Capability Statement.docx

DOCX document 33 KB Posted

Attached to
Egyptian Naval Armament Department Shiplift Maintenance Inpsections
Solicitation number
W912ER23R0028
Issued by

About this file

This capability statement template outlines requirements for a contractor to perform semi-annual maintenance inspections of a shiplift installation at the Ras El Tin Naval Base in Alexandria, Egypt under solicitation number W912ER23R0028 from the U.S. Army Corps of Engineers Engineering District Middle East. The template requests information on the contractor's capabilities, including whether it is registered in the System for Award Management and has performed similar work in Egypt, the CENTCOM area of responsibility, or at the naval base. It also includes a project experience template to provide details on up to three relevant past projects within the last five years, specifying location, contract information, description of work, and role as a prime contractor or subcontractor.

View the file

Other files

File Type Posted
A.02_Performance Work Statement.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAPABILITY STATEMENT

Solicitation No. W912ER23R0028 Egyptian Naval Armament Department Shiplift Maintenance Inspections

SECTION 1. GENERAL:

1. Business Name: (Insert Business Name)

2. Business Address: (Insert Business Address)

3. Unique Entity ID: (Insert Unique Entity ID)

4. NAICS Codes: (Insert all applicable NAICS Codes)

5. Responsible Point of Contact:

Name:(Insert Name)
Telephone:(Insert Telephone Number)
Email:(Insert Email Address)

1. Check All That Apply: Our firm is:

|_| United States (U.S) registered |_| Small business |_| 8(a) small business |_| Veteran-owned small business |_| Service-disabled veteran-owned small business |_| HUBZone small business |_| Small disadvantaged business |_| Women-owned small business concern.

|_| Large Business

SECTION 2. CONTRACTOR ARRANGEMENT:

Our firm would propose on this project as a:

|_| Sole contractor |_| Prime contractor performing at least 50% of the work with subcontractor(s) |_| Prime contractor performing at least 50% of the work with the following team member subcontractor(s) (Insert business name, business size, Unique Entity ID, and work which will be subcontracted) |_| Joint venture with (Insert business name, business size, and Unique Entity ID)

[See FAR subpart 9.6 for the government policy on teaming arrangements, as well as 8(a) Program regulations described in 13 CFR 124.513, HUBZone Program regulations described in 13 CFR 126.616, and Service-Disabled Veteran-Owned Program regulations described in FAR 19.1403 (c) and 13 CFR 125.15(b).]

SECTION 3. CAPABILITY:

1. Our firm is registered in the System for Award Management (SAM):

|_| Yes |_| No

1. Our firm can provide management, labor, materials, equipment, tools, supervision, and knowledge to accomplish a broad range of routine maintenance inspections for various facilities throughout the Country of Egypt:

|_| Yes |_| No

2. Our firm has performed work in the following locations:

|_| Egypt |_| CENTCOM AOR |_| None

3. Our firm can perform semi-annual maintenance inspections of the Shiplift installation:

|_| Yes |_| No

4. If awarded a contract, our firm |_| is/ |_| is not financially capable to perform the cost of this procurement and related services.

5. Our firm has the capabilities to obtain base access at the Ras El Tin Naval Base, Alexandria, Egypt.

|_| Yes |_| No

6. Our firm has previously worked on the Ras El Tin Naval Base, Alexandria, Egypt.

|_| Yes |_| No

SECTION 4. PROJECT EXPERIENCE:

Complete the sheet below titled “Project Experience Template” for no more than three (3) projects within the last five (5) years you have inspection experience similar to the requirements in the Performance Work Statement (PWS). Provide information in sufficient detail regarding previous experience (indicate whether as a prime contractor or subcontractor) on similar requirements (include size, scope, complexity, timeframe, etc.) that will facilitate in making a capability determination.

CAPABILITY STATEMENT

Solicitation No. W912ER23R0028 Egyptian Naval Armament Department Shiplift Maintenance Inspections

PROJECT EXPERIENCE TEMPLATE

SERVICES OF SIMILAR SIZE AND SCOPE PROJECTS

(Make additional copies as needed but not more than three pages)

Project Title:

Location:

Address of work site:

Contract number:

Task order number:

Dates of performance:
From

To

Total Contract Value:
$
Total Value to date:
$

Procuring activity:

Procurement point of contact:

Phone:

Type of agency:
Government

Non-Government

Performed as:
Prime Contractor

Subcontractor

Other (describe)

General description of work:

Describe your specific duties/roles, being sure to list relevant criteria associate with this project in relation to those described in the market research; notice:

File details come from the government source that posted it. Updated .