CASS-Bldg35-FlooringInstall-SOW.pdf
PDF 135 KB Posted
- Attached to
- Cass Job Corps Center Flooring Installation
- Solicitation number
- 1282A721Q0019
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| General Decision Number AR20200018.pdf | ||
| 1282A721Q0019.pdf | ||
| CASS-Bldg35-Flooring-Plans-Photos.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FLOORING REPLACEMENT 010150 – 1
CASS JOB CORPS CCC GENERAL REQUIREMENTS
BUILDING 35 BUMPERS DORM SOUTH WINGS FLOORING INSTALLATION
CASS JOB CORPS CIVILIAN CONSERVATION CENTER
SECTION 010150
GENERAL REQUIREMENTS
PART 1 – SUMMARY OF WORK
1.1 EXISTING CONDITIONS
A. Presently the old flooring in the Southwest and Southeast wing dorm rooms, hallway, common areas, and RA offices has been removed. Due to age and wear of this flooring it needed replacing. This project is designed to upgrade the existing flooring in these wings to match the remainder of the building. See attached floorplan and photos.
1.2 PROJECT REQUIREMENTS
A. Work for this project requires the contractor to be responsible for supplying all labor, equipment, miscellaneous items, and all necessary valid licenses for the work summarized as follows:
1. The vendor will install approximately 140 square yards. of commercial style direct glue nylon carpet tiles, 6000 sq. ft of ceramic floor tile, and 2300 linear feet. of 6” vinyl wall base in the Southwest and Southeast wings of Bumpers Dorm. (see floor plan for identified areas). All tile, mortar, grout, carpet, adhesives/sealers and rubber transitions/ moldings will be provided by Cass Job Corps Center. The vendor shall provide labor for final surface area preparations and installation of new floor surface. The areas are approximate. The vendor is responsible for verifying quantities prior to submitting a proposal.
a. Carpet tiles are 24” x 24”
b. Ceramic tile is 7”x36”
c. Cove base is 6” vinyl wall base
1.3 LOCATION
A. The Cass Job Corps Center is located in the Ozark National Forest 13 miles north of Ozark, Arkansas. The address is 21424 N. Highway 23 Ozark, AR 72949
1.4 PROJECT SCHEDULING
A. Work hours for this project are between 7:30 AM-4:00 PM Monday through Friday.
After hours and weekend, work is permitted with prior approval from center POC.
1.5 PERIOD OF PERFORMANCE
A. The work shall be completed within 21 calendar days from notice to proceed.
1.6 POINT OF CONTACT
FLOORING REPLACEMENT 010150 – 2
Center Point of Contact: Charles Prewitt, charles.prewitt@usda.gov, 479-667-0910
1.7 USE OF PREMISES
A. Workers must sign in at the Administrative Office and receive a visitor pass each day;
sign out can be done at the Administrative Office during office hours or at the Residential Living Office after hours.
B. Confine constructions operations to immediate area of work. Do not disturb portions of project site beyond areas in which the work is indicated.
C. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's day-to-day operations.
D. Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times.
Do not use these areas for parking or storage of materials. Do not close or obstruct walkways, corridors, or other occupied or used facilities without written permission from Government and authorities having jurisdiction.
1.8 WORK RESTRICTIONS
A. Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes.
B. Fraternization with students is not permitted.
1.9 SCHEDULE OF ITEMS
A. Schedule of Items: Provide pricing for all items listed in the Schedule of Items.
B. Base Items (BI):
1. Base Item No. 1- Flooring Installation
a. Measurement: This item is measured as a Lump Sum quantity.
b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to install government furnished carpet tile, ceramic tile and vinyl base.
PART 3 – TEMPORARY FACILITIES AND CONTROLS
2.1 USE OF UTILITIES
A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an mailto:charles.prewitt@usda.gov
FLOORING REPLACEMENT 010150 – 3
acceptable condition. At Substantial Completion, restore these facilities to condition existing before initial use. The following are available for use by the contractor: water, and electrical power services. The following are not available: telephone service.
