Capabilites Survey.pdf
PDF 48 KB Posted
- Solicitation number
- W912UM23R0001
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sources Sought-Capabilities Survey for Solicitation No. W912UM-23-R-0001 MATOC for D-B Construction, Various Locations, Korea
1. Company information
Name: __________________________________________________________________________
SAM UEI Number: __________________________________________________________________________
Address: __________________________________________________________________________
Point of Contact: __________________________________________________________________________
Phone Number: __________________________________________________________________________
E-mail Address: __________________________________________________________________________
2. Company's interest in submitting a proposal to the solicitation when it is issued. ☐Yes ☐No
3. List of D-B and D-B-B construction projects completed as the prime contractor within the last 5 years in Korea, no less than KRW 300,000,000 (approx. $250k) and greater than or equal to KRW 69,000,000,000
(approx. $50M). Insert more rows if necessary.
Contract Number
(if any)
Project Title Won Amount
4. List of design projects completed as the Designer of Record (DOR), either by your company or by a potential subcontractor, within the last 5 years for construction projects in Korea (US Standard design) or in the U.S. Insert more rows if necessary.
Sources Sought-Capabilities Survey for Solicitation No. W912UM-23-R-0001 MATOC for D-B Construction, Various Locations, Korea
Name of DOR Contract Number
(if any)
Project Title Design Amount Estimated
Construction Cost
5. Statement of Capability stating your skills, experience, knowledge, and equipment required to perform the specified type of work.
(1) Include past specialized experience and technical competence in performing similar projects, up to five past projects for which your firm was the prime contractor. Projects should include Design Build and Design Bid
Build experience.
(2) Include your ability to obtain construction equipment and materials either through subcontractors, or personally owned equipment, and ability to obtain equipment and materials from the U.S. (vendors, etc).
Include name of subcontractors, specialty trades and type of equipment.
(3) Include your ability to perform multiple projects simultaneously, i.e. 5 projects simultaneously.
(4)This should include documentation of past specialized experience and technical competence in performing similar projects, up to five past projects for which your firm was the prime contractor. Include your ability to work in diverse, multiple regions covered by the proposed solicitation.
***Please attach a separate Statement of Capability not to exceed 10 pages in length.***
6. Other Comments (if any)
| 1: |
| 2: |
| 3: |
| SAM UEI Number 1: |
| SAM UEI Number 2: |
| SAM UEI Number 3: |
| 2 Companys interest in submitting a proposal to the solicitation when it is issued: Off |
| Contract Number if anyRow1: |
| Project TitleRow1: |
| Won AmountRow1: |
| Contract Number if anyRow2: |
| Project TitleRow2: |
| Won AmountRow2: |
| Contract Number if anyRow3: |
| Project TitleRow3: |
| Won AmountRow3: |
| Contract Number if anyRow4: |
| Project TitleRow4: |
| Won AmountRow4: |
| Contract Number if anyRow5: |
| Project TitleRow5: |
| Won AmountRow5: |
| Contract Number if anyRow6: |
| Project TitleRow6: |
| Won AmountRow6: |
| Contract Number if anyRow7: |
| Project TitleRow7: |
| Won AmountRow7: |
| Contract Number if anyRow8: |
| Project TitleRow8: |
| Won AmountRow8: |
| Contract Number if anyRow9: |
| Project TitleRow9: |
| Won AmountRow9: |
| Contract Number if anyRow10: |
| Project TitleRow10: |
| Won AmountRow10: |
| Name of DORRow1: |
| Contract Number if anyRow1_2: |
| Project TitleRow1_2: |
| Design AmountRow1: |
| Estimated Construction CostRow1: |
| Name of DORRow2: |
| Contract Number if anyRow2_2: |
| Project TitleRow2_2: |
| Design AmountRow2: |
| Estimated Construction CostRow2: |
| Name of DORRow3: |
| Contract Number if anyRow3_2: |
| Project TitleRow3_2: |
| Design AmountRow3: |
| Estimated Construction CostRow3: |
| Name of DORRow4: |
| Contract Number if anyRow4_2: |
| Project TitleRow4_2: |
| Design AmountRow4: |
| Estimated Construction CostRow4: |
| Name of DORRow5: |
| Contract Number if anyRow5_2: |
| Project TitleRow5_2: |
| Design AmountRow5: |
| Estimated Construction CostRow5: |
| Name of DORRow6: |
| Contract Number if anyRow6_2: |
| Project TitleRow6_2: |
| Design AmountRow6: |
| Estimated Construction CostRow6: |
| Name of DORRow7: |
| Contract Number if anyRow7_2: |
| Project TitleRow7_2: |
| Design AmountRow7: |
| Estimated Construction CostRow7: |
| Name of DORRow8: |
| Contract Number if anyRow8_2: |
| Project TitleRow8_2: |
| Design AmountRow8: |
| Estimated Construction CostRow8: |
| Name of DORRow9: |
| Contract Number if anyRow9_2: |
| Project TitleRow9_2: |
| Design AmountRow9: |
| Estimated Construction CostRow9: |
| Name of DORRow10: |
| Contract Number if anyRow10_2: |
| Project TitleRow10_2: |
| Design AmountRow10: |
| Estimated Construction CostRow10: |
| 6 Other Comments if any: |
File details come from the government source that posted it. Updated .