Categorical Exclusion Form (NEPA).pdf
PDF 258 KB Posted
- Attached to
- Everglades National Park Federal contract opportunity
- Solicitation number
- 693C73-22-B-000013
About this file
This document summarizes a federal contract opportunity for pavement preservation work at Everglades National Park. The National Park Service is seeking sealed bids from small business concerns only for project NP SER PMS FY22(1), with an estimated price range of $2 million to $5 million. The work includes microsurfacing, pavement markings, and other miscellaneous tasks across 29.57 miles of the Main Park Road and pull-off areas. Bids are due on a date specified in Block 13a of the solicitation. Interested vendors must register at www.sam.gov to receive email notifications and bid documents for this project available at that website as of approximately June 27, 2022. Annual representations and certifications must also be completed online at SAM.gov and www.dol.gov/vets/vets4212.htm. Questions should be directed to eflhd.contracts@dot.gov.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Results of Bid Opening- NP SER PMS FY22(1).pdf | ||
| VETS-4212 Form.pdf | ||
| ADV_Bidders Qualifications Form.doc | DOC document | |
| Plans - NP SER PMS FY22(1).pdf | ||
| SER PMS FY21(1) and FY22(1)_EVER_Pavement Memo_20210921_signed.pdf | ||
| FP14_Eng.pdf | ||
| IFB Solicitation - NP SER PMS FY22(1).pdf | ||
| EVER_C6_RipReport.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04)
NP SER PMS FY21(1), NP SER PMS FY22(1)
Eastern Federal Lands Highway Division NEPA Categorical Exclusion Form
Project Number: NP SER PMS FY21(1), NP SER PMS FY22(1) Date: 8/20/2021
Project Name: Pavement Preservation of Roads and Parking Areas in Everglades National Park
Location: National Park Service Everglades National Park Collier, Miami-Dade, and Monroe Counties
CE Category 23 CFR 771.117 (c)(26): Modernization of a highway by resurfacing, restoration, rehabilitation, reconstruction, adding shoulders, or adding auxiliary lanes (including parking, weaving, turning, and climbing lanes), if the action meets the constraints in paragraph (e)[..]
See 23 CFR 771.117 for full description of CE categories, including additional requirements when applying (c)26-28.
Project Description The project will provide pavement preservation treatment including micro surfacing, asphalt concrete patching, crack cleaning, crack sealing, pavement markings, and other minor maintenance. The work will be limited to the existing roadway, and will not involve soil disturbances, vegetation removal, or other impacts to park resources.
FY21(1)
Approximately 29.8 miles of roadway and parking areas will be improved at the following locations: Long Pine Campground, Flamingo VC, Whitewater Bay Access and Parking, Flamingo Campground, Shark Valley Access Road, and Shark Valley VC.
FY22(1)
Approximately 29.57 miles of Main Park Road will be improved.
Environmental Commitments and Mitigation Measures Standard BMPS will be used to protect air quality, water quality, and prevent pollution.
Summary of Section 7 of the Endangered Species Act Compliance The National Park Service is the lead federal agency for Section 7 compliance. The project has no potential to effect endangered species.
https://www.ecfr.gov/cgi-bin/text-idx?SID=842bb87055f89f1d0ff242f2b9e20ff7&mc=true&node=pt23.1.771&rgn=div5#se23.1.771_1117
EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04)
Summary of Section 106 of the National Historic Preservation Act Compliance The National Park Service is the lead federal agency for Section 106 compliance. The project will not result in changes to the character of the Park roadway system and will not result in ground disturbance outside the existing paved area. The project will have no effect on historic resources.
Additional Agency Coordination and Compliance The National Park Service has documented NEPA compliance for this project under PEPC ID 101941. It is tiered from the existing PEPC 61956, a multi-year pavement preservation CE.
No environmental permits are required to construct these projects.
EFLHD NEPA Categorical Exclusion Form EFL-TM-ENV-03(04)
Categorical Exclusion Recommendation:
On the basis of the environmental impact information in the statutory compliance file, with which I am familiar, I believe the project should be categorically excluded from further NEPA analysis.
Ryan Kimberley Environmental Protection Specialist
Federal Highway Administration
Date
Categorical Exclusion Determination:
On the basis of the environmental impact information in the statutory compliance file, with which I am familiar, I am categorically excluding the described project from further NEPA analysis. The project meets the 23 CFR 771.117(a) definition of a categorical exclusion. No unusual circumstances per 23 CFR 771.117(b) apply.
Kevin S. Rose Environmental Team Leader
Federal Highway Administration
Date
| 2021-08-20T10:09:10-0400 | |
| RYAN DEFOREST KIMBERLEY |
| 2021-08-20T11:27:22-0400 | |
| KEVIN S ROSE |