CBR SOW (Metal Shear Repair and Maintenance Contract) 13 May 21 kb.pdf
PDF 191 KB Posted
- Attached to
- Det 6 Metal Shear Repair and Maintenance
- Solicitation number
- FA302021Q0021
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 1 Det 6 Metal Shear Repair and Maintenance.docx | DOCX document | |
| New Combo Det 6 Metal Shear Repair and Maintenance (1).pdf | ||
| Accurshear Manual.pdf | ||
| CLSExport_FA302021Q0021.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK FOR
366TRS Det6 Metal Shear Repair
May 2021
PREPARED BY
Mr. Kerry Bryant
366 TRS/TRR
SHEPPARD AFB TX 76311
PROJECT MANAGER: Mr. William Carter
PHONE: (228) 871-2462
STATEMENT OF WORK
Statement of Work 366TRS Det6 Metal Shear Repair - 1
1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS:
A. Project Description: The work to be performed under this contract and in accordance with these contract documents consists of furnishing all necessary plant, labor, materials, and incidental related work in execution of the repair of the ACCURSHEAR, Metal Shear, model 850010, SN 3080, located at NCTC Gulfport MS.
1. Replace 2ea hydraulic cylinders, P/N SCY40061; Drain, flush and refill hydraulic system with ISO grade 46 hydraulic AW (anti wear) oil; Calibrate and adjust all OPERATING CONTROLS as outlined in the ACCUSHEAR Operation, Installation, Service Manual, section 3; Provide a realistic Equipment Expiration date.
2. Perform ANNUAL Maintenance as outlined in the ACCUSHEAR Operation, Installation, Service Manual, section 8. Annual maintenance will consist of two visits, six months apart.
Rotate blade on 2nd visit. Annual maintenance base plus four years
B. Location: The work shall be located at Naval Construction Training Center (NCTC), 5510 CBC 8th St Bldg. 67 Gulfport, MS 39501.
1. RAPID GATE - “Commander, Navy Installations Command (CNIC), has established the Navy Commercial Access Control System (NCACS), a standardized process for granting unescorted access privileges to vendors, contractors, suppliers, and service providers not otherwise entitled to the issuance of a Common Access Card (CAC) who seek access to and can provide justification to enter Navy installations and facilities. Visiting vendors may obtain daily passes directly from the individual Navy Installations by submitting identification credentials for verification and undergoing a criminal screening/ background check. Alternatively, if the vendor so chooses, it may voluntarily elect to obtain long-term credentials through enrollment, registration, background vetting, screening, issuance of credentials, and electronic validation of credentials at the vendor’s own cost through a designated independent contractor NCACS service provider. Credentials will be issued every five years and access privileges will be reviewed/renewed on an annual basis. The costs incurred to obtain Navy Installation access of any kind are not reimbursable, and the price(s) paid for obtaining long-term NCACS credentials will not be approved as a direct cost of this contract. Further information regarding NCACS can be found under “Popular Links” at http://cnic.navy.mil/CNIC_HQ_Site/index.htm”
C. Demonstration shall be provided for the operation of the installed equipment.
D. Work hours, utility outages and special conditions:
1. Work hours are 7:00 a.m. to 4:00 p.m., Monday through Friday, exclusive of Federal holidays. At the government’s option and with approval of the contracting officer, work may be permitted on Federal holidays, weekends or after 4:00 p.m. daily at no additional cost to the government. The contractor shall provide written notice to the contracting officer at least 48 hours before starting the scheduled work.
2. Occupancy of Premises: The contractor will perform all work with the immediate work unoccupied. The contractor shall coordinate all work with the facility managers, the contracting officer (CO), and the construction inspector. Before work is started, the contractor shall arrange with the CO a sequence of procedure, means of access, and space for storage of materials and equipment.
http://cnic.navy.mil/CNIC_HQ_Site/index.htm
Statement of Work 366TRS Det6 Metal Shear Repair - 2
3. Utility Outages: When an extended utility outage is necessary to perform the contract work in an occupied facility, regardless of whether or not the work area itself is occupied, the contractor shall perform the outage during non-duty hours at no additional cost to the government, unless otherwise approved by the contracting officer. The contractor shall give written notice two weeks in advance of any scheduled outage.
4. The contractor shall remove and reinstall any furniture and equipment to accommodate the contractor’s work.
Attachments:
1) ACCURSHEAR Operation, Installation, Service Manual
END OF SECTION