View the file

Other files

File Type Posted
FA812122R0034_Solicitation_Extension.pdf PDF
FA812122R0034_Solicitation.pdf PDF
Packaging Requirements.pdf PDF
DID.pdf PDF
Special Packaging Requirements.pdf PDF
Ordering_Period_Outline.pdf PDF
DID5.pdf PDF
GFP_reduced.pdf PDF
3436122_PWS.pdf PDF
DID3.pdf PDF
RQR.pdf PDF
DID4.pdf PDF
Engineering instructions.pdf PDF
Exhibit_A_CDRL.pdf PDF
DID6.pdf PDF
Transportation Data.pdf PDF
DID2.pdf PDF
DID1.pdf PDF
Repair Data List 0001.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAV AF Reporting

In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the Contractor shall include a DD1348-1 when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure a DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the receiving report (DD250).

File details come from the government source that posted it. Updated .