CC0M KSU Technical Specs.pdf

PDF 258 KB Posted

Attached to
RFP-06-26 Design-Build KSU Betty White Building Renovation
Solicitation number
RFP-785-2600000008-1
Issued by
Fayette County, Kentucky

About this file

This technical specifications document is for a Design-Build Services project for the Betty White Building Renovation at Kentucky State University (KSU) located in Frankfort, Kentucky. The project involves a comprehensive renovation of an approximately 10,400 gross square foot building originally constructed in the early 1970s, previously used as the School of Nursing. The project is scheduled to begin on August 13, 2025, with substantial completion by January 1, 2026, and final completion by January 31, 2026. The renovation is funded by a USDA grant and requires incremental reimbursements to KSU, with strict adherence to the project timeline being critical to maintaining grant funding.

The project scope encompasses extensive upgrades including complete roof replacement, window and door replacement, mechanical and electrical system upgrades, plumbing system modifications, and interior renovations. The design-build team is required to develop a detailed Critical Path Method (CPM) schedule and submit a comprehensive proposal that includes architectural and engineering design fees, construction materials and labor, permitting fees, and all associated costs. The renovation aims to upgrade the building to meet current building codes and include improvements such as laboratory spaces, lecture classrooms, restrooms, and general-use areas. The university desires maximum interior renovation within the provided construction budget, with a focus on creating functional, code-compliant spaces that meet the needs of future building users.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Design Build Services for the Betty White Building Renovation Kentucky State University (KSU) Frankfort, KY 40601

Index

• Schedule

• Project Description

• Scope of Work and Project Summary/Requirements

• Compliance

• Technical Performance Requirements

Schedule

Design and Construction Start: August 13, 2025

Substantial Completion: Jan. 1, 2026

Final Completion: Jan. 31, 2026

6 Months for Design and Construction, plus 30 Days to Final Completion

Because of the federal funding source for this project, the University is obliged to complete the project by

January 31st, 2026. Failure to meet this date will mean withdrawal of funds from this project. As this time frame is urgent in nature, the schedule developed by the Design/Build (D/B) Team will be a factor in the evaluation criteria for the award of this project.

This project (Betty White Building Renovation) consists of (funds permitting) the complete renovation of the existing structure. The budget of this project is afforded by a Grant from USDA and will require incremental reimbursements to KSU. KSU will be responsible to present documentation required in pay applications to

USDA for reimbursement.

The proposed liquidated damages for this project will be calculated by the KSU standard for loss of office space use (see attached) plus the loss of the grant amount failed to be reimbursed to KSU at the closing of the project with USDA.

Exact date for the closing with USDA to be provide by KSU.

Submitting Design/Build (D/B) Teams will be required to submit a detailed Critical Path Method (CPM) schedule showing how the scope of the project will be achieved by the Final Completion date including detailed project milestones. The proposed schedule must include all code compliance and permitting review times, design phases, long lead-time items, construction and close-out documentation.

Project Description

The scope of the project includes necessary exterior and interior renovations to the Betty White Building located on Kentucky State University’s campus. The building is approximately 10,400 gross square feet and was constructed in the early 1970s. Originally named the Student Infirmary Building, it later served as the home of Kentucky State University’s School of Nursing, providing training space, classrooms, offices and student study areas. The School of Nursing recently relocated to another building and the Betty White

Building now stands vacant and ready for renovations.

Design Intent

The goal of this Design/Build (D/B) project is to renovate the building and upgrade it to meet current building codes, including as many improvements as possible within the not-to-exceed construction budget.

Proposals must include all costs associated with the project including but not limited to architectural and engineering design fees, all construction material and labor and required permitting fees, and any other associated costs that are a part of a typical D/B project.

In addition, the D/B firms submitting a proposal must submit a detailed schedule illustrating the path to complete the project by January 31, 2026. Failure to complete the scope on time will result in liquidated damages. Refer to the “Schedule” section of this request for additional information.

Asbestos Abatement Risk: The D/B is responsible for the removal of any hazardous materials associated with their scope of work and as required by code. The D/B is responsible for all asbestos-related risks, including worker safety, disposal, and air quality monitoring. For additional information, see attached “Limited

Renovation Survey Asbestos and Other Hazardous Materials” report.

Scope of Work and Project Summary/Requirements

A. Roof Replacement – Remove existing roofing system in its entirety, including insulation, roofing accessories, roofing trim, roof drains, skylights, and abandoned equipment to existing concrete deck. Install complete SBS Modified Bitumen roofing system including, but not limited to, metal trim, fascia, insulation, roof drains, and miscellaneous roofing materials. Infill skylight openings with appropriate material and cover with the new roofing system. Provide all required flashing, curbs, and other waterproofing requirements as needed. The new roofing system must slope as required by code for proper drainage. Roofing is to receive a manufacturer’s no-dollar limit, 20-year, full-system warranty.

B. Window and Door Replacement – Remove existing aluminum windows, storefronts, and glazing in their entirety. Replace with new aluminum storefront, insulated glazing, and aluminum doors.

