CAV_AF_Reporting.pdf
PDF 394 KB Posted
- Solicitation number
- FA812122R0034
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FA812122R0034_Solicitation_Extension.pdf | ||
| FA812122R0034_Solicitation.pdf | ||
| Packaging Requirements.pdf | ||
| DID.pdf | ||
| Special Packaging Requirements.pdf | ||
| Ordering_Period_Outline.pdf | ||
| DID5.pdf | ||
| GFP_reduced.pdf | ||
| 3436122_PWS.pdf | ||
| DID3.pdf | ||
| RQR.pdf | ||
| DID4.pdf | ||
| Engineering instructions.pdf | ||
| Exhibit_A_CDRL.pdf | ||
| DID6.pdf | ||
| Transportation Data.pdf | ||
| DID2.pdf | ||
| DID1.pdf | ||
| Repair Data List 0001.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CAV AF Reporting
In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the Contractor shall include a DD1348-1 when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the DD1348-1, but will ensure a DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the receiving report (DD250).
File details come from the government source that posted it. Updated .