2.2 SANITARY FACILITIES
A. Sanitary facilities are available for use by the Contractor. Facilities must be cleaned and maintained daily (in lobby of Bumpers Dorm).
2.3 CONSTRUCTION WASTE DISPOSAL FACILITIES
A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste.
2.4 SAFETY AND ENVIRONMENTAL PROTECTION
A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamination or pollution or other undesirable effects.
B. Fire Protection.
1. Store combustible materials in containers in fire-safe locations.
2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas.
3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition.
PART 4 – EXECUTION REQUIREMENTS
3.1 EXAMINATION
A. Before beginning work, examine areas and document existing conditions. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions.
B. Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents.
3.2 INSTALLATION
A. Locate the Work and components of the Work accurately, in correct alignment and elevation to fit with existing construction.
FLOORING REPLACEMENT 010150 – 4
B. Install per manufacturer's written instructions and recommendations.
3.3 PROGRESS CLEANING
A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully.
1. Comply with NFPA 241 requirements for removal of combustible waste materials and debris.
2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C).
B. Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
3.4 PROTECTION OF INSTALLED CONSTRUCTION
A. Provide protection and maintain conditions that ensure installed Work does not get damaged or deteriorated prior to Substantial Completion.
3.5 CORRECTION OF THE WORK
A. Repair or remove and replace defective construction. Restore damaged substrates and finishes.
1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment.
PART 5 – CLOSEOUT PROCEDURES
4.1 SUBSTANTIAL COMPLETION
A. Definition of Substantial Completion: The Date certified by the CO when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use for which it is intended, as expressed in the Contract Documents.
B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request.
1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete.
2. Advise the CO of pending insurance changeover requirements.
3. Submit specific warranties, workmanship bonds, final certifications, and similar documents.
4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities.
FLOORING REPLACEMENT 010150 – 5
5. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable.
6. Complete startup testing of systems.
7. Submit changeover information related to Government occupancy, use, operation, and maintenance.
8. Complete final cleaning requirements, including touchup painting.
9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects.
C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Completion after inspection or will notify Contractor of items, either on Contractor's list or additional items identified by CO, that must be completed or corrected before certificate will be issued.
1. Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected.
2. Results of completed inspection will form the basis of requirements for Final Completion.
4.2 FINAL COMPLETION
A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following:
1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved for acceptance.
2. Submit evidence of final, continuing insurance coverage complying with insurance requirements.
3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems.
B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspection or will notify Contractor of construction that must be completed or corrected before certificate will be issued.
1. Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected.
FLOORING REPLACEMENT 010150 – 6
4.3 LIST OF INCOMPLETE ITEMS (PUNCH LIST)
A. Preparation: Submit two copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are outside the limits of construction.
4.4 FINAL CLEANING
A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations.
B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces.
C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project:
1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances.
2. Remove tools, construction equipment, machinery, and surplus material from Project site.
3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces.
Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration.