Replace any deteriorated blocking that cannot be reused with new wood blocking. All new windows are to be fixed, non-operable. D/B will be responsible for providing new sill and trim components as required for the new window installation and to coordinate those details with the existing masonry openings. Air barriers, caulking, blocking, and flashing as required to achieve leak-proof windows is required. Windows must meet or exceed IECC 2012.

C. Exterior Door Hardware – All exterior doors are to be replaced in their entirety as a part of the new storefront entry system. Hardware must be coordinated with KSU.

D. Soffit Repair – Remove existing exterior gypsum board soffits and insulation in its entirety. Repair, replace and reinsulate exposed piping and mechanical equipment as necessary. Provide freeze protection on all piping to remain within the exterior soffit upon completion of the project. Refer to

MEP scope descriptions for additional information. Install a new insulated metal panel soffit system.

Provide access panels as required for maintenance of piping to remain above soffit.

E. Plumbing System Requirements

a. New restroom configurations and locations are to be determined by the D/B.

b. Restrooms shall be renovated to meet the current Kentucky Plumbing Code and ADA

Accessibility requirements of ANSI 117.1-2009. Provide all new plumbing fixtures throughout the renovated project area.

i. Each floor must have one accessible men’s restroom and one accessible women’s restroom.

c. The following fixture count shall be required in accordance with KY Plumbing Code:

i. First Floor:

1. Women: 2 water closets, 2 lavatories

2. Men: 1 water closet, 1 urinal, 2 lavatories

3. 2 drinking fountains, one including water bottle refilling spout

4. 1 mop sink

ii. Second Floor:

1. Women: 2 water closets, 2 lavatories

2. Men: 1 water closet, 1 urinal, 2 lavatories

3. 1 mop sink

d. Replace central water heater and recirculating pump

e. Install new laboratory acid waste drain collection system

f. Provide freeze protection of existing domestic water piping in exterior soffit

g. Refer to “Technical Performance Requirements” below for additional information

F. HVAC System Requirements

a. Replace existing perimeter two-pipe hot-chilled water fan coil units

b. Replace central air handling unit

c. Provide freeze protection of existing hot-chilled water piping in exterior soffit

d. Provide new laboratory hazardous exhaust system, dedicated outdoor air system, and supply and exhaust venturi-valve controls system with hot water reheat temperature control

e. Provide general exhaust system with venturi valve flow control

f. Integrate all new HVAC equipment into the University’s campus-wide Tridium-based building automation system

g. Refer to “Technical Performance Requirements” below for additional information

G. Electrical System Requirements

a. Provide new LED lighting throughout the renovated area

b. Provide occupancy sensing lighting controls where required by current energy code

c. Replace all branch power panels; existing service entrance switchgear will remain

d. Replace the existing fire alarm system with a new central addressable system

e. Refer to “Technical Performance Requirements” below for additional information

H. IT/AV Upgrades

a. Provide rough-in only for data, security, and access control systems (the University will provide all associated equipment, devices, and cabling for these systems)

b. Provide line-voltage power circuits to support each of these low-voltage systems

I. Interior Upgrades

a. The University desires as much interior renovation as possible within the provided construction budget

b. It is the responsibility of the successful D/B contractor to meet with and design the spaces to meet the needs of building users

c. Submitters shall include a schematic design layout in their RFP response illustrating how they will fit the desired program into the existing footprint of the building

i. The schematic design shall incorporate ample space for systems including, but not limited to, MEP and IT/AV systems, restrooms, circulation and any other spaces required to make the building functional

ii. D/B must review the space and layout of the existing facility and clearly indicate on the proposed schematic design any areas that are not to be included or renovated as a part of the D/B’s Guaranteed Maximum Price (GMP)

iii. Any renovated areas must meet current code and accessibility requirements

d. Proposed Program:

Priority Space Quantity NSF Occupancy Description

1 Soil Analysis

Laboratory

1 1,800 36 - 1st floor location preferred

- Dirty lab space with washout sinks

- 2 Fume hoods

- Laptop workstation

- Heavy duty cabinets and counter tops (stainless desired)

- Corner guard protection on all wall corners

- A minimum of 48” between cabinets/workstations to allow circulation of carts

- Island floor cabinets are desired

(and currently in place)

- Locations for four subzero freezers

- Area for gas cylinder storage

- Wide carts are used to move materials in and out of the lab [IS

THIS COVERED ABOVE OR IS THIS

ABOUT DOOR WIDTH? SPECIFY

DIMENSION]

2 Animal

Science

Research

Laboratory

2 400 8 - 2nd floor location preferred

- Dirty lab space with washout sinks

- 1 fume hood

- Laptop workstation

- Heavy duty cabinets with metal tops

- One soil lab will have corrosive chemicals in use [THIS IS AN

ANIMAL SCIENCE LAB]

- A minimum of 48” between cabinets/workstations to allow circulation of carts

- Corner guard protection on all wall corners

- Double wide exterior doors (pair

3-foot-wide doors)

- Locations for four subzero freezers

- Area for gas cylinder storage

- Wide carts are used to move materials in and out of the lab [IS

THIS COVERED ABOVE OR IS THIS

ABOUT DOOR WIDTH? SPECIFY

DIMENSION]

3 Lecture

Classrooms

2 800 30 - One per floor preferred

- Two teaching walls each with markerboards, tackboards, and data and power for monitory installation

4 Corridors As Required TBD by

D/B

N/A

5 General Use TBD by D/B TBD by

D/B

N/A - Generous number of power receptacles preferred

- Finished as required for use by

University as open office space

Refer to technical requirements for additional information regarding the scope of work.

