REQUEST FOR QUOTES (RFQ)

FOR

DATA CENTER NETWORK DESIGN & IMPLEMENTATION SERVICES

SOLICITATION NO. CB18-RFQ0010

Congressional Budget Office

Washington, DC

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24 & 30

1. REQUISITION NUMBER

5. SOLICITATION NUMBER

CB18-RFQ0010

2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER 6. SOLICITATION ISSUE

DATE

04/27/2018

7. FOR SOLICITATION INFORMATION

CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls) 202-226-9850

8. OFFER DUE DATE / LOCAL

TIME

05/18/2018 @ 5:00PM

CODE AOCBO

Acquisitions Office Congressional Budget Office FHOB 2nd & D Streets, SW Acquisitions@cbo.gov Washington, DC 20515

9. ISSUED BY X UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS: 541512

SIZE STANDARD: $27.5M

10. THE ACQUISITION IS

SEE

SCHEDULE

11. DELIVERY FOR FOB DESTINATION

UNLESS BLOCK IS MARKED

12. DISCOUNT TERMS

13a. THIS CONTRACT IS

RATED ORDER UNDER DPAS

13b. RATING

RFQ IFBX RFP

14. METHOD OF SOLICITATION

SSCBOCODE15. DELIVER TO

Congressional Budget Office 2nd and D Streets, SW

FHOB

Washington, DC 20515-0001

CODE AOCBO16. ADMINISTERED BY

Acquisitions Office Congressional Budget Office FHOB 2nd & D Streets, SW Acquisitions@cbo.gov

FACILITY

CODE

CODE

Telephone No.

17a. CONTRACTOR/

OFFEROR

AOCBOCODE18a. PAYMENT WILL BE MADE BY Congressional Budget Office Office of Financial Management invoices@cbo.gov OR Fax: 202-226-3879 Washington, DC 20515

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER SEE ADDENDUM

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS

CHECKED

19. ITEM NO. 20. SCHEDULE OF SUPPLIES/SERVICES

(Use Reverse and/or Attach Additional Sheets as Necessary)

21. QUANTITY 22. UNIT 23. UNIT PRICE 24. AMOUNT

See Lines

25. ACCOUNTING AND APPROPRIATION DATA

See Line Item Detail

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED

X 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1 COPIES TO

ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SET FORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY ADDITIONAL SHEETS SUBJECT TO THE

TERMS AND CONDITIONS SPECIFIED.

29. AWARD OF CONTRACT: REF. _____________________________ OFFER

DATED _________________ . YOUR OFFER ON SOLICITATION (BLOCK 5)

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN,

IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF THE CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 02/2012)

Prescribed by GSA - FAR (48 CFR) 53.212

Document Number: CB18-RFQ0010 Page 1 of 35

Section 1 - Continuation Sheet

Number Supplies or Services Quantity Unit Unit Price Total ( Inc. disc., tax, and fees)

1 Network Design and Implementation 1.000000 NTE

Period of Performance: 06/01/2018 - 12/31/2018

Description: Contractor shall provide advanced expert professional services in network design and implementation for CBO's new data center. See Statement of Work for details. The estimated ceiling amount is $75,000.

Document Number: CB18-RFQ0010 Page 2 of 35

Solicitation No. CB18-RFQ0010 Page 3 of 35

Part 2 – Contract Clauses

The following clause applies to Open Market contracts:

2.1A. CBO 201-01 Terms and Conditions Limited (May 2003) This contract expressly limits acceptance to terms and conditions stated herein. Any additional or different terms and conditions proposed by the Contractor are rejected unless expressly agreed to by the Congressional Budget Office (CBO) in writing. If the Contractor commences shipment or performance pursuant to this contract, then the Contractor shall be deemed to have agreed to and accepted this contract in its entirety, including its terms and conditions as set forth herein.

The following clause applies to GSA Schedule orders:

2.1B. CBO 201-01 Terms and Conditions Limited (May 2003) Alternate I (July 2004) The instant action is subject to the terms and conditions under the GS Schedule number referenced in Block 2 of the award form, as supplemented by the following terms. If any of the terms or conditions in the GS Contract and this supplement are inconsistent, the terms and conditions of the GS Schedule shall govern, unless otherwise agreed between the parties.

2.2 CBO 201-02 Endorsements/News Releases/Advertising (May 2003) The Contractor agrees not to refer to this contract or CBO, in advertising, promotional or any other materials, in such a manner as to state or imply that the products or services provided are endorsed or preferred by CBO or are considered by CBO to be superior to other products or services. No news release, press conference, or advertisement pertaining to this contract will be distributed or broadcast without prior written approval by CBO.

2.3 CBO 203-170 Contractor Employee Whistleblower Rights (Dec 2014) The Contractor shall not require any employees or contractors of the Contractor seeking to report fraud, waste, or abuse to sign internal confidentiality agreements or statements prohibiting or otherwise restricting such employees or contactors from lawfully reporting such waste, fraud, or abuse to a designated investigative or law enforcement representative of a Federal department or agency authorized to receive such information.

