This is an addendum to a construction contract for Owosso Public Schools, a Michigan school district undertaking a 6-12 Campus project managed by Clark with Project No. 2770. The addendum, designated as Addendum No. 3 for Bid Package Release No. 4 focused on casework work, extends the bid proposal due date to Wednesday, June 12, 2019 at 11:00 a.m. All bidders are required to acknowledge receipt of this addendum on their Bid Proposal Form and are held responsible for reviewing the document and incorporating all work reasonably inferred from the scope into their proposals.
The addendum clarifies that manufacture options for materials are open to suppliers beyond those initially listed in the contract documents, provided that alternate suppliers meet the specified quality and performance requirements outlined in the Project Manual. All incidental work required in connection with the casework scope shall be included in bid proposals even if not explicitly detailed in the specifications.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Addendum No. 3 Project No. 2770
Owosso – 6-12 Campus
Bid Release No. 4 Casework
6/03/19
ADDENDUM NO. 3
PROJECT: Owosso Public Schools
DESCRIPTION: 6-12 Campus
BID PACKAGE RELEASE NUMBER: 3
CLARK PROJECT NO: 2770
BID PROPOSAL DUE DATE/TIME: 11:00am Wednesday June 12, 2019
The following clarifications and/or Changes made to the Contract Documents are hereby made part of the
Contract Documents.
The general character of the Work clarified or revised by this Addendum shall be the same as required by the complete set of Contract Documents. All incidentals required in connection with the Work of this
Addendum shall be included in the Scope of Work even though not specifically specified.
All bidders shall be held responsible to review the Addendum and to include in its Bid Proposal all Work reasonably inferred to be included in its Scope of Work.
Acknowledge receipt of this Addendum in the space provided on the Bid Proposal Form.
A. Bidding and Contract Requirement Modifications:
1. Bid Due date extended to Wednesday June 12, 2019 at 11:00am.
B. Scope Changes / Clarifications:
General
1. Manufacture options are open beyond the listed manufacturers as long as alternate suppliers meet the quality and performance specifications of the
Project Manual.
END OF SECTION