Compliance

The latest version of the Kentucky Building Code is the required standard. The Commonwealth of

Kentucky’s Department of Housing Buildings and Construction is responsible for review and permitting:

Department of Housing, Buildings and Construction

101 Sea Hero Road, Suite 100

Frankfort KY 40601

Phone: 502-573-0373

All design and engineering professionals must be licensed in the Commonwealth of Kentucky.

Final drawings must be sealed and signed by registered professionals.

General Building Information:

A. Construction Type: IIB

B. Occupancy Type: Business

C. Building is non-sprinklered and construction must comply with all code requirements regarding building that do not have fire protection including, but not limited to the following:

a. All exit access corridors are 1-hour fire-rated

b. Firestopping and dampers required at corridor walls (coordinate with MEP)

c. All exit access and exit doors will have a 45-minute fire-rating including glazing, frames and hardware

d. Fire-rated glazing is required for all glazing in exit access corridors; wire glass is not acceptable

D. Confirm with the University all chemicals to be used in the lab and the amounts to each to ensure compliance with KBC Section 414 Hazardous Materials

Contractor-Provided Temporary Facilities and Controls

A. Construction Office/Trailer: Trailer or office is required for this project.

B. Staging / Parking: Available location(s) to be identified at Pre-Construction Conference.

C. Temporary Fencing and Signage: Portable chain-link fencing with concrete base or as required for project-specific security or safety.

D. Portable Toilet Facilities: Required and to be located within construction fencing.

E. Utilities: Contractor to coordinate with University for hook-up of existing utilities where applicable.

F. Water: University provided for Renovation.

G. Electric: University provided for Renovation

Technical Performance Requirements

The following vendors are acceptable to the Commonwealth of Kentucky as the Basis of Design Vendor or equivalent vendor for the Betty White Building Renovation at Kentucky State University to provide all required components for a complete renovation assembly:

All proposed materials, systems, fixtures, and equipment shall be reviewed for durability, maintainability, consistency with stated RFP requirements and replacement availability. Any deviations from the Basis of

Design listed below must be submitted as a part of the RPF response.

D/B shall submit product data and shop drawings for all material to be included in the project for review by the University’s representatives during construction.

D/B shall provide a schedule of warranties that are included as a part of their work. Schedule shall include at a minimum the following: Product/manufacturer, duration, dollar amount, and any limitations.

All color selections shall be reviewed and approved by the University prior to ordering materials.

D/B shall be responsible for providing a record set of the drawings and specifications for the University’s records.

Division 2 – Existing Conditions

1. Selective demolition and disposal of existing roofing and accessories, exterior window and door system, exterior soffit system, interior walls, ceilings and floor finishes, mechanical, electrical and plumbing systems as required for the renovation design.

Division 3 – Concrete

1. Any structural modifications including holes in the existing concrete roof and floor deck are to be coordinated with a structural engineer.

Division 6 - Rough Carpentry

1. Blocking, nailers, supports in walls; Southern Pine, S4S, MC19, No.2 boards or Clark Dietrich Danback

Flexible Wood Backing Plate.

Division 7 - Thermal and Moisture Protections

1. Roof System: 2-Ply SBS, IECC minimum R-value 25 c.i., 20-year NDL warranty.

2. Roof System Basis of Design: Cap Sheet – Johns Manville DynaGlas FR

a. Equivalent Vendors to the Basis of Design:

i. Siplast

ii. Elevate

iii. Soprema

3. Roof System Basis of Design: Base Sheet – Johns Manville DynaBase

a. Equivalent Vendors to the Basis of Design:

i. Siplast

ii. Elevate

iii. Soprema

4. Roof System Basis of Design: Flashing Sheet – Johns Manville DynaClad

a. Equivalent Vendors to the Basis of Design:

i. Siplast

ii. Elevate

iii. Soprema

5. Roof System Basis of Design: Cover Board – Johns Manville Fesco Board

a. Equivalent Vendors to the Basis of Design:

i. Siplast

ii. Elevate

iii. Soprema

6. Roof System Basis of Design: Insulation – Johns Manville Energy 3 Flat and Tapered

a. Equivalent Vendors to the Basis of Design:

i. Siplast

ii. Elevate

iii. Soprema

7. Roof System Basis of Design: Vapor Barrier – Johns Manville GlasPly IV

a. Equivalent Vendors to the Basis of Design:

i. Siplast

ii. Elevate

iii. Soprema

8. Roof System Basis of Design: Coping and/or Fascia – Metal-Era Perma-Tite Coping

a. Equivalent Vendors to the Basis of Design:

i. Siplast

ii. Elevate

iii. Siplast

iv. Johns Manville

9. Roof System Basis of Design: Retrofit Roof Drain – OMG Hercules Retro-Drain

a. Equivalent Vendors to the Basis of Design:

i. Marathon Roofing Products

ii. Zurn Light Commercial Plumbing Products

10. Roof System Basis of Design: One-Way Roof Membrane Vent – Johns Manville FP-10

i. Marathon Roofing Products

11. Soffit Panels Basis of Design: Insulated Soffit Panel – Kingspan Kooltherm K110 Plus.

a. Equivalent Vendors to the Basis of Design:

i. Centria

ii. Metl-Span

Division 8 – Doors and Frames

1. Basis of Design: Hollow Metal Door Frames – Steelcraft F-Series 14 ga.

a. Equivalent Vendors to the Basis of Design:

i. Curries

ii. De La Fontaine

iii. Republic Doors

iv. Metal Products, Inc.