2.4 CBO 212-04 Compliance with Laws (Jan 2015)

The Contractor shall comply with all applicable Federal, State, and local laws, rules and regulations applicable to its performance under this contract. The Contractor further agrees to hold CBO harmless from any and all liabilities, claims, fines, penalties, including reasonable costs and settlements, which may arise out of the delivery by the Contractor of goods or supplies or the furnishing of services that do not meet the requirements of any applicable laws or regulations.

2.5 CBO 223-20 Special Inspection Procedures (Jan 2007)

All persons entering the Ford House Office Building shall gain access to the building by passing through magnetometer screening devices. In addition, all hand-carried items shall be screened by x-ray devices prior to entry into the building.

2.6 CBO 222-41 Service Contract Act (Jan 2015)

Certain contracts exceeding $2,500 for which the principal purpose is providing services must comply with the Service Contract Act of 1965, as amended. Generally, services provided by bona fide executive, administrative, or professional employees as described in 29 C.F.R. § 541 (that is, members of professions that have a recognized status based on acquiring knowledge through prolonged study) are exempt from these requirements. The types of contracts listed in 41 U.S.C. § 6702(b) and any other variances or exemptions issued by the Secretary of Labor are also exempt. For example, contracts for the maintenance or repair of certain equipment and the commercial services described in 29 C.F.R.

§ 4.123(e)(2) are exempt, provided the Contractor certifies in writing that the relevant conditions are met.

The Contractor must pay its service employees performing work under this Contract wages and fringe benefits at rates at least equivalent to the prevailing wage determination for the appropriate classes of employees made by the Department of Labor (DOL) that is attached to this Contract. (See Attachment No. 2) The Contracting Officer will determine the prevailing wage rates for any employee class to which an existing DOL wage determination does not apply and may request a formal wage determination from DOL to inform this decision. The Contracting Officer may adjust the Contract price during the period of performance as required to comply with any change in the Fair Labor Standards Act of 1938, as amended, or a new wage determination issued by the Department of Labor during the period of performance or any option year. In any event, no employee performing work under this Contract shall be paid less than the minimum wage specified in section 6(a)(1) of the Fair Labor Standards Act (29 U.S.C. § 206(a)(1)). Nothing in this clause shall relieve the Contractor or any subcontractor of any other obligation under law or contract for payment of a higher wage to any employee.

Solicitation No. CB18-RFQ0010 Page 4 of 35

The Contractor will provide notice of the compensation required under this clause to each service employee commencing work under this Contract or will post a notice of the required compensation in a prominent place at the worksite. When available, the Contracting Officer will provide information on the wages and fringe benefits that would be payable to each class of service employee expected to be employed under this Contract if such employees were employed directly by CBO. None of the services under this Contract may be performed in a work environment or under working conditions that are unsanitary, hazardous, or dangerous to the health or safety of employees engaged in performing this Contract.

Failure to pay the wages or fringe benefits required under this clause will be considered a violation of the terms of this Contract. If the Contracting Officer has reason to believe such a violation has occurred, or upon request of the DOL, the Contracting Officer must withhold from payments due to the Contractor under this or any other Contract an amount equal to the estimated wage underpayment. If a subsequent investigation confirms a violation occurred, the Contracting Officer must adjust the withholding as necessary. Otherwise, the Contracting Officer must release the payment to the Contractor.

However, if DOL requested the withholding, the CO may not reduce or release the withholding without DOL’s written approval.

2.7 CBO 232-02 Invoice (Oct 2005)

(a) Unless this contract does not require submission of an invoice for payment, the Contractor’s invoices must be submitted before payment can be made. An invoice is the Contractor’s bill or written request for payment under the contract for supplies delivered or services performed. An invoice shall be prepared and submitted to the Office of Financial Management by one of the following methods:

Option 1 Option 2 Option 3 E-mail invoices to:

invoices@cbo.gov

Fax invoices to:

(202) 226-3879

Mail/deliver invoices to:

Office of Financial Management Congressional Budget Office 2nd and D Streets SW Washington DC 20515 Tel: (202) 226-2609

NOTICE: Mailing invoices to CBO’s street address in lieu of electronic submission may delay payment. Due to the special mail handling procedures currently in effect, it can take up to 2 weeks for CBO to receive invoices through the mail. Electronic submission is the preferred invoice submission method.

(b) A proper invoice must include the items below. If the invoice does not comply with these requirements, the Contractor shall be notified of the defect within seven (7) days after receipt of the invoice by CBO’s Office of Financial Management.

(1) Name and address of the Contractor;

(2) Invoice number and date;

(3) The Contractor’s Tax Identification Number;

(4) Purchase Order or contract number or other authorization for supplies delivered or services performed;

(5) Description, quantity, unit of measure, unit price, and extended price of supplies delivered or services rendered;

(6) Name, title, phone number, and mailing address of person to be notified in the event of a defective invoice;

(7) Any other information or documentation required by the contract.

