Capabilities Questionnaire - T6 ACI 2_23_23 March 16 23.xlsx
XLSX spreadsheet 20 KB Posted
- Solicitation number
- N0042122RFPREQTPM2730466
View the file
Other files
| File | Type | Posted |
|---|---|---|
| T-6_Reports_FOIA_Responsive_Documents_Redacted.pdf | ||
| T-6 ACI PWS 9 March 2023.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sample Questionnaire
| CAPABILITIES QUESTIONNAIRE - T-6 AIRCRAFT CONDITIONAL INSPECTION AND STRIP AND REPAINT | |
| UPDATED 16 MARCH 2023 | |
| COMPANY NAME | |
| COMPANY CAGE CODE |
| # | Capability | YES | NO | Provide Details |
| 1 | The Government is trying to identify barriers to small business participation for this solicitation. Are there changes that your company would recommend be made to the PWS or included in the RFP that would increase small business participation as either a prime or a subcontractor for this requirement? For large businesses, please explain your general plans for Small Business Utilization by PWS tasks. |
2 Are there any comments and/or recommendations for the PWS to improve understanding of the requirements or contractibility?
| 3 | Are there limitations your company has in meeting the schedule for the base and option periods? If there are, please provide a recommended schedule with key events identified. |
| 4 | Describe your current and past experience (within last five years) of T-6 aircraft depot maintenance support. Provide the number of aircraft, type of work, location and how the work was similar in scope to that defined for this effort. For aircraft other than the T-6, please describe the same. |
| 5 | Please describe your technical approach for manning quality assurance and maintenance positions for work to be performed on aircraft. Include personnel experience requirements, certification requirements and the initial and recurring training required for personnel to be qualified and to certify others to operate T-6 aircraft systems required for power-on and engine run checks. Also explain any On the Job Training program that would be used for this effort. |
| 6 | Please describe your current engineering capability and whether you have performed engineering on the T-6 aircraft. |
| 7 | Please describe your Part 145 certification and approvals as they relate to requirements specified for this effort. Also describe any limitations and your approach to overcoming them. |
| 8 | Pleae describe your experience operating under requirements of DCMA INST 8210.1 and Naval Aviation Maintenance Program COMNAVAIRFORINST 4790. Describe the maintenance programs anitcipated for this effort and your capability to develop Ground Operating Procedures for them. (Example: Tool Control, Egress and Explosives System Checkout) Do you have similar programs and operating procedures established under FAA or FAR regulations? |
| 9 | Please describe your current experience, capability and manpower certifications and training for handling and maintaining T-6 egress, explosives and ALSS systems. Please include a summary describing the program and instructions used for managing these requirements. If your company does not have experience maintaining these systems on the T-6, please describe your current egress, explosives and ALSS capability and the timeline for establishing certification, training and programs necessary for the T-6.. |
| 10 | The Government is considering the benefits of longer periods of performance, ranging from five-to-ten years, and is interested in receiving from industry specific examples of long-term benefits of a total contract term more than five years (one-year base plus four one-year options), such as a one-year base plus five–to-nine one-year options instead. Please provide specific examples that would pertain to enhanced strategic relationships, increased cost efficiency of ramp-up or infrastructure investments, advantageous contract terms that would apply, or any other efficiencies that would be available only through such a longer-term contract. Additionally, please provide comments and/or recommendations regarding the effect of contract duration on cost effectiveness and industry participation. |
| 11 | Please describe your company's current capability and approach for establishing the necessary supply and component repair capabilities for this effort. Please explain any risks with regards to supply chain issues and issues with turn around time for repair of components. |
| 12 | Please describe whether your company has existing support equipment that can reduce Government Furnished support equipment anticipated to be provided for this effort. Please reference Government Furnished property list in the Bidders Library. |
| 13 | Please describe the facility and location your company anticipates work will be performed. Include field size, runway length, operating hours, hangar size, storage space and any facility upgrades, limitations or constraints that need to be addressed for accomplishing the totality of requirements specified. |
| 14 | Would you submit as the Prime Contractor or as a subcontractor? If your company would submit as a subcontractor, indicate the Prime Contractor with whom you would subcontract. |
15 What Government technical information, data, or reports would aid potential offerers in better understanding the work and be helpful in preparation of proposals?
16 Describe any limitations your company may have for responding to these requirements. Include limitations and courses of action necessary to overcome the limitation. Identify whether the limitation is based on cost, schedule or technical performance issues you feel should be considered.
File details come from the government source that posted it. Updated .