D. Remove waste materials from Project site and dispose of lawfully.
END OF SECTION 010150
| 1. |
| 1.1 Existing conditions |
| A. Presently the old flooring in the Southwest and Southeast wing dorm rooms, hallway, common areas, and RA offices has been removed. Due to age and wear of this flooring it needed replacing. This project is designed to upgrade the existing flooring i... |
| 1.2 project requirements |
| A. Work for this project requires the contractor to be responsible for supplying all labor, equipment, miscellaneous items, and all necessary valid licenses for the work summarized as follows: |
| 1. The vendor will install approximately 140 square yards. of commercial style direct glue nylon carpet tiles, 6000 sq. ft of ceramic floor tile, and 2300 linear feet. of 6” vinyl wall base in the Southwest and Southeast wings of Bumpers Dorm. (see f... |
| a. Carpet tiles are 24” x 24” |
| b. Ceramic tile is 7”x36” |
| c. Cove base is 6” vinyl wall base |
| 1.3 location |
| A. The Cass Job Corps Center is located in the Ozark National Forest 13 miles north of Ozark, Arkansas. The address is 21424 N. Highway 23 Ozark, AR 72949 |
| 1.4 project scheduling |
| A. Work hours for this project are between 7:30 AM-4:00 PM Monday through Friday. After hours and weekend, work is permitted with prior approval from center POC. |
| 1.5 PERIOD OF PERFORMANCE |
| A. The work shall be completed within 21 calendar days from notice to proceed. |
| 1.6 point of contact |
| Center Point of Contact: Charles Prewitt, charles.prewitt@usda.gov, 479-667-0910 |
| 1.7 USE OF PREMISES |
| A. Workers must sign in at the Administrative Office and receive a visitor pass each day; sign out can be done at the Administrative Office during office hours or at the Residential Living Office after hours. |
| B. Confine constructions operations to immediate area of work. Do not disturb portions of project site beyond areas in which the work is indicated. |
| C. Government will occupy site and buildings during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform the work so as not to interfere with Government's... |
| D. Keep driveways, parking areas, loading areas and entrances to buildings clear and available to Government, Government's employees, and emergency vehicles at all times. Do not use these areas for parking or storage of materials. Do not close or ob... |
| 1.8 WORK RESTRICTIONS |
| A. Smoking is not permitted within the buildings or within 25 feet (8 m) of entrances, operable windows, or outdoor air intakes. |
| B. Fraternization with students is not permitted. |
| 1.9 schedule of items |
| A. Schedule of Items: Provide pricing for all items listed in the Schedule of Items. |
| B. Base Items (BI): |
| 1. Base Item No. 1- Flooring Installation |
| a. Measurement: This item is measured as a Lump Sum quantity. |
| b. Payment: The contract lump sum price as shown in the Schedule of Items includes all materials, equipment, labor and incidentals to install government furnished carpet tile, ceramic tile and vinyl base. |
| 2. |
| 2.1 use of UTILITies |
| A. Utilities: Use of Government existing facilities will be permitted without metering and without payment of use charges, as long as facilities are cleaned and maintained in an acceptable condition. At Substantial Completion, restore these facilitie... |
| 2.2 sanitary facilities |
| A. Sanitary facilities are available for use by the Contractor. Facilities must be cleaned and maintained daily (in lobby of Bumpers Dorm). |
| 2.3 construction WASTE DISPOSAL faciLITIES |
| A. Provide waste-collection containers in sizes adequate to handle waste from construction operations. Containerize and clearly label hazardous, dangerous, or unsanitary waste materials separately from other waste. |
| 2.4 safety and environmental PROTECTION |
| A. Environmental Protection: Contractor shall provide protection, operate temporary facilities, and conduct construction in ways and by methods that comply with environmental regulations and that minimize possible air, waterway, and subsoil contamina... |
| B. Fire Protection. |
| 1. Store combustible materials in containers in fire-safe locations. |
| 2. Maintain unobstructed access to fire extinguishers, fire hydrants, fire-protection facilities, stairways, and other access routes for firefighting. Prohibit smoking in hazardous fire-exposure areas. |
| 3. Supervise welding operations, combustion-type temporary heating units, and similar sources of fire ignition. |
| 3. |
| 3.1 EXAMINATION |
| A. Before beginning work, examine areas and document existing conditions. Proceed with installation only after unsatisfactory conditions have been corrected. Proceeding with the Work indicates acceptance of surfaces and conditions. |
| B. Immediately on discovery of the need for clarification of the Contract Documents, submit a request for information to CO. Include a detailed description of problem encountered, together with recommendations for changing the Contract Documents. |
| 3.2 INSTALLATION |
| A. Locate the Work and components of the Work accurately, in correct alignment and elevation to fit with existing construction. |
| B. Install per manufacturer's written instructions and recommendations. |
| 3.3 PROGRESS CLEANING |
| A. Clean Project site and work areas daily, including common areas. Dispose of materials lawfully. |
| 1. Comply with NFPA 241 requirements for removal of combustible waste materials and debris. |
| 2. Do not hold materials more than 7 days during normal weather or 3 days if the temperature is expected to rise above 80 deg F (27 deg C). |
B. Burying or burning waste materials on-site will not be permitted. Washing waste materials down sewers or into waterways will not be permitted.