2.8 CBO 232-07 Payments Under Time-and-Materials and Labor-Hour Contracts (Aug 2012) The government will pay the Contractor as follows upon the submission of vouchers approved by the Contracting Officer or the Contracting Officer’s Representative (COR):

(a) Hourly rate.

(1) Hourly rate means the rate(s) prescribed in the contract for payment for labor that meets the labor category qualifications of a labor category specified in the contract that are—

(i) Performed by the Contractor;

(ii) Performed by the subcontractors; or

(iii) Transferred between divisions, subsidiaries, or affiliates of the Contractor under a common control.

(2) The amounts shall be computed by multiplying the appropriate hourly rates prescribed in the Schedule by the number of direct labor hours performed.

Solicitation No. CB18-RFQ0010 Page 5 of 35

(3) The hourly rates shall be paid for all labor performed on the contract that meets the labor qualifications specified in the contract. Labor hours incurred to perform tasks for which labor qualifications were specified in the contract will not be paid to the extent the work is performed by employees that do not meet the qualifications specified in the contract, unless specifically authorized by the Contracting Officer.

(4) The hourly rates shall include wages, indirect costs, general and administrative expense, and profit.

Fractional parts of an hour shall be payable on a prorated basis.

(5) Vouchers may be submitted not more than once every two weeks, to the Contracting Officer or COTR. A small business concern may receive more frequent payments than every two weeks. The Contractor shall substantiate vouchers (including any subcontractor hours reimbursed at the hourly rate in the schedule) by evidence of actual payment and by—

(i) Individual daily job timekeeping records;

(ii) Records that verify the employees meet the qualifications for the labor categories specified in the contract; or

(iii) Other substantiation approved by the Contracting Officer.

(6) Promptly after receipt of each substantiated voucher, the Government shall, except as otherwise provided in this contract, and subject to the terms of paragraph (d) of this clause, pay the voucher as approved by the Contracting Officer or COTR.

(7) Unless otherwise prescribed in the Schedule, the Contracting Officer may unilaterally issue a contract modification requiring the Contractor to withhold amounts from its billings until a reserve is set aside in an amount that the Contracting Officer considers necessary to protect the Government’s interests. The Contracting Officer may require a withhold of 5 percent of the amounts due under paragraph (a) of this clause, but the total amount withheld for the contract shall not exceed $50,000. The amounts withheld shall be retained until the Contractor executes and delivers the release required by paragraph (f) of this clause.

(8) Unless the Schedule prescribes otherwise, the hourly rates in the Schedule shall not be varied by virtue of the Contractor having performed work on an overtime basis. If no overtime rates are provided in the Schedule and overtime work is approved in advance by the Contracting Officer, overtime rates shall be negotiated. Failure to agree upon these overtime rates shall be treated as a dispute under the Disputes clause of this contract. If the Schedule provides rates for overtime, the premium portion of those rates will be reimbursable only to the extent the overtime is approved by the Contracting Officer.

(b) Materials.

(1) For the purposes of this clause—

(i) Direct materials means those materials that enter directly into the end product, or that are used or consumed directly in connection with the furnishing of the end product or service.

(ii) Materials means—

(A) Direct materials, including supplies transferred between divisions, subsidiaries, or affiliates of the Contractor under a common control;

(B) Subcontracts for supplies and incidental services for which there is not a labor category specified in the contract;

(C) Other direct costs (e.g., incidental services for which there is not a labor category specified in the contract, travel, computer usage charges, etc.); and

(D) Applicable indirect costs.

(2) If the Contractor furnishes its own materials that meet the definition of a commercial item at Federal Acquisition Regulation (FAR) 2.101, the price to be paid for such materials shall not exceed the Contractor’s established catalog or market price, adjusted to reflect the—

(i) Quantities being acquired; and

(ii) Actual cost of any modifications necessary because of contract requirements.

(3) Except as provided for in paragraph (b)(2) of this clause, the Government will reimburse the Contractor for allowable cost of materials provided the Contractor—

(i) Has made payments for materials in accordance with the terms and conditions of the agreement or invoice; or

Solicitation No. CB18-RFQ0010 Page 6 of 35

(ii) Ordinarily makes these payments within 30 days of the submission of the Contractor’s payment request to the Government and such payment is in accordance with the terms and conditions of the agreement or invoice.

(4) The Contractor may include allocable indirect costs and other direct costs to the extent they are—

(i) Comprised only of costs that are clearly excluded from the hourly rate;

(ii) Allocated in accordance with the Contractor’s written or established accounting practices; and

(iii) Indirect costs are not applied to subcontracts that are paid at the hourly rates.

(5) To the extent able, the Contractor shall—

(i) Obtain materials at the most advantageous prices available with due regard to securing prompt delivery of satisfactory materials; and

(ii) Take all cash and trade discounts, rebates, allowances, credits, salvage, commissions, and other benefits. When unable to take advantage of the benefits, the Contractor shall promptly notify the Contracting Officer and give the reasons. The Contractor shall give credit to the Government for cash and trade discounts, rebates, scrap, commissions, and other amounts that have accrued to the benefit of the Contractor, or would have accrued except for the fault or neglect of the Contractor.