2. Basis of Design: Wood Doors - Masonite Architectural/Marshfield Door System WDMA, Grade A

Faces, Extra Heavy Duty, 5-Ply white birch, book and balance match veneer, 1-3/4 inch thick, factory finished.

a. Basis of Design:

i. Equivalent Vendors to the Basis of Design:

1. Oshkosh Architectural Wood Doors

2. VT Industries/Eggers Industries

3. Graham Wood Doors

3. Basis of Design: Aluminum-Framed Storefront: Exterior Storefront EFCO, LLC – Series 403 Flush Glazed

Thermal Screw Spline. Anodized finish.

a. Equivalent Vendors to the Basis of Design:

i. Kawneer North America

ii. Oldcastle Building Envelope

iii. Apogee Enterprises/Tubelite, Inc.

4. Basis of Design: Door Hardware – Coordinate with the University.

5. Basis of Design: Glazing: Exterior IGU 6mm, clear, tempered, double pane, 1- inch total thickness, Solarban 70 Low-E. Interior glazing; 6mm tempered at non-rated locations, fire-rated/impact safety-rated 8mm at rated wall locations.

a. Equivalent Vendors to the Basis of Design:

i. AGC Flat Glass North America

ii. Guardian Industries Corp.

iii. Vitro Architectural Glass

Division 9 – Finishes

1. Basis of Design: Metal Stud Framing: Clark Dietrich Building Systems

a. Equivalent Vendors to the Basis of Design:

i. J. N. Linrose Manufacturing, LLC.

ii. Marino Ware

iii. Telling Industries, LLC.

2. Basis of Design: Gypsum-Based Board: USG Corporation

i. American Gypsum Company

ii. Saint-Gobain BPB/Certainteed

iii. National Gypsum Company

3. Basis of Design: Tiling: Florida Tile

a. Equivalent Vendors to the Basis of Design:

i. American Olean

ii. Crossville

iii. Dal-Tile

b. Style: Passenger

c. Size: 24”x24”

d. Note, 4” tile cut base with extruded aluminum trim as cap.

e. Floor transition to adjacent flooring shall be an extruded aluminum trim piece sized appropriately for floor type.

f. Self-Leveling system of clips & wedges.

4. Basis of Design: Acoustical Panel Ceilings (Typical): Armstrong Commercial

a. Equivalent Vendors to the Basis of Design:

i. USG

ii. CertainTeed

b. Style: Fine Fissured

c. Size: 24”x24”

d. Grid: 15/16”

5. Basis of Design: Resilient Tile Flooring (2nd floor corridors & Typical Classrooms): Tarkett Solid Vinyl Tile

a. Equivalent Vendors to the Basis of Design:

i. American Biltrite

ii. Patcraft

b. Style: Cortina Grande

c. Size: 24”x24”

d. Floor Slab Preparation: The installer is required to prepare all areas of floor slabs by utilizing a self-leveling material equivalent to Mapei M-20 with T-2 primer, Schonox XM or TEC Level

Set 300, as required over the entire floor surface. Following the manufacturer’s directions completely before installing tiles.

6. Basis of Design: Resilient Wall Base and Accessories: Tarkett Rubber Base

a. Equivalent Vendors to the Basis of Design:

i. Flexco

ii. Roppe

b. Style: Vinyl Wall Base: Products complying with FS SS-W-40, Type I

c. Shape: Cove with top-set toe.

d. Minimum Nominal Thickness: 1/8".

e. Size: 6”

f. Lengths: Coils in lengths standard with manufacturer, but not less than 100 feet.

g. Corners: Pre-molded pr formed on job

h. Vinyl Accessory Designation: Resilient Edge Strips (typical between resilient flooring type of varying heights.

i. Profile and Dimensions: 1/8" thick, homogeneous rubber composition, tapered or bullnose edge.

7. Basis of Design: Resilient Tile Flooring (Administrative, Offices, 1st Floor Corridors, Elevator)– Shaw

Luxury Vinyl Plank

a. Equivalent Vendors to the Basis of Design:

i. Tarkett

ii. Mannington

b. Style: Terrain II

c. Size: 6” x 48”

d. Construction: Heavy Commercial Luxury Vinyl Tile

e. Edge profile: Square edge

f. Thickness: 2.5MM

g. Wear layer: 20-30 Mil

h. Floor Slab Preparation: The installer is required to prepare all areas of floor slabs by utilizing a self-leveling material equivalent to Mapei M-20 with T-2 primer, Schonox XM or TEC Level

Set 300, as required over the entire floor surface. Following the manufacturer’s directions completely before installing tiles.

