WORK ITEM 1: Canvas Awning, Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the canvas awnings on the 01 Deck and the Fantail.
1.2 Government-furnished property.
None.
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 154 WPC-613-201, Rev C, Rigging & Covers A&D Coast Guard Publications
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
Other References
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences).
3.2 Awning and track removal. The Contractor shall remove the existing canvas awnings and the starboard 01 Deck awning track attaching the awning to the pilothouse. Turn over removed canvas and track to the Coast Guard inspector for disposal.
3.3 Renew awning canvas. The Contractor shall provide materials, fabricate and install new awning canvases on the Main Deck Fantail area and the 01 Deck aft of the Pilothouse using Coast Guard Drawing 154 WPC-613-201 as guidance.
3.3.1 The aft main deck awning requires 750 (approx.. 31’ x 24’) square feet of royal blue, marine grade, Top Gun canvas, secured to the ship’s awning frame with 3/16” black, braided nylon cordage.
3.3.2 The 01 deck awning requires 476 (approx.. 23.5’ x 20.5’) square feet of royal blue, marine grade, Top Gun canvas, secured to the ship’s awning frame with 3/16” black, braided nylon cordage.
4. NOTES
4.1 This Scope of Work was generated by and is applicable to:
USCGC CHARLES SEXTON
100 Trumbo Pt. Rd.
Key West, FL, 33040
(305) 292-8731
4.2 Expected installation dates are during CGC CHARLES SEXTON’S 2020 Registered Dockside Availability. Those dates inclusive are August 17th – October 19th.