The Contractor shall not deduct from gross costs the benefits lost without fault or neglect on the part of the Contractor, or lost through fault of the Government.

(6) The Government will not pay profit or fee to the prime Contractor on materials.

(c) Total cost. It is estimated that the total cost to the Government for the performance of this contract shall not exceed the ceiling price set forth in the Schedule, and the Contractor agrees to use its best efforts to perform the work specified in the Schedule and all obligations under this contract within such ceiling price. If at any time the Contractor has reason to believe that the hourly rate payments and material costs that will accrue in performing this contract in the next succeeding 30 days, if added to all other payments and costs previously accrued, will exceed 85 percent of the ceiling price in the Schedule, the Contractor shall notify the Contracting Officer giving a revised estimate of the total price to the Government for performing this contract with supporting reasons and documentation. If at any time during performing this contract, the Contractor has reason to believe that the total price to the Government for performing this contract will be substantially greater or less than the then stated ceiling price, the Contractor shall so notify the Contracting Officer, giving a revised estimate of the total price for performing this contract, with supporting reasons and documentation. If at any time during performing this contract, the Government has reason to believe that the work to be required in performing this contract will be substantially greater or less than the stated ceiling price, the Contracting Officer will so advise the Contractor, giving the then revised estimate of the total amount of effort to be required under the contract.

(d) Ceiling price. The Government will not be obligated to pay the Contractor any amount in excess of the ceiling price in the Schedule, and the Contractor shall not be obligated to continue performance if to do so would exceed the ceiling price set forth in the Schedule, unless and until the Contracting Officer notifies the Contractor in writing that the ceiling price has been increased and specifies in the notice a revised ceiling that shall constitute the ceiling price for performance under this contract. When and to the extent that the ceiling price set forth in the Schedule has been increased, any hours expended and material costs incurred by the Contractor in excess of the ceiling price before the increase shall be allowable to the same extent as if the hours expended and material costs had been incurred after the increase in the ceiling price.

(e) Audit. At any time before final payment under this contract, the Contracting Officer may request audit of the vouchers and supporting documentation. Each payment previously made shall be subject to reduction to the extent of amounts, on preceding vouchers, that are found by the Contracting Officer or authorized representative not to have been properly payable and shall also be subject to reduction for overpayments or to increase for underpayments. Upon receipt and approval of the voucher designated by the Contractor as the “completion voucher” and supporting documentation, and upon compliance by the Contractor with all terms of this contract (including, without limitation, terms relating to patents and the terms of paragraph (f) of this clause), the Government shall promptly pay any balance due the Contractor. The completion voucher, and supporting documentation, shall be submitted by the Contractor as promptly as practicable following completion of the work under this contract, but in no event later than 120 days (or such longer period as the Contracting Officer may approve in writing) from the date of completion.

(f) Assignment and Release of Claims. The Contractor, and each assignee under an assignment entered into under this contract and in effect at the time of final payment under this contract, shall execute and deliver, at the time of and as a condition precedent to final payment under this contract, a release discharging the Government, its officers, agents, and

Solicitation No. CB18-RFQ0010 Page 7 of 35 employees of and from all liabilities, obligations, and claims arising out of or under this contract, subject only to the following exceptions:

(1) Specified claims in stated amounts, or in estimated amounts if the amounts are not susceptible of exact statement by the Contractor.

(2) Claims, together with reasonable incidental expenses, based upon the liabilities of the Contractor to third parties arising out of performing this contract, that are not known to the Contractor on the date of the execution of the release, and of which the Contractor gives notice in writing to the Contracting Officer not more than 6 years after the date of the release or the date of any notice to the Contractor that the Government is prepared to make final payment, whichever is earlier.

(3) Claims for reimbursement of costs (other than expenses of the Contractor by reason of its indemnification of the Government against patent liability), including reasonable incidental expenses, incurred by the Contractor under the terms of this contract relating to patents.

(g) Interim payments.

(1) Interim payments made prior to the final payment under the contract are contract financing payments.

(2) The designated payment office will make interim payments for contract financing on the 30th day after the designated billing office (CBO’s Office of Financial Management) receives a proper payment request.

In the event that the Government requires an audit or other review of a specific payment request to ensure compliance with the terms and conditions of the contract, the designated payment office is not compelled to make payment by the specified due date.

2.9 CBO 232-19 Obligations Contingent on Future Appropriation (May 2003) Unless otherwise provided in this contract, CBO’s obligation under this contract in any fiscal year beyond the fiscal year for which this contract is entered into is contingent on the availability of appropriated funds.

2.10 CBO 232-23 Assignment (May 2003)

(a) Neither this contract nor the obligation of the Contractor to perform shall be assigned or delegated by the Contractor without CBO’s consent.