8. Basis of Design: Epoxy Resin Flooring (Labs): Tnemec poured floor

a. Equivalent Vendors to the Basis of Design:

i. Manufacturer shall be an associate member of NTMA.

ii. Engage an epoxy manufacturer with at least ten (10) years experience in the manufacture of epoxy flooring materials.

b. Style: Make-up consists of:

i. 241-00GR Ultra-Tread MVT w/30-50 Sand

ii. 237-46GR Power-Tread

iii. 237-46GR Power-Tread

iv. 248-46GR Everthane

c. Wall Base: 6” integral

9. Basis of Design: Paint: Sherwin Williams

a. Equivalent Vendors to the Basis of Design:

i. Benjamin Moore

b. It shall be the full responsibility of the painter to verify all paint types to determine if paint(s) system specified are compatible with one another and with the substrates indicated under conditions of service and application, as demonstrated by painter/manufacturer based on testing and field experience. All existing painted surfaces shall be tested to ensure product compatibility and to ensure that the paint bonds will not fail.

c. Interior Primers:

i. Interior Gypsum Board Primer: Factory formulated latex based primer for interior application.

1. Sherwin-Williams Promar 200 Zero VOC Latex Primer B28W2600 VOC 2 G/L

1.5 DFT

ii. Interior Ferrous Metal Primer: Factory formulated quick drying rust inhibitive alkyd based metal primer.

1. Sherwin-Williams Pro-Industrial Pro-Cryl Universal acrylic Primer B66-1310 series VOC 110 g/l 2.0-4.0 mils DFT

d. Interior Finish Coats:

i. Interior Finish Coats - Metal (hollow metal door frames): Factory formulated water based alkyd urethane enamel:

1. Sherwin Williams; Pro-Industrial, Waterbased Alkyd Urethane, number B53-

1050 series, gloss (B53-1150 semi-gloss, B53-1250 low sheen) VOC 50 g/l

<0.42 lb/gal, wet mils 4.0 - 5.0, dry mils 1.4 - 1.7

ii. Interior Flat Acrylic Paint (ceilings): Factory formulated flat acrylic emulsion latex paint for interior application.

1. Sherwin-Williams Promar 200 Zero VOC Interior Latex Flat B30W2651 VOC 2

G/L 1.6 DFT

iii. Interior Eggshell Acrylic Paint (typical walls): Factory formulated eggshell acrylic latex paint for interior application:

1. Sherwin Williams Promar 200 Zero VOC Interior Latex Eggshell B20W2600 applied as a dry film thickness

Division 10 - Specialties

1. Basis of Design: Visual Display Boards: Claridge

a. Equivalent Vendors to the Basis of Design:

i. Ghent Manufacturing

ii. Polyvision

iii. ASI Visual Display

b. Style: Porcelain Enamel Markerboard

c. Face Sheet: 24-gauge enameling grade steel; 3 coat process

d. Core: 3/8-inch-thick particle board core complying with ANSI A208.1, Grade 1-M-1

e. Backing Sheet: Manuf. Standard 0.015-inch-thick aluminum sheet backing

f. Adhesive: moisture resistant thermoplastic-type adhesive

g. Accessories:

i. Metal trim not less than 0.062-inch-thick aluminum

ii. Tray: solid extruded aluminum, ribbed with endcaps

iii. Map Rail: Display rail with end stops & map hooks

2. Basis of Design: Wall and Corner Guards: InPro

a. Equivalent Vendors to the Basis of Design:

i. C/S Group

ii. Koroseal Interior Products Group

b. Style: Surface Mounted: High impact vinyl with extruded aluminum full height retainer and integral impact absorbing device.

c. Corner: Bullnose

d. Length: 4’-0”, one piece

e. Preformed end caps

3. Basis of Design: Toilet and Bath Accessories: Bobrick

a. Equivalent Vendors to the Basis of Design:

i. AJ Washroom Accessories

ii. American Specialties, Inc.

b. Grab Bars (accessible restroom)

i. Stainless steel.

ii. Mounting: Concealed, manufacturer's standard anchorages

iii. Clearance: 1-1/2 inches clearance between wall surface and inside face of bar

iv. Gripping Surfaces: Smooth, satin finish

v. Heavy-Duty Size: Outside diameter of 1-1/2 inches

vi. Product: Bobrick B-6806 or approved equivalent

c. Mirror Units

i. Style: Stainless Steel Framed Mirror Units: Type 430 Stainless Steel 1/2" x 1/2" x 3/8" channel with 1/4" return at rear with bright polish finish. Provide locking devices to secure mirror to concealed wall hanger. Utilize concealed Philips-head locking screws to securely fasten mirror to wall hanger.

ii. 24”W x 36”H (Typical)

iii. 24”W x 60”H (accessible restroom)

d. Soap Dispenser (wall mounted)

e. Automatic Roll Paper Towel Dispenser

f. Electric hand Dryer

g. Sanitary Napkin Disposal Unit (Surface Mounted)

h. Under lavatory Guard: Handicapped sink locations will receive under lavatory guard complying with the following:

i. Products: Available products include the following:

1. Insulating Piping Coverings: White, anti-microbial, molded-vinyl covering for supply and drain piping assemblies intended to use at accessible lavatories to prevent direct contact with burns from piping. Provide components as required for applications indicated with flip tops at valves that allow service access without removing coverings.

i. Diaper Changing Station:

j. Coat Hook:

i. Satin-finished stainless-steel hat and coat hook with concealed, 19 gauge stainless steel mounting bracket. All welded construction. Secured to wall plate with a stainless-steel set screw. Hat and coat hook shall be equivalent to Gamco Model

Number 76827 or equivalent.

