Performance Oriented Construction Activities Design-Build / Design-Bid-Build Construction Kuwait Multiple Award Task Order Contract
W5J9JE-22-S-0001
Capability Statement
SECTION 1. GENERAL
1. Business Name:
2. Business Address:
3. CAGE Code:
4. NAICS Codes:
5. JCCS Identification Number (if applicable):
6. Responsible Point of Contact:
Telephone:
Email:
7. Our firm is (check all that apply):
☐ Small business ☐ 8(a) small business ☐ Veteran-owned small business ☐ Service-disabled veteran-owned small business HUBZone small business ☐ Small disadvantaged business ☐ Women-owned small business concern.
☐ None of the above.
SECTION 2. CONTRACTOR ARRANGEMENT
1.
☐ Sole contractor ☐ Prime contractor performing at least 50% of the work with subcontractor(s) ☐ Prime contractor performing at least 50% of the work with the following subcontractor(s) (Insert business name, business size, cage code, and work which will be subcontracted) _____________________________________________________ ☐ Joint venture with (Insert business name, business size, and cage code). _______
See FAR subpart 9.6 for Government policy on teaming arrangements, as well as 8(a) Program regulations described in 13 CFR 124.513, HUBZone Program regulations described in 13 CFR 126.616, and Service-Disabled Veteran-Owned Program regulations described in FAR 19.1403 (c) and 13 CFR 125.15(b)
SECTION 3. CAPABILITY
1. If awarded a contract, the maximum capacity our firm can adequately perform and provide a Surety Performance Bond and Payment Bonds for any single Task / Delivery Order is:________________________________________________________
2. If awarded a contract, the maximum total contract capacity our firm can adequately perform and provide a Surety Performance Bond and Payment Bonds is: _______________________________________________________________
3. Our firm is capable of performing: ☐ 1 order ☐ 2 - 5 orders simultaneously If 2 - 5, provide a potential team composition for managing four Task Orders and address the associated tasks and responsibilities for each team member: ____________ __________________- Address on separate document_-__________________
4. Our firm has performed work in Kuwait: ☐ Yes ☐ No
5. Our firm currently has the necessary documents / permits / certifications required to perform work in Kuwait: ☐ Yes ☐ No If yes, address ability and capability to perform in Kuwait:___________________ __________________- Address on separate document_-__________________
6. Our firm has constructed the following facility types / projects (check all that apply):
☐ Infrastructure Connections ☐ Pavements and Roads ☐ Administrative Buildings ☐ Warehouses ☐ Maintenance Facilities ☐ Military Living Quarters ☐ Microgrid Power Plants ☐ Covered Parking ☐ Security Fencing ☐ Work in Secured Areas
7. Provide a minimum of 2 / maximum of 5 projects completed in the past seven (7) years (work in Kuwait preferred) demonstrating previous experience performing services that demonstrate experience with projects similar to the ones identified in paragraph 6 of this section. _________________- Address on separate document_-________________
8. If awarded a contract, our firm ☐ is / ☐ is not capable to perform at least 15% of the cost of the construction and related services.
9. Based on your previous experience, identify the percent work effort you would expect to subcontract. __________________________________________________________
10. Our firm is performing or has successfully performed construction of facilities and associated services for either US or Foreign military commands / facilities / projects: ☐ Yes ☐ No If yes, provide name of project location, type of work performed, role of firm (prime, sub, team member), dollar value of work performed by your firm, percentage of total contract value performed by your firm, and date work was performed. Include no more than two single-spaced, 10 font, 8 1/2" x 11" pages containing this information. ____________ ____________________- Address on separate document_-_____________________
11. Our firm currently ☐ has / ☐ does not have a Facilities Clearance, or ☐ held a Facility Clearance in the past.
12. Our firm ☐ is / ☐ is not experienced in obtaining Defense Base Act (DBA) insurance for our personnel.
13. Our firm ☐ is / ☐ is not experienced with operating under SPOT requirements.
SECTION 4. RETURN INSTRUCTIONS
Submit capability packages via email to: Jessica Merrill, Contracting Officer at Jessica.l.Merrill@usace.army.mil and Uriel Ramirez, Contract Specialist at Uriel.Ramirez@usace.army.mil no later than 4:00 pm Eastern Time on 27 May 2022. In the subject line state “USACE TAD Design Build and Design-Bid-Build IDIQ MATOC – Kuwait - [Company Name]." All information concerning this requirement will be posted only on the SAM website (https://sam.gov).
File details come from the government source that posted it. Updated .