(b) The Contractor may assign its rights to be paid amounts due or to become due as a result of the performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency.

(c) If the Contractor assigns the proceeds of this contract, the Contractor shall require as a condition of any such assignment, that the assignee submit a completed Vendor Survey form and shall be paid by EFT in accordance with the terms of the Method of Payment clause of this contract. In all respects, the requirements of that clause shall apply to the assignee as if it were the Contractor. EFT information that shows the ultimate recipient of the payment to be other than the Contractor, in the absence of a proper assignment of claims acceptable to CBO, is incorrect EFT information within the meaning of paragraph (b) of the Method of Payment clause.

2.11 CBO 232-34 Method of Payment (July 2013)

(a) All payments by CBO under this contract shall be made by electronic funds transfer (EFT). CBO shall make payment to the Contractor using the EFT information—

(1) provided by the Contractor on the CBO Vendor Survey form; or

(2) obtained MANUALLY by CBO from the System for Award Management (SAM) database.

(b) CBO need not make payment to the Contractor under this contract, and any invoice shall be deemed not to be a proper invoice for the purpose of the payment clause under this contract, unless and until CBO has been provided or has been able to obtain the Contractor’s EFT information under paragraph (a).

(c) The Contractor shall be responsible for notifying CBO when the Contractor’s EFT information changes. The Contractor shall either:

(1) provide a revised CBO Vendor Survey form; or

(2) notify CBO Procurement Services that changes have been entered into the SAM database (CBO DOES NOT

MAINTAIN AN AUTOMATED LINK TO SAM).

(d) (1) If an incomplete or erroneous transfer occurs because CBO used the Contractor’s correct EFT information inaccurately, CBO remains responsible for making a correct payment and recovering any erroneously directed funds.

(2) If an incomplete or erroneous transfer occurs because the Contractor’s EFT information was incorrect, or was revised within 30 days of release of the EFT payment transaction instruction to the Federal Reserve System, then—

Solicitation No. CB18-RFQ0010 Page 8 of 35

(a) if the funds are no longer under the control of the designated billing office, CBO is deemed to have made payment and the Contractor is responsible for recovery of any erroneously directed funds; or

(b) if the funds remain under the control of the designated billing office, CBO shall not make payment until the Contractor provides CBO with the notification required in paragraph (b).

(e) CBO shall forward to the Contractor available payment information at the request of the Contractor. CBO does not guarantee that any particular format or method of delivery is available and retains the latitude to use the format and delivery method most convenient to CBO.

2.12 CBO 233-01 Disputes (April 2015) Alternate I (Dec 1991)

(a) This contract is subject to the Contract Disputes Act of 1978, as amended (41 U.S.C. chapter 71), and as modified by Section 1501 of Title I of Division H of the Consolidated Appropriations Act, 2008, Pub. L. No. 110-161, 121 Stat. 1844 (2008).

(b) Except as provided in the Act, all disputes arising under or relating to this contract shall be resolved under this clause.

(c) “Claim,” as used in this clause, means a written demand or written assertion by one of the contracting parties seeking, as a matter of right, the payment of money in a sum certain, the adjustment or interpretation of contract terms, or other relief arising under or relating to this contract. However, a written demand or written assertion by the Contractor seeking the payment of money exceeding $50,000 is not a claim under the Act until certified. A voucher, invoice, or other routine request for payment that is not in dispute when submitted is not a claim under the Act. The submission may be converted to a claim under the Act, by complying with the submission and certification requirements of this clause, if it is disputed either as to liability or amount or is not acted upon in a reasonable time.

(d) (1) A claim by the Contractor shall be made in writing and, unless otherwise stated in this contract, submitted within 6 years after accrual of the claim to the Contracting Officer for a written decision. A claim by the Government against the Contractor shall be subject to a written decision by the Contracting Officer.

(2) (i) The Contractor shall provide the certification specified in paragraph (d)(2)(iii) of this clause when submitting any claim exceeding $50,000.

(ii) The certification requirement does not apply to issues in controversy that have not been submitted as all or part of a claim.

(iii) The certification shall state as follows: “I certify that the claim is made in good faith; that the supporting data are accurate and complete to the best of my knowledge and belief; that the amount requested accurately reflects the contract adjustment for which the Contractor believes the Government is liable; and that I am duly authorized to certify the claim on behalf of the Contractor.”

(3) The certification may be executed by any person duly authorized to bind the Contractor with respect to the claim.

(e) For Contractor claims of $100,000 or less, the Contracting Officer must, if requested in writing by the Contractor, render a decision within 60 days of the request. For Contractor-certified claims over $100,000, the Contracting Officer must, within 60 days, decide the claim or notify the Contractor of the date by which the decision will be made.