4. Basis of Design: Toilet Partitions and Urinal Screens: Scranton

a. Equivalent Vendors to the Basis of Design:

i. ASI

ii. Metpar

b. Style: Solid plastic, floor and overhead braced.

Division 11 – Equipment

1. Basis of Design: Laboratory Fume Hood: Casework, fume hood and equipment manufacturer:

Collegedale Casework, LLC, PO Box 810, Collegedale, TN 37315

i. Fisher Hamilton

ii. Campbell Rhea

b. Laboratory fume hoods that shall meet the definition of a Laboratory Fume Hood as stated in the SEFA 1 – 2002 Recommended Practice. (Scientific Equipment & Furniture Association)

c. The fume hood shall include a complete ceiling closure panel system to match the hoods exterior color. The closure panels (valance) shall extend to the under side of the ceiling.

d. Steel: High quality, cold rolled, mild steel meeting requirements of ASTM A366; gauges U.S.

Standard and galvanized.

e. Stainless steel: Type 304; gauges U.S. Standard.

f. Ceiling closure panels: Minimum 18 gauge; finish to match hood exterior.

g. Downdraft bypass: Low resistant type, 18 gauge steel chamber, directional louvers – not acceptable. All bypass air shall enter top of bypass chamber and enter hood in a downflow direction. Chambers shall protect user from expelled particulate in the event of an adverse internal reaction.

h. Safety glass: 7/32" thick laminated safety glass

i. Sash chain: ANSI 35 steel, single strand. Average tensile strength of 2,400 pounds, maximum working load of 480 pounds.

j. Sash guides: Extruded PVC.

Division 12 – Furnishings

1. Basis of Design: Metal Casework (Labs): Campbell Rhea/Mohon International, Inc.

a. Equivalent Vendors to the Basis of Design:

i. Kewaunee Scientific Equipment Corp.

ii. Sheldon Labs.

b. Style: Metal casework units, complete with stainless steel countertops, integral sinks, accessories, and mechanical and electrical service fittings mounted on countertop.

c. General: Provide laboratory casework with a factory-applied finish that is capable of withstanding the tests specified in this article with no permanent change in gloss, color, film hardness, adhesion, or film protection.

d. Basis of Design: Acid Storage Cabinet: Campbellrhea Wood Casework by Mohon

International, Inc

i. Model No. 6781-A equipped with one adjustable shelf; one built in top tray;

swinging doors open to 180 deg; doors have a three-point latching and locking handle.

e. Basis of Design: Flammable Storage Cabinet: Campbellrhea, Mohon International, Inc.,

i. Model No. 6778-A

f. Basis of Design: First Aid Kit: Campbellrhea, Mohon International, Inc.,

i. First Aid Kit, 9962

g. Basis of Design: Safety Glasses/Goggles Monitor: Campbellrhea, Mohon International, Inc.,

i. Safety Glasses/Goggle Sanitizer No.6784.

h. Basis of Design: Safety Glasses/Goggles Monitor: Campbellrhea, Mohon International, Inc.,

i. Fire blanket 9960 with metal case. Cabinet size, 19 1/2" H x 17" W x 12" D.

2. Basis of Design: Institutional Casework: TMI Systems Design

a. Equivalent Vendors to the Basis of Design:

i. Stevens industries.

ii. Advance Cabinet Systems

iii. Case Systems Inc.

b. Plastic Laminate faced wood cabinets of stock design.

i. Quality Standard: Comply with AWI Section 400 requirements for laminate cabinets.

ii. Laminate Cladding for Exposed Surfaces: High-pressure decorative laminate complying with the following requirements:

1. Horizontal Surfaces Other Than Tops: HGS.

2. Postformed Surfaces: HGP.

3. Vertical Surfaces: HGS.

4. Edges: Self-edged plastic laminate.

5. Body Front Edging: HGS

iii. Style: Flush overlay with wire pulls

iv. Plastic Laminate Manufacturers:

1. Wilsonart

2. Formica

v. Filler Strips: Provide as needed to close spaces between cabinets and walls, ceilings, and indicated equipment. Fabricate from same material and with the same finish as cabinets.

c. Solid Surface Counters and splashes. Basis of Design: Corian Grade C

i. Equivalent Vendors to the Basis of Design:

1. Avonite

2. LG Surfaces

ii. Quality Standard: Comply with AWI Section 400 requirements for countertops.

iii. Solid-Surfacing-Material Thickness: 1/2 inch (13 mm)

iv. Edges: Eased

v. Fabricate tops in one piece with field-applied backsplashes and edges, unless otherwise indicated. Comply with solid-surfacing-material manufacturer's written recommendations for adhesives, sealers, fabrication, and finishing.