| 3.4 PROTECTION OF INSTALLED CONSTRUCTION |
| A. Provide protection and maintain conditions that ensure installed Work does not get damaged or deteriorated prior to Substantial Completion. |
| 3.5 CORRECTION OF THE WORK |
| A. Repair or remove and replace defective construction. Restore damaged substrates and finishes. |
| 1. Repairing includes replacing defective parts, refinishing damaged surfaces, touching up with matching materials, and properly adjusting operating equipment. |
| 4. |
| 4.1 SUBSTANTIAL COMPLETION |
| A. Definition of Substantial Completion: The Date certified by the CO when construction is sufficiently complete, in accordance with the Contract Documents, so the Government can occupy or utilize the Work or designated portion thereof for the use fo... |
| B. Preliminary Procedures: Before requesting inspection for determining date of Substantial Completion, complete the following. List items below that are incomplete in request. |
| 1. Prepare a list of items to be completed and corrected (punch list), the value of items on the list, and reasons why the Work is not complete. |
| 2. Advise the CO) of pending insurance changeover requirements. |
| 3. Submit specific warranties, workmanship bonds, final certifications, and similar documents. |
| 4. Obtain and submit releases permitting Government unrestricted use of the Work and access to services and utilities. |
| 5. Deliver tools, spare parts, extra materials, and similar items to location designated by Government. Label with manufacturer's name and model number where applicable. |
| 6. Complete startup testing of systems. |
| 7. Submit changeover information related to Government occupancy, use, operation, and maintenance. |
| 8. Complete final cleaning requirements, including touchup painting. |
| 9. Touch up and otherwise repair and restore marred exposed finishes to eliminate visual defects. |
| C. Inspection: Submit a written request for inspection for Substantial Completion. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare the Certificate of Substantial Comple... |
| 1. Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected. |
| 2. Results of completed inspection will form the basis of requirements for Final Completion. |
| 4.2 FINAL COMPLETION |
| A. Preliminary Procedures: Before requesting final inspection for determining date of Final Completion, complete the following: |
| 1. Submit certified copy of CO’s Substantial Completion inspection list of items to be completed or corrected (punch list), endorsed and dated by CO. The certified copy of the list shall state that each item has been completed or otherwise resolved f... |
| 2. Submit evidence of final, continuing insurance coverage complying with insurance requirements. |
| 3. Instruct Government personnel in operation, adjustment, and maintenance of products, equipment, and systems. |
| B. Inspection: Submit a written request for final inspection for acceptance. On receipt of request, CO will either proceed with inspection or notify Contractor of unfulfilled requirements. CO will prepare a final Certificate for Payment after inspe... |
| 1. Re-inspection: Request re-inspection when the Work identified in previous inspections as incomplete is completed or corrected. |
| 4.3 LIST OF INCOMPLETE ITEMS (PUNCH LIST) |
| A. Preparation: Submit two copies of list. Include name and identification of each space and area affected by construction operations for incomplete items and items needing correction including, if necessary, areas disturbed by Contractor that are o... |
| 4.4 fiNAL CLEANING |
| A. General: Provide final cleaning. Conduct cleaning and waste-removal operations to comply with local laws and ordinances and Federal and local environmental and antipollution regulations. |
| B. Cleaning Agents: Use cleaning materials and agents recommended by manufacturer or fabricator of the surface to be cleaned. Do not use cleaning agents that are potentially hazardous to health or property or that might damage finished surfaces. |
| C. Complete the following cleaning operations before requesting inspection for certification of Substantial Completion for entire Project or for a portion of Project: |
| 1. Clean Project site, yard, and grounds, in areas disturbed by construction activities, including landscape development areas, of rubbish, waste material, litter, and other foreign substances. |
| 2. Remove tools, construction equipment, machinery, and surplus material from Project site. |
| 3. Touch up and otherwise repair and restore marred, exposed finishes and surfaces. Replace finishes and surfaces that cannot be satisfactorily repaired or restored or that already show evidence of repair or restoration. |
D. Remove waste materials from Project site and dispose of lawfully.