(f) The Contracting Officer’s decision shall be final unless the Contractor appeals, within 90 days of receipt of a Contracting Officer’s decision, to the following authority:

Government Accountability Office Contract Appeals Board 441 G Street N.W., Room 7182 Washington DC 20548 Fax: (202) 512-9749 E-mail: CAB@gao.gov

Solicitation No. CB18-RFQ0010 Page 9 of 35

(g) If the claim by the Contractor is submitted to the Contracting Officer or a claim by the Government is presented to the Contractor, the parties, by mutual consent, may agree to use alternative dispute resolution (ADR). If the Contractor refuses an offer for ADR, the Contractor shall inform the Contracting Officer, in writing, of the Contractor’s specific reasons for rejecting the offer.

(h) The Government shall pay interest on the amount found due and unpaid from (1) the date that the Contracting Officer receives the claim (certified, if required); or (2) the date that payment otherwise would be due, if that date is later, until the date of payment. With regard to claims having defective certifications, as defined in FAR 33.201, interest shall be paid from the date that the Contracting Officer initially receives the claim. Simple interest on claims shall be paid at the rate, fixed by the Secretary of the Treasury as provided in the Act, which is applicable to the period during which the Contracting Officer receives the claim and then at the rate applicable for each 6-month period as fixed by the Treasury Secretary during the pendency of the claim.

(i) The Contractor shall proceed diligently with performance of this contract, pending final resolution of any request for relief, claim, appeal, or action arising under or relating to the contract, and comply with any decision of the Contracting Officer.

2.13 CBO 233-03 Protest after Award (Aug 1996)

(a) Upon receipt of a notice of protest (as defined in Federal Acquisition Regulations (FAR) 33.101) or a determination that a protest is likely (see FAR 33.102(d)), the Contracting Officer may, by written order to the Contractor, direct the Contractor to stop performance of the work called for by this contract. The order shall be specifically identified as a stop-work order issued under this clause. Upon receipt of the order, the Contractor shall immediately comply with its terms and take all reasonable steps to minimize the incurrence of costs allocable to the work covered by the order during the period of work stop-page. Upon receipt of the final decision in the protest, the Contracting Officer shall either—

(1) Cancel the stop-work order; or

(2) Terminate the work covered by the order as provided in the Termination for Default, or the Termination for Convenience, clause of this contract.

(b) If a stop-work order issued under this clause is canceled either before or after a final decision in the protest, the Contractor shall resume work. The Contracting Officer shall make an equitable adjustment in the delivery schedule or contract price, or both, and the contract shall be modified, in writing, accordingly, if—

(1) The stop-work order results in an increase in the time required for, or in the Contractor’s cost properly allocable to, the performance of any part of this contract; and

(2) The Contractor asserts its right to an adjustment within 30 days after the end of the period of work stoppage; provided, that if the Contracting Officer decides the facts justify the action, the Contracting Officer may receive and act upon a proposal at any time before final payment under this contract.

(c) If a stop-work order is not canceled and the work covered by the order is terminated for the convenience of the Government, the Contracting Officer shall allow reasonable costs resulting from the stop-work order in arriving at the termination settlement.

(d) If a stop-work order is not canceled and the work covered by the order is terminated for default, the Contracting Officer shall allow, by equitable adjustment or otherwise, reasonable costs resulting from the stop-work order.

(e) The Government’s rights to terminate this contract at any time are not affected by action taken under this clause.

(f) If, as the result of the Contractor’s intentional or negligent misstatement, misrepresentation, or miscertification, a protest related to this contract is sustained, and the Government pays costs, as provided in FAR 33.102(b)(2) or 33.104(h)(1), the Government may require the Contractor to reimburse the Government the amount of such costs. In addition to any other remedy available, and pursuant to the requirements of Subpart 32.6, the Government may collect this debt by offsetting the amount against any payment due the Contractor under any contract between the Contractor and the Government.

2.14 FAR 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) United States law will apply to resolve any claim of breach of this contract.

Solicitation No. CB18-RFQ0010 Page 10 of 35

2.15 CBO 239-01 Security for Confidential Information (Dec 2014)

(a) All CBO information must be appropriately protected by the Contractor. The Contractor acknowledges that, during the course of this contract, the Contractor may become acquainted with and have access to certain confidential information owned or licensed by CBO or used by CBO in the conduct of its business, which may include, but is not limited to: IT security measures; personnel data; trade secrets, commercial and financial information, and other proprietary business data; and personal information, including financial and medical records.

(b) Contractor who is maintaining CBO confidential information on the Contractor’s computer system shall secure that information against loss (whether destruction or theft) and unauthorized access, use, modification, or disclosure.

Unless measures are specified elsewhere in this contract, the Contractor shall use the same degree of care, but no less than a reasonable degree of care, as the Contractor uses to protect its own confidential information of a like nature to prevent loss, and unauthorized access, use, modification, or disclosure.