Division 22 – Plumbing

1. Manufacturers:

a. Noted below are manufacturers that are acceptable to the University. Alternative manufacturers may be considered with University approval if determined to be of equivalent construction, performance, and advantageous to the project schedule.

b. For all systems, the D/B shall propose new equipment that will be suitable to meet the project schedule.

2. Key existing plumbing issues to resolve

a. The University has had issues with the existing domestic water piping freezing in the exterior soffit serving second floor plumbing fixtures. The D/B shall provide a freeze prevention solution for this piping. Repairing the piping & soffit with new insulation only, like the existing installation, is considered not an acceptable freeze prevention method.

3. General Plumbing Requirements

a. All penetrations through fire and/or smoke rated assemblies shall be appropriately fire/smoke stopped by a U.L. listed method acceptable to the AHJ.

b. Replace and upgrade the central electric water heating & recirculation pump. Provide redundant electric water heaters. Reuse existing domestic water piping where suitable for new design.

i. Water heater manufacturers: Bradford White, AO Smith, Rheem.

ii. Recirculating pump manufacturers: Taco, Grundfos.

c. Provide new restroom facilities. The fixture quantities provided shall comply with the KY

Plumbing Code. The restroom layouts shall be accessible where required by the KY Building

Code and references.

d. Provide new line sized reduced pressure principle backflow preventer at existing domestic water service entrance.

e. All piping that runs between floors shall be concealed in new walls / chases and appropriately fire/smoke stopped.

4. Laboratory Plumbing Systems

a. Provide an acid waste drain collection system and dilution tank.

b. Provide bottled lab gases which may include hydrogen, helium, air, nitrogen, and carbon dioxide. These gases will be connected to specific lab equipment (chromatographs, etc.)

and lab gas nozzles at countertops. Coordinate with the University the location and type of gases needed at each lab workspace. Provide code compliant storage of gases based on quantities and size of storage vessels.

c. Provide an emergency shower and eyewash within each laboratory.

i. Manufacturers: Guardian, Global Industrial, Hughes Safety

5. Plumbing fixture requirements:

a. Toilets shall be equipped with flush valves.

i. Toilet manufacturers: American Standard, Toto, Kohler

ii. Flush valve manufacturers: American Standard, Zurn, Toto

b. Lavatories shall be vitreous china construction, equipped with cast brass faucets.

i. Lavatory manufacturers: American Standard, Sloan, Zurn

ii. Faucet manufacturers: Delta, Zurn, T&S Brass

c. Laboratory sinks shall be integral with the countertop system, epoxy construction, and equipped with cast brass gooseneck faucet with 4” wristblades.

i. Faucet manufacturers: Delta, Zurn, T&S Brass

d. Drinking fountains shall be bi-level with bottle filler.

i. Manufacturers: Elkay, Oasis, Halsey Taylor

e. All floor drains shall be equipped with a trap seal device.

f. All wall mounted fixtures shall be provided with concealed, floor mounted wall carriers.

6. Plumbing materials

a. All domestic water piping shall be copper with sweated or pro-press fittings. The domestic hot and cold-water piping shall be insulated in accordance with the current energy code.

b. All sanitary waste and vent piping shall be schedule 40 PVC with solvent joints or hubless cast iron where installed within a return air plenum.

c. All acid waste and vent piping shall be polypropylene with fusion welded joints.

Division 23 – Heating, Ventilation, and Air Conditioning

a. Noted below are manufacturers that are acceptable to the University. Alternative manufacturers may be considered with University approval if determined to be of equivalent construction, performance, and advantageous to the project schedule.

b. For all systems, the D/B shall propose new equipment that will be suitable to meet the project schedule.

2. Key existing mechanical issues to resolve

a. The University has had issues with the existing hot-chilled water and condensate drain piping freezing in the exterior soffit serving second floor fan coil units. The D/B shall provide a freeze preventive solution for this piping. Repairing the piping & soffit with new insulation only, like the existing installation, is considered not an acceptable freeze prevention method.

3. General HVAC requirements

a. All penetrations through fire and/or smoke rated assemblies shall be appropriately fire/smoke stopped by a U.L. listed method acceptable to the AHJ.

b. The University wants to continue utilizing chilled and hot water provided by the campus central plant for the building’s primary heating and cooling systems.

c. The perimeter rooms are heated & cooled via two-pipe hot-chilled water fan coil units. All fan coil units shall be replaced. Additional fan-coils shall be provided for perimeter rooms as required to support the programmed floor plan. Two-pipe fan coils shall not be utilized in interior spaces where minimal heating is required. Each perimeter room shall have its own fan coil unit and wall thermostat. Note that the existing fan coil units do not provide outside air.

i. Manufacturers: Enviro-tech, York, Daikin, Nailor.

d. The interior core rooms & corridors are conditioned & ventilated via a central air handling unit. This AHU also provides outside air to the perimeter rooms. This AHU shall be replaced.

i. Manufacturers: Carrier, Daikin, Trane.

e. Provide new restroom exhaust system(s).

i. Manufacturers: Greenheck, Loren Cook, Twin City

f. All new rooftop HVAC equipment and roof penetrations shall be reviewed by a Structural

Engineer.

g. All ductwork and piping that runs between floors shall be concealed in new walls / chases and appropriately fire/smoke stopped.

h. All outside air and exhaust air systems shall terminate at the roof. Penetrations through the exterior walls for new vents are not acceptable.

