior to construction activities to ensure that the treatment, storage or disposal of hazardous wastes and low-level radioactive wastes at the facility will be conducted in compliance with applicable State and federal laws and regulations.
8. The proposed project may involve rehabilitation, redevelopment, revitalization, or property acquisition of commercial, industrial property. Accordingly, MDE's Brownfields Site Assessment and Voluntary Cleanup Programs (VCP) may provide valuable assistance to you in this project.
These programs involve environmental site assessment in accordance with accepted industry and financial institution standards for property transfer. For specific information about these programs and eligibility, please Land Restoration Program at (410) 537-3437.
9. Borrow areas used to provide clean earth back fill material may require a surface mine permit.
Disposal of excess cut material at a surface mine may requires site approval. Contact the Mining Program at (410) 537-3557 for further details.