(c) The Contractor shall safeguard the security and confidentiality of all confidential information owned or licensed by CBO or used by CBO in the conduct of its business. The Contractor shall comply with all CBO security requirements and protocols and agrees not to disclose, directly or indirectly, any confidential information or to use it in any manner, during the term of this contract or thereafter, except for authorized purposes under this contract. Contractor employees, representatives or agents working on or with CBO systems, whether on- or off-site, will be required to execute individual non-disclosure agreements consistent with this clause. (See Attachment No. 3)

(d) These provisions are consistent with and do not supersede, conflict with, or otherwise alter the employee obligations, rights, or liabilities created by existing statute or Executive order relating to (1) classified information,

(2) communications to Congress, (3) the reporting to an Inspector General of a violation of any law, rule, or regulation, or mismanagement, a gross waste of funds, an abuse of authority, or a substantial and specific danger to public health or safety, or (4) any other whistleblower protection. The definitions, requirements, obligations, rights, sanctions, and liabilities created by controlling Executive orders and statutory provisions are incorporated into this agreement and are controlling.

2.16 CBO 242-100 Contracting Officer’s Authority (June 2004)

The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract, notwithstanding any provision contained elsewhere in this contract. In the event that the Contractor makes any change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract price to cover any increase in costs incurred as a result thereof.

2.17 CBO 242-101 Contracting Officer’s Representative (COR) (Sept 2017)

(a) The Contracting Officer’s Representative (COR) is a representative of CBO with limited authority who has been designated in writing by the Contracting Officer to provide technical direction, clarification, and guidance with respect to existing specifications and performance work statement/statement of work/statement of objectives, as established in the contract. The COR also monitors the progress and quality of the Contractor’s performance for payment purposes. The COR shall promptly report Contractor performance discrepancies and suggested corrective actions to the Contracting Officer for resolution.

(b) The COR is not authorized to take any direct or indirect actions or make any commitments that will result in changes to price, quantity, quality, schedule, place of performance, delivery or any other terms or conditions of the written contract.

(c) The Contractor is responsible for promptly providing written notification to the Contracting Officer if it believes the COR has requested or directed any change to the existing contract. No action shall be taken by the Contractor for any proposed change to the existing contract until the Contracting Officer has issued a written directive or a written modification to the contract. CBO will not accept and is not liable for any alleged change to the contract unless the change is included in a written contract modification or directive signed or issued by the Contracting Officer.

(d) COR authority is not delegable.

(e) The COR for this contract is: (This information will be provided at the time of contract award)

Solicitation No. CB18-RFQ0010 Page 11 of 35

Name: Guanli Lu Job Title: Senior Network Systems Engineer Unit / Division: IRM & TS Unit / MBIS Division Telephone: (202) 226-3098 E-mail: Guanli.Lu@cbo.gov

2.18 CBO 243-01 Changes (May 2003)

(a) CBO may at any time, by written order, make changes within the general scope of this contract in any one or more of the following:

(1) Description of services to be performed;

(2) Time of performance;

(3) Place of delivery or performance.

(4) Drawings, designs, or specifications when supplies to be furnished are to be specially manufactured for CBO.

(b) If any such change causes an increase or decrease in the cost of, or the time required for, performance of any part of the work under this contract, CBO shall make an equitable adjustment in the contract price, the delivery schedule, or both, and shall modify the contract.

(c) The Contractor must assert its right to an adjustment under this clause within 30 days from the date of receipt of the written order. However, if CBO decides that the facts justify it, CBO may receive and act upon a proposal submitted before final payment of the contract.

(d) Failure to agree to any adjustment shall be a dispute under the Disputes clause. However, nothing in this clause shall excuse the Contractor from proceeding with the contract as changed.

2.19 CBO 246-02 Inspection and Acceptance (May 2003)

The Contractor shall only tender for acceptance those supplies or services that conform to the requirements of this contract. CBO reserves the right to inspect or test any supplies or services that have been tendered for acceptance. CBO may require repair or replacement of nonconforming supplies or re-performance of nonconforming services at no increase in contract price. Payment for any supplies or services hereunder shall not be deemed an acceptance thereof and is without prejudice to any and all claims that CBO may have against the Contractor.

2.20 CBO 246-17 Warranties (May 2003)

(a) The Contractor warrants free and clear title to all delivered products and further warrants that the products shall be free from defects in workmanship, material or design and shall conform either to the description and specifications in this contract or consistent with the sample of said product provided to CBO.

(b) The Contractor warrants that the products, in the form delivered to CBO, are free from any valid claim for patent infringement and that any labels or trademarks affixed thereto by or on behalf of the Contractor are free from any valid claim for copyright or trademark infringement and agrees to save and hold harmless and indemnify CBO against such infringement liability based upon CBO’s possession thereof without alteration.

(c) The goods and services provided shall be free from defects in materials and workmanship for a period of at least ninety (90) days after completion of performance (in the case of services) or after acceptance (in the case of goods or supplies) unless a longer warranty period is provided or is required by law. Should the Contractor’s services or goods or supplies prove to be defective within the warranty period, the Contractor agrees to promptly replace or repair the goods or supplies or correct such services to CBO’s satisfaction without cost to CBO.