4. Laboratory HVAC Systems

a. Provide a fume hood hazardous exhaust system.

i. Manufacturers: Greenheck, Loren Cook, Twin City

b. Provide supply & exhaust system venturi-valves and controls to maintain room & fume hood pressure relationships.

i. Manufacturers: Antec Controls, Phoenix Controls

c. It’s anticipated that a new dedicated outdoor air system will be provided to condition & dehumidify the outside air required for the lab exhaust systems.

i. Manufacturers: Greenheck, Daikin, Mojave, Munters.

5. HVAC System Controls

a. All new HVAC equipment shall be integrated with KSU’s tridium-based campus building automation system.

b. The existing Level 2 building controller shall be upgraded / expanded as required to integrate all new HVAC equipment.

c. The BAS architecture implementation and any expansion shall be accomplished with open protocols. All vendor engineering tools (including database, programming and graph creating applications), software and licenses shall be included, and shall not be limited in anyway, nor should there be any additional charges for use or distribution.

d. All control points shall adhere to CEMCS points naming convention.

e. Control sequences shall comply with ASHRAE 36 – High Performance Sequences of

Operation for HVAC Systems.

6. Test & Balance

a. The D/B contractor shall provide testing & balancing of the HVAC systems by an independent, NEBB or AABC certified TAB contractor. Air balance shall include all main ducts, branch ducts, diffusers & grilles, HVAC equipment, and fans. Hydronic balance shall include all HVAC equipment, pumps, and coils.

7. HVAC Materials

a. All hot & chilled water hydronic piping shall be copper with brazed or pro-press fittings. The hydronic piping shall be insulated in accordance with the current energy code.

b. All condensate piping shall be copper and insulated.

c. All exposed exterior insulated piping (refrigerant piping, etc) shall be wrapped with a field applied weatherproof jacket.

i. Basis of design: Polyguard Alumaguard.

d. All general-use ductwork shall be sheet metal construction and insulated in accordance with the current energy code.

e. The hazardous exhaust system ductwork shall be of suitable construction to carry the hazardous air – to be determined by the design build contractor.

f. All flexible ductwork shall be limited to a maximum length of five feet.

Division 26 – Electrical

a. Noted below are manufacturers that are acceptable to the University. Alternative manufacturers may be considered with University approval if determined to be of equivalent construction, performance, and advantageous to the project schedule.

b. For all systems, the D/B shall propose new equipment that will be suitable to meet the project schedule.

2. General Electrical Requirements

a. All penetrations through fire and/or smoke rated assemblies shall be appropriately fire/smoke stopped by a U.L. listed method acceptable to the AHJ.

b. Provide dedicated, technical cooling only, ductless mini-split for data/server room(s).

3. Lighting Requirements

a. Provide new LED lighting throughout the renovated area, including new exterior lighting on the building facade.

i. Manufacturers: Current lighting brands, Acuity lighting brands, Cooper lighting

b. Provide new room lighting controls with occupancy sensors where required by the current energy code. The lighting control system shall be stand alone for each room. Lighting controls networking or integration to building automation systems are not required.

i. Manufacturers: NX Lighting Controls, nLight Lighting Controls, Wattstopper Lighting

Controls

c. All offices, classrooms, and meeting space shall have dimmable lighting controls.

d. Provide new LED exit signs and emergency egress lighting. All exit & egress light fixtures shall be equipped with 90-minute battery backup.

e. Room lighting illumination (foot candles) shall be in accordance with IESNA standards for each room type.

4. Power Requirements

a. The facility’s main electrical service entrance is expected to be reused. This service entrance switchgear is 1970s vintage, 1200-amp, 208-volt, 3-phase. The D/B shall modify this existing equipment as required to support the programmed building upgrades in accordance with the National Electric Code.

b. Replace each branch panelboard. Provide a new type-written panel schedule in each panel. Provide 20% space and capacity in each panel, and 20% future feeder ampacity for future electrical loads.

i. Manufacturers: Eaton, Square D, Siemens

c. The D/B shall coordinate with the University to provide sufficient power for all renovated spaces, which includes dedicated equipment circuits, general use receptacles, sufficient lab receptacles for countertop equipment and tasks, etc. The D/B shall include a receptacle layout in his schematic design submission to the University.

Division 27 – Communications

1. Data, Access Control & Security Systems

a. The contractor shall provide rough-in only for data systems. The University will provide all networking equipment and data cabling outside of this contract.

b. The contractor shall provide rough-in only for a new security system and access control system. The University will provide all associated equipment and low voltage cabling outside of this contract.

c. The contractor shall provide line voltage power for each system, which may include circuits for head-end equipment, door actuator power supplies, etc.

d. Provide above ceiling j-hook pathways for low voltage system cable management.

Division 28 – Electronic Safety and Security

1. Fire Alarm System

a. Remove the existing central fire alarm system completely.

b. Provide a new addressable type fire alarm system. Provide notification and initiation devices throughout the building in accordance with KY Building Code.

i. Manufacturers: Honeywell, Siemens, Simplex