Carroll County Bridge Replacement.pdf
PDF 94 KB Posted
- Attached to
- Carroll County Bridge Replacement
- Solicitation number
- BRO-R017 (002)
- Issued by
- Cass County, Missouri
About this file
This is an Invitation to Bid issued by the Carroll County Commission in Missouri for the construction of a replacement bridge. The project, designated BRO-R017 (002), involves the construction of a 148-foot-2¼-inch long, single-span steel plate girder bridge at a 20-degree skew and 0% grade, located on County Road 271 over Tater Hill Creek in Carroll County, Missouri. Sealed bids will be received at 8 S. Main, Suite 6, Carrollton, Missouri 64633 until 10:00 a.m. on July 22, 2026. Plans and specifications are available for purchase through Drexel Technologies via their eDistribution platform at www.drexeltech.com or by contacting distribution@drexeltech.com. Contract documents may also be obtained from Drexel Technologies at 10840 West 86th Street, Lenexa, Kansas 66214, telephone 913-371-4430, with all shipping charges the responsibility of the requesting party. Technical questions regarding the project should be directed to Aaron McVicker of McClure at 660-415-4007.
All bidders must be listed on MoDOT's Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, with contractor questionnaires required to be on file seven days prior to bid opening. A certified or cashier's check or bid bond in the amount of 5% must accompany each proposal. All labor must comply with prevailing wage requirements established by the U.S. Department of Labor or Missouri Department of Labor and Industrial Relations, whichever is higher. Contractors and subcontractors must provide a 10-Hour OSHA construction safety program or approved equivalent to on-site employees within 60 days of work commencement. The DBE goal for the project is 0%, and no second-tier subcontracting is permitted. The contract will be awarded to the lowest responsive, responsible bidder complying with contract conditions and within the owner's budget. The Carroll County Commission reserves the right to reject any and all bids and to waive any informality.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
BRO-R017 (002) - Carroll County Bridge Replacement
Sealed bids for BRO-R017 (002), Carroll County Replacement Bridge No. 2170008 , will be received at: 8 S. Main, Suite 6, Carrollton MO 64633 until 10:00 a.m. on the 22nd day of July, 2026 , at the office of the Carroll County Commission , and at that time will be publicly opened and read. All bids shall be submitted in the form of a hard copy.
The proposed work includes the construction of a 148’-2 1/4” long, single span, Steel Plat Girder bridge at 20-degree L.A. skew and 0% grade, located on County Road 271, over Tater Hill Creek in Carroll County MO.
Copies of plans and specifications can be seen or purchased for a Non-Refundable fee on-line at www.drexeltech.com in their eDistribution plan room, additional assistance is available at distribution@drexeltech.com. Information regarding this project can be found in the “Public Jobs” link on the website. Contractors desiring the Contract Documents for use in preparing bids may also obtain a set of such documents from Drexel Technologies; 10840 West 86th Street, Lenexa, KS 66214, telephone number is 913-371-
4430. Bidding documents will be shipped only if the requesting party assumes responsibility for all related charges. Corporate, certified, or cashier’s checks shall be made payable to Drexel Technologies, Inc.Any questions regarding the project, plans, specifications, or bid documents should be directed to Aaron McVicker of
McClure, at 660-415-4007.
All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the United States Department of Labor (Federal Wage Rates) and Missouri Department of Labor and Industrial Relations (State Wage Rates), whichever is higher.
The Carroll County Commission hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award.
All bidders must be on MoDOT’s Qualified Contractor List per Section 102.2 of the Missouri Standard
Specifications for Highway Construction, including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening.
Contractors and sub-contractors who sign a contract to work on public works project provide a 10-Hour OSHA construction safety program, or similar program approved by the Department of Labor and Industrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project.
A certified or cashier’s check or a bid bond in the amount of 5% shall be submitted with each proposal.
The contract, if awarded, will be awarded to the lowest, responsive, responsible bidder complying with the
Conditions of the Contract Documents within the Owner’s budget. The Bidder to whom the awards are made will be notified at the earliest possible date. The Owner, however, reserves the right to reject any and all Bids and to waive any informality in Bids received whenever such rejection or waiver is in his interest.
The DBE Goal for this project is 0% .
No 2nd tier subcontracting will be allowed on this project.
http://www.drexeltech.com/ mailto:distribution@drexeltech.com
File details come from the government source that posted it. Updated .