(d) Unless this contract specifies otherwise, the Contractor represents that all goods, supplies, and other materials provided are new and are not of such age or so deteriorated as to impair their usefulness or safety.

(e) Except as otherwise provided by an express or implied warranty, the Contractor will not be liable to CBO for consequential damages resulting from any defect or deficiencies in accepted items.

2.21 CBO 249-02 Termination for Convenience (May 2003)

CBO reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor will be notified by the Contracting Officer, in writing, and shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of

Solicitation No. CB18-RFQ0010 Page 12 of 35

CBO have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. The Contractor shall not be paid for any work performed or costs incurred which reasonably could have been avoided.

2.22 CBO 249-08 Termination for Default (May 2003)

CBO may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide CBO, upon request, with adequate assurances of future performance. In the event of termination for cause, the Contractor will be notified by the Contracting Officer in writing. CBO shall not be liable to the Contractor for any amount for supplies or services not accepted, and the Contractor shall be liable to CBO for any and all rights and remedies provided by law. If it is determined that CBO improperly terminated this contract for default, such termination shall be deemed a termination for convenience.

2.23 CBO 249-11 Waiver of Default (May 2003)

Waiver by either party of any default by the other hereunder shall not be deemed a waiver by such party of any other, subsequent default.

2.24 CBO 249-14 Excusable Delays (May 2003)

The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, describing the matter in detail, shall remedy such occurrence expeditiously, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

Solicitation No. CB18-RFQ0010 Page 13 of 35

Part 3 – List of Contract Documents

Attachment No.

Title No. of Pages

1 Statement of Work 3 2 DoL Wage Determination No.: 2015-4281, Rev. 9 (01/10/2018)

3 Non-disclosure Agreement 1 4 Offeror Representations and Certifications

Solicitation No. CB18-RFQ0010 Page 14 of 35

Attachment No. 1 – Statement of Work Data Center Network Design and Implementation

3.1 OBJECTIVE

The Congressional Budget Office (CBO) requires advanced expert professional services in network design and implementation for a new data center located in Silver Spring, Maryland.

3.2 BACKGROUND

CBO currently has a mid-size campus network (FD) in Washington, D.C. and an Alternate Computing Facility (ACF) in Manassas, Virginia, each with independent internet services. CBO has standardized on the Cisco network platform and has deployed over 40 routers, switches, access servers, Virtual Private Network (VPN) and other network devices to support 300+ users in Washington, DC. CBO has recently leased additional rack space which creates a new data center at ByteGrid (BG), located in Silver Spring, Maryland. The new data center (BG) will have dedicated private connections with CBO’s existing data centers (FD and ACF), and with its own independent internet service.

3.3 SCOPE

The Contractor shall provide advanced expert level technical services in network engineering design, integration, enhancements, and implementation for the new BG data center.

3.4. DESCRIPTION OF WORK/TASKS

3.4.1 Task Descriptions

Task 1: Review the existing network infrastructure and redesign CBO’s network architecture to reflect the new data center requirements, ensuring the new network architecture meets the industry standards, best practices, and CBO’s security requirements.

Examples of the network architecture reviews include:

(1) Campus network

(2) ACF network

(3) CAPNET (private network for Legislative Branch agencies)

(4) AWS Cloud (network)

(5) Internal air-gap network

(6) CBO staff (private) and Public Wireless networks

Task 2: Identify and evaluate network performance and issues, work across technical teams and functional areas to collect data, diagnose problems, provide effective solutions to address network problems, and incorporate the solutions into the new design.

Task 3: Review the current network security model and ensure the network enhancement strengthens the existing security architecture and complies with CBO security policies.

Examples of tasks include:

(1) Review current and specific security threats and attacks directed at the Legislative branch networks and assure the network design works cooperatively with CBO’s security architecture to prevent and/or contain the attacks.

(2) Ensure security monitoring to have visibilities into various points of the network, and utilize network systems security controls and system monitoring to implement a self-defending network with multi-layered in-depth security.

Task 4: Provide engineering design for the new BG data center located in Silver Spring, Maryland, and revise and redesign CBO’s existing ACF data center to ensure all network systems are not only cost effective but also complement and enhance the newly designed network.

(1) Redesign CBO’s network architecture to reflect the integration of the new BG data center requirements.

(2) Design the new BG data center private connections with the existing datacenters and networks.

(3) Design the new internet connectivity in conjunction with CBO’s approved ISP providers, to ensure full redundancy and load balancing.

(4) Revise and redesign CBO’s existing FD and ACF data centers as necessary.

Solicitation No. CB18-RFQ0010 Page 15 of 35

(5) Modify the existing networks as necessary.

(6) Modify the existing data center design as necessary.

(7) Integrate the new BG datacenter with the existing data centers.

(8) Integrate the new network architecture with the existing and new security stack.

(9) Integrate the existing Cloud services/applications with the newly designed datacenters.

(10) Provide the detailed blue print for implementing the newly acquired network equipment.

(11) Implementation